0% found this document useful (0 votes)
348 views3 pages

Common Application Form I Part A For Establishment: Government of Andhra Pradesh Department of Industries

This document is an application from Apollo Tyres Ltd. for establishing an industrial unit in Chinnapanduru, Kanchipuram district. The proposed unit will manufacture tires and allied products with an annual installed capacity of 40,000 metric tons. It will require 44,000 KVA of power and 2,500 KL of water per day. The total estimated project cost is Rs. 120 crores and it will provide direct employment to 550 people and indirect employment to 50 people. The promoter, Moses E. K. Seelan, signed the application on June 8, 2018 seeking necessary approvals from the Government of Andhra Pradesh.

Uploaded by

Latha Yerur
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
348 views3 pages

Common Application Form I Part A For Establishment: Government of Andhra Pradesh Department of Industries

This document is an application from Apollo Tyres Ltd. for establishing an industrial unit in Chinnapanduru, Kanchipuram district. The proposed unit will manufacture tires and allied products with an annual installed capacity of 40,000 metric tons. It will require 44,000 KVA of power and 2,500 KL of water per day. The total estimated project cost is Rs. 120 crores and it will provide direct employment to 550 people and indirect employment to 50 people. The promoter, Moses E. K. Seelan, signed the application on June 8, 2018 seeking necessary approvals from the Government of Andhra Pradesh.

Uploaded by

Latha Yerur
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

GOVERNMENT OF ANDHRA PRADESH

DEPARTMENT OF INDUSTRIES

COMMON APPLICATION FORM I Application ID: CAE1801281


PART A
FOR ESTABLISHMENT

This format is to be filed with the Nodal Agency for the purpose of arranging site clearance, statutory approvals from
Gram Panchayat, Municipality, TC & P, Urban Development Authority, Factories, Alienation of land / Acquisition of land,
Power feasibility and Power connection from DISCOM, sanction of water supply from local bodies / Ground water for
setting up of industrial units in A.P.

(Please submit required number of copies as per check slip including one for your record)

1.1 NAME & ADDRESS OF THE PROMOTER/INDUSTRIAL UNDERTAKING IN FULL

Name of the Industrial Undertaking APOLLO TYRES LTD.


Name of the Promoter/M.D./Mg. Partner with MosesE K Seelan
surname first

S/o./D/o./W/o. Nargunraj Santosum Moses


Age 56
Occupation Service
UID (Aadhar ID) 735454613177

1.2 ADDRESS FOR COMMUNICATION

Door No. B - 25
Street Name Sipcot Industrial Growth Centre
Village/Town Mathur
Mandal Sriperumbudur
District KANCHIPURAM
Pin Code 602105
E-mail seelan.moses@apollotyres.com
Fax
Telephone (incl. STD code) 9176619130

2 Nature of Organisation : Public

3 For Proprietary Units Only. Do you belong to : 0


4.1 Line of manufacture

S.No Item Description Annual Installed Capacity


Units Quantity
1 Tyres and Allied Products Metric Tons 40000
Per Year
4.2 Raw - materials used in process

S.No Name of the Raw Material Annual Installed Capacity


Units Quantity

4.3 Details of Plant & Machinery (Pl. enclose list)

4.4 Brief description of manufacturing process : (Pl. enclose separate sheet)

4.5 Type and Nature of wastes and effluents their Quantities and the methods of their disposal
(Enclose Separate Sheet)
5.0 Estimated Project Cost.

Estimated Project New Unit


6.1 Land (in lakhs.) 2230
6.2 Building (in lakhs.) 24000
6.3 Plant and Machinery (in lakhs.) 93770
6.4 Total cost of (6.1 + 6.2+6.3) (in lakhs.) 120000

6.0 Probable Employment Potential :


(In No. of persons to be employed)

Male Female
Direct (On unit’s payroll) 550 0
Indirect (On factory premises) 50 0

7.0 Details of existing Approvals of Factories dept Gram Panchayat / Municipality / Electricity / Water, if any

S.No Reference No Date Clearance

8.0 Proposed location of the factory

Proposed factory Others


Location/Name of IE/IDA/EZ/PE Undeveloped Land
Survey No 52,53,54,etc....
Extent 809400 Sq.Mts
Street Name Tada Satyavedu Road
Village/Town Chinnapanduru
Mandal
District
Pin code 517541
Tele Phone No 9176619130
Nearest Tele Phone No. 9810454701
9.0 Power required for the unit

Contracted Load is 132KV or 220KV(44000)


Contracted Load Maximum demand in KVA 44000
Connected load 250000 KW
Aggregate installed capacity of the transformer to be installed by 107239
the entrepreneur in case of H.T. (H.T. means above 150 H.P.)
Proposed maximum working hours 24 Per day
720 Per month
Expected month and year of trial production 10 - 2019
Probable date of requirement of power supply. 01/06/2019
Total HP of the machinery proposed to be installed 335120
Is Power Installation above 650V Yes
Power Installation Type Fresh Installations
Power Installation Voltage 132 KV

10 Water Supply and Sewer connection

Water Supply from Other Sources


Water requirement
i) Drinking Water 250 KL/Day
ii) Water for Processing (Industrial Use) 2250 KL/Day
Size of Water Supply connection applied for Others

Size of sewer connection applied for Others

Area for Survey 200 Acres

11 Permission to draw water

Agency Other Sources


Requirement of Water Quantity 2500KL/Day

I declare that the particulars given above are true to the best of my knowledge and belief. I shall
obey the rules and regulations in force. If any deviation is found, suitable action may be initiated.

Place : Signature of Promoter or authorised person only in Ink

Date: 08-JUN-2018 NAME (IN BLOCK LETTERS)

(DESIGNATION)

You might also like