Pre - Feasibility Study For Redevelopment of Jawaharlal Nehru Stadium Under PPP Mode NITI Aayog Government of India
Pre - Feasibility Study For Redevelopment of Jawaharlal Nehru Stadium Under PPP Mode NITI Aayog Government of India
Redevelopment of Jawaharlal
Nehru Stadium under PPP
Mode
NITI Aayog
Government of India
Draft Report
2018
Disclaimer
This Draft Pre-feasibility Report (the “Report”) has been prepared by Ernst & Young LLP (hereinafter referred to as “EY” or “we”
or “us”) for NITI Aayog (hereinafter referred to as “NITI” or “You” or “Client”) for the purpose of undertaking a Pre-Feasibility study
for Redevelopment of Jawaharlal Nehru Stadium.
The findings submitted in this Report are based on information collated through primary and secondary research, data provided
by Sports India, NITI and EY’s internal databases. EY has taken due care to validate the authenticity and correctness of sources
used to obtain the information; however, neither EY nor any of our respective partners, officers, employees, consultants or agents,
provide any representations or warranties, expressed or implied, as to the authenticity, accuracy or completeness of the
information, data or opinions that third parties or secondary sources provided to us. The information and images (if any) provided
or analysed in the Report have been collated from various industry sources, including web resources, public-domain information
sources, data provided by NITI Aayog and our internal databases. EY has ensured reasonable care to validate the data presented
in the Report; however, EY have not conducted an audit, due diligence or an independent verification of such information. It is
also to be noted that the images presented (if any) are pictorial representations of the overall concept and are in no way intended
to represent any concrete imagery for the proposed development. Neither EY, nor affiliated partnerships or bodies corporate, nor
the directors, shareholders, managers, partners, employees or agents of any of them, make any representation or warranty,
express or implied, as to the accuracy, reasonableness or completeness of the information contained in this Report. All such
parties and entities expressly disclaim any and all liability for, or based on or relating to any such information contained in, or
errors in or omissions from, this Report or based on or relating to the recipient’s use of this Report.
Our sub-contractor MOFA studios Pvt. Ltd. has carried out architectural assessment of the site in respect of master planning
potential, the information provided by them has been included in proposing development options and product mix for JLN stadium.
References to EY in the Report relate to EY advice, recommendations and analysis and do not indicate that EY take any
responsibility for the information concerned or are assembling or associating ourselves with any financial information, including
prospective financial information. This Report has been prepared for your internal use, on your specific instructions, solely for the
purpose of exploring the pre-feasibility and structuring of the project and must not be used or relied upon for any other purpose.
This Report is strictly confidential, and no part thereof may be reproduced or used by any other party other than NITI Aayog,
except as otherwise agreed between NITI Aayog and EY. If NITI Aayog is permitted to disclose the Report (or a portion thereof),
you shall not alter, edit or modify it from the form EY has provided.
This Report has not considered issues relevant to any third parties. Use of this Report by any third party for whatever purpose
should not, and does not, absolve such third party from using its own due diligence in verifying the Report’s contents. If any third
party chooses to rely upon any of the contents of this Report they do so entirely at their own risk, and we shall have no responsibility
whatsoever in relation to any such use. EY accept no duty of care or liability of any kind whatsoever to any such third party, and
no responsibility for damages, if any, suffered by any third party as a result of decisions made, or not made, or actions taken, or
not taken, based on this document, unless expressly agreed between NITI Aayog, EY and such third party in writing.
Notwithstanding anything contained herein to the contrary, EY shall not be liable for any loss of profit, data, goodwill or revenues,
or for any indirect, incidental, consequential, special or punitive damages that NITI Aayog or any third party may incur as a result
of your use of this Report.
This Report supersedes any previous oral presentations or summaries EY may have made in connection herewith. Neither EY
nor any of our affiliates worldwide are responsible for revising or updating this Report because of events or transactions occurring
subsequent to the date of this Report. Any updates or second opinions on this Report cannot be sought by the management from
external agencies (including our affiliates) without our prior written consent.
The information contained in the Report is based on judgmental estimates and assumptions, about circumstances and events.
Accordingly, EY cannot provide any assurance that the projected results will be attained in this ever changing dynamic market
environment.
Further, neither this Report nor any part of it shall form the basis of, or be relied upon in connection with, any contract or
commitment whatsoever. This Report is being supplied to NITI Aayog solely for your information and is confidential.
