Amps X 100 Barra 8 (Nom. kV=4,16, Plot Ref.
kV=4,16)
,5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K
500 T4 500
FLA
300 300
100 Relay_Sec_trafo_4 - P 100
OC1
50 Siemens 50
Mtr2-100% Mtr2-Cold 7SJ61
30 CT Ratio 800:5 30
Mtr2-Hot IEC - Long Inverse
Pickup = 5,2 (0,5 - 10 Sec - 5A)
Time Dial = 0,19
10 3x = 11,4 s, 5x = 5,7 s, 8x = 3,26 s 10
Inst = 16,6 (0,5 - 175 Sec - 5A)
Time Delay = 0,2 s
5 Relay_Motor_2 - P 5
Seconds
Seconds
OC1 Relay_Prim_trafo_4 - P
3 Siemens
OC1 3
7SJ61 Siemens
CT Ratio 300:5 7SJ61
IEC - Long Inverse CT Ratio 300:5
1 Pickup = 5,1 (0,5 - 20 Sec - 5A) IEC - Long Inverse 1
Time Dial = 0,65 Pickup = 4,35 (0,5 - 10 Sec - 5A)
3x = 39 s, 5x = 19,5 s, 8x = 11,1 s Time Dial = 0,21
,5
Inst = 38 (0,5 - 175 Sec - 5A) T4 3x = 12,6 s, 5x = 6,3 s, 8x = 3,6 s ,5
Time Delay = 0,05 s Inst = 15,2 (0,5 - 175 Sec - 5A)
,3 Time Delay = 0,25 s ,3
Relay_Prim_trafo_4
CB3
±
I>
T4
5 MVA
,1 ,1
±
I>
T4
CB2 Relay_Sec_trafo_4 Inrush
,05 ,05
Barra 8
CB1 Relay_Motor_2
,03 ,03
±
I>
Mtr2
1500 kW
,01 ,01
,5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
Amps X 100 Barra 8 (Nom. kV=4,16, Plot Ref. kV=4,16) ETAP Star 12.6.0H
Star32
Project: Date: 26-04-2020
Location: SN:
Contract: Rev: Base
Engineer: Fault: Phase
Filename: C:\ETAP 1260\TALLERPRACTICO1\TALLERPRACTICO1.OTI