Quality Inspection Form

This document is a quality inspection form for the final acceptance of a biogas plant construction in Shashamene, Ethiopia. It contains checklists to audit various components of the plant, including the household situation, construction materials, plant site selection, trench construction, protection structures, fencing, and the reservoir stand. The inspector evaluates each component and indicates whether it passes or fails based on factors such as material quality, proper dimensions, and workmanship. An overall assessment is made for each section and the total number of fails is recorded.

Uploaded by

Tesfu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
232 views3 pages

Quality Inspection Form

This document is a quality inspection form for the final acceptance of a biogas plant construction in Shashamene, Ethiopia. It contains checklists to audit various components of the plant, including the household situation, construction materials, plant site selection, trench construction, protection structures, fencing, and the reservoir stand. The inspector evaluates each component and indicates whether it passes or fails based on factors such as material quality, proper dimensions, and workmanship. An overall assessment is made for each section and the total number of fails is recorded.

Uploaded by

Tesfu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

ACP-EU Energy Facility Action LVIA Shashamene – “HydroBioPower” BIOGAS action

Quality Inspection Form – Final Acceptance


Complete plant construction, digester sealed and first feeding executed
Date of inspection:
Biogas plant Details
1. Name and Address of Owner Owner Name …………………………………………..
Kebele ……………………………….. Town/Village ………………………………..
Zone ………………………………….. Regional State …...………………………….
2. Name of Manufacturer Name…………………………………………………. Reg. No. …………………….
3. Construction Period a)Started: ...…………… b)Completed: .....……………. c)Total Days: ………..
4. Reason if longer than 1 week …………………………………………………………………………………………
…………………………………………………………………………………………
To be filled by LVIA expert supervisor Auditing
A. Household features (plant feasibility)
1. Space availability Yes □ No □ Pass □ Fail □
2. Total number head of cattle …….. head Pass □ Fail □
3. Water source Pass □ Fail □
Yes □ No □
(amount, proximity, availability during year)
4. HH compound is a permanent residence Yes □ No □ Pass □ Fail □
Total Fail ….....
Section Auditing: Pass □ Fail □ ……. pts
B. Construction materials and appliances
1. Bricks: regular size, sound Good □ Fair □ Bad □ Pass □ Fail □
2. Eucalyptus poles: quality Good □ Fair □ Bad □ Pass □ Fail □
3. Polyethylene film: digester, reservoir a) Diameter …………cm Pass □ Fail □
b) Thickness ………. µm
c) Color …………….........
d) UV filter ………… %
4. Polyethylene film: trench shelter a) Diameter …………cm Pass □ Fail □
b) Thickness ………. µm
c) Color …………….........
d) UV filter ………… %
5. Inlet/outlet digester drainpipe a) uPVC □ Other □ Pass □ Fail □
b) Diameter …………cm/inch
6. Inlet/outlet reservoir drainpipe a) uPVC □ Other □ Pass □ Fail □
b) Diameter ………….inch
7. Biogas pipe a) uPVC □ Other □ Pass □ Fail □
b) Diameter ………….inch
8. Pipeline fittings (corners, reducers etc.) a) uPVC □ Other □ Pass □ Fail □
quality  b) Good □ Fair □ Bad □
9. Reducer for hosepipe a) Bronze □ Other □ Pass □ Fail □
sound  b) Good □ Fair □ Bad □
10. Used inner car tube rubber: sound Good □ Fair □ Bad □ Pass □ Fail □
11. Flexible gas hosepipe a) Diameter …………mm Pass □ Fail □
quality  Good □ Fair □ Bad □
12. Clamp (hosepipe, uPVC pipe) quality Good □ Fair □ Bad □ Pass □ Fail □
13. Mesh wire quality Good □ Fair □ Bad □ Pass □ Fail □
14. Biogas Stove Approved by LVIA □ Other □ Pass □ Fail □
15. Bucket: adapted for feeding Good □ Fair □ Bad □ Pass □ Fail □
Total Fail ….....
Section Auditing: Pass □ Fail □ ……. pts