In taking any commercial decisions relating to our services or this Report, NITI Aayog shall have regard to the restrictions and
limitations on our scope of services, liability and duty of care as set out in the Contract Agreement and this Report. Accordingly,
NITI Aayog remain responsible for all management decisions relating to EY services and/or this Report, including the use or
implementation of this Report. This disclaimer forms an integral part of the Report.
Table of Contents
1. Executive Summary ....................................................................................................................... 9
Background ........................................................................................................................................... 9
Recommendations ............................................................................................................................... 13
Accessibility ......................................................................................................................................... 16
Catchment Area................................................................................................................................... 18
Stakeholder’s Perspective.................................................................................................................... 19
3. Development Concept.................................................................................................................. 29
Regulatory compliances....................................................................................................................... 44
Area Statement.................................................................................................................................... 50
Transstadia.......................................................................................................................................... 86
List of Tables
Table 1: JLN sports infrastructure............................................................................................................. 17
Table 2: Stadiums in catchment area of JLN Stadium............................................................................... 22
Figure 3: Comparison of facility infrastructure between competing facilities .............................................. 24
Table 4: Membership options in competing complexes ............................................................................. 24
Table 5: Commercial retail rates of catchment area .................................................................................. 26
Table 6: Commercial office space rates of catchment area ....................................................................... 26
Table 7: Hospitality in vicinity ................................................................................................................... 27
Table 8: Recreational games center in vicinity .......................................................................................... 27
Table 9: JLN stadium area statement ....................................................................................................... 30
Table 10: Activities permitted under divisional sports infrastructure........................................................... 31
Table 11: JLN stadium upgradation, renovation, relocation ....................................................................... 33
Table 12: JLN stadium area breakup floor wise ........................................................................................ 34
Table 13: Programme under the stadium stands ...................................................................................... 36
Table 14: First floor proposed plan ........................................................................................................... 37
Table 15: Second floor of JLN stadium ..................................................................................................... 38
Table 16: Tentative activities under sports adventure hub ........................................................................ 39
Table 17: Product mix at 40 FAR.............................................................................................................. 43
Table 18: Product mix at 400 FAR............................................................................................................ 43
Table 19: Stakeholder approvals .............................................................................................................. 44
Table 20: Risk matrix ............................................................................................................................... 48
Table 21: Responsibility matrix................................................................................................................. 49
Table 22: Proposed area statement for JLN stadium ................................................................................ 50
Table 23: Cost inputs at 40 FAR .............................................................................................................. 51
Table 24: Cost inputs at 400 FAR............................................................................................................. 51
Table 25: Project phasing......................................................................................................................... 52
Table 26: Financial cost assumptions ....................................................................................................... 52
Table 27: Operation and maintenance cost assumptions .......................................................................... 53
Table 28: Revenue Assumptions.............................................................................................................. 53
Table 29: Financing structure Assumptions .............................................................................................. 55
Table 30: Key financial indicators ............................................................................................................. 56
Glossary
AFC - Asian Footbal Confederation
1.Executive Summary
Background
Sports India (SI), the implementation body under Ministry of Youth Affairs and Sports (MYAS) currently
operates and maintains five stadiums in Delhi (i.e. Jawaharlal Nehru Stadium, Indira Gandhi Stadium, Dr.
Karni Singh Shooting Range, Dr. Shyama Prasad Mukherjee Swimming Pool Complex and Major Dhyan
Chand National Stadium).
SI intends to improve and upgrade existing sports infrastructure to world class standards and assess the
potential of developing other sports, allied and supporting commercial activities at Jawaharlal Nehru Stadium
and Indira Gandhi Stadium on Public Private Partnership (PPP) basis.
SI has sought guidance from NITI Ayog to assess development activity at JLN Stadium with the primary
objectives stated below1:
► The stadium should address the needs of all sections of sports community
► The development should be financially self-sustainable
► The design should incorporate hostel / hotel / service apartment accommodation requirement for
players and coaches (3 to 5 star accommodation)
► The stadium should be able to accommodate a footfall of 20 lakh
► The stadium should be open and accessible to every strata of society
► Sporting facilities for senior athletes should not be affected during construction phase
► The design and operative mechanism of the stadium should encourage younger generation to use
the facilities
► The stadium should adhere to international standards of athletic events
Niti Aayog has appointed Ernst & Young LLP (hereafter referred to as “EY LLP” and consultant) to carry out
a Pre-Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium (JLN Stadium) and Indira Gandhi
Stadium (IG Stadium) on PPP to achieve the objectives.
