Incoming Mail From MSRDC
Incoming Mail From MSRDC
Sr. No. Date of Latter Received Date Letter No. Subject Action to be taken till Action Taken on Outgoining Letter No. Remarks
1 3/8/2019 3/9/2019 MSRDC-1757 Construction-Package-1 3/16/2019 3/13/2019 ROC-0009
2 3/15/2019 3/15/2019 MSRDC-1879 Reply of issues of M/s.AFCONS 3/22/2019 3/23/2019
3 3/14/2019 3/15/2019 MOM-MSRDC-1911 MOM 3/22/2019 3/15/2019
4 3/16/2019 3/18/2019 MSRDC-1950 Appointment of Mr.Srikanth Alugavi 3/25/2019 5/6/2019 Geodata
5 3/14/2019 3/18/2019 MSRDC-1896 Joint inspection with NAVAYUGA 3/25/2019 3/23/2019
6 3/1/2019 3/18/2019 MSRDC-1533 Package II 3/25/2019 8/17/2019 SO-P1-0139/SO-P2-0214
7 3/22/2019 3/23/2019 MSRDC-20-missing link - 2185 Submission of detailed traffic 3/30/2019 3/23/2019
8 3/22/2019 3/23/2019 MSRDC-YCEWML-25-Part III-2019-2180 Tree falling permission from CH.581100 KM 3/30/2019 NA
9 3/25/2019 3/27/2019 MSRDC-YCEWML/17/Part III/2018/2019/2227 Facilities for officials of MSRDC 4/3/2019 NA
10 3/25/2019 3/27/2019 MSRDC-YCEWML/17/Part III/2018/2019/2204 Professional Fees 4/3/2019 NA
11 3/25/2019 3/27/2019 MSRDC-YCEWML/17/Part III/2018/2019/2228 MSRDC Certify 4/3/2019 NA
12 3/29/2019 3/29/2019 MSRDC-YCEWML/26/2018-Part III/2019/2315 Request of shift of electrical line-22 ROW of existing 4/5/2019 NA
13 3/29/2019 3/29/2019 MSRDC-YCEWML/26/2018-Part III/2019/2314 Request of shift of water pipe line-22 ROW of existing 4/5/2019 NA
14 3/29/2019 3/29/2019 MSRDC-YCEWML/26/2018-Part III/2019/2312 Submission of detailed traffic 4/5/2019 NA
15 3/29/2019 3/29/2019 MSRDC-YCEWML/26/2018-Part III/2019/2313 Request of shift of water pipe line-22 ROW of existing 4/5/2019 NA
16 3/30/2019 3/30/2019 MSRDC-YCEWML/26/2018-Part III/2019/2331 Facilities to be provided to authority as per schedule-Q 4/6/2019 NA
17 3/30/2019 3/30/2019 MSRDC-YCEWML/25/2018-Part III/2019/2332 Facilities to be provided to authority as per schedule-Q 4/6/2019 NA
18 4/1/2019 4/2/2019 MSRDC-YCEW/57/2016/2019/2393 Handing taking care of stretches-MIPL 4/9/2019 NA
19 3/30/2019 4/2/2019 MSRDC-YCEWML/26/2018-Part III/2019/2403 Testing of natural coarse silica sand as auxiliary catalyst 4/9/2019 8/17/2019 SO-P2-0217 Mr.Amit Priyadarshi
20 3/20/2019 4/4/2019 MSRDC-YCEWML/17/2018-Part III/2019/2116 Appointment of general consultant 4/11/2019 NA NA
21 4/5/2019 4/8/2019 MSRDC-YCEWML/17/2018-Part II/2018/2119/2495 General consultant for peer-review of detailed project repor 4/15/2019 09-04-2019/24-12-2019 ROC-0029/ROC-0295
22 2/25/2019 4/8/2019 MSRDC-YCEWML/626 part III/2019/1416 Construction of missing link with viaduct 4/15/2019 4/10/2019 NA
23 4/4/2019 4/8/2019 MIS-1010416/C.R.243/CH certificate 4/15/2019 NA NA
24 4/10/2019 4/12/2019 MSRDC-YCEWML/26/2018-Part III/2019/2573 Shifting /Heightening of LT line electrical poles on the road 4/19/2019 6/29/2019 SO-P2-0120
25 4/10/2019 4/12/2019 MSRDC-YCEWML/26/2018-Part III/2019/2574 Shifting of electrical poles/HT cables/HT Line Tower in th 4/19/2019 6/29/2019 SO-P2-0120
26 4/11/2019 4/12/2019 MSRDC-YCEW-17-2019-2597 Appointment of Mr.Mohommad Akhtar as Environment Speci 4/19/2019 4/12/2019 NA
27 4/10/2019 4/12/2019 MSRDC-YCEWML-17-2019-2579 M/s.Geodata-LB Consortium letter no. ROC-0029 dated 9/4/ 4/19/2019 4/12/2019 NA
28 4/10/2019 4/12/2019 MSRDC-YCEWML-17-2019-2567 Commencement date for phase-III vide letter no. MSRDC-YC 4/19/2019 4/23/2019 ROC-0036 Mr.Anadhi Joshi
29 4/15/2019 4/17/2019 MSRDC-YCEWML-26-2018-Part-III-2019-2655 Submission of proposal span arrangement scheme for cable s 4/24/2019 Pending DSA
30 4/5/2019 4/17/2019 MSRDC-YCEWML-11-2017-2511 Approval for road no.64(in marathi) 4/24/2019 Pending RWA
31 4/12/2019 4/23/2019 MSRDC-YCEWML-26-2018-Part-III-2019-2619 Handing over of land for establishment of Authority & Author 4/30/2019 NA
32 4/18/2019 4/23/2019 MSRDC-YCEW-57-2016-2019-2718 Progress review meeting on 22/4/2019 4/30/2019 4/23/2019 NA
33 4/18/2019 4/23/2019 MSRDC-YCEW-57-2016-2019-2697 Progress review meeting on 22/4/2019 4/30/2019 4/23/2019 NA
34 4/20/2019 4/23/2019 MSRDC-YCEWML/25/2018-Part III/2019/2749 Facilities to be provided to authority as per schedule-Q 4/30/2019 4/23/2019 NA
35 4/20/2019 4/23/2019 MSRDC-YCEWML/26/2018-Part III/2019/2748 Facilities to be provided to authority as per schedule-Q 4/30/2019 4/23/2019 NA
36 4/22/2019 4/23/2019 MSRDC-YCEWML/26/2018-Part III/2019/2765 Execute rent agreement for handing over of land for casting 4/30/2019 4/23/2019 NA
37 4/22/2019 4/23/2019 MSRDC-YCEWML/26/2018-Part III/2019/2766 Execute rent agreement for handing over of land for casting 4/30/2019 4/23/2019 NA
38 4/22/2019 4/23/2019 MSRDC-YCEWML-17-2018-part III-2019-2772 Appointment of Mr.Ashok Maan as Quantity Surveyor 4/30/2019 4/23/2019 NA
39 4/22/2019 4/23/2019 MSRDC-YCEWML-17-2018-part III-2019-2777 RTI of Shri.Sanjay Ramesh Shirodkar regarding contractors a 4/30/2019 5/3/2019 ROC-0041
40 4/25/2019 4/26/2019 MSRDC-YCEWML/25/2018-Part III/2019/2845 Permission for tree counting and marking with ROW of viaduc 5/3/2019 NA
41 4/25/2019 4/26/2019 MSRDC-YCEWML-17-2018-part III-2019-2846 Regarding comments for revised final design report of tunnel 5/3/2019 4/26/2019 ROC-0042
42 4/25/2019 4/26/2019 MSRDC-YCEWML-17-2018-part III-2019-2847 Regarding comments for submission of traffic diversion, muc 5/3/2019 NA
43 4/25/2019 4/26/2019 MSRDC-YCEWML/25/2018-Part III/2019/2849 Operation and maintainance of mumbai pune section of YCEW: 5/3/2019 Pending DSA
44 4/25/2019 4/27/2019 MSRDC-YCEWML/25/2018-Part III/2019/2848 Submission of Original Contract 5/4/2019 Pending RWA
45 4/26/2019 4/27/2019 MSRDC-YCEWML/25/2018-Part III/2019/2863 Regarding Consent letter for muck disposal at MADAP land. 5/4/2019 NA
46 4/24/2019 4/27/2019 MSRDC-04-SE-2019-2316 Joint visit for discussion and finalization of proposal for ne 5/4/2019 NA
47 4/26/2019 4/27/2019 MSRDC-YCEWML/25/2018-Part III/2019/2891 Package-1.regarding comments for dismanting of crash barrie 5/4/2019 Pending LPS
48 4/26/2019 4/30/2019 E/8189/YCEW&NH4/RNY/2701 Submission of Inventory of MPEW 5/7/2019 Pending RWA
49 5/4/2019 5/6/2019 MSRDC-YCEWML-25-2018-Part-III-2019-2974 Regarding submission of drawing of point of supply to MSE 5/13/2019 Pending ask to sarkar sir as per GMR Instruction
50 5/4/2019 5/6/2019 MSRDC-YCEWML-26-2018-Part-III-2019-2970 About water pipeline 5/13/2019 Pending ask to sarkar sir as per GMR Instruction
51 5/4/2019 5/6/2019 MSRDC-YCEWML-25-2018-Part-III-2019-2971 Disposal at village Madap 5/13/2019 NA
52 5/4/2019 5/6/2019 MSRDC-YCEWML-25-2018-Part-III-2019-2973 Regarding handing over Muck disposal area at Pimpaloli and 5/13/2019 3/19/2020 SO-P1-0303
53 5/2/2019 5/6/2019 MSRDC-YCEWML-26-2018-Part-III-2019-2933 Execution of rent agreement for land at CH 43+500 village k 5/13/2019 Pending RWA
54 5/6/2019 5/7/2019 MSRDC/-04/CA/missing link -2499-2019 Regarding tree cutting near kusgaon 5/14/2019 NA
55 5/7/2019 5/7/2019 MSRDC-YCEWML-25-2019-3039 Regarding tree cutting near kusgaon 5/14/2019 NA
56 5/7/2019 5/8/2019 MSRDC/02/MPEW/MISSING LINK/3050 Inspection Note 5/15/2019 NA
57 5/7/2019 5/8/2019 MSRDC-YCEWML-17-2018-Part-III-2019-3055 Appointment of L.P.Sahu(R.E.) 5/15/2019 NA Information
58 5/7/2019 5/8/2019 MSRDC-YCEWML-17-2018-Part-III-2019-3056 CV Approval Letter 5/15/2019 2/10/2020 ROC-0348
59 5/7/2019 5/9/2019 MSRDC-YCEWML-2018-Part-IV-2019-3038 Regarding grant permission for Topo survey at Talegaon toll 5/16/2019 NA
60 5/9/2019 5/9/2019 MSRDC-YCEWML-26-2018-Part-IV-2019-3091 Regarding Service road changes concerning 8-laning of the 5/16/2019 5/29/2019 ROC-0071
61 5/15/2019 5/16/2019 MSRDC-YCEWML-25-2018-PART-III-2019-3243 Regarding unsafe working condition at Tunnel T2 exit 5/23/2019 NA
62 5/15/2019 5/16/2019 MSRDC-YCEWML-17-2018-PART-III-2019-3244 Lacunaes have been observed by MSRDC 5/23/2019 Pending ask to sarkar sir as per GMR Instruction
63 5/16/2019 5/16/2019 MSRDC-YCEWML-26-2018-PART-IV-2019-3254 Regarding Stoppage of work by local people 5/23/2019 NA
64 5/15/2019 5/17/2019 MSRDC-YCEWML-25-2018-PART-III-2019-3270 Regarding Schedule Q: Facilities to be provided to authority 5/24/2019 NA
65 5/15/2019 5/17/2019 MSRDC-YCEWML-26-2018-PART-III-2019-3271 Regarding Schedule Q: Facilities to be provided to authority 5/24/2019 5/29/2019 SO-P2-0082
66 5/16/2019 5/17/2019 MSRDC-YCEWML-26-2018-PART-IV-2019-3272 Regarding Tree Cutting 5/24/2019 2/17/2020 ROC-0357
67 5/23/2019 5/24/2019 MSRDC-YCEWML-26-2018-PART-V-2019-3363 Review of LHS and RHS Carriageway Plan and Profile, SRL RHS 5/31/2019 NA
68 5/23/2019 5/24/2019 MSRDC-YCEWML-26-2018-PART-V-2019-3364 Safety Specialist Weekly site safety inspection report 5/31/2019 NA
69 5/23/2019 5/24/2019 MSRDC-YCEWML-26-2018-PART-V-2019-3361 Regarding comments on monthly progress report for the mo 5/31/2019 NA
70 5/23/2019 5/24/2019 MSRDC-YCEWML-26-2018-PART-V-2019-3362 Submission of Revised method statement- Package II 5/31/2019 NA
71 5/24/2019 5/24/2019 MSRDC-YCEWML-26-2018-PART-V-2019-3383 Regarding deposition for Execution of Rent Agreement for la 5/31/2019 Pending RWA
72 5/31/2019 5/31/2019 MSRDC-YCEWML-26-2018-PART-V-2019-3492 Regarding Granting permission for carrying out Axle load sur 6/7/2019 NA
73 5/31/2019 6/1/2019 MSRDC/Missing Link/3350 Regarding Discrepancies at T-2 End from Dongargaon Village 6/8/2019 NA
74 5/28/2019 6/3/2019 MSRDC/02/ENVT/3452 Regarding Review meeting for forest clearance and Wild lif 6/10/2019 NA
75 6/3/2019 6/4/2019 MSRDC-YCEWML-25-2018-PART-III-2019-3589 Regarding Deposition of rent for Kusgaon village 6/11/2019 Pending RWA
76 6/7/2019 6/8/2019 MSRDC-YCEWML-11-2017-Part III-2019-3687 Regarding queries raised by Addl. Pri. Chief Conservator of F 6/15/2019 6/12/2019 ROC-0086
77 6/7/2019 6/8/2019 MSRDC-YCEWML-25-2018-PART-IV-2019-3695 Regarding Completion of remaining work pending in peer re 6/15/2019 6/20/2019 ROC-0095
78 6/7/2019 6/8/2019 MSRDC-YCEWML-26-2018-PART-V-2019-3696 Regarding Sevice road changes concerning 8- Laning project 6/15/2019 10/23/2019 ROC-0214
79 6/3/2019 6/10/2019 MSRDC-YCEWML-2019-3629 Extra Land acquisition in T2 exit portal area 6/17/2019 6/11/2019 ROC-0084
80 5/22/2019 6/10/2019 Right To Information Act,2005 Account of Mumbai Pune Expressway Missing Link and Nagp 6/17/2019 Pending
81 5/22/2019 6/10/2019 Right To Information Act,2005 Mumbai Pune Expressway Missing Link Project 6/17/2019 Pending
82 6/10/2019 6/11/2019 MSRDC-YCEWML-26-2018-Part-V-2019-3732 Regarding Grant Permission for Axle Load Survey. 6/18/2019 Pending
