ThyssenKrupp Elevator                            Electrical Details             Date :
( India )                         Schematics - 1                  JOB NO
                                                                                            Layout Drg. No.
Project Name and Location :
                                                                                            Wing No.        Lift No.
       To                      To                                     To             For m/c room      For car light in   For hoistway
    Controller                Motor                                Controller            lights          Controller           lights
                            To Governor unit
                                                                                           DPIC               DPIC           DPIC
                                                                   TPIC                     OR                 OR             OR
                                                 ELCB                                      MCB                MCB            MCB
    Earthing plate
                                                         12 gauge GI or 14 gauge copper.                       M/C Room area
                 Earthing
                                                3 Phase 4 Wires Power Cable for
                 bracket
                                                      ……….. HP Motor.
                                               Single Phase 3 Wires Lighting
            6 Guage GI or                      Cable for Main Light supply.
               8 Gauge
              copper or
                 3X20
              Aluminium
                 strip.
                                                                                METER ROOM area
        Earthing from earth
               plate.                                       DPIC
                                           TPIC              OR
                                                            MCB
Earthing from electrical
        source.
TKE's Representative's Name :                                              Client's Representative's Name :
Doc No. : 0095OP999901360                                                                                                       Page 8
                  ThyssenKrupp Elevator         Electrical Details                        Date :
                         ( India )                Schematics - 2                            JOB NO
                                                                                          Layout Drg. No.
  Project Name and Location :
                                                                                          Wing No.        Lift No.
                                                Hoistway light wiring from m/c room
                                                hoistway light switch to pit light box.
                       M/C Room
                                                      Terrece Level
                              Top light
                                                                      Top bulk head fitting to be fixed 2500 mm up
                                                                      from top floor landing.
                                             Top floor Level
                                                                      Bulk head fitting with 40 watts lamp &
                                                                      3 pin plug socket with operating switch
                                                                        to be provided on each landing or at
                                                                                  every 3 meters..
                                                                           300 mm                                  300 mm
                                                            300 mm                                                          300 mm
                                                                                   Installation Engineer should mark
                                                                                    the position in this drawing from
                                                                                    which corner the power and light
                                                                                   cables should run through the lift
                                                                                       shaft including shaft lights.
   Pit Light Sw.
    Pit sw.and
    Hooter Box
                                          1000 mm
   just near the                                           Bottom floor Level
     floor level
      Pit light                           Pit Depth
        6oo mm
   TKE's Representative's Name :                                Client's Representative's Name :
Doc No. : 0095OP999901360   Page 9