HYDRAULIC CALCULATION REPORT
(ON SITE DETENTION)
UNTUK
PERMOHONAN KEBENARAN MERANCANG UNTUK CADANGAN MENDIRIKAN 1 UNIT
RUMAH PENGURUSAN PENGEBUMIAN (FUNERAL PARLOUR) 1 TINGKAT DI ATAS
SEBAHAGIAN LOT 1711, SEKSYEN 2, BANDAR GEORGE TOWN, D.T.L.,
DI JALAN BATU GANTONG, PULAU PINANG.
UNTUK : TETUAN
TETUAN UNITED HOKKIEN CEMETERIES
PERUNDING YAA SDN. BHD.
[COMPANY NO. 335410-T ]
JURUTERA PERUNDING - CONSULTING ENGINEERS
NO. 45, JALAN FREE SCHOOL, 11600 PULAU PINANG, MALAYSIA.
Tel: (04) - 2811717[ 4 Lines ], 2811066 Fax: (604) - 2816995
email: design@perundingyaa.com.my
URBAN STORMWATER MANAGEMENT MANUAL FOR MALAYSIA
(MSMA Edisi 2)
ON-SITE DETENTION DESIGN BASED ON 'MANUAL SALIRAN MESRA ALAM EDISI 2'
Based on simplified OSD Procedure Chapter 5.83
1) Catchment Area = 352 m2
= 0.087 Acres
= 0.035 Hactres
Catchment Data
i. Catchment Reion = 3
ii. Type of Catchment = Mild
Type Post-development(m2)
Building 352
Infra & Road 0.0
Impervious Area % 100
Design Average Recurrence Interval
For Medium density,
Minor ARI = 10 years
Major ARI = 100 years
From Table 5.A1
Region 3 PSD (l/s/ha) SSR (m3/ha)
Type of Catchment Mild 70.10 499.06
2) Permissible Site Discharge
0.035 ha x 70.10 l/s/ha = 2.47 l/s
= 0.002 m3/s
3) Site Storage Requirements
0.035 ha x 499.06 m3/ha = 17.57 m3
4) Proposed On-Site Detention
Detention Pond = 0.5625 m2 (Area) x 42 m (Length)
750 mm x 750 mm
Width Depth
= 23.625 m3 > 17.57 m3
Hence, OK
5) Design of Final Control Outlet - Orifice Outlet
5 years ARI dischrge, Q = C0A0(2gH0)0.5 (m3/s) (Eq. 1)
and
Q = KorD2H00.5 (Eq. 2)
Where,
Design discharge, Q = 0.002 m3/s
Kor = 2.09
Discharge Coefficient, Co = 0.6
Gravitational accelreation, = 9.81 m2/s
g
Trial and Error Method (By Eq. 2)
Pipe Sizes (mm) H0(m) Discharge Capacity, Q
25 0.738 0.001
50 0.725 0.004
75 0.713 0.010
100 0.700 0.017
150 0.675 0.039
225 0.638 0.084
300 0.600 0.146
375 0.563 0.220
450 0.525 0.307
600 0.450 0.505
750 0.375 0.720
900 0.300 0.927
1050 0.225 1.093
1200 0.150 1.166
1350 0.075 1.043
1500 0.000 0.000
Proposed 25 mm Orificice Control Outlet
Where, 0.001 m3/s < 0.002 m3/s
Table 5 A3 Overflow Pipe Adopt 1 nos of
As SPT is not in the list in Table 5.A2, refer Table 5.A3 only. 250mm PVC Pipe