83 6/11/2019 6/12/2019 MSRDC-YCEWML-25-2018-Part-IV-2019-3770 Tree Cutting and working permissions 6/19/2019 Pending
84 6/12/2019 6/13/2019 MSRDC-YCEWML-25-2018-Part IV-2019-3817 Regarding deposition of rent for kusgaon land 6/20/2019 NA
85 6/12/2019 6/13/2019 MSRDC-YCEWML-26-2018-Part V-2019-3819 Handing Over of approach road (Shemdi – Chavani - Gavadhan 6/20/2019 1/15/2020 SO-P2-0436
86 5/6/2019 6/15/2019 MSRDC-02-ENVT-Missing Link-3000 Consent to establish for construction of Missing link on Mu 6/22/2019 18-06-2019/12-07-2019/23-12-2019/1 SO-P1-0082,SO-P2-0105,ROC-0126,SO-P2-0408/0449,SO-P1-0261
87 6/15/2019 6/15/2019 MSRDC-YCEWML-25-2018-Part IV-2019-3710 Regarding Queries raised by Account Department. 6/22/2019 Pending
88 6/15/2019 6/15/2019 MSRDC-YCEWML-25-2018-Part-III-2019-3717 Regarding Submission of approved detailed for Dongargaon v 6/22/2019 Pending
89 6/15/2019 6/15/2019 MSRDC-YCEWML-26-2018-Part V-2019-3698 Regarding Maintaining Safety Precaution while Execution of 6/22/2019 6/18/2019 SO-P2-0104
90 6/20/2019 6/20/2019 MSRDC-YCEWML-17-2018-Part III 2019-4039 CV Approval Letter 6/27/2019 NA
91 6/11/2019 6/24/2019 MSRDC-02-ENVT-MOM-3737 Minutes of review meeting of environment & forest clearanc 7/1/2019 NA
92 6/27/2019 6/27/2019 MSRDC-YCEWML-25-2018-PART IV-2019-4182 Regarding Safety Precautions and Medical arrangements at si 7/4/2019 NA
93 6/27/2019 6/27/2019 MSRDC-YCEWML-26-2018-Part V-2019-4183 Regarding Safety Precautions and Medical arrangements at si 7/4/2019 NA
94 6/27/2019 6/27/2019 MSRDC-YCEWML-26-2018-Part V-2019-4192 Regarding submission of details for trees to be cut within R 7/4/2019 Pending
95 6/27/2019 6/28/2019 MSRDC-YCEWML-11-2017-part III-2019-4194 Regarding Joint Meeting Date 7/5/2019 NA
96 6/28/2019 6/29/2019 MSRDC-YCEWML-26-2018-Part V-2019-4219 Execution of rent agreement for land at Khopoli and Sajgaon 7/6/2019 NA
97 6/29/2019 7/1/2019 MSRDC-YCEWML-26-2018-Part V-2019-4250 Regarding submission of consent for testing of material 7/8/2019 Pending
98 6/29/2019 7/1/2019 MSRDC-YCEWML-26-2018-Part V-2019-4276 Letter regarding Non- Conformance Report(NCR) 7/8/2019 NA
99 6/29/2019 7/1/2019 MSRDC-YCEWML-17-2018-Part-III-2019-4277 Appointment of Mr.Debashish Chakrabarty as Contract Specia 7/8/2019 NA
100 6/29/2019 7/1/2019 MSRDC-YCEWML-26-2018-Part V-2019-4278 Letter regarding working condition at site 7/8/2019 Pending
101 6/29/2019 7/1/2019 MSRDC-YCEWML-26-2018-Part V-2019-4279 Regarding Pending of sign on joint inventory 7/8/2019 Pending
102 7/3/2019 7/4/2019 MSRDC-YCEWML-26-2018-PART-V-2019-4332 Letter regarding non conformance report 7/11/2019 7/17/2019 ROC-130
103 7/3/2019 7/4/2019 MSRDC-YCEWML-17-Part-IV-2019-4337 Approval of CV of staff proposed by M/s Geodata -Lb Consor 7/11/2019 09-11-2019/23-12-2019/04-03-2020 ROC-0234/0294/0383
104 7/4/2019 7/5/2019 MSRDC-YCEWML-25-2018-Part-IV-2019-4346 Regarding deposition of rent for Kusgaon land 7/12/2019 NA
105 7/3/2019 7/6/2019 MSRDC-YCEWML-26-2018-Part-V-2019-4322 Regarding Protection of Foundation of structures from disc 7/13/2019 7/17/2019 ROC-130
106 7/9/2019 7/10/2019 MSRDC-YCEWML-262018-Part V-2019-4425 Execution of rent agreement for land at Kusgaon 7/17/2019 NA
107 7/10/2019 7/10/2019 MSRDC-YCEWML-26-2018-Part VII-2019-4461 Toll Exemption at Khalapur and Talegaon toll plaza at Mumb 7/17/2019 NA
108 7/10/2019 7/10/2019 MSRDC-YCEWML-26-2018-Part VII-2019-4462 Service road changes concerning 8- Lane Project of the expr 7/17/2019 NA
109 7/2/2019 7/15/2019 MSRDC-04-CA-2019-YCEW-3887 Application for grant of permission for access to private prop 7/22/2019 NA
110 7/12/2019 7/12/2019 MSRDC-YCEWML-26-2018-Part VII-2019-4552 Letter regarding submission of approved detailed design for 7/19/2019 Pending Mr.Srinivasrao Koppolu
111 7/12/2019 7/12/2019 MSRDC-YCEWML-26-2018-Part VII-2019-4557 Letter regarding Provision of PIMS or Common Data Environ 7/19/2019 Pending Mr.D. Chakrabarty/Hichem Zammit
112 7/12/2019 7/12/2019 MSRDC-YCEWML-26-2018-Part VII-2019-4559 Letter to MSEB Pen regarding shifting of electrical poles/ 7/19/2019 NA
113 7/15/2019 7/15/2019 MSRDC-YCEWML-17-2018-Part III-2019-4579 Regarding submission of New Team Leader CV 7/22/2019 7/29/2019 ROC-0145
114 7/15/2019 7/15/2019 MSRDC-YCEWML-26-2018-Part III-2019-4595 Regarding Scheme for protection of existing foundation of 7/22/2019 NA
115 7/18/2019 7/18/2019 MSRDC-YCEWML-26-2018-Part-VIII-2019-4663 Regarding Meeting held on 19.07.2019 7/25/2019 Pending
116 7/20/2019 7/20/2019 MSRDC-YCEWML-11-2017-Part III 2019-4689 Enumeration of trees 7/27/2019 Pending
117 7/18/2019 7/20/2019 MSRDC-YCEWML-73-2019-4672 Regarding Tree plantation 7/27/2019 8/6/2019 ROC-0149
118 7/20/2019 7/20/2019 MSRDC-YCEWML-26-2018-Part VII-2019-4687 Regarding Proposal for Altering Payment Procedure of Tunne 7/27/2019 8/21/2019 ROC-0160
119 7/20/2019 7/20/2019 MSRDC-YCEWML-26-2018-Part VII-2019-4688 Regarding change of scope notice. 7/27/2019 Pending
120 7/20/2019 7/20/2019 MSRDC-YCEWML-26-2018-Part VII-2019-4696 Regarding Consent to Establishment for construction of Missi 7/27/2019 1/17/2020 SO-P2-0449
121 7/20/2019 7/20/2019 MSRDC-YCEWML-25-2018-Part VI-2019-4691 Regarding Submission of Methodology, Design and Drawing 7/27/2019 Pending
122 7/23/2019 7/24/2019 MSRDC-YCEWML-17-2018-Part III-2019-4766 Approval of Survey Engineer Mr.Partha Bhattacharya 7/31/2019 NA
123 7/23/2019 7/24/2019 MSRDC-YCEWML-17-2018-Part III-2019-4767 Approval of Tunnel Design Specialist ,Highway Engineer and 7/31/2019 NA
124 7/23/2019 7/24/2019 MSRDC-YCEWML-64-2018-Part V-2019-4771 Letter regarding package II 7/31/2019 30-08-2019/16-10-2019 SO-P2-0190,ROC-0162,ROC-0213
125 7/23/2019 7/24/2019 MSRDC-YCEWML-26-2018-Part VIII-2019-4769 Letter regarding improper curing 7/31/2019 NA
126 7/23/2019 7/24/2019 MSRDC-YCEWML-25-2018-Part IV-2019-4770 Letter regarding non conformance report 7/31/2019 NA
127 7/23/2019 7/24/2019 MSRDC-YCEWML-26-2018-Part VIII-2019-4768 Letter regarding deployment of representative for witnessin 7/31/2019 04-01-2020/29-01-2020 SO-P2-0421/0480
128 7/29/2019 7/29/2019 MSRDC-YCEWML-26-2018-Part-VIII-2019-4855 Compliance status of preventive measures to safeguard the e 8/5/2019 Pending
129 7/29/2019 7/29/2019 MSRDC-YCEWML-26-2018-Part-VIII-2019-4854 Letter regarding review of contractors laboratory equipment 8/5/2019 Pending
130 8/1/2019 8/1/2019 MSRDC-YCEWML-17-Part-V-2018-2019-4232 Vehicle Facility 8/8/2019 Pending
131 8/1/2019 8/1/2019 MSRDC-YCEWML-26-2018-Part V-2019-4234 Letter regarding submission of revised TCS for 5.85km 8/8/2019 NA
132 8/2/2019 8/2/2019 MSRDC-YCEWML-25-2018-Part V-2019-4964 Regarding submission of stamp duty and registration,insuran 8/9/2019 NA
133 8/2/2019 8/2/2019 MSRDC-YCEWML-17-2018-Part III-2019-4965 Appointment of Mr.Satish Chandra Sharma as Tunnel Enginee 8/9/2019 NA
134 8/2/2019 8/2/2019 MSRDC-YCEWML-26-2018-Part VIII-2019-4969 Letter regarding use of polyurethane and anti carbonation poi 8/9/2019 Mr.Amit Priyadarshi
135 8/8/2019 8/9/2019 MSRDC-YCEWML-17-2018-Part IV 2019-5093 Regarding Appointment for Team Leader 8/16/2019 Pending
136 8/8/2019 8/9/2019 MSRDC-YCEWML-17-2018-Part IV-2019-5116 Letter regarding corrosion inhibiting admixture. 8/16/2019 Pending
137 7/24/2019 8/9/2019 MSRDC-YCEWML-26-2018-Part VIII-2019-4789 Signing of Inventory Details for MPEW from Km 32/800 to 3 8/16/2019 2/17/2020 ROC-0357
138 7/11/2019 8/14/2019 MSRDC-YCEWML-17/2018/Part-III-2019-4534 Regarding Permission on private land 8/21/2019 Pending
139 8/13/2019 8/14/2019 MSRDC-YCEWML-17-2018-Part IV-2019-5182 Regarding review for additional land required for Toll Plaza 8/21/2019 8/20/2019 ROC-0156
140 8/13/2019 8/14/2019 MSRDC-YCEWML-26-2018-Part IX-2019-5199 Regarding Submission of sub-contractor details for controlled 8/21/2019 Pending
141 8/13/2019 8/14/2019 MSRDC-YCEWML-77-2019-5197 Regarding Environment Management Plan 8/21/2019 Pending
142 8/16/2019 8/17/2019 MSRDC-YCEWML-25-2018-Part VII-2019-5271 Submission of Inventory of Mumbai Pune Expressway (YCEW 8/24/2019 Pending
143 8/14/2019 8/17/2019 MSRDC-YCEWML-26-2018-Part VIII-2019-5240 Regarding Consent to Establishment for construction of Missi 8/24/2019 17-01-2020/18-01-2020 SO-P2-0449/SO-P1-0261
144 8/23/2019 8/26/2019 MSRDC-YCEWML-26-2018-Part IX-2019-5402 मुंबई-पुणे द्रुतगती महामार्ग मिसिंग लिंक प्रकल्पाची माहिती त्वरित मिळणेबाबत 9/2/2019 Pending
145 8/23/2019 8/26/2019 MSRDC-YCEWML-2018-Part VI-2019-5403 Regarding Non Conformance Report 9/2/2019 Pending
146 8/21/2019 8/27/2019 MSRDC-YCEWML-17-2018-Part IV-2019-5337 Augumentation of Toll plaza on MPEW 9/3/2019 Pending
147 8/27/2019 8/27/2019 MSRDC-YCEWML-26-2018-Part III-2019-5451 Regarding submission of monthly inspection report 9/3/2019 14-10-2019/08-01-2020/09-03-2020 ROC-0206/0309/0374
148 8/27/2019 8/27/2019 MSRDC-YCEWML-25-2018-Part VI 2019-5452 Regarding submission of methodology to be adopted for supp 9/3/2019 Pending
149 8/26/2019 8/28/2019 MSRDC-YCEWML-17-2018-Part IV-2019-5438 Regarding Meeting held on 27.08.2019 9/4/2019 Pending
150 8/29/2019 8/29/2019 MSRDC-YCEWML-25-2018 Part-VI-2019-5521 Appointment of Proof consultant 9/5/2019 Pending
151 8/29/2019 8/29/2019 MSRDC-YCEWML-26-2018-Part IX-2019-5522 Regarding revised appointment date 9/5/2019 8/31/2019 ROC-0169
152 8/29/2019 8/30/2019 MSRDC-YCEWML-64-2016-Part III-2019-5520 Letter regarding reply to RTI application of Shri. Jayanta K 9/6/2019 Pending
153 8/30/2019 8/30/2019 MSRDC-02-5563 Letter regarding meeting on 04.09.2019 9/6/2019 NA
154 8/31/2019 8/31/2019 MSRDC-YCEWML-17-2018-Part IV 2019-5578 Letter regarding meeting on 04.09.2019 9/7/2019 NA
155 9/3/2019 9/3/2019 MSRDC-YCEWML-25-2018-Part VI-2019-5599 Regarding Submission of Blasting Pattern for Half Face Headi 9/10/2019 Pending
156 9/7/2019 9/9/2019 MSRDC-YCEWML-17-2018-Part III-2019-5695 Approval of Sub Professional and Support Staff 9/16/2019 10/1/2019 ROC-0201
157 9/9/2019 9/11/2019 MSRDC-YCEWML-64-2019-5720 Regarding use of Power cables in the works 9/18/2019 2/13/2020 ROC-0359
158 9/11/2019 9/12/2019 MSRDC-02-PD-NMSCEW-2019-5746 Regarding construction of tunnels and viaducts under capac 9/19/2019 Pending
159 9/13/2019 9/16/2019 MSRDC-YCEWML-25-2018-Part VI-2019-5801 Regarding installation of information boards ,sign boards and 9/23/2019 2/12/2020 ROC-0355
160 9/16/2019 9/16/2019 MSRDC-YCEWML-26-2018-Part X-2019-5808 Toll Exemption for Vehicle Mumbai Pune Expressway Project 9/23/2019 3/3/2020 ROC-0381