1
C. Plant site selection inside the household compound
1. Does the plant stand within a grazing area? Yes □ No □ Pass □ Fail □
2. Does the house roof drain rainwater on the component parts of the plant? Yes □ No □ Pass □ Fail □
3. Flood/stagnant water problem Yes □ No □ Pass □ Fail □
4. Correct orientation of digester inlet/outlet Yes □ No □ Pass □ Fail □
5. Total length of the biogas pipeline ……… m Pass □ Fail □
Total Fail ….....
Section Auditing: Pass □ Fail □ ……. pts
D. Trench, Slurry Pits and Inlet Facility
1. Digester trench dimensions a) Length ………m Pass □ Fail □
b) Width ……….m
2. Digester trench width (including walls) ……….. m Pass □ Fail □
3. Trench slope in terms of height level inlet/outlet ……….. cm Pass □ Fail □
4. Adobe brick wall construction Good □ Fair □ Bad □ Pass □ Fail □
5. Trench plastering Good □ Fair □ Bad □ Pass □ Fail □
6. Trench diversion edges constructed Yes □ No □ Pass □ Fail □
7. Pits excavated with proper dimensions Good □ Fair □ Bad □ Pass □ Fail □
8. Inlet facility properly constructed Good □ Fair □ Bad □ Pass □ Fail □
Total Fail ….....
Section Auditing: Pass □ Fail □ ……. pts
E. Inverted V-shape protection
1. Number of wooden structures constituting the protection …….. Pass □ Fail □
2. Eucalyptus pole dimensions (length, diameter) Good □ Fair □ Bad □ Pass □ Fail □
3. Eucalyptus pole assembly Good □ Fair □ Bad □ Pass □ Fail □
4. Protection dimensions: structure 1  A1) Length ………m Pass □ Fail □
B1) Width ……….m
structure 2  A2) Length ………m
B2) Width ……….m
5. Mesh wire placement Good □ Fair □ Bad □ Pass □ Fail □
6. Plastic shelter width ……….. m Pass □ Fail □
7. Plastic shelter placement (as for the BG pipe outlet, nails) Good □ Fair □ Bad □ Pass □ Fail □
Total Fail ….....
Section Auditing: Pass □ Fail □ ……. pts
F. Plant fence
1. Materials Euphorbia □ Entada □ Pass □ Fail □
Wooden palings □ Other □
2. Does the fence isolate the plant area from the compound? Yes □ No □ Pass □ Fail □
3. Can the fence put up with animal smashes? – Conditions – Good □ Fair □ Bad □ Pass □ Fail □
Total Fail ….....
Section Auditing: Pass □ Fail □ ……. pts
G. Reservoir stand
1. Eucalyptus pole dimensions (length, diameter) Good □ Fair □ Bad □ Pass □ Fail □
2. Eucalyptus pole assembly Good □ Fair □ Bad □ Pass □ Fail □
3. Stand dimensions: Length ………m Pass □ Fail □
Width ……….m
Reservoir floor height ……. m
4. Plastic sheet of the reservoir floor: placement, conditions Good □ Fair □ Bad □ Pass □ Fail □
5. Closure of the stand roof and laterals sides Good □ Fair □ Bad □ Pass □ Fail □
Total Fail ….....
Section Auditing: Pass □ Fail □ ……. pts

2
H. Digester
1. Digester tube length …… m Pass □ Fail □
2. Digester tube assembly: number of polyethylene layers …… Pass □ Fail □
3. Biogas outlet assembly Good □ Fair □ Bad □ Pass □ Fail □
4. Inlet/outlet drainpipe assembly Good □ Fair □ Bad □ Pass □ Fail □
Total Fail ….....
Section Auditing: Pass □ Fail □ ……. pts
I. Reservoir and pressure system
1. Digester tube length …… m Pass □ Fail □
2. Digester tube assembly: number of polyethylene layers …… Pass □ Fail □
3. Inlet/outlet drainpipe assembly Good □ Fair □ Bad □ Pass □ Fail □
4. Pressure system: dimensions, assembly Good □ Fair □ Bad □ Pass □ Fail □
Total Fail ….....
Section Auditing: Pass □ Fail □ ……. pts
J. Biogas pipeline
1. Assembly of the component parts along the pipeline Correct □ Incorrect □ Pass □ Fail □
2. Pipeline path design Correct □ Incorrect □ Pass □ Fail □
3. Total length of horizontal pipeline …… m Pass □ Fail □
4. Assembly of “biogas digester outlet/safety valve” pipeline length Correct □ Incorrect □ Pass □ Fail □
5. Safety valve assembly Correct □ Incorrect □ Pass □ Fail □
6. Gas gate valve assembly Correct □ Incorrect □ Pass □ Fail □
7. Reservoir pipeline branch connection Correct □ Incorrect □ Pass □ Fail □
8. Stove assembly and positioning Correct □ Incorrect □ Pass □ Fail □
9. Pipeline anchorage Good □ Fair □ Bad □ Pass □ Fail □
Total Fail ….....
Section Auditing: Pass □ Fail □ ……. pts
Total points …..………
Plant Approved □ Plant NOT Approved □
Comments:

Approved by LVIA expert Name:…………………………………. Signature:…….….……………….


supervisor Date:……………..

Agreed by manufacturer Name:…………………………………. Signature:…….….……………….


representative Date:……………..
Name:…………………………………. Signature:…….….……………….
Witnessed by the user
Date:……………..