This activity sheet asks students to estimate the electrical materials needed for a job based on a diagram. The job involves wiring a 4' x 4' x 3/4" plywood board with nonmetallic conduit to control 4 bulbs (A, B, C, D) using various switches. Bulb A is controlled by 1 four-way and 2 three-way switches. Bulbs B-D are each controlled by a single pole switch in parallel. Students are to fill in a table with the necessary materials and PPE. Their work will be assessed based on completeness of materials, identifying required PPE, and time efficiency.

Uploaded by

Roniel Balverde
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
403 views2 pages

Group Activity

This activity sheet asks students to estimate the electrical materials needed for a job based on a diagram. The job involves wiring a 4' x 4' x 3/4" plywood board with nonmetallic conduit to control 4 bulbs (A, B, C, D) using various switches. Bulb A is controlled by 1 four-way and 2 three-way switches. Bulbs B-D are each controlled by a single pole switch in parallel. Students are to fill in a table with the necessary materials and PPE. Their work will be assessed based on completeness of materials, identifying required PPE, and time efficiency.

Uploaded by

Roniel Balverde
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

ACTIVITY SHEET 1.

4
ESTIMATE ELECTRICAL MATERIALS NEEDED FOR THE JOB

Directions: Estimate the electrical materials that have been used in the wiring installation in
figure x.
Job specification: Nonmetallic conduit with 4 bulbs assigned as bulb A, B,C and D. Bulb A is
controlled in 3 locations by one 4-way switch ( S 4W ) and two 3-way (S3w) switches. Bulbs B to D
connected in parallel each controlled by a single pole switch. The size of wiring board is 4’ x 4’ x
3
/4”plywood.

Figure x
Note: Write the materials on the table provided for.

Materials and Personal Protective Equipment Used in the Installation:


Materials: Quantity


















Personal Protective Equipment:


GROUP ACTIVITY
GRADE 9 – SECTION: DATE:

GROUP MEMBERS:
1.
2.
3.
4.
5.
6.
7.

Assessment Criteria

Dimensions Points

1. Quantity of material are complete based on the job 20


2. Personal Protective Equipment had been identified 5

3. Effective use of time (speed) 5