161 9/18/2019 9/19/2019 MSRDC-YCEWML-26-2018-Part X-2019-5915 Regarding revised appointment date. 9/26/2019 NA
162 9/18/2019 9/19/2019 MSRDC-YCEWML-25-2018-Part VI-2019-5916 Meeting regarding submission of Design and Drawing for gap 9/26/2019 NA
163 9/21/2019 9/23/2019 MSRDC-YCEWML-57-2018-2019-6001 Meeting schedule on 25.09.2019 9/30/2019 NA
164 9/23/2019 9/23/2019 MSRDC-YCEWML-57-2018-2019-6018 Regarding meeting held on 25.09.2019 9/30/2019 NA
165 9/26/2019 9/26/2019 MSRDC-YCEWML-82-2019-6089 जमिनी संबंधित दाखले मिळणेबाबत. 10/3/2019 Pending
166 9/25/2019 9/26/2019 MSRDC-YCEWML-26-2018-Part IX-2019-6096 Regarding submission of design& drawing for LHS Ch.2663 t 10/3/2019 1/14/2020 SO-P2-0435
167 9/25/2019 9/26/2019 MSRDC-YCEWML-25-2018-Part VI-2019-6101 Regarding approval of material as recommended by Authorit 10/3/2019 NA
168 9/25/2019 9/26/2019 MSRDC-YCEWML-25-2018-Part II-2019-6102 Regarding approval of material as recommended by Authorit 10/3/2019 26-09-2019/30-12-2019 SO-P2-0265/ROC-0299
169 9/26/2019 9/26/2019 MSRDC-YCEWML-25/17-/2018-Part V-2019-6106 Appointment of mr. pravin kumar jain as senior QA &QC exp 10/3/2019 10/14/2019 ROC-0208
170 9/26/2019 9/26/2019 MSRDC-YCEWML-26/2018-Part IX-2019-6138 Regarding maintenance of existing road as per EPC agreeme 10/3/2019 NA
171 9/30/2019 10/1/2019 MSRDC-YCEWML-26-2018-Part X-2019-6174 Regarding review for safety specialist joint inspection report 10/8/2019 Pending
173 10/4/2019 10/4/2019 MSRDC-YCEWML-25-2018 Part IV-2019-6307 Permission for modified construction vehicle movement 10/11/2019 Pending
174 10/4/2019 10/4/2019 MSRDC-YCEWML-40-2018-2019-6309 मौजे आडोशी येथील संयुक्त मोजणी करण्याबाबत. 10/11/2019 Pending
175 10/5/2019 10/5/2019 MSRDC-YCEWML-11-2017-Part IV-2019-6346 submission of estimate of forest information center at survey 10/12/2019 10/21/2019 ROC-0215
176 10/7/2019 10/10/2019 MSRDC-YCEW-57-2016-2019-631 Review meeting on 10.10.2019 10/17/2019 Pending
177 10/11/2019 10/16/2019 MSRDC-YCEWML-25-2018-Part XI-2019-6471 Felling of trees for viaduct 1 &viaduct 2 10/23/2019 Pending
178 10/16/2019 10/16/2019 MSRDC-YCEWML-17-2018-Part V-2019-6527 Appointment of Mr. Debashish Ray as Bridge Design Specialis 10/23/2019 11/4/2019 ROC-0225
179 10/16/2019 10/16/2019 MSRDC-04-EE-Missing Link-2019-5808 Toll Exemption for Vehicle Mumbai Pune Expressway Project 10/23/2019 11/23/2019 SO-P2-0344
180 10/16/2019 10/16/2019 MSRDC-YCEWML-17-2018-Part V-2019-6526 Approval of sub Professional. 10/23/2019 NA
181 10/19/2019 10/17/2019 MSRDC-YCEW-64-2016-Part III-2019-4019 Right to Information Act-2005. 10/24/2019 Pending
182 10/17/2019 10/18/2019 MSRDC-YCEWML-26-2018-Part X-2019-6569 Regarding Interim Extension of Time for the Schedule Compl 10/25/2019 18-10-2019/26-10-2019/07-11-2019/0 SO-P2-0295/ROC-0223/SO-P2-0311,ROC-0302,SO-P2-0461
183 10/23/2019 10/24/2019 MSRDC-YCEWML-17-2018-Part-V-2019-6672 Regarding non-deployment of the staff 10/31/2019 Pending Mr.Debashish Chakrabarty/Mayank Bhardwaj
184 10/23/2019 10/24/2019 MSRDC-YCEWML-17-2018-Part V-2019-6658 Regarding submission of incorrect organization chart in the 10/31/2019 Pending Mr.Debashish Chakrabarty
185 11/2/2019 11/2/2019 MSRDC-YCEWML-25-2018-Part VII-2019-6811 Regarding Dongergaon Villagers claiming compensation for cr 11/9/2019 Pending
186 11/2/2019 11/4/2019 MSRDC-YCEWML-11-2017-Part III-2019-6809 मुंबई पुणे मार्गावरील खोपोली ते खंडाळा या घाट लांबीतील नविन मार्गिके (Missing Link) 11/11/2019 Pending
187 11/2/2019 11/2/2019 MSRDC-YCEWML-17-2018-Part V-2019-6815 Approval Of Site Order Book 11/9/2019 Pending
188 11/4/2019 11/5/2019 MSRDC-YCEWML-17-2018-Part V-2019-6849 Approval of Key Professional and Sub Professional. 11/12/2019 12/30/2019 ROC-0298
189 11/2/2019 11/5/2019 MSRDC-YCEWML-26-2018-Part XI-2019-6812 Regarding Missing Link Project 11/12/2019 Pending
190 11/5/2019 11/5/2019 MSRDC-YCEWML-25-2018-Part VI-2019-6870 Regarding meeting held on Dated 7.11.2019 at 15.30 Pm 11/12/2019 Pending
191 11/8/2019 11/9/2019 MSRDC-YCEWML-64-Part II-2019-6942 Regarding Approval of materials-Package-2 11/16/2019 11/28/2019 ROC-0255
192 11/8/2019 11/9/2019 MSRDC-YCEWML-64-Part II-2019-6941 Regarding approval of materials-Package-1 11/16/2019 Pending
193 11/13/2019 11/15/2019 MSRDC-YCEWML-25-2018-Part-VI-2019-6993 Regarding Change Of Scope 11/22/2019 15-11-2019/30-11-2019 SO-P2-0324/0360
194 11/14/2019 11/15/2019 MSRDC-YCEWML-25-2018-Part VII-2019-7019 Regarding Request for Deduction of Royalty from RA Bills 11/22/2019 Pending
195 11/15/2019 11/16/2019 MSRDC-YCEWML-26-2018-Part XI-2019-7051 Regarding verification of SBC for foundation's based on RMR 11/23/2019 Pending
196 11/15/2019 11/16/2019 MSRDC-YCEWML-17-2018-Part-V-2019-7048 Regarding appointment of Mr. Noel P. Mundo as team leader 11/23/2019 Pending
197 11/14/2019 11/16/2019 MSRDC-YCEWML-107-2019-7016 Letter regarding यशवंतराव चव्हाण मुंबई - पुणे एक्सप्रेस वे संबंधीचे मिसींग लिंक बाबतचा शासकीय
11/23/2019
प्रकल्प हा सामान्य जनतेच्याPending
कु ठल्याही प्रकारे हिताचे नसल्याने
198 11/16/2019 11/16/2019 MSRDC-02-Missing link-7060 Letter regarding submission of organization chart as per cont 11/23/2019 Pending
199 11/18/2019 11/18/2019 MSRDC-YCEWML-106-2019-7092 Regarding Requirement of documents for commence the sys 11/25/2019 11/29/2019 ROC-0267
200 11/15/2019 11/18/2019 MSRDC-YCEWML-26-2018-part-XI-2019-7049 Regarding delay in tree felling at viaduct 1 and 2 locations. 11/25/2019 NA
201 11/18/2019 11/19/2019 MSRDC-YCEWML-17-2018-Part-V-2019-7091 Regarding Facilities for officials of MSRDC 11/26/2019 NA
202 11/18/2019 11/19/2019 MSRDC-YCEWML-11-2017-Part-V-2019-7116 Letter of Dehu Kondbhar-change of name 11/26/2019 NA
203 11/19/2019 11/21/2019 MSRDC-YCEWML-26-2018-Part-XI-2019-7140 Regarding Estimate for shifting of LT Electric poles/HT Line 11/28/2019 NA
204 11/19/2019 11/21/2019 MSRDC-YCEWML-26-2018-Part-XI-2019-7139 Regarding Estimate for shifting of LT Electric poles/HT Line 11/28/2019 NA
205 11/22/2019 11/22/2019 MSRDC-YCEWML-26-2018-Part XII-2019-7207 Regarding submission of work programme package - II 11/29/2019 20-12-2019/22-01-2020 SO-P2-0401/0461
206 11/22/2029 11/22/2019 MSRDC-YCEWML-26-2018-Part XII-2019-7206 Letter regarding request for deduction of royalty from RA Bill 11/29/2019 NA
207 11/27/2019 11/28/2019 MSRDC-YCEWML-64-2016-Part IV-2019-7267 Regarding First Appeal hearing held on 17.12.2019. 12/5/2019 NA
208 12/2/2019 12/2/2019 MSRDC-YCEWML-17-Part-IV-2019-7378 Approval of Key Professional 12/9/2019 12/13/2019 ROC-0284
209 12/5/2019 12/6/2019 MSRDC-YCEW-15-2016-Part V-2019-7478 Letter regarding Consent to Establishment for construction of 12/13/2019 17-1-2020/18-01-2020 SO-P2-0449/SO-P1-0261
210 12/6/2019 12/7/2019 MSRDC-YCEWML-26-2018-Part XII-2019-7499 Regarding submission of video recording as per clause 11.1 12/14/2019 NA
211 12/7/2019 12/9/2019 MSRDC-YCEWML-26-2018-Part XII-2019-7533 Letter regarding submission of compliance to the remarks gi 12/16/2019 NA
212 12/7/2019 12/9/2019 MSRDC-YCEWML-20-2018-19-Part XII-2019-7572 Regarding SOS poles Shifting 12/16/2019 11-12-2019/17-01-2020/31-01-2020 SO-P2-0383/0447/0484
213 12/7/2019 12/9/2019 MSRDC-YCEWML-26-2018-Part -XII-2019-7543 Regarding obtaining details of accepted tenders 12/16/2019 NA
214 12/7/2019 12/11/2019 MSRDC-YCEWML-64-Part III-2019-7547 Letter regarding consent for material. 12/18/2019 12/10/2019 SO-P1-0221
215 12/12/2019 12/12/2019 MSRDC-YCEWML-26-2018-Part XII-2019-7657 Letter regarding proposal for using TMT bars in lieu of fusio 12/19/2019 02-01-2020/16-01-2020 SO-P2-0416,ROC-0320
216 12/16/2019 12/17/2019 MSRDC-YCEWML-114-2019-7708 Regarding Proposal for engagement of consultant as "Author 12/24/2019 2/1/2020 SO-P2-0495
217 12/17/2019 12/17/2019 MSRDC-YCEWML-26-2018-Part XIII-2019-7734 Letter regarding Interim Extension of Time for the schedule 12/24/2019 NA
218 12/17/2019 12/17/2019 MSRDC-YCEWML-26-2018-Part XIII-2019-7735 Letter regarding change of scope for service road changes 12/24/2019 NA
219 12/17/2019 12/17/2019 MSRDC-YCEWML-25-2018-Part VIII-2019-7736 Letter regarding providing details of lead cost for muck disp 12/24/2019 30-12-2019/06-01-2020/11-02-2020 ROC-0300/0308/0351
220 12/19/2019 12/19/2019 MSRDC-YCEWML-26-2018-Part XIII-2019-7765 Regarding submission of Minutes Of Meeting. 12/26/2019 Pending
221 12/19/2019 12/19/2019 MSRDC-YCEWML-26-2018-Part XIII-2019-7766 Regarding slow progress of I - Girder Casting 12/26/2019 NA
222 12/19/2019 12/19/2019 MSRDC-YCEWML-26-2018-Part XIII-2019-7767 Regarding submission of drawing as per time period mention 12/26/2019 Pending
223 12/21/2019 12/21/2019 MSRDC-YCEW-64-2016-part IV-2019-7813 Regarding First Appeal hearing held on 07.01.2020 12/28/2019 NA
224 12/23/2019 12/24/2019 MSRDC-YCEWML-26-2018-Part XII-2019-7831 Regarding HDPE Sheathing Pipes 12/31/2019 1/20/2020 ROC-0297
225 1/1/2020 1/2/2020 MSRDC-YCEWML-26 & 25-2018-Part XII-2020-20 Change of designation of Authorities 1/9/2020 2/10/2020 SO-P2-0509
226 1/2/2020 1/3/2020 MSRDC-YCEWML-25-2018-part-VII-2020-31 Letter regarding work process from Singhgad institute to Kha 1/10/2020 NA
227 1/2/2020 1/3/2020 MSRDC-YCEWML-26-2018-Part XIII-2019-30 Letter regarding detail report for crack developed by blastin 1/10/2020 1/4/2020 ROC-0305
228 12/31/2019 1/3/2020 MSRDC-YCEWML-26-2018-Part XIII-2019-24 Letter regarding delay in submission of drawings and design 1/10/2020 1/8/2020 SO-P2-0427
229 1/3/2020 1/3/2020 MSRDC-YCEWML-71-2016-part II-2020-80 Joint Inspection on 12.01.2020 at Dongargaon 1/10/2020 NA
230 1/4/2020 1/4/2020 MSRDC-YCEWML-26-2018-Part XIV-2020-97 Regarding Reinforcing bar couplers 1/11/2020 1/17/2020 ROC-0324
231 1/4/2020 1/4/2020 MSRDC-YCEWML-26-2018-part-XI-2020-111 Regarding delay in tree felling within Viaduct 1 & viaduct 2 1/11/2020 NA
232 1/8/2020 1/9/2020 MSRDC-YCEWML-26-2018-Part XIV-2020-199 Letter regarding non compliance to the condition 1/16/2020 1/17/2020 SO-P2-0449
233 1/8/2020 1/9/2020 MSRDC-YCEWML-112-2019-2020-194 Regarding Sifting of Electric Cable 22Kv Newly Detected 1/16/2020 NA
234 1/8/2020 1/9/2020 MSRDC-YCEWML-112-2019-2020-195 Regarding Sifting of Electric Cable 22Kv Newly Detected 1/16/2020 NA
235 1/9/2020 1/9/2020 MSRDC-YCWML-17-2018-part-VI-2020-219 Regarding Approval of cv's 1/16/2020 20-01-2020/19-02-2020 ROC-0322/0363
236 5/6/2019 1/10/2020 MSRDC-02-ENVT-Missing Link-3000 For URGENT Compliance regarding Consent to Establishment f 1/17/2020 17-01-2020/14-01-2020/18-01-2020/0 SO-P2-0449/ROC-0317/SO-P1-0261/SO-P2-0499
