Building Cost Expenditure Pattern: S-Curve For Expenditure

The document shows two S-curve graphs, one for expenditure and one for income over a 5 period construction project. The expenditure graph shows that costs start low, increase rapidly to a peak in period 3, and then taper off by period 5. The income graph shows that revenue starts at 0, increases slowly at first and then more rapidly after period 3 as the project is completed and property can be sold, reaching 100% by period 5.

Uploaded by

maizurah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views1 page

Building Cost Expenditure Pattern: S-Curve For Expenditure

The document shows two S-curve graphs, one for expenditure and one for income over a 5 period construction project. The expenditure graph shows that costs start low, increase rapidly to a peak in period 3, and then taper off by period 5. The income graph shows that revenue starts at 0, increases slowly at first and then more rapidly after period 3 as the project is completed and property can be sold, reaching 100% by period 5.

Uploaded by

maizurah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

S-CURVE FOR EXPENDITURE

Building Cost Expenditure Pattern

120.00

100.00
Contract Value %

80.00

60.00 Expenditure
40.00

20.00

-
1 2 3 4 5
Construction Period

S-CURVE FOR INCOME

Building Income Pattern

120

100

80
Sales Value %

60 Income

40

20

0
1 2 3 4 5
Construction Period