Existing Situation
Jawaharlal Nehru Stadium is located in Delhi. It is
developed over a land parcel of 100 acres with a
seating capacity of ~60,000. The stadium is designed
and constructed to meet international sports standards.
It is owned and managed by SI on behalf of Ministry of
Youth Affairs and Sports (MYAS).
1
The objectives have been identified in consultation with SI and NITI Aayog for self-sustainable development of sports infrastructure
facility.
Page | 9
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
Despite being strategically placed to cater to the affluent, it is understood that it is currently being by low
income groups.
Accessibility: JLN Stadium is easily accessible, through roads, metro and other modes of public transport.
The nearest metro stations for accessing the stadium are Jangpura and JLNS, located at a distance of 300-
800 meters.
Based on preliminary assessment of the existing facilities at JLN Stadium 2 and proposed objective for overall
development of the stadium, two options were evaluated for undertaking financial viability.
Planning Norms
2
The consultant conducted site visits of JLN and IG stadium and carried out primary surveys with users and SI, in order to evaluate
existing user profile and assessment of infrastructure facilities.
Page | 10
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
Based on the FAR utilized and FAR available as per the TOD norms, the area statement of JLN stadium is
presented in the table below:
Probable loss on builtup area due to TOD influence zone & ASI norms @upto 50% 0
Based on the above estimates, the total area available in case of 40 and 400 FAR is ~62,000 sq.m, and ~15
lakh sq.m respectively.
An indicative product mix for both the options are evaluated. The table below highlights the product mix for
40 FAR
In the existing FAR byelaws of the MPD 2021, the built up or the programme includes, Adventure sports hub
and sports university apart from the up gradation, utilization and optimization of the existing sports facilities.
The total base cost as per current prices is estimated at INR 268 crores which includes the cost towards
renovation/refurbishment/relocation of existing sports infrastructure, a sports university and development of
area for commercial exploitation. Such commercial area shall be restricted to sports related activities only
and may include, sports shops (Decathalon), retails units (Nike, Reebok, Adidas), virtual gaming (Smaash,
BluO), adventure zones or any other allied activity.
Page | 11
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
8 Government offices
3,09,842 667
9 Semi Government offices
In case of 400 FAR as per TOD Zone, a mix of Sports Adventure hub, University, Academies, Retail,
Commercial offices and Government offices is proposed
The total base cost as per current prices is estimated to be INR 3,213 crores which includes cost towards
renovation/refurbishment/relocation of existing sports infrastructure, sports university, sports academies,
hotels (3/4/5 star, budget hotels, AirBnB etc) and development of area for commercial exploitation. Such
commercial area shall be restricted to sports related activities only and may include, sports shops
(Decathalon), retails units (Nike, Reebok, Adidas), virtual gaming (Smaash, BluO), adventure zones or any
other allied activity.
As per TOD norms, the overall development mix shall include residential complexes to the tune of 30% of
total builtup area. Based on interactions with officials at SI and Niti Aayog, the objective of this project is to
develop JLN stadium as a hub to promote sports for all. In view of the same, residential option shall be
restricted and SI or the private developer shall seek approval from the competent authority in this regard.
Page | 12
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
Recommendations
Based on the conceptual development options for 40 and 400 FAR, financial analysis was carried out by the
consultant. The table below summarizes the key results of the analysis.
As per the financial analysis, for an equity IRR of 18% the revenue share is estimated to be between 25% -
30% with a provision of an annual concession fee of INR 100 crores escalated annually.
A DBFOT concession is proposed for development of JLN stadium for a 45 year concession period and a 30
year period for stadia operations. The model has been summarized in the figure below.
Page | 13
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
► To upgrade current sports facilities, operate and maintain the same for 30 years as per specified
performance standards.
► Further, develop additional sporting facilities, operate and maintain them for 30 years
► Develop, operate and maintain commercial areas as per applicable laws for [45 (30+15) - 60 (30+30)
yrs.].
► Sports facilities to be regulated by SI but operated and maintained by private sector
Way forward
Based on the recommendations for development options, SI may take the proposal to bidding stage. As per
standard industry practice, a two stage bidding process shall be undertaken wherein the first phase is the
qualification stage to shortlist applicants based on technical and financial criteria. The second stage is the
bid stage wherein the Request for Proposal along with draft Concession Agreement is shared with the
shortlisted bidders to invite financial bid. The bidding parameter for selection of preferred bidder shall be
based on highest revenues share (the bidder offering highest per cent of total gross revenues from sports &
non-sports activities shall be selected).