237 1/10/2020 1/10/2020 MSRDC-YCEWML-26-2018-Part XIV-2020-249 Letter regarding handing over of Right of Way 1/17/2020 Pending
238 1/14/2020 1/14/2020 MSRDC-YCEWML-71-2019-2020-331 Letter regarding handing over of casting yard land at chavani 1/21/2020 NA
239 1/15/2020 1/15/2020 MSRDC-YCEWML-25-2018-part-IX-2020-385 सिंहगड इंन्स्टिट्युट (कु सगाव बु.) ते खालापूर येथे सुरु असलेल्या कामाबाबत 1/22/2020 NA
240 1/15/2020 1/16/2020 MSRDC-YCEWML-71-2019-2020-375 Temporary permission for casting yard at Viaduct 2 1/23/2020 Pending
241 1/18/2020 1/20/2020 MSRDC-YCEWML-26-2018-Part XIII-2020-477 Regarding Handing over available ROW 1/27/2020 21-01-2020/24-01-2020 ROC-0329/SO-P1-0266
242 1/21/2020 1/21/2020 MSRDC-YCEWML-25-2018-Part VIII-2020-531 Letter regarding Consent to Establishment for Construction of 1/28/2020 NA
243 1/21/2020 1/21/2020 MSRDC-YCEWML-25-2018-Part VIII-2020-530 Letter regarding submit the compliance of the Environment 1/28/2020 NA
244 1/21/2020 1/22/2020 MSRDC-YCEW-64-2016-part IV-2020-532 Regarding First Appeal hearing held on 29.01.2020 1/29/2020 NA
245 1/22/2020 1/24/2020 MSRDC-YCEWML-26-2018-Part XIV-2020-571 Letter regarding dismenteling of existing electrical utility 1/31/2020 NA
246 1/24/2020 1/24/2020 MSRDC-YCEWML-17-2018-part VI-2020-612 Letter regarding demobilization of staff and extension of ma 1/31/2020 NA
247 1/28/2020 1/28/2020 MSRDC-YCEWML-25-2018-Part IX-2020-668 Letter regarding rent for land at Kusgaon 2/4/2020 NA
248 1/28/2020 1/29/2020 MSRDC-YCEWML-25-2018-Part-VIII-2019-703 Letter regarding royalty payment 2/5/2020 NA
249 1/28/2020 1/29/2020 MSRDC-YCEWML-26-Part-IX-2019-704 Letter 2/5/2020 NA
250 1/31/2020 2/3/2020 MSRDC-YCEWML-26-2018-Part-XIV-2020-775 Regarding Rejection of post tensioned I girder 20.7Mtr lengt 2/10/2020 Pending
251 2/1/2020 2/3/2020 MSRDC-YCEWML-26-2018-Part XV-2020-792 Letter regarding improvement of work quality 2/10/2020 NA
252 2/1/2020 2/3/2020 MSRDC-YCEWML-26-2018-Part XV-2020-793 Letter regarding poor Quality Workmanship and Negligence i 2/10/2020 NA
253 2/1/2020 2/3/2020 MSRDC-YCEWML-26-2018-Part XV-2020-788 Letter regarding Augmentation of toll plazas at Khalapur, T 2/10/2020 2/12/2020 ROC-0352
254 2/4/2020 2/5/2020 MSRDC-YCEWML-26-2018-Part XV-2020-860 Regarding damaging MSRDC properties (Informatory Boards and 2/12/2020 NA
255 2/4/2020 2/5/2020 MSRDC-YCEWML-26-2018-Part-XV-2020-861 Regarding interest on delayed payment. 2/12/2020 NA
256 2/4/2020 2/5/2020 MSRDC-YCEWML-26-2018-Part XV-2020-862 Regarding Non Conformance Report (NCR) Non compliance of 2/12/2020 NA
257 2/4/2020 2/5/2020 MSRDC-YCEWML-71-2019-2020-863 Regarding handing over of casting yard land at Chavani villag 2/12/2020 NA
258 2/4/2020 2/5/2020 MSRDC-YCEWML-25-2018-Part VIII-2019-864 Regarding site observation / Non compliance at Adit I and Tu 2/12/2020 NA
259 2/5/2020 2/5/2020 MSRDC-YCEWML-26-2018-Part XIV-2020-872 regarding submission of design and drawings 2/12/2020 Pending
260 2/5/2020 2/7/2020 MSRDC-YCEWML-17-2018-Part-VI-2020-921 Letter regarding appointment of Typist for Authority 2/14/2020 NA
261 2/11/2020 2/11/2020 MSRDC-YCEWML-26-2018-part-XV-2020-996 Regarding reinforcement bar coupler 2/18/2020 2/19/2020 SO-P2-0529
262 2/11/2020 2/12/2020 MSRDC-YCEWML-26-2018-Part-XV-2020-1030 Regarding Traffic closure for laying of new electric line (22K 2/19/2020 NA
263 2/13/2020 2/14/2020 MSRDC-YCEWML-15-2018-Part-V-2020-1092 Letter regarding consent to establishment and Environmenta 2/21/2020 2/26/2020 ROC-0377
264 2/13/2020 2/14/2020 MSRDC-YCEWML-17-2018-Part-IV-2020-1093 Letter regarding Presentation on Review of Tunnel Design on 2/21/2020 NA
265 2/13/2020 2/14/2020 MSRDC-YCEWML-26-2018-Part-XV-2020-1100 Regarding deployment of of Supervisor / Engineer. 2/21/2020 NA
266 2/13/2020 2/14/2020 MSRDC-YCEWML-25-2018-Part-IX-2020-1099 Regarding additional land required at T1 End & T2 Start. 2/21/2020 NA
267 2/17/2020 2/18/2020 MSRDC-YCEWML-73-2019-2020-1252 Regarding Landscaping and tree plantation. 2/25/2020 NA
268 2/24/2020 2/25/2020 MSRDC-YCEWML-80-2019-2020-1348 Letter regarding tree felling permission at starting of Tunne 3/3/2020 NA
269 2/25/2020 2/25/2020 MSRDC-YCEWML-25-2018-Part VIII-2019-1373 Letter regarding crossing of GAIL pipeline 3/3/2020 NA
270 2/25/2020 2/26/2020 MSRDC-YCEWML-17-2018-Part-VI-2020-1383 Letter regarding approval of CV of Mr. Parvaze Bhatt 3/4/2020 3/5/2020 ROC-0384
271 2/27/2020 2/28/2020 MSRDC-YCEWML-112-2019-2020-1448 Regarding estimate verification. 3/6/2020 3/7/2020 ROC-0386
272 2/27/2020 2/28/2020 MSRDC-YCEWML-26-2018-Part-XV-2020-1452 Regarding delay in tree felling at viaduct 1( starting of tunnel 3/6/2020 NA
273 3/2/2020 3/3/2020 MSRDC-YCEWML-26-2018-part XV-2020-1541 Letter regarding appointment of Typist 3/10/2020 NA
274 3/5/2020 3/6/2020 MSRDC-YCEWML-25-2018-part-IX-2020-1625 Regarding intimation of blasting work for adit-2 tunnel at Gu 3/13/2020 NA
275 3/6/2020 3/7/2020 MSRDC-YCEWML-26-2018-Part-XVII-2020-1629 Regarding use of Regular TMT bars in lieu of Fusion Bonded 3/14/2020 NA
276 3/6/2020 3/7/2020 MSRDC-YCEWML-26-2018-part-XV-2020-1664 Letters regarding process of work and facilities provided 3/14/2020 NA
277 3/6/2020 3/7/2020 MSRDC-YCEWML-26-2018-Part-XV-2020-1665 Regarding process of work 3/14/2020 NA
278 3/9/2020 3/11/2020 MSRDC-YCEWML-17-2018-Part-VI-2020-1688 Letter regarding permission for carrying out drone shooting 3/18/2020 NA
279 3/12/2020 3/12/2020 MSRDC-YCEWML-130-2020-1748 Letter regarding change of scope for Adit II 3/19/2020 Pending DCK/RWAGH
280 3/12/2020 3/13/2020 MSRDC-YCEWML-26-2018-Part-XVII-2020-OUT.REG-733 Regarding issuing of metal beam crash barrier. 3/20/2020 NA
281 3/16/2020 3/17/2020 MSRDC-YCEWML-133-2020-1800 Regarding shifting of sewer drainage line from proposed RO 3/24/2020 NA
282 3/16/2020 3/17/2020 MSRDC-YCEWML-133-2020-1849 Regarding shifting of waste water pipeline. 3/24/2020 NA
283 3/16/2020 3/17/2020 MSRDC-YCEWML-133-2020-1850 Regarding shifting of waste water pipeline. 3/24/2020 NA
284 3/17/2020 3/18/2020 MSRDC-YCEWML-26-2018-Part-XVI-2020-1902 Regarding Health, hygiene and Novel Corona virus preventiv 3/25/2020 NA
285 3/18/2020 3/19/2020 MSRDC-YCEWML-26-Part XVIII-2020-1928 Meeting scheduled on 24.03.2020 at 3.00 P.M in MSRDC offi 3/26/2020 NA
286 3/17/2020 3/21/2020 MSRDC-YCEWML-133-2020-1864 Regarding shifting of jio communication tower. 3/28/2020 NA
INCOMING MAIL FROM NAVAYUGA
Sr. No. Date of Letter Received Date Letter No. Subject Action to be takeAction Taken Outgoining Letter No. Remarks
1 3/12/2019 3/12/2019 NEC-MPEW/2018-19-041 Tunnel 2 end point merging details 3/19/2019 3/15/2019 SO-P1-0011
2 3/12/2019 3/12/2019 NEC-MPEW/2018-19-042 Requesting for the trees falling 3/19/2019 NA NA
3 3/14/2019 3/13/2019 NEC-MPEW-2018-19-043 Appointment of the safety consultant 3/20/2019 NA NA
4 3/18/2019 3/19/2019 NEC-MPEW/2018-19-044 Detailed Traffic Management Plan- Stage-I – Reg 3/26/2019 20-03-2019/26SO-P1-0015/39
5 3/20/2019 3/21/2019 NEC-MPEW-2018-19-045 Requesting for the trees falling 3/28/2019 NA NA
6 3/23/2019 3/23/2019 NEC-MPEW-2018-19-046 Pune Expresway-Reg 3/30/2019 3/24/2019 SO-P1-0016
7 3/29/2019 3/29/2019 NEC-MPEW-2018-19-048 Submission of credentials of Admixture suppliers- Reg. 4/5/2019 4/3/2019 SO-P1-0019 Mr.Amit Priyadarshi
8 3/30/2019 3/30/2019 NEC-MPEW-2018-19-049 Geological-geotechnical hazard and monitoring plan-reg. 4/6/2019 09-04-2019/ 1 SO-P1-0024/26
9 3/30/2019 3/30/2019 NEC-MPEW-2018-19-050 Environmental Management plan-reg. 4/6/2019 4/10/2019 SO-P1-0027
10 3/30/2019 3/30/2019 NEC-MPEW-2018-19-051 Submission of revised safety & traffic management plan-reg. 4/6/2019 4/15/2019 SO-P1-0029
11 4/1/2019 4/1/2019 NEC-MPEW-2018-19-052 Submission of blasting design 4/8/2019 4/3/2019 SO-P1-0021,23 Mr.Rahul Wagh
12 4/1/2019 4/2/2019 NEC-MPEW-2018-19-053 Submission of construction program -Reg 4/9/2019 4/3/2019 SO-P1-0022
13 4/3/2019 4/3/2019 NEC-MPEW-2018-19-054 Submission of detailed design for portal and open cut of T-2 and Adit-Reg. 4/10/2019 4/17/2019 SO-P1-0031
14 4/4/2019 4/8/2019 NEC-MPEW-2018-19-055 Revision of work program-Reg. 4/15/2019 4/10/2019 SO-P1-0028
15 4/15/2019 4/17/2019 NEC-MPEW-2018-19-058 Requesting for handing over of ROW, Muck disposal area and portal areas-Reg. 4/24/2019 16-04-2019/23SO-P1-0030/0137/0303
16 4/10/2019 4/17/2019 NEC-MPEW-2018-19-056 Submission of test report for mix design-Reg. 4/24/2019 4/18/2019 SO-P1-0032
17 4/17/2019 4/18/2019 NEC-MPEW-2018-19-059 Submitting details of key persons of IIT's for approval of proof consultants-Reg. 4/25/2019 NA
18 4/17/2019 4/18/2019 NEC-MPEW-2018-19-060 Request for handing over ROW, Muck Disposal area and portal areas-Reg. 4/25/2019 5-12-2019/12- ROC-0270/ROC-0282
19 4/20/2019 4/23/2019 NEC-MPEW-2018-19-067 Resubmission of proposal for appointment of a proof check consultant-Reg. 4/30/2019 4/25/2019 SO-P1-0038
20 4/20/2019 4/23/2019 NEC-MPEW-2018-19-063 Submission of BIM Sub-Contractor Credentials of Package-I 4/30/2019 4/23/2019 SO-P1-0036
21 4/20/2019 4/23/2019 NEC-MPEW-2018-19-064 Submission of Traffic Diversion, Muck Disposal & Safety Measures Plan At T-2 Exit of our MPEW Proj4/30/2019 23-04-2019/26SO-P1-0034/39
22 4/20/2019 4/23/2019 NEC-MPEW-2018-19-065 Submission of the key personnel details for the project-Reg. 4/30/2019 NA
23 4/20/2019 4/23/2019 NEC-MPEW-2018-19-066 Submission of major equipment details-(plan vs available at site)-Reg. 4/30/2019 4/23/2019 SO-P1-0035
24 4/20/2019 4/23/2019 NEC-MPEW-2018-19-068 Submission of detailed organization chart-Reg. 4/30/2019 NA
25 4/17/2019 4/23/2019 NEC-MPEW-2018-19-061 Credentials of NABL Accredited third party testing & calibration laboratory for QA/QC purpose-Reg. 4/30/2019 4/22/2019 SO-P1-0033
26 4/20/2019 4/23/2019 NEC-MPEW-2018-19-062 Submission of revised final design report tunnel-Reg. 4/30/2019 5/3/2019 SO-P1-0041
27 4/24/2019 4/26/2019 NEC-MPEW-2018-19-069 Request for dismantling of crash barriers and chain link fencing-Reg. 5/3/2019 25-04-
NA
2019/02-05-
NEC-MPEW-2018-19-024 Review of vendor credentials kunal admixture 2019/09-05-
28 2019/13-05- SO-P1-0037/40/43/46/65
2019/28-05-
29 4/26/2019 4/27/2019 NEC-MPEW-2018-19-070 Submission of revised enviromental mamangement plan-Reg. 5/4/2019 NA
2019
30 4/27/2019 4/30/2019 NEC-MPEW-2018-19-071 RTI of Shri.Sanjay Ramesh Shirodkar regarding contractors all risk policy and workman compensation5/7/2019 NA
31 4/28/2019 4/30/2019 NEC-MPEW-2018-19-072 Submission of muck disposal plan at pimpaloli village -Reg. 5/7/2019 5-12-2019/12- ROC-0270/ROC-0282
