Bahwalpur Railway Station Classic WBS Layout 23-Jul-18 07:26
Activity ID Activity Name Original Start Finish 2017 2018 2019
Duration Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Bahwalpur Railway Station 631 23-Jul-16 A 31-Dec-18 31-Dec-18, Bahwalpur
Building Works 631 23-Jul-16 A 31-Dec-18 31-Dec-18, Building Wo
Demolition Works 60 09-Jun-17 A 31-Aug-17 A 31-Aug-17 A, Demolition Works
A1210 Demolition of existing structures including 60 09-Jun-17 31-Aug-17 Demolition of existing structures including disposal of sa
disposal of salvage materials A A
EarthWorks 517 23-Jul-16 A 25-Dec-17 A 25-Dec-17 A, EarthWorks
A1000 Excavation upto 5ft 30 23-Jul-16 A 31-Aug-16 Excavation upto 5ft
A
A1010 Excavation upto 10ft 30 08-Sep-16 02-Nov-16 Excavation upto 10ft
A A
A1020 Re-handling of ordinary earth Upto a lead of 30 03-Nov-16 14-Dec-16 Re-handling of ordinary earth Upto a lead of 500 ft. (radius within the Pro
500 ft. (radius within the Project area). A A
A1220 Filling and Backfilling of soil including 50 17-Oct-17 25-Dec-17 Filling and Backfilling of soil including compacti
compaction A A
Concrete & Masonry Works 526 16-Dec-16 21-Dec-18 21-Dec-18, Concrete &
A1030 PCC Works 120 16-Dec-16* 14-Apr-17 PCC Works
A1040 RCC Works 200 18-Aug-17 24-May-18 RCC Works
A1050 Brick Masonry 400 14-Apr-17 26-Oct-18 Brick Masonry
A1090 PCC Floor works 280 04-Aug-17 31-Aug-18 PCC Floor works
A1100 Mosaic Tiles and Skirting 60 31-Aug-18 23-Nov-18 Mosaic Tiles and Skirting
A1110 Porcelain tile and skirting 60 07-Sep-18 30-Nov-18 Porcelain tile and skirting
A1120 Plastering Works 125 11-Apr-18 03-Oct-18 Plastering Works
A1250 Providing and fixing granite slabs, tiles and 50 12-Oct-18 21-Dec-18 Providing and fixing gran
skirting for Kitchen and Stairs
A1260 Providing and laying Terrazzo on floor 80 31-Aug-18 21-Dec-18 Providing and laying Ter
A1270 Providing and laying Hand made, blue tiles 15 23-Nov-18 14-Dec-18 Providing and laying Han
Water Supply Works 85 24-Aug-18 21-Dec-18 21-Dec-18, Water Supp
A1360 Providing and fixing PPR pipes for cold water 30 31-Aug-18 12-Oct-18 Providing and fixing PPR pip
A1370 Providing and fixing valves and fixtures 5 12-Oct-18 19-Oct-18 Providing and fixing valves a
Actual Work Critical Remaining Work Summary Page 1 of 8 TASK filter: All Activities
Remaining Work Milestone © Primavera Systems, Inc.
Bahwalpur Railway Station Classic WBS Layout 23-Jul-18 07:26
Activity ID Activity Name Original Start Finish 2017 2018 2019
Duration Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
A1380 Providing and fixing Plumbing fixtures and 50 12-Oct-18 21-Dec-18 Providing and fixing Plu
accessories
A1420 Excavation of trenches 10 24-Aug-18 07-Sep-18 Excavation of trenches
A1440 Providing, fixing, jointing and testing 15 07-Sep-18 28-Sep-18 Providing, fixing, jointing and
Polyethylene Pipes
Sewerage/Drainage Works 60 31-Aug-18 23-Nov-18 23-Nov-18, Sewerage/Dra
A1340 Providing and fixing UPVC drain pipes with 60 31-Aug-18 23-Nov-18 Providing and fixing UPVC
fixtures
A1350 Construction of collection chamber with 30 28-Sep-18 09-Nov-18 Construction of collection c
grating complete in all respects
A1390 Excavation of trenches for pipe laying 15 31-Aug-18 21-Sep-18 Excavation of trenches for pip
A1400 Laying RCC Pipe 20 21-Sep-18 19-Oct-18 Laying RCC Pipe
A1410 Rehandling of excavated soil, backfilling and 10 19-Oct-18 02-Nov-18 Rehandling of excavated so
compaction
A1430 Construction of Manholes including covers 20 21-Sep-18 19-Oct-18 Construction of Manholes in
2.5 x 2.5 ft
Electrical Works 60 21-Sep-18 14-Dec-18 14-Dec-18, Electrical W
Earthing System 20 12-Oct-18 09-Nov-18 09-Nov-18, Earthing System
A1490
Construction of Earthing point 20 12-Oct-18 09-Nov-18 Construction of Earthing po
LT Main Panel Board 10 09-Nov-18 23-Nov-18 23-Nov-18, LT Main Pane
A1480
Providing and fixing LT Main Panel boards 10 09-Nov-18 23-Nov-18 Providing and fixing LT M
Distribution Boards 20 12-Oct-18 09-Nov-18 09-Nov-18, Distribution Boa
A1460
Providing and fixing Main DIstribution Boards 20 12-Oct-18 09-Nov-18 Providing and fixing Main D
Lighting and Fixtures 25 09-Nov-18 14-Dec-18 14-Dec-18, Lighting and
A1500
Providing and fixing lighting fixtures, fans and 10 09-Nov-18 23-Nov-18 Providing and fixing lightin
accessories
A1510
Providing and fixing lights, fans and 10 30-Nov-18 14-Dec-18 Providing and fixing light
accessories
Wiring and Conduits 25 21-Sep-18 26-Oct-18 26-Oct-18, Wiring and Cond
A1450
Laying main power cables 15 21-Sep-18 12-Oct-18 Laying main power cables
Actual Work Critical Remaining Work Summary Page 2 of 8 TASK filter: All Activities
Remaining Work Milestone © Primavera Systems, Inc.
Bahwalpur Railway Station Classic WBS Layout 23-Jul-18 07:26
Activity ID Activity Name Original Start Finish 2017 2018 2019
Duration Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
A1470
Providing and fixing LT wiring for building with 10 12-Oct-18 26-Oct-18 Providing and fixing LT wirin
conduits
Communication Infrastructure 40 26-Oct-18 21-Dec-18 21-Dec-18, Communica
Telephone System 15 26-Oct-18 16-Nov-18 16-Nov-18, Telephone Sys
A1560
Providing and laying wiring for telephonic 10 26-Oct-18 09-Nov-18 Providing and laying wiring
infrastructure
A1570
Providing and fixing telephone connection 5 09-Nov-18 16-Nov-18 Providing and fixing teleph
points
A1580
Providing and fixing EPABX System for 20 5 09-Nov-18 16-Nov-18 Providing and fixing EPAB
lines
Public Address System 25 09-Nov-18 14-Dec-18 14-Dec-18, Public Addre
A1590
W iring for PA System 10 09-Nov-18 23-Nov-18 Wiring for PA System
A1600
Providing and fixing speakers 10 23-Nov-18 07-Dec-18 Providing and fixing spea
A1610
Installation and comissioning of amplifiers, 15 23-Nov-18 14-Dec-18 Installation and comissio
Mics and BGM System
Computer Networking 5 14-Dec-18 21-Dec-18 21-Dec-18, Computer N
A1620
Providing and fixing computer connectivity 5 14-Dec-18 21-Dec-18 Providing and fixing com
points
Miscellaneous 160 16-Nov-17 A 23-Nov-18 23-Nov-18, Miscellaneous
A1330 Providing and applying anti-termite treatment 160 16-Nov-17 23-Nov-18 Providing and applying an
of approved chemical A
Fire Alarm System 25 26-Oct-18 30-Nov-18 30-Nov-18, Fire Alarm Sy
A1520 Providing and fixing PVC insulated wires and 15 26-Oct-18 16-Nov-18 Providing and fixing PVC i
conduits
A1530 Addressable Fire Alarm Control Panel 5 16-Nov-18 23-Nov-18 Addressable Fire Alarm C
A1540 Providing and fixing heat and smoke detectors 10 16-Nov-18 30-Nov-18 Providing and fixing heat
A1550 Addressable break glass manual call stations 10 16-Nov-18 30-Nov-18 Addressable break glass
Roofing and Water Proofing 183 18-Apr-18 A 31-Dec-18 31-Dec-18, Roofing and
A1060 Providing and fixing polyethylene sheet 30 14-Sep-18 26-Oct-18 Providing and fixing polyeth
A1070 Khura on roof 30 12-Oct-18 23-Nov-18 Khura on roof
Actual Work Critical Remaining Work Summary Page 3 of 8 TASK filter: All Activities
Remaining Work Milestone © Primavera Systems, Inc.
Bahwalpur Railway Station Classic WBS Layout 23-Jul-18 07:26
Activity ID Activity Name Original Start Finish 2017 2018 2019
Duration Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
A1080 Kahprail Tiling on roof 30 19-Nov-18 31-Dec-18 Kahprail Tiling on roof
A1230 Providing and laying roof insulation of 20 19-Nov-18 17-Dec-18 Providing and laying roo
"Extruded polystyrene board
A1240 Provide and apply 2-coats of cold applied 150 18-Apr-18 14-Nov-18 Provide and apply 2-coats
rubberized bitumen on roof slab A
Carpentry Works 62 03-Oct-18 28-Dec-18 28-Dec-18, Carpentry W
A1130 Providing and Fixing Doors (complete with all 60 03-Oct-18 26-Dec-18 Providing and Fixing Do
accessories)
A1140 Providing and fixing formica sheets 60 05-Oct-18 28-Dec-18 Providing and fixing form
A1280 Providing and fixing cabinets 30 14-Nov-18 26-Dec-18 Providing and fixing cab
Painting and Varnishing 80 05-Sep-18 26-Dec-18 26-Dec-18, Painting and
A1150 Preparing surface and painting exteriors of 60 05-Sep-18 28-Nov-18 Preparing surface and pa
buildings with weather shield paint.
A1160 Preparing surface and painting with three (3) 60 03-Oct-18 26-Dec-18 Preparing surface and p
coats emulsion paint complete in all respect.
A1170 Fresh polishing over deodar wood panelled 20 28-Nov-18 26-Dec-18 Fresh polishing over deo
door on new work complete in all respect.
A1290 Providing and applying 1/2" thick Colour 45 03-Oct-18 05-Dec-18 Providing and applying 1/
Crete on wall
Metal Works 94 17-Aug-18 26-Dec-18 26-Dec-18, Metal Work
A1180 Providing and fixing aluminum doors and 15 05-Dec-18 26-Dec-18 Providing and fixing alu
frames
A1190 Providing and fixing aluminum windows and 15 05-Dec-18 26-Dec-18 Providing and fixing alu
frames
A1200 Providing and fixing stair railing 15 05-Dec-18 26-Dec-18 Providing and fixing sta
A1300 Providing and fixing diamond mesh in 30 17-Aug-18 27-Sep-18 Providing and fixing diamond
concrete
A1310 MS Steel Grill for windows 15 31-Aug-18 21-Sep-18 MS Steel Grill for windows
A1320 Providing and fixing MS Steel Louvers 10 12-Dec-18 26-Dec-18 Providing and fixing MS
doors/windows
Platform & Allied Works 517 22-Dec-16 A14-Dec-18 14-Dec-18, Platform & A
Actual Work Critical Remaining Work Summary Page 4 of 8 TASK filter: All Activities
Remaining Work Milestone © Primavera Systems, Inc.
Bahwalpur Railway Station Classic WBS Layout 23-Jul-18 07:26
Activity ID Activity Name Original Start Finish 2017 2018 2019
Duration Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Demolition Works 100 22-May-17 A06-Oct-17 A 06-Oct-17 A, Demolition Works
A1710 Demolition of existing platform including 100 22-May-17 06-Oct-17 Demolition of existing platform including disposal of s
disposal of salvage materials A A
Earthworks 287 18-Sep-17 A23-Oct-18 23-Oct-18, Earthworks
A1630 Excavation works 100 04-Oct-17 20-Feb-18 Excavation works
A A
A1640 Filling watering and ramming earth under 5 18-Sep-17 29-Sep-17 Filling watering and ramming earth under floors
floors A A
A1650 Fill,Backfill compact of (A-4) material on 80 02-Nov-17 21-Feb-18 Fill,Backfill compact of (A-4) material on Fo
Foundation,etc A A
A1720 Filling sweet earth of approved quality 5 29-Aug-18* 04-Sep-18 Filling sweet earth of approved
borrowed from outside
A1740 Supplying, dressing ramming and compaction 45 22-Aug-18 23-Oct-18 Supplying, dressing rammin
of select fill material
Concrete & Masonry Works 423 05-Apr-17 A 14-Dec-18 14-Dec-18, Concrete & M
A1660 PCC Works under floor 100 28-Sep-17 14-Feb-18 PCC Works under floor
A A
A1670 RCC Works 180 05-Apr-17 A 09-Jan-18 A RCC Works
A1680 Sand under floor 120 07-Jul-17 A 21-Dec-17 Sand under floor
A
A1690 Providing and fixing paver tiles 50 02-Mar-18 21-Jun-18 Providing and fixing paver tiles
A A
A1700 Providing and laying floor of mosaic marble 15 23-Nov-18 14-Dec-18 Providing and laying floo
chips tiles
A1730 Pacca brick work on Toe Wall of Platform 20 12-Oct-18 09-Nov-18 Pacca brick work on Toe W
A1750 Providing PVC 10mm thick Water Stopper in 5 09-Jan-18* 15-Jan-18 Providing PVC 10mm thick Water Stopper in c
construction joints of RCC water tanks
A1760 Providing and fixing of cooping by using 4000 15 04-Sep-17 22-Sep-17 Providing and fixing of cooping by using 4000 Psi conc
Psi concrete A A
A1770 Providing and fixing of 1.5" thick Thermopore 5 03-Dec-18 10-Dec-18 Providing and fixing of 1.
Sheet at expension joints
Generator Room 517 22-Dec-16 A14-Dec-18 14-Dec-18, Generator R
Actual Work Critical Remaining Work Summary Page 5 of 8 TASK filter: All Activities
Remaining Work Milestone © Primavera Systems, Inc.
Bahwalpur Railway Station Classic WBS Layout 23-Jul-18 07:26
Activity ID Activity Name Original Start Finish 2017 2018 2019
Duration Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Earthwork 208 22-Dec-16 A09-Oct-17 09-Oct-17, Earthwork
A1780
Excavation Works 40 22-Dec-16 15-Feb-17 Excavation Works
A A
A1790
Supplying and filling of local sand under floors 5 26-Sep-17* 02-Oct-17 Supplying and filling of local sand under floors
A1900
Supplying, filling select fill material, watering, 5 03-Oct-17 09-Oct-17 Supplying, filling select fill material, watering, rammin
ramming and compaction
Concrete & Masonry Works 342 13-Jul-17 A 02-Nov-18 02-Nov-18, Concrete & Ma
A1800
PCC Works 50 04-Oct-17 12-Dec-17 PCC Works
A A
A1810
RCC Works 150 13-Jul-17 A 07-Feb-18 RCC Works
A
A1820
Prvoviding, laying and fixing pacca Guttka 15 12-Oct-18 02-Nov-18 Prvoviding, laying and fixing
bricks
A1830
Providing and laying Terracotta Khaprail Tiles 15 12-Oct-18 02-Nov-18 Providing and laying Terrac
A1840
PCC for Floor 10 12-Oct-18 26-Oct-18 PCC for Floor
A1850
Providing and laying floor of mosaic marble 5 26-Oct-18 02-Nov-18 Providing and laying floor o
chips
A1860
Mosaic tile skirting 5 26-Oct-18 02-Nov-18 Mosaic tile skirting
A1870
Cement plaster under soffit of RCC roof slabs 10 05-Mar-18 16-Mar-18 Cement plaster under soffit of RCC roof sla
A A
A1880
Cement plaster on internal/external walls 10 23-Mar-18 05-Apr-18 Cement plaster on internal/external walls
A A
Finishing Works 20 02-Nov-18 30-Nov-18 30-Nov-18, Finishing Wor
A1890
Surface Preparation and painting works 5 02-Nov-18 09-Nov-18 Surface Preparation and p
A1910
Provision and installation of doors, windows & 15 09-Nov-18 30-Nov-18 Provision and installation
grills etc
Miscellaneous 320 25-Sep-17 A14-Dec-18 14-Dec-18, Miscellaneou
A1920
Anti Termite treatment 15 25-Sep-17 13-Oct-17 Anti Termite treatment
A A
A1930
Electrical works of generator room including 10 30-Nov-18 14-Dec-18 Electrical works of gene
lights, fans, sockets and cable from main DB
Actual Work Critical Remaining Work Summary Page 6 of 8 TASK filter: All Activities
Remaining Work Milestone © Primavera Systems, Inc.
Bahwalpur Railway Station Classic WBS Layout 23-Jul-18 07:26
Activity ID Activity Name Original Start Finish 2017 2018 2019
Duration Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Diesel Generator Set 0
Water Filtration Room 0
Earthworks 0
Concrete Works 0
Finishing Works 0
Miscellaneous 0
Disposal Station 0
Earthworks 0
Concrete Works 0
Waterproofing 0
Sewerage/Drainage Works 0
Water Supply Network 0
Walkways and Pavements 0
Earthworks 0
Sub Base and Base 0
Surface Works 0
Boundary Wall 0
Earthworks 0
Concrete Works 0
Finishing Works 0
Road Lighting 0
Road Lighting Poles and Foundation 0
Light Control Panels 0
Earthing 0
Actual Work Critical Remaining Work Summary Page 7 of 8 TASK filter: All Activities
Remaining Work Milestone © Primavera Systems, Inc.
Bahwalpur Railway Station Classic WBS Layout 23-Jul-18 07:26
Activity ID Activity Name Original Start Finish 2017 2018 2019
Duration Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Transformer 0
Actual Work Critical Remaining Work Summary Page 8 of 8 TASK filter: All Activities
Remaining Work Milestone © Primavera Systems, Inc.