Prior to floating the RFP documents, SI shall seek approval from the competent ministries (MYAS and
Ministry of Finance – Department of Economic Affairs).
An indicative timeline for the same is presented below:
Page | 14
PROJECT APPRECIATION
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
The Jawaharlal Nehru Stadium was constructed by the Government of India to host the athletic events and
ceremonies of the 1982 Asian Games. It also hosted the 1989 Asian Championships in Athletics. The stadium
was renovated/upgraded for the 2010 Commonwealth Games (CWG), hosting the track and field events and
opening and closing ceremonies.
Accessibility
Page | 16
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
# Description Discipline
Existing infrastructure
Athletics
1 JLN stadium
Football
Weightlifting
2 Weightlifting auditorium Wushu
Wrestling
Archery
Cricket
Football
Basketball
Badminton
3 On ground (Come & Play)
Table Tennis
Tennis
Volleyball
Handball
Lawn Ball
Fitness center + Spa
4 Others
Players hostel
The main athletic track is located inside the stadium forming a periphery of the main football ground. Practice
area outside the main stadium constitutes of Javelin throw, shot put and discus throw along with a practice
track. The stadium incorporates two full size football grounds, one futsal ground and a small park for non-
sports activities. The main ground is used to host football sports events and futsal ground with synthetic pitch
has been constructed for small practice sessions and is used to train children below the age of 10-12 years.
JLN stadium also houses infrastructure for archery wherein dedicated space is allocated with high boundaries
and different target ranges. Other sports facilities, like badminton, basketball, lawn tennis and table tennis
facilities are located in close proximity to each other. Four volleyball outdoor courts are provided. Weightlifting
area has ample space for pre-workout on the ground floor and the practice area is located in the basement.
The stadium also provides hostel facility to athletes and campers within the complex with fitness center.
3
Information has been collated based on site visits on JLN Stadium and discussion with SI.
Page | 17
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
The primary source of revenue of the stadium is from users registered under the ‘Come and Play Scheme 4’
and renting out assets to national teams/ league franchises. Use of facilities for hosting events such as
concerts and other non-sports activities are also undertaken. SI has improved their level of service offerings
through online viewing and ease of booking of stadia for sporting events to enhance asset utilization.
Catchment Area
A review of leisure and sporting facilities in the catchment area and benchmarking principles indicate that
local or municipal recreation or sporting facilities have a primary catchment radius of approximately 5kms
and a secondary catchment radius of 10kms. Approximately 75% to 85% of users reside within a 5 km radius
while the remaining 15% to 25% come from areas within the 5km to 10km radius of the facility. Developing
a stadium with state of the art sports infrastructure will attract users from a much wider catchment area 5.
The catchment area is also influenced by a number of other factors, including range and quality of facilities
and services offered, natural and built barriers i.e. road connectivity, travel times and the availability of any
other competing facilities. Considering regional planning principles, it is common that facilities usually share
catchment areas, particularly secondary catchment area. The map below illustrates catchment area within 5
km, 10 km and 20 km influence zone of JLN Stadium.
Figure 2: JLN catchment area The major residential areas near the stadium
include Defence Colony, Sewa Nagar, Lodhi
Colony, Pragati Vihar and Kotla-
Mubarakpur. JLN is also closely located to
affluent market places such as Khan Market,
Khanna Market and Meherchand Market.
4
The Come & Play Scheme was initiated by SI at various stadium complex for optimum utilization of sports facilities in Delhi and across
the country. The scheme primarily focusses on encouraging local sports persons and sports enthusiasts with an opportunity to train
under SI coaches. The trainees are provided with playing arenas/non-consumable equipment such as field, track, tables, mats, etc. and
minimum inescapable consumables like balls, shuttle-cocks, etc. by SAI. However, trainees are required to bring sports equipment like
racquets, bats etc.
5
Major Regional Sports Facility Feasibility Study, City of Darebin, September 2014
Page | 18
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
Stakeholder’s Perspective
It is imperative to identify major stakeholders of the project who would help define a vision for the
development.
A comprehensive stakeholder engagement would help identify the requirements of the sports fraