0% found this document useful (0 votes)
99 views1 page

Additional Cost Break Up Details For Chimney: Base Plate OD

The document provides additional cost break down details for building a chimney, including specifications for the base plate, compression ring, gussets, and flanges. It lists the outer diameter, inner diameter, thickness, length, breadth, and other details. The total weight of the chimney is calculated as 2401 kg. Additional costs include Rs. 200,000 for galvanizing the ladder and platform and Rs. 300,000 for consumables and plasma cutting, bringing the total additional cost to Rs. 2,180,700.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
99 views1 page

Additional Cost Break Up Details For Chimney: Base Plate OD

The document provides additional cost break down details for building a chimney, including specifications for the base plate, compression ring, gussets, and flanges. It lists the outer diameter, inner diameter, thickness, length, breadth, and other details. The total weight of the chimney is calculated as 2401 kg. Additional costs include Rs. 200,000 for galvanizing the ladder and platform and Rs. 300,000 for consumables and plasma cutting, bringing the total additional cost to Rs. 2,180,700.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

Additional cost break up details for Chimney:

Base plate OD 3000 mm


ID 2400 mm
Thickness 32 mm 792
Comp. ring OD 3000 mm
ID 2400 mm
Thickness 25 mm 618
Gussets Length 300 mm
Breadth 340 mm
Quantity 24 Nos
Thickness 16 mm 376
Flanges OD 1700 mm
ID 1500 mm
Thickness 16 mm
Quantity 4 Nos 391
Gussets Length 150 Nos
Breadth 100 Nos
Quantity 24 Nos
Thickness 16 mm 224

Total weight 2401 1680700

Additional chages for


Galvanising of ladder 200000
and Platform
Additional cost of
consumables and for
plasma cutting 300000

2180700

You might also like