32 5/2/2019 5/6/2019 NEC-MPEW-2018-19-073 Consent letter for Muck Dsposal at MADAP land-Reg. 5/13/2019 5-12-2019/12- ROC-0270/ROC-0282
33 5/4/2019 5/6/2019 NEC-MPEW-2018-19-074 Credentials of NABL Accredited third party testing & calibration laboratory for QA/QC purpose-Reg. 5/13/2019 5/27/2019 SO-P1-0061
34 5/9/2019 5/9/2019 NEC-MPEW-2018-19-075 Removing of Tree from Ch:12+300 to 12+670-Reg. 5/16/2019 NA
35 5/9/2019 5/10/2019 NEC-MPEW-2018-19-077 Letter Regarding non-usage of additions to cement - Reg. 5/17/2019 NA Mr.Amit Priyadarshi
36 5/13/2019 5/13/2019 NEC-MPEW-2018-19-081 Submission of Construction water test report - Reg. 5/20/2019 5/13/2019 SO-P1-0048
37 5/11/2019 5/13/2019 NEC-MPEW-2018-19-079 Submission of Credentials of Macro Synthetic Fibre Suppliers - Reg. 5/20/2019 13-05-2019/28SO-P1-0047/SO-P1-0066/ROC-0220
38 5/11/2019 5/13/2019 NEC-MPEW-2018-19-080 Submission of Cement capsule and Resin capsule suppliers - Reg. 5/20/2019 13-05-2019/28SO-P1-0047/SO-P1-0067
39 5/11/2019 5/13/2019 NEC-MPEW-2018-19-078 Reply to Comments on Design Report-reg 5/20/2019 5/17/2019 SO-P1-0053
40 5/13/2019 5/13/2019 NEC-MPEW-2018-19-082 Submission of Credentials of Admixture Suppliers - Reg. 5/20/2019 13-05-2019/31SO-P1-0047/SO-P1-0070
41 5/14/2019 5/16/2019 NEC-MPEW-2018-19-083 Submission of Details of Temporary Ventilation Systems-Reg. 5/23/2019 5/18/2019 SO-P1-0054
42 5/20/2019 5/20/2019 NEC-MPEW-2018-19-084 Safety Specialist Weekly Site Safety Inspection Report 5/27/2019 NA Mr.Srikanth For Record
43 5/21/2019 5/22/2019 NEC-MPEW-2018-19-085 Additional land reqired for permanent diversion road at tunnel 5/29/2019 5/22/2019 ROC-0068
44 5/23/2019 5/23/2019 NEC-MPEW-2018-19-086 Safety Specialist Weekly Site Safety Inspection Report-Reg. 5/30/2019 NA Mr.Srikanth For Record
45 5/23/2019 5/24/2019 NEC-MPEW-2018-19-087 Safety Specialist Weekly Site Safety Inspection Report-Reg. 5/31/2019 NA Mr.Srikanth For Record
46 5/23/2019 5/24/2019 NEC-MPEW-2018-19-088 Submission of Method Statement for Geological Mapping and Probing-Reg 5/31/2019 5/27/2019 SO-P1-0064
47 5/23/2019 5/23/2019 NEC-MPEW-2018-19-089 Submission of Monsoon Preparedness required on top priority - Reg. 5/30/2019 NA
48 5/24/2019 5/24/2019 NEC-MPEW-2018-19-090 Submission of Blasting permission and Blasters - Reg. 5/31/2019 NA Mr.Gagan Sharma/Mr.Srikanth
49 5/24/2019 5/25/2019 NEC-MPEW-2018-19-091 Submission of MS for Trial Statement - Reg. 6/1/2019 Pending LPS/Tunnel Team
50 5/25/2019 5/25/2019 NEC-MPEW-2018-19-092 Submission of SLD and Motor IP Ratings for Temporary Ventilation Systems - Reg. 6/1/2019 5/29/2019 SO-P1-0069
51 5/28/2019 5/28/2019 NEC-MPEW-2018-19-093 Method Statement for Trial Shotcrete - Reg. 6/4/2019 5/28/2019 SO-P1-0068
52 5/29/2019 5/29/2019 NEC-MPEW-2018-19-094 Submission of 3 Months Program - Reg. 6/5/2019 6/1/2019 SO-P1-0071
53 5/30/2019 5/31/2019 NEC-MPEW-2018-19-095 Submission of Third Laboratory drinking water test report sourced from camp site - Reg. 6/7/2019 6/4/2019 SO-P1-0074
54 5/30/2019 5/31/2019 NEC-MPEW-2018-19-096 Submission of chemical tests for Coarse Aggregate and petrographic test - Reg. 6/7/2019 6/4/2019 SO-P1-0075
55 5/30/2019 5/31/2019 NEC-MPEW-2018-19-097 Submission of credentials of Macro Synthetic Fibre suppliers - Reg. 6/7/2019 Pending Mr.Amit Priyadarshi
56 5/31/2019 5/31/2019 NEC-MPEW-2018-19-098 Discrepancies at T-2 End from Dongargaon Villagers 6/7/2019 Pending LPS
57 6/1/2019 6/1/2019 NEC-MPEW-2018-19-099 Submisson of T2 EXIT TRAFFIC DIVERSION PLAN and SAFETY MEASURES PLAN STAGE - 1 with sign boa6/8/2019 NA Mr.Srikanth For Record
58 6/5/2019 6/6/2019 NEC-MPEW-2018-19-100 Submission of Monthly Progress Report-Reg. 6/13/2019 Pending LPS/Tunnel Team
59 6/7/2019 6/8/2019 NEC-MPEW-2018-19-102 Regarding Balance Advance Payment 6/15/2019 6/8/2019 ROC-0077
60 6/9/2019 6/10/2019 NEC-MPEW-2018-19-104 Submission of Single Line Diagram for DG at T-2 End 6/17/2019 6/21/2019 SO-P1-0087
61 6/8/2019 6/10/2019 NEC-MPEW-2018-19-103 Submission of Revised Method Statement for Geological Mapping and Probing 6/17/2019 25-06-2019/04SO-P1-0092/SO-P1-0103
62 6/14/2019 6/15/2019 NEC-MPEW-2018-19-107 RTI of Employment Generation for Locals-Reg. 6/22/2019 NA
63 6/14/2019 6/15/2019 NEC-MPEW-2018-19-108 Submission of Geological Mapping and description of left wall at T-2 Approach Cut-Reg. 6/22/2019 8/9/2019 SO-P1-0130
64 6/12/2019 6/15/2019 NEC-MPEW-2018-19-105 Submission of 25mm TMT Bar Mechanical & Chemical Test Report. 6/22/2019 9/20/2019 SO-P1-0165 Mr.Badrinarayan
65 6/15/2019 6/15/2019 NEC-MPEW-2018-19-110 Method Statement for Rockbolting 6/22/2019 6/22/2019 SO-P1-0088
66 6/15/2019 6/15/2019 NEC-MPEW-2018-19-111 Method Statement for Shotcrete 6/22/2019 6/22/2019 SO-P1-0089
67 6/18/2019 6/19/2019 NEC-MPEW-2018-19-116 Request for Havells Factory Inspection 6/26/2019 Pending Mr.Subramani V.
68 6/18/2019 6/19/2019 NEC-MPEW-2018-19-117 Submission of Technical Design Report for Tunnel Electrification System-Reg. 6/26/2019 7/8/2019 SO-P1-0104
69 6/18/2019 6/19/2019 NEC-MPEW-2018-19-118 Proposal for Altering Payment Procedure of Tunnel Equipments 6/26/2019 6/21/2019 ROC-0096
70 6/19/2019 6/20/2019 NEC-MPEW-2018-19-120 Submission of Revised QAP 6/27/2019 6/22/2019 SO-P1-0091
71 6/18/2019 6/19/2019 NEC-MPEW-2018-19-119 Submission of BOQ along with Price Break for external power supply -Reg. 6/26/2019 21-06-2019/04SO-P1-0085/SO-P1-0100
72 6/21/2019 6/22/2019 NEC-MPEW-2018-19-122 Submission of Core & Cube Test Reports 6/29/2019 Pending Mr.Amit Priyadarshi
73 6/21/2019 6/22/2019 NEC-MPEW-2018-19-124 Submission of BOQ along with Price Breakup for External Power Supply 6/29/2019 7/4/2019 SO-P1-0100
74 6/21/2019 6/22/2019 NEC-MPEW-2018-19-123 Submission of ELV System Technical Report 6/29/2019 7/4/2019 SO-P1-0101
75 6/17/2019 6/24/2019 NEC-MPEW-2018-19-115 Submission of Vibration Report at Tunnel-II Exit Approach Cut-Reg. 7/1/2019 Pending Mr.Gagan Sharma/Mr.Rahul Samnotra/Ajay Patel
76 6/22/2019 6/24/2019 NEC-MPEW-2018-19-127 Submission of Traffic Diversion, Muck Disposal & Safety Measures Plan at T-2 End -Reg 7/1/2019 NA Mr.Srikanth For Record
77 6/22/2019 6/24/2019 NEC-MPEW-2018-19-128 Safety Specialist Joint inspection report-Reg 7/1/2019 NA Mr.Srikanth For Record
78 6/24/2019 6/24/2019 NEC-MPEW-2018-19-131 Submission of BIM Execution plan for our MPEW Project Package-I, Lonavala 7/1/2019 Pending Mr.Hichem Zammit/Mr.D.Chakrabarty
79 6/24/2019 6/25/2019 NEC-MPEW-2018-19-129 Submission of Vibration Report at Tunnel-II Exit Approach Cut-Reg. 7/2/2019 7/1/2019 SO-P1-0098
80 6/25/2019 6/25/2019 NEC-MPEW-2018-19-132 Non-compliance of work as per CA and poor work quality. 7/2/2019 7/1/2019 SO-P1-0093
81 6/25/2019 6/25/2019 NEC-MPEW-2018-19-134 Tree cutting & Handing over of Site 7/2/2019 Pending Mr.Srinivasarao Koppolu/Mr.Ajay Patel
82 6/25/2019 6/25/2019 NEC-MPEW-2018-19-133 Compliance to Safety Specialist Joint inspection report 7/2/2019 NA Mr.Srikanth For Record
83 6/25/2019 6/25/2019 NEC-MPEW-2018-19-130 Regarding Submission of approved detailed Design for Dongargaon Village 7/2/2019 7/13/2019 SO-P1-0108
84 6/22/2019 6/26/2019 NEC-MPEW-2018-19-126 Resubmission of Test Reports for Mix Design for our MPEW Project Package-I 7/3/2019 29-06-2019/04SO-P1-0095,96,102
85 6/26/2019 6/27/2019 NEC-MPEW-2018-19-135 Submission of Power of Attorney of Mr. K.Anil Kumar for our MPEW project, Package-I 7/4/2019 NA Mr.Ravindra Lokhande
86 7/1/2019 7/1/2019 NEC-MPEW-2018-19-136 Regarding Safety Precautions & Medical Arrangements-Reg. 7/8/2019 NA Mr.Srikanth For Record
87 7/1/2019 7/2/2019 NEC-MPEW-2018-19-137 Submission of Revised Environmental Management Plan-Reg. 7/9/2019 7/15/2019 SO-P1-0111
88 7/1/2019 7/2/2019 NEC-MPEW-2018-19-138 Submission of Revised Health and Safety Plan-Reg. 7/9/2019 7/9/2019 SO-P1-0105
89 7/1/2019 7/2/2019 NEC-MPEW-2018-19-139 Submission of Billing Breakup of Schedule -H &RA Bill Format for our MPEW Project-Package-I-Reg 7/9/2019 7/9/2019 SO-P1-0106
90 7/5/2019 7/5/2019 NEC-MPEW-2018-19-140 Revised Method Statement for RockBolts and Comments Sheet-Reg. 7/12/2019 Pending Mr.Srinivasarao Koppolu/Mr.Ajay Patel
91 7/5/2019 7/6/2019 NEC-MPEW-2018-19-141 Revised Method Statement for Shotcrete and comments sheet-Reg. 7/13/2019 Pending Mr.Srinivasarao Koppolu/Mr.Ajay Patel
92 7/5/2019 7/6/2019 NEC-MPEW-2018-19-142 Submission of Method Statement for Wire Mesh-Reg. 7/13/2019 Pending Mr.Srinivasarao Koppolu/Mr.Ajay Patel
93 7/6/2019 7/6/2019 NEC-MPEW-2018-19-143 Submission of Geological Mapping of Portal Slope and Right Wall at T-2 Exit 7/13/2019 7/13/2019 SO-P1-0110
94 7/9/2019 7/10/2019 NEC-MPEW-2018-19-145 MPR of June-2019 7/17/2019 Pending Mr.Gagan Sharma/Mr.Rahul Samnotra
95 7/10/2019 7/10/2019 NEC-MPEW-2018-19-146 Submission of updated Geological Mapping of Portal Slope and Right Wall at T-2 Exit -Reg. 7/17/2019 7/13/2019 SO-P1-0110
96 7/13/2019 7/13/2019 NEC-MPEW-2018-19-147 Submission of Revised ELV Systems Technical Report -Reg 7/20/2019 7/29/2019 SO-P1-0120
97 7/15/2019 7/16/2019 NEC-MPEW-2018-19-148 Material test witness at third party lab-Reg 7/23/2019 Pending Mr.Amit Priyadarshi
98 7/17/2019 7/18/2019 NEC-MPEW-2018-19-150 Submission of Proposal for Access Road for T-1 Entry- Reg 7/25/2019 Pending Mr.Srinivasarao Koppolu/Mr.Ajay Patel
99 7/18/2019 7/18/2019 NEC-MPEW-2018-19-151 Submission of three months construction program 7/25/2019 7/23/2019 SO-P1-0112
100 7/18/2019 7/20/2019 NEC-MPEW-2018-19-152 Revised Traffic Management Plan 7/27/2019 7/23/2019 SO-P1-0114
101 7/19/2019 7/22/2019 NEC-MPEW-2018-19-153 Submission of Geological Mapping of Portal Slope and Left Wall at T-2 Exit 7/29/2019 7/24/2019 SO-P1-0116
102 7/23/2019 7/23/2019 NEC-MPEW-2018-19-154 Submission of DGPS Survey & Traversing Report 7/30/2019 29-07-2019/26SO-P1-0117/SO-P1-0118/SO-P1-0238
103 7/22/2019 7/24/2019 NEC-MPEW-2018-19-155 Handing Over of Required Land and permission for tree cutting 7/31/2019 8/9/2019 SO-P1-0129
104 7/24/2019 7/24/2019 NEC-MPEW-2018-19-156 Submission of Machinery Safety Inspection Report-Reg. 7/31/2019 NA Mr.Subramani V. For Information
105 7/26/2019 7/26/2019 NEC-MPEW-2018-19-158 Submission of Method Statement for Forepoling-Reg. 8/2/2019 7/29/2019 SO-P1-0121
106 7/26/2019 7/26/2019 NEC-MPEW-2018-19-160 Submission of Construction Program of our MPEW Project- Package-I- Reg 8/2/2019 8/1/2019 SO-P1-0123 V.Chinchore,Gagan Sharma,Ajay Patel,Mayank B.
107 7/26/2019 7/26/2019 NEC-MPEW-2018-19-161 Submission of Credentials of Cement and Resin Capsule Suppliers-Reg. 8/2/2019 10/25/2019 ROC-0219 Mr.Badrinarayan
108 7/26/2019 7/27/2019 NEC-MPEW-2018-19-162 Submission of Method Statement for Geological Mapping and Probing-Reg. 8/3/2019 8/1/2019 SO-P1-0122
109 7/26/2019 7/29/2019 NEC-MPEW-2018-19-159 Submission of Detailed Approved Design for Dongargaon Village-Reg. 8/5/2019 7/29/2019 ROC-0144
110 7/28/2019 7/29/2019 NEC-MPEW-2018-19-163 Regarding Schedule-Q Facilities to be provided to Authority & Authority Engineer 8/5/2019 8/30/2019 SO-P1-0148
111 7/29/2019 7/29/2019 NEC-MPEW-2018-19-164 Survey Data Requirement 8/5/2019 NA Mr.Rakesh Rathor
112 7/30/2019 7/30/2019 NEC-MPEW-2018-19-165 Submission of Mapping of Portal Slope and Left Wall at T-2 Exit-Reg. 8/6/2019 8/7/2019 SO-P1-0124
113 8/2/2019 8/2/2019 NEC-MPEW-2018-19-166 Compliance of AE Site Electrical Inspection Report-Reg. 8/9/2019 NA
114 8/2/2019 8/2/2019 NEC-MPEW-2018-19-167 Compliance of AE Safety Specialist Joint Inspection Report-Reg. 8/9/2019 NA
115 8/2/2019 8/2/2019 NEC-MPEW-2018-19-168 Compliance of AE Safety Specialist Joint Inspection Report-Reg. 8/9/2019 NA
116 8/2/2019 8/3/2019 NEC-MPEW-2018-19-169 Credentials of ACC Cement Limited (Cement OPC 53 Grade)-Reg. 8/10/2019 Pending
117 8/3/2019 8/6/2019 NEC-MPEW-2018-19-170 Submission of Detailed Tunnel - 2 Exit Drawings-Reg. 8/13/2019 8/27/2019 SO-P1-0144 Mr.Srnivasarao Koppolu
118 8/4/2019 8/6/2019 NEC-MPEW-2018-19-171 Submission of Third Party Certificate for Lifting Tools and Tackles_Reg. 8/13/2019 Pending
119 8/8/2019 8/9/2019 NEC-MPEW-2018-19-172 Submission of Geological Mapping of Left Wall at T-2 Exit - Reg. 8/16/2019 8/9/2019 SO-P1-0131
120 8/9/2019 8/9/2019 NEC-MPEW-2018-19-174 Submission of Method Statement for Survey and Measurement in Tunnels-Reg. 8/16/2019 8/26/2019 SO-P1-0140
121 8/9/2019 8/9/2019 NEC-MPEW-2018-19-175 Review of Construction Program-Reg 8/16/2019 Pending
122 8/9/2019 8/9/2019 NEC-MPEW-2018-19-176 Tree Cutting Permission for Balance Portion of T-2 End-Reg 8/16/2019 Pending
123 8/8/2019 8/9/2019 NEC-MPEW-2018-19-173 Submission of Vibration Report for the Month of July 19 8/16/2019 Pending
124 8/10/2019 8/13/2019 NEC-MPEW-2018-19-177 Monthly Progress Report for the month of July'19-Reg. 8/20/2019 8/30/2019 SO-P1-0147
125 8/9/2019 8/13/2019 NEC-MPEW-2018-19-178 Submission of method statement for Tunnel Excavation-Reg. 8/20/2019 8/26/2019 SO-P1-0133
126 8/12/2019 8/13/2019 NEC-MPEW-2018-19-179 Primary Support Measures-Reg. 8/20/2019 8/13/2019 SO-P1-0126
127 8/14/2019 8/14/2019 NEC-MPEW-2018-19-181 Handing over of required land and permission for tree cutting-Reg. 8/21/2019 Pending Mr.Debashish Chakrabarty
128 8/12/2019 8/16/2019 NEC-MPEW-2018-19-180 Compliance of Non-Conformance Report (NCR/TNL/001)-Reg. 8/23/2019 8/21/2019 SO-P1-0134
129 8/19/2019 8/26/2019 NEC-MPEW-2018-19-182 Submission of credentials of new Proof Consultant proposed for MPEW Package-I Project-Reg. 9/2/2019 8/21/2019 SO-P1-0135/ROC-0163
130 8/21/2019 8/26/2019 NEC-MPEW-2018-19-183 Submission of WC policy & CAR policy of our MPEW Project, Package-I 9/2/2019 NA Mr.Ravindra Lokhande For Information
131 8/22/2019 8/26/2019 NEC-MPEW-2018-19-184 Consent for Establishment for Construction of Missing Link-Reg. 9/2/2019 NA Mr.Mohammad Akhtar/Mr.SrikantFor Information and record
132 8/24/2019 8/26/2019 NEC-MPEW-2018-19-185 Inadequate Support at T-2 Exit Portal Portion 9/2/2019 9/9/2019 SO-P1-0157
133 8/26/2019 8/26/2019 NEC-MPEW-2018-19-186 Submission of revised observations on ELV Systems Technical Report-Reg 9/2/2019 8/29/2019 SO-P1-0145
134 8/26/2019 8/26/2019 NEC-MPEW-2018-19-187 Submission of complied AE Safety Observations vide SO 132 9/2/2019 NA Mr.Srikanth Aluguri For Information and record
135 8/26/2019 8/26/2019 NEC-MPEW-2018-19-188 Submission of proposed make of ELV equipments-Reg. 9/2/2019 9/10/2019 SO-P1-0159
136 8/26/2019 8/26/2019 NEC-MPEW-2018-19-189 Submission of Blasting Pattern for Half Face and Full face heading-Reg. 9/2/2019 09-09-2019/19SO-P1-0155/0232
137 8/27/2019 8/27/2019 NEC-MPEW-2018-19-190 Submission of Method Statement for Lattice Girder-Reg. 9/3/2019 Pending Mr.Satish Sharma
138 8/27/2019 8/28/2019 NEC-MPEW-2018-19-191 Submission of Replies to Comments on Technical Design Report for Tunnel Electrification System-Re 9/4/2019 03-09-2019/10SO-P1-0150/0159
139 8/27/2019 8/28/2019 NEC-MPEW-2018-19-192 Submission of replies to your comments on Observation on Electrical BOQ-Reg. 9/4/2019 9/3/2019
140 8/28/2019 8/28/2019 NEC-MPEW-2018-19-193 Submission of probe hole data at chainage 12+300 and 12+260.5-Reg. 9/4/2019 8/30/2019
141 8/29/2019 8/29/2019 NEC-MPEW-2018-19-194 Material Test Witness at Third Party Lab 9/5/2019 NA
142 8/30/2019 8/30/2019 NEC-MPEW-2018-19-195 Information about encroachment of forest area at Dasturi village-Reg. 9/6/2019 NA
143 8/31/2019 8/31/2019 NEC-MPEW-2018-19-196 Review and Comments on Monthly Progress Report for the Month of July 19 9/7/2019 Pending Mr.Gagan Sharma/Satish Sharma
144 8/31/2019 8/31/2019 NEC-MPEW-2018-19-197 Regarding Schedule Q facilities 9/7/2019 NA Mr.Ravindra Lokhande/MBW
145 9/3/2019 9/4/2019 NEC-MPEW-2018-19-198 Reply to regarding letter of submission of blasting pattern for half face heading and full face headin 9/11/2019 Pending Mr.Gagan Sharma/Satish Sharma
146 9/4/2019 9/4/2019 NEC-MPEW-2018-19-199 Preventive Action on Near Miss Incident 9/11/2019 NA
147 9/4/2019 9/4/2019 NEC-MPEW-2018-19-200 Monitoring Report for the Month of August 2019 9/11/2019 9/10/2019
148 9/5/2019 9/5/2019 NEC-MPEW-2018-19-201 Submission of Electrical Single Line Diagram for Temporary Ventilation System-Reg. 9/12/2019 9/12/2019
149 9/5/2019 9/5/2019 NEC-MPEW-2018-19-202 Reply to Minutes of Meeting (SO-0154)-Reg. 9/12/2019 Pending Mr.Satish Sharma/Ajay Patel
150 9/9/2019 9/9/2019 NEC-MPEW-2018-19-203 Complied AE Safety Specialist Joint Inspection Report 9/16/2019 NA
151 9/9/2019 9/9/2019 NEC-MPEW-2018-19-204 Submission of Face mapping from Ch:12+300 to 12+209.5-Reg. 9/16/2019 9/11/2019
152 9/10/2019 9/10/2019 NEC-MPEW-2018-19-205 Monthly Progress Report for the month of August'2019-Reg. 9/17/2019 Pending Mr.Gagan Sharma/Satish Sharma
153 9/10/2019 9/10/2019 NEC-MPEW-2018-19-206 Submission of Revised Blasting Pattern 9/17/2019 12/19/2019 SO-P1-0232
154 9/12/2019 9/18/2019 NEC-MPEW-2018-19-207 Submission of Advance Construction Programme for 1 Month & 3 Months-Reg 9/25/2019 Pending Mr.Satish Sharma/Gagan Sharma
155 9/12/2019 9/18/2019 NEC-MPEW-2018-19-208 Reply to Submission of Electrical SLD for Temporary Ventilation System-Reg. 9/25/2019 NA
156 9/14/2019 9/18/2019 NEC-MPEW-2018-19-209 Deposition of 6 months rent for kusgaon land to MSRDC-Reg 9/25/2019 NA
157 9/17/2019 9/18/2019 NEC-MPEW-2018-19-210 Submission of BOQ with Price Breakup with Billing Schedule of ELV systems 9/25/2019 NA Mr.Subramani V.
158 9/20/2019 9/23/2019 NEC-MPEW-2018-19-211 facemapping submission-2 9/30/2019 10/3/2019 Mr.Ajay Patel
159 9/20/2019 9/23/2019 NEC-MPEW-2018-19-212 PROBE HOLE 003 AND 004 9/30/2019 9/30/2019 Mr.Ajay Patel
160 9/23/2019 9/24/2019 NEC-MPEW-2018-19-213 Material Test Witness at Third Party Lab 10/1/2019 10/25/2019 Mr.Badrinarayan
161 9/27/2019 9/28/2019 NEC-MPEW-2018-19-214 Submission of Compliance of AE Safety Specialist Joint Inspection Report-SO-0163-Reg. 10/5/2019 NA
162 9/28/2019 9/28/2019 NEC-MPEW-2018-19-215 Submission of Compliance of AE Safety Specialist Joint Inspection Report-SO-0168-Reg. 10/5/2019 NA
163 9/27/2019 9/28/2019 NEC-MPEW-2018-19-216 Submission of Letter regarding Milestone-I-Reg. 10/5/2019 Pending Mr.Debashish Chakrabarty
164 9/30/2019 10/1/2019 NEC-MPEW-2018-19-217 HT Cable Laying along the Express-way-Reg. 10/8/2019 NA Mr.Subramani V.
165 10/1/2019 10/3/2019 NEC-MPEW-2019-20-218 Request for Kirloskar Factory Visit-Reg 10/10/2019 NA Mr.Subramani V.
166 10/1/2019 10/3/2019 NECL-MSRDC-MPEW-I-IPC-03 Submission of IPC-03 of MPEW Project, Package-I, Lonavala 10/10/2019 11-10-2019/16-10-2019/24-10-2019
167 10/1/2019 10/3/2019 NEC-MPEW-2019-20-219 Additional Land Required at T-1 End & T-2 start-Reg. 10/10/2019 11-10-2019/26SO-P1-0175/ROC-0296
168 10/1/2019 10/3/2019 NEC-MPEW-2019-20-220 Submission of Monthly Monitoring Repoprt for the Month of september 2019-Reg. 10/10/2019 10/4/2019
169 10/1/2019 10/4/2019 NEC-MPEW-2019-20-221 Change of location of entry in Adit - 1-Reg. 10/11/2019 11-10-2019/12ROC-0205/0393
170 10/3/2019 10/4/2019 NEC-MPEW-2019-20-222 Submission of letter regarding Minutes of meeting held on 25.09.2019-Reg. 10/11/2019 10/4/2019
171 10/5/2019 10/7/2019 NEC-MPEW-2019-20-223 Compliance regarding Consent to Establishment for construction of Missing Link-Reg. 10/14/2019 10/14/2019
172 10/5/2019 10/7/2019 NEC-MPEW-2019-20-224 submission of compliance of AE Safety Specialist Joint Inspection Report.-Reg. 10/14/2019 NA Mr.Srikant Aluguri
173 10/7/2019 10/9/2019 NEC-MPEW-2019-20-225 Review comments on submission of letter regarding minutes of meeting held on 25.09.2019 -Reg. 10/16/2019 Pending Mr.Mayank Bhardwaj/Mr.Debashish Chakrabarty
174 10/7/2019 10/9/2019 NEC-MPEW-2019-20-226 Submission of credentials of OPC 53 Grade JSW Cement-Reg. 10/16/2019 10/31/2019 Mr.Badrinarayan
175 10/9/2019 10/11/2019 NEC-MPEW-2019-20-227 Monthly progress report for the month of september 2019-Reg. 10/18/2019 12/19/2019 SO-P1-0233
176 10/9/2019 10/11/2019 NEC-MPEW-2019-20-228 Handing over of muck disposal area at Kusgaon,Waksar and Deoghar-Reg. 10/18/2019 NA Mr.Debashish Chakrabarty/Mr.Suprio Choudhury
177 10/9/2019 10/11/2019 NEC-MPEW-2019-20-229 Submitting the estimate for Forest Information Centre at survey No-296 in Kusgaon (Bk) Village-Reg10/18/2019 NA Mr.Ashok Maan
178 10/9/2019 10/11/2019 NEC-MPEW-2019-20-230 Submission of 7 copies of Registered Contract Agreement-Reg. 10/18/2019 NA Mr.Ravindra Lokhande/Mr.Ashok Gaikar
179 10/11/2019 10/11/2019 NEC-MPEW-2019-20-231 Request for release of RA Bill-03-Reg. 10/18/2019 NA
180 10/12/2019 10/14/2019 NEC-MPEW-2019-20-233 Request for Release of RA Bill - 03-Reg. 10/21/2019 10/18/2019
181 10/17/2019 10/18/2019 NEC-MPEW-2019-20-236 Submission of Compliance of AE Safety Observations vide SO-177-Reg. 10/25/2019 NA
182 10/17/2019 10/18/2019 NEC-MPEW-2019-20-237 Credentials of geophysical survey 10/25/2019 10/24/2019 Mr.Suprio Choudhury
183 10/17/2019 10/18/2019 NEC-MPEW-2019-20-238 Request Letter for Release of RA Bill-03-Reg. 10/25/2019 10/18/2019
184 10/11/2019 10/12/2019 NEC-MPEW-2019-20-232 HT Cable Laying along Expressway-Reg. 10/19/2019 NA Mr.Subramani V.
185 10/17/2019 10/18/2019 NEC-MPEW-2019-20-234 Submission of Test Report for flexural Strength of M30 A10 Grade Shotcrete-Reg. 10/25/2019 11/4/2019 Mr.Badrinarayan/Mr.Satish Sharma
186 10/17/2019 10/18/2019 NEC-MPEW-2019-20-235 Unconfined Compression Strength Test Report-Reg. 10/25/2019 10/24/2019 Mr.Suprio Choudhury
187 10/28/2019 10/30/2019 NEC-MPEW-2019-20-239 Submission of Design Report and Drawings-Reg. 11/6/2019 8-11-2019/13- SO-P1-0192/0196/0227/0280
188 10/30/2019 10/31/2019 NEC-MPEW-2019-20-240 Method statement for open excavation of Adit - I-Reg 11/7/2019 11/13/2019 Mr.Gagan Sharma/Ajay Patel
189 10/31/2019 10/31/2019 NEC-MPEW-2019-20-241 Submit Method Statement for Cross-Passage-Reg. 11/7/2019 NA Mr.Satich Sharma/Mr.Ajay Patel
190 10/31/2019 10/31/2019 NEC-MPEW-2019-20-242 Regarding ELMCB in Electrical Panels-Reg. 11/7/2019 Pending Mr.Subramani V.
191 10/31/2019 10/31/2019 NEC-MPEW-2019-20-243 Submission of compliance of AE Safety Specialist Joint Inspection Report-Reg. 11/7/2019 NA NA Mr.Srikanth Aluguri
192 11/1/2019 11/1/2019 NEC-MPEW-2019-20-244 Dongargaon Villagers claiming compensation for cracks on walls and roof of their houses 11/8/2019 NA NA Mr.Satich Sharma/Mr.Partha Bhattacharya
193 11/4/2019 11/4/2019 NEC-MPEW-2019-20-246 T-I Entry Access Road Proposal-Reg. 11/11/2019 NA NA Mr.Gagan Sharma,Satish Sharma
194 11/5/2019 11/6/2019 NEC-MPEW-2019-20-247 Detailed Contractors All Risk Policy 11/13/2019 NA NA
195 11/5/2019 11/6/2019 NEC-MPEW-2018-19-248 Submission of Blasting Pattern for Cross Passage Tunnel-Reg. 11/13/2019 11/9/2019 SO-P1-0194
196 11/7/2019 11/7/2019 NEC-MPEW-2018-19-249 Submission of credentials of Resin and Cement capsule suppliers (Ramtek)-Reg 11/14/2019 11/14/2019 SO-P1-0200 Mr.Badrinarayan
197 11/7/2019 11/7/2019 NECL-MSRDC-MPEW-I-IPC-04 Submission of IPC -04 for Request for Release of RA Bill-04-Reg. 11/14/2019 11/13/2019 ROC-0239
198 11/9/2019 11/11/2019 NEC-MPEW-2019-20-250 Monthly Progress Report for the month of October'19 - Reg. 11/18/2019 12/19/2019 SO-P1-0233
199 11/11/2019 11/12/2019 NEC-MPEW-2019-20-251 Handing over of Required ROW, Additional Land at T-2 Exit and Muck Disposal Area-Reg. 11/19/2019 30-12-2019/06ROC-0300/0308/0351
200 11/14/2019 11/15/2019 NEC-MPEW-2019-20-252 Submission of compliance for AE Safety Specialist Joint Inspection vide SO-0187 11/22/2019 NA NA
201 11/16/2019 11/16/2019 NEC-MPEW-2018-19-253 Submission of Method Statement for Cement Grouting-Reg. 11/23/2019 11/22/2019 SO-P1-0204
202 11/18/2019 11/18/2019 NEC-MPEW-2018-19-254 Submission of Open Cut Plan - L and Section Drawings for Adit-I-Reg. 11/25/2019 11/26/2019 SO-P1-0211
203 11/18/2019 11/18/2019 NEC-MPEW-2019-20-255 Submission of revised Open Excavation Method Statement for Adit-I and Comments Sheet-Reg. 11/25/2019 11/28/2019 SO-P1-0213
204 11/18/2019 11/18/2019 NEC-MPEW-2019-20-256 Contractor's Chief Geologist-Reg. 11/25/2019 NA
205 11/18/2019 11/18/2019 NEC-MPEW-2019-20-257 Compliance for Review and Comments on Submission of Design Report and Drawings-Reg. 11/25/2019 22-11-2019/19SO-P1-0208/0227
206 11/18/2019 11/19/2019 NEC-MPEW-2019-20-259 Submission of M30 Grade Shotcrete site Laboratory Mix Design Test Report-Reg. 11/26/2019 19-12-2019/20SO-P1-0226/0229/0230
207 11/19/2019 11/21/2019 NEC-MPEW-2019-20-260 Submission of batching plant calibration report-Reg. 11/28/2019 11/21/2019 SO-P1-0205
208 11/19/2019 11/21/2019 NEC-MPEW-2019-20-261 Submission of credentials of JSW Steel and Dalmia Cement-Reg 11/28/2019 11/30/2019 SO-P1-0214
209 11/22/2019 11/23/2019 NEC-MPEW-2019-20-263 Submission of revised batching plant calibration report as per AE Comments 11/30/2019 11/26/2019 SO-P1-0210
210 11/25/2019 11/25/2019 NEC-MPEW-2019-20-264 Submission of Letter regarding Involvement of Mining Department – certain issues- Request for Reso12/2/2019 NA NA
211 11/27/2019 11/28/2019 NEC-MPEW-2019-20-265 Submission of Videos on Existing houses in Kusgaon and Guruvasthi 12/5/2019 NA NA
212 11/28/2019 11/29/2019 NEC-MPEW-2019-20-266 Compliance for Safety Specialist Joint inspection Report -Reg 12/6/2019 NA NA
213 11/28/2019 11/29/2019 NEC-MPEW-2019-20-267 Reply Letter for RTI 12/6/2019 NA Mr.Partha Bhattacharya/Mr.Satish Sharma
214 11/29/2019 11/29/2019 NEC-MPEW-2019-20-268 Letter for Dongargaon Villagers Claiming for Compensation 12/6/2019 NA
215 11/29/2019 11/30/2019 NEC-MPEW-2019-20-269 Request to Approve For Paying Land Rent of Kusgaon on Half Yearly Basis in Advance - Reg 12/7/2019 NA
216 12/6/2019 12/7/2019 NECL-MSRDC-MPEW-I-IPC-05 Submission of IPC - 05 for Request for Release of RA Bill-05-Reg 12/14/2019 12/10/2019 ROC-0279 Mr.Ashok Maan/Mr.Gagan Sharma/Mr.Satish Sharma
217 12/9/2019 12/10/2019 NEC-MPEW-2019-20-270 Regarding Compliance of consent to establish letter issued by MPCB for RMC Plant-Reg. 12/17/2019 12/12/2019 SO-P1-0222
218 12/9/2019 12/10/2019 NEC-MPEW-2019-20-271 Request for Release of Payments 12/17/2019 NA Mr.Debashish Chakrabarty/Mr.L.P.Sahu
219 12/10/2019 12/11/2019 NEC-MPEW-2019-20-273 Submission of MPR for the Month of November'19-Reg. 12/18/2019 12/19/2019 SO-P1-0233
220 12/13/2019 12/13/2019 NEC-MPEW-2019-20-274 Handing Over of Required ROW, Additional Land at T-2 Exit & land for muck disposal area 12/20/2019 NA
221 12/14/2019 12/16/2019 NEC-MPEW-2019-20-275 Submission of Quarter Video Recording 12/23/2019 1/8/2020 SO-P1-0247
222 12/14/2019 12/16/2019 NEC-MPEW-2019-20-276 Submission of Advance Construction Program for Three Months-Reg. 12/23/2019 12/19/2019 SO-P1-0231
223 12/18/2019 12/19/2019 NEC-MPEW-2019-20-277 Submission of Revised method Statement for Open excavation for Adit-1-Reg. 12/26/2019 12/23/2019 SO-P1-0237
224 12/18/2019 12/19/2019 NEC-MPEW-2019-20-278 Submission of Credentials of Ordinary Macro Synthetic Fibre Suppliers-Reg. 12/26/2019 12/30/2019 SO-P1-0243 Mr.Badrinarayan
225 12/18/2019 12/19/2019 NEC-MPEW-2019-20-279 Submission of credentials of Admixtures and Accelerators -Reg. 12/26/2019 12/30/2019 SO-P1-0242 Mr.Badrinarayan
226 12/20/2019 12/20/2019 NEC-MPEW-2019-20-280 Compliance for AE Safety Specialist Joint inspection Report -Reg 12/27/2019 NA
227 12/23/2019 12/24/2019 NEC-MPEW-2019-20-281 Request to Release the Payments of IPC 03,IPC 04 &IPC 05-Reg. 12/31/2019 NA
228 12/24/2019 12/24/2019 NEC-MPEW-2019-20-283 Regarding lead cost for muck disposal at Pimploli village and Bedse Village-Reg 12/31/2019 30-12-2019/06ROC-0300/0308/0351
229 12/24/2019 12/24/2019 NEC-MPEW-2019-20-282 Submission Of Method Statement for Adit -I Tunnel Excavation -Reg 12/31/2019 2/17/2020 SO-P1-0239
230 12/30/2019 12/30/2019 NECL-MSRDC-MPEW-I-IPC-06 Submission of IPC - 06 for Request for Release of RA Bill-05-Reg 1/6/2020 1/3/2020 ROC-0304
231 12/31/2019 1/2/2020 NEC-MPEW-2019-20-285 Letter for Factory visit of cement, resin capsule & macro synthetic fibres 1/9/2020 1/10/2020 ROC-0315/0316
232 1/3/2020 1/3/2020 NEC-MPEW-2019-20-290 Submission of Compliance to the Remarks given by Accounts Department 1/10/2020 NA
233 1/3/2020 1/3/2020 NEC-MPEW-2019-20-289 Compliance of consent to establish letter issued by MPCB for RMC Plant 1/10/2020 1/9/2020 SO-P1-0252
234 1/4/2020 1/4/2020 NEC-MPEW-2019-20-291 Regarding Alternative Land for Adit-II 1/11/2020 Pending Mr.Partha Bhattacharya
235 1/4/2020 1/4/2020 NEC-MPEW-2019-20-292 Regarding Vibration at Sinhgad Institute. 1/11/2020 NA
236 1/3/2020 1/4/2020 NEC-MPEW-2019-20-288 Submission of Monthly Vibration Report for the month October'19, November'19 and December'19 1/11/2020 1/7/2020 SO-P1-0246,ROC-0307
237 1/4/2020 1/6/2020 NEC-MPEW-2019-20-293 Environment Management Plan by Navayuga (MSRDC Format)-Reg. 1/13/2020 08-01-2020/18SO-P1-0250/0260
238 1/7/2020 1/7/2020 NEC-MPEW-2019-20-294 Regarding Site Observation Report, Un-supported and Unsafe working condition-Reg 1/14/2020 1/15/2020 SO-P1-0256
239 1/8/2020 1/9/2020 NEC-MPEW-2019-20-295 Information regarding removal of Boreholes falling in Tunnel Alignment at T-2 End RHS-Reg. 1/16/2020 NA
240 1/8/2020 1/9/2020 NEC-MPEW-2019-20-296 Submission of Blast Monitoring Plan-Reg 1/16/2020 1/11/2020 SO-P1-0253
241 1/9/2020 1/9/2020 NEC-MPEW-2019-20-299 Submission of Monthly Progress Report for the month of December'19-Reg 1/16/2020 1/15/2020 SO-P1-0257
242 1/9/2020 1/10/2020 NEC-MPEW-2019-20-300 Handing Over Of Required ROW , Additional Land and Muck Disposal area at T-2 Exit -Reg. 1/17/2020 1/21/2020 ROC-0329
243 1/9/2020 1/10/2020 NEC-MPEW-2019-20-298 Submission of Construction of temporary HT LT cable Layout-Reg. 1/17/2020 1/14/2020 SO-P1-0254
244 1/9/2020 1/13/2020 NEC-MPEW-2019-20-301 Inadequate geotechnical Investigation data submitted till date 1/20/2020 1/17/2020 SO-P1-0258
245 1/11/2020 1/13/2020 NEC-MPEW-2019-20-302 Change in location of Entry of Adit-02-Reg 1/20/2020 21-01-2020/24ROC-0329/SO-P1-0266
246 1/2/2020 1/14/2020 NEC-MPEW-2019-20-286 Submission of Monthly Monitoring Report-Reg 1/21/2020 1/30/2020 SO-P1-0272
247 1/14/2020 1/14/2020 NEC-MPEW-2019-20-304 Submission of L-Section Drawing for Adit-I Tunnel-Reg. 1/21/2020 Pending Mr.Partha Bhattacharya
248 1/18/2020 1/22/2020 NECL-MSRDC-MPEW-I-IPC-07 IPC-07-Reg. 1/29/2020 1/21/2020 ROC-0330
249 1/19/2020 1/22/2020 NEC-MPEW-2019-20-308 Compliance of the queries raised by RTI Applicant under Right To Information Act 2005. 1/29/2020 1/27/2020 SO-P1-0267
250 1/24/2020 1/24/2020 NEC-MPEW-2019-20-311 Proposals for Adit-II Portal Location-Reg. 1/31/2020 31-01-2020/18ROC-0334/0364/SO-P1-0300
251 1/25/2020 1/27/2020 NEC-MPEW-2018-19-312 Submission of Sample Collection Schedule for Third Party Laboratory Testing-Reg. 2/3/2020 Pending Mr.Badrinarayan
252 1/25/2020 1/27/2020 NEC-MPEW-2018-19-313 Submission of JSW Steel Mechanical and Chemical Test report for 25 mm-Reg. 2/3/2020 1/31/2020 SO-P1-0275
253 1/25/2020 1/27/2020 NEC-MPEW-2019-20-314 Non-Submission of report regarding compliance to all condition of Consent to Establish Certificate-R2/3/2020 Pending Mr.Mohammad Akhtar
254 1/25/2020 1/27/2020 NEC-MPEW-2019-20-315 Non-Submission of Completed Environmental Management Plan-Reg. 2/3/2020 2/12/2020 ROC-0356
255 1/25/2020 1/27/2020 NEC-MPEW-2019-20-316 Compliance of AE Safety Specialist Joint Inspection Report-Reg. 2/3/2020 NA
256 1/31/2020 1/31/2020 NEC-MPEW-2019-20-317 Compliance of AE Safety Specialist Joint Inspection Report-Reg. 2/7/2020 NA
257 1/31/2020 1/31/2020 NEC-MPEW-2019-20-318 Site Observation Non-Compliance for tunnel T2 LHS (Stage-2)-Reg. 2/7/2020 Pending
258 2/1/2020 2/3/2020 NEC-MPEW-2019-20-319 Submission of Monthly Vibration Monitoring Report for the month of January'2020-Reg 2/10/2020 Pending Tunnel Engineers/Mr.Partha Bhattacharya
259 2/3/2020 2/3/2020 NEC-MPEW-2019-20-320 Submission of Compliance for the comments for Method Statement of Adit-1 Tunnel Excavation-Re 2/10/2020 2/27/2020 SO-P1-0284
260 2/3/2020 2/3/2020 NEC-MPEW-2019-20-321 Submission of Monthly Monitoring Report for the month of January 2020 2/10/2020 2/7/2020 SO-P1-0279
261 2/6/2020 2/7/2020 NEC-MPEW-2019-20-323 Non Submission Of Report Regarding Compliance to all Conditions Of Consent to Establish Certificat 2/14/2020 2/7/2020 SO-P1-0278
262 2/6/2020 2/7/2020 NEC-MPEW-2019-20-324 Reply to RTI dated 27.01.2020- Reg 2/14/2020 NA
263 2/6/2020 2/7/2020 NEC-MPEW-2019-20-325 Submission of completed Environmental Management Plan-Reg 2/14/2020 2/12/2020 ROC-0356
264 2/6/2020 2/7/2020 NECL-MSRDC-MPEW-I-IPC-08 IPC-08 Request for release of RA Bill-08-Reg 2/14/2020 2/7/2020 ROC-0347
265 2/10/2020 2/10/2020 NEC-MPEW-2019-20-327 Submission of Credentials of Ordinary Portland Cement (OPC 53 Grade)-Reg 2/17/2020 3/4/2020 ROC-0380
266 2/10/2020 2/11/2020 NEC-MPEW-2019-20-328 Submission of Monthly Progress Report for the month of January-2020-Reg 2/18/2020 3/20/2020 SO-P1-0305
267 2/13/2020 2/14/2020 NEC-MPEW-2019-20-329 Submission of Detailed Design Report and Drawings 2/21/2020 17-02-2020/22SO-P1-0286/ROC-0369
268 2/15/2020 2/15/2020 NEC-MPEW-2019-20-330 Obstruction work at Adit-2 Site from GAIL (India) Limited 2/22/2020 NA
269 1/20/2020 2/18/2020 NEC-GRAMPANCHAYAT-002 Submission of Compliance of Consent to Establish for Construction of Missing Link on Mumbai-Pun 2/25/2020 NA
270 2/19/2020 2/19/2020 NEC-MPEW-2019-20-336 Schedule Of Environmental Monitoring Testing Report to be conducted at our site-Reg 2/26/2020 NA
271 2/19/2020 2/19/2020 NEC-MPEW-2019-20-337 Submission of Water Seepage Record-Reg 2/26/2020 Pending Mr.Hichem Zammit/Tunnel Engineers
272 2/19/2020 2/19/2020 NEC-MPEW-2019-20-338 Submission of Site Observation Non-Compliance at Adit-1 2/26/2020 Pending Tunnel Engineers
273 2/18/2020 2/20/2020 NEC-MPEW-2019-20-333 Handing over of required ROW, Additional Land for permanent diversion road and Muck Disposal area 2/27/2020 2/25/2020 SO-P1-0287
274 2/19/2020 2/24/2020 NEC-MPEW-2019-20-334 Submission of Revised Traffic Management Plan -Reg 3/2/2020 2/27/2020 SO-P1-0274
275 2/19/2020 2/24/2020 NEC-MPEW-2019-20-335 Submission of Revised Health, Safety management Plan - Reg 3/2/2020 2/27/2020 SO-P1-0274
276 2/19/2020 2/24/2020 NEC-MPEW-2019-20-339 Information Regarding Second Health Checkup camp at our site 3/2/2020 NA
277 2/20/2020 2/24/2020 NEC-MPEW-2019-20-340 Submission of credentials of chemical admixtures,resin capsule & cement capsule-Reg 3/2/2020 3/4/2020 ROC-0382
278 2/20/2020 2/24/2020 NEC-MPEW-2019-20-341 Electrical Engineer Inspection Report at Adit-I -Reg 3/2/2020 3/4/2020 SO-P1-0291 Mr.Subramani V.
279 2/21/2020 2/24/2020 NEC-MPEW-2019-20-342 Crossing of GAIL Pipe Line-reg 3/2/2020 2/22/2020 ROC-0370
280 2/25/2020 2/25/2020 NEC-MPEW-2019-20-343 Compliance of AE Safety Specialist Joint Inspection Report- Reg 3/3/2020 NA
281 2/25/2020 2/25/2020 NEC-MPEW-2019-20-344 Discrepancies at Adit-II by Sarpanch of Kusgaon Village 3/3/2020 NA
282 2/27/2020 2/27/2020 NEC-MPEW-2019-20-345 Submission of Detailed Design Report and Drawings 3/5/2020 Pending Mr.Hichem Zammit
283 2/28/2020 2/29/2020 NEC-MPEW-2019-20-346 Submission of Method Statement for Instrumentation and Monitoring for Tunnels-Reg. 3/7/2020 Pending Mr.Suprio Choudhury
284 3/2/2020 3/2/2020 NEC-MPEW-2019-20-347 Submission of Advanced Construction Program for a Period of 01.03.2020 to 31.05.2020-Reg. 3/9/2020 3/16/2020 SO-P1-0296
285 3/3/2020 3/3/2020 NECL-MSRDC-MPEW-I-IPC-09 IPC-09-Reg. 3/10/2020 3/7/2020 ROC-0388
286 3/4/2020 3/4/2020 NEC-MPEW-2019-20-350 Vibration Monitoring Report For the Month of February'2020-MPEW Project, Package-I 3/11/2020 Pending
287 3/4/2020 3/4/2020 NEC-MPEW-2019-20-349 submission of Monthly Monitoring Report for the month of Febrauary 2020 3/11/2020 3/18/2020 SO-P1-0301
288 3/5/2020 3/6/2020 NEC-MPEW-2019-20-351 Inadequate Geotechnical Investigation data submitted till date-Reg 3/13/2020 Pending
289 3/7/2020 3/7/2020 NEC-MPEW-2019-20-352 Submission of Method Statement for Adit-2 Tunnel Open Excavation-Reg. 3/14/2020 Pending
290 3/7/2020 3/7/2020 NEC-MPEW-2019-20-353 Handing Over of required ROW, Additional Land for permanent diversion road and Muck disposal area 3/14/2020 Pending
291 3/7/2020 3/7/2020 NEC-MPEW-2019-20-354 Submission of Credentials of Cement (OPC-53),PU Injection Products & Macro Synthetic Fiber Suppli3/14/2020 3/18/2020 SO-P1-0302/ROC-0398/0399
292 3/7/2020 3/9/2020 NEC-MPEW-2019-20-355 Submission of Monthly Progress Report - February'2020-Reg 3/16/2020 3/20/2020 SO-P1-0305
293 3/8/2020 3/9/2020 NEC-MPEW-2019-20-357 Factory Visit for material Testing Chettinad Cement 3/16/2020 12-03-2020/18ROC-0392/0400
294 3/9/2020 3/9/2020 NEC-MPEW-2019-20-358 Minutes of Meeting for Inspection of 22 KV Outdoor HT Panel-Reg 3/16/2020 NA
295 3/11/2020 3/12/2020 NEC-MPEW-2019-20-360 Request for Kirloskar & Inovic Power Solutions Pvt Ltd Factory Inspection-Reg 3/19/2020 Pending
296 3/11/2020 3/12/2020 NEC-MPEW-2019-20-361 Request to Release the Payments of IPC 08-Reg 3/19/2020 NA
297 3/12/2020 3/12/2020 NEC-MPEW-2019-20-362 Compliance to Safety inspection report of SO-288-Reg 3/19/2020 NA
298 3/9/2020 3/13/2020 NEC-MPEW-2019-20-359 House Keeping Condition at Navayuga Site -Reg 3/20/2020 NA
299 2/17/2020 2/17/2020 NEC-MPEW-2019-20-332 Submission of Compliance of Consent to Establish-Reg 2/24/2020 3/9/2020 SO-P1-0293 Mr.Mohammed Akhtar
300 3/14/2020 3/16/2020 NEC-MPEW-2019-20-363 Non-Compliance of Unsafe working procedure for height works and No Marshal for guiding Constru 3/23/2020 3/16/2020 SO-P1-0298
301 3/16/2020 3/16/2020 NEC-MPEW-2019-20-364 Submission of Compliance for the comments for Method Statement of Adit-1 Tunnel Excavation-Reg3/23/2020 Pending
302 3/19/2020 3/19/2020 NEC-MPEW-2019-20-366 Non-Compliance of Unsafe working procedure for height works and No Marshal for guiding Constru 3/26/2020 Pending
303 3/20/2020 3/20/2020 NEC-MPEW-2019-20-367 Electrical Inspection at Adit-1-Reg. 3/27/2020 NA
304 3/21/2020 3/21/2020 NEC-MPEW-2019-20-370 Submission of Third Party test report for Chloride content,sulphate content and permeability of M3 3/28/2020 Pending
305 3/21/2020 3/21/2020 NEC-MPEW-2019-20-369 Submission of Minutes of Meeting and test report for Kirloskar and Inovic Power Solutions Pvt Ltd-R 3/28/2020 Pending
306 3/21/2020 3/21/2020 NEC-MPEW-2019-20-368 Corona Virus-Force Majeure Clause (FMC)-Reg 3/28/2020 NA
307 3/23/2020 3/23/2020 NEC-MPEW-2019-20-371 Health Hygiene and Novel Corona Virus Preventive Measures Inspection-Reg. 3/30/2020 NA
308 3/23/2020 3/23/2020 NEC-MPEW-2019-20-372 Discrepancies observed in between submitted FRL between Ms Afcons and Ms Navayuga-Reg. 3/30/2020 Pending