We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 3
SC MONTAJ CARPATIS.A.
SPECIFICATIA PROCEDURI DE SUDARE WPSNR. | DATAELABORARIT
WELDING PROCEDURE SPECIFICATION. 12014 DATE OF ISSUE: 10.09.2014
UNITATEA/COMPANY: SC MONTAJ CARPATI SA
PROCEDEUL DE SUDARE WELDING PROCESS: 11 | TIPULIMBINARI | TYPE OF JOINT:
POZITIA DE SUDARE/WELDING POSITION: PB Fw
MATERIAL DE BAZA/ BASE MATERIAL -MATERIALE DE ADAOS! FILLER MATERIALS
MBI | Denumire/ Designation: SHSSI2 “Marea/ Grade: Superbaz E 42 4 B42 HS
BMI SREN 10208 ‘Norma /Standard: SREN 499 ; EN ISO 25604
Hewat Dimension | Size (mm): 25:32
Diametral Diametarimm) | Useare / Draying: Temp. CC) 250
12 2 Timechr):2
MB2 | Denumivel Designation: S393I2 Elecirod nefinibivNonmelting el. | Tip"Type WA
BM 2 Norma/ Standard: SR EN 10204 Gaz (Gas | De protectie"Shieldings N/A
Grupal Group: TaRadacinal Backing: WA
Grosime! Thickness frm): | Diameiru/ Diameterfnm) | Debit Gaz. | De Protectie/ Shielding: NA
2 2 Gas flow:
Temp. de preincalzire! Prefeaiing temp. (C) NAA Taradacina/ Backing? NA
Temp. intre sraturl Temp between layers(*C)e 200-250 |
SCHEMA DE PREGATIRE A IMBINARIT SUCCESIUNEA OPERATIILOR DE SUDARE
JOINT PREPARATION SKETCH | WELDING SEQUENCES
pe tee
us
2 2
PARAMETRI DE SUDARE” WELDING DETAILS
Rand rr TF T 7 7 Tm 7
| rots a aT Wag rower TT TT 17 i TT Ti
Dineriones Hesrodiy Filermaisalsos | 935mm | asm | O25mm | O32nm @iaum | o3dnm
Cae Carot aso | 730 | 7090 | 100190 100-130 | 100130
Tense Votge (Vp eis | teas | ioe | 202i aoa | 2021
Tip Corsa Polariat; Carrent Type! Port = i i a = a
Viteza Sarmev Wire Feed Speed a ‘mimin mein mimi mimin ‘mien mimi
Vicars dian Weting Tava SSS 2a [aot | manasa} a6 OBO | 200357
ea | eect Occ eccnaee Ware Meat
rege Tei ear iar T-07 | 08-07 | Us-07 | Oras | 07-08 | U7-08 | a7-O8
Winn _| wien _| ein iii | “tia | “tiie _| “in
Mahi de vanieratmsahiay Meaivanir | areeeani | weckaric | wedeare | wceledre | wecearc | ar elaine | we dkene
TTEHINICA DESUDARE TRATAMENT TERMICI POSTWELD HEAT TREATMENT
Pregatirea sanfrenului/Edge preparation: Tip'Type : NA a ‘Temperatura/Temp: NA
Mecanic/ Machining jaca las
Scobire radacina/Back gouging! ge “imp mentinereolding Rasire/Coalings NA
Supor radacina/ Root support: —nb
Curatie inte sraturi/Cleaning between layersi | Witeza de inca Viteea de racers
Polizare / bushi Hewingirte AS icoaaligrai NA
Pendulare: de3 ori 6 eleciad
Tntocmit de:Stan Vasile
Issued BySC MONTAJ CARPATIS.A.
SPECIFICATIA PROCEDURII DE SUDARE
WELDING PROCEDURE SPECIFICATION
DATA ELABORARII
DATE OF ISSUE: 10.09.2014
WPS NR.
2/2014
UNITATEA/COMPANY: SC MONTAS CARPATI SA
sai
PROCEDEUL DE SUDARE WELDING PROCESS: 186] TIPUL IMBINARII | TYPE OF JOINT:
POZITIA DE SUDARE/ WELDING POSITION: PF EW.
MATERIAL DE BAZA / BASE MATERIAL ‘MATERIALE DE ADAOS/ FILLER MATERIALS
MBI | Denumire/ Designation: $355J2 Marea’ Grade: Superbaz E71-T1
BM1 | Normal Standard: SREN T0025 Norma Standard: EN ISO 1763-4
‘Grupa! Group i Dimension Size (nm): L2
Grosime! Thickness (mm): | Diametral Diameterfnma) | Uscare/ Draying: Temp (O:NA
2 é Time): NA
MB2 | Denumire! Designation: 835502 Hlectrod nefiaibiNonmeling el [TipiType NA
BM2_ | Nowma/Standard: SR EN 10025 Gaz Gas De proweaie/Shieldings CO?
| Grupa’ Group: Z La Radacina/ Back WA
Diametrw’ Diameier(mn) | Debit Guz | Be Protecie! Shielding = 16-18Vmin
Gas flo
Tarradasina Backing» N/A
Preheaing temp. (C5
[tem ns sa Temp ene nce |
ant
‘SCHEMA DE PREGATIRE A IMBINARIT
JOINT PREPARATION SKETCH
ee
|
SUCCESIUNEA OPERATITOR DE SUDARE
WELDING SEQUENCES.
io
1 eee!
[e g
| recede de sure Welding Proceer | 136 136 138 a7] ia
Dimensiunes Eleeiroduluy Piller O12 O12 w12 O12 ="
‘Curent Current CW) 165.180 | 165-180 | 165-180 | 165-180) _ |
‘Viteza Sarmei! Wire Feed Speed as 45 a5 as :
TEHNICA DESUDARE
TRATAMENT TERMIC/ POSTWELD HEAT TREATMENT
regalo ereaulul Eg reper | Tip'Type NA
“Temperatura/Temp: NA
Mecanic/Mach
Seobire rad ag | Timp mentinere/Holding NA Racire/Cooling: NA
‘Suport radacina/ Root support: —nb
orate ine ratar/Cheaning between [Vile J inealre
Viteza de raciere:
layers:Polizare/ brushing Heating rae: Cooling rate: NA
Pendulate
Intocmit de’Stan Vasil, | RTS: Stan Vasile
Issued By. l feeSC MONTAJ CARPATIS.A.
SPECIFICATIA PROCEDURI DE SUDARE
WELDING PROCEDURE SPECIFICATION
DATA ELABORARII
DATE OF ISSUE: 10.09.2014
WPSNR-
32014
UNITATEA(COMPANT: SC MONTAI CARPATI SA,
|
PROCEDEUL DE SUDARE/WELDING PROCESS: 136
POZITIA DE SUDARE/WELDING POSITION: PB
ey
T TIPULIMBINARI | TYPE OF JOINT:
FW
MATERIAL DE BAZA/ BASE MATERIAL
MATERIALE DE ADAOS/ FILLER MATERIALS
MBI | Denumire/ Designation: SH53 Marca/ Grade: Superbaz E 71-T
BMI Normai Standard: SREN 10025 ‘Norma / Standard: EN ISO 17632-A
Grupa Grow i mension / Size(mm): 1.2
‘Grosimel Thickness (mmm): | Diameteal Diameter(mmm) | Uscare / Draying: Temp. (OE NA
Neca eles aie a Timely NA
MB2 | Denumire! Designation: S33302 | Blecirod nefuzibi7Nonmeling el. |Tip/Type |N/A
BM 2 | Nonmal Standard: SR EN T0025 ‘Gaz (Gas | De proteti/Shieidings CO? |
Grupa Grow: ‘La Radacinal Backing: N/A
‘Growin’ Thickness (mm): | Diametrw Dizmetergmm) | Debit Gaz_| De Protect! Shiefding = 16-18min
0 F | Gas tow: |
“Tennp. de prelacalsirel Proheating emp. (C)_73 Taradasina Backing? NA
~ Lemp. intr strturi Temp Benween laers('Che__ 300-250
SCHEMA DE PREGATIRE A IMBINARIT
JOINT PREPARATION SKETCH
%o
] SUCCESIUNEA OPERATIILOR DE SUDARE
WELDING SEQUENCES.
] _[s°
FARAMETRM DE SUDARE/ WELDING DETAILS
Taner SE] SE | ess ea | |
Feciacemiy [ise | ue |e | a | i | uw | i | oe | a | a | a6
mime | a2 | ow | ee [ew | oz | a | en | ee [oe | es | on
a mee | ee | oe | | Sn | me |
Curent Cures TAY | tesa | 16s-100 | 16180 15180 isso | 165-100 |
Teena Veen (vy 20-24 20-24 20-24 2024 2024 20-24 2024
Tptwev rome es fas Pm | ms | mw | ae Sales
| cae Tne Ps zane |
Vics See Re | 43] a3] a5 Asia letra SSE ae a eae a
Peale ofan | wa | nia fan_| man_| mn | mi | nin | nn | in
iss dead ——J 300580] 300380 sars50-] sesso] 3eo390-|-3EDI90 | Bao) | 30080 | SEOs | BOOS | 30.80
WeiiewTaelSees | emion | oman | ominn | mania | amine | mm | ania | emia | mde | mmm | wovmin
erga Temas far] 08-08-0506 [Os 08 Os 08 TOs-OF Tse [uses [as-06 | Os-06 1 as
lige! Wine” | tino [Pitan [ton | im | Yan | timm [tlm | tim tine
Feeeter Tea eal eae ee 7
enbisncalvonstr | oceve | susie | deve | ope | wcare | comme | cine | atere | aeare dave
TTEHNICA DE SUDARE
TRATAMENT TERMIC! POSTWELD HEAT TREATMENT
Pregatirea sanffenului/Edge preparation: Mecanie/Machining
TiptType: NA NA
‘Scobire radacina/Back gouging: 92,
“Temperatura’Temp: NA
“Timp mentinere Holding: NA | Racire/Cooling: NA
‘Suport radacinay Root support: nb
‘Curatire intre straturi‘Cleaning between layers;Polizare / brushing
ea arash ane
Gosling ate:
NA
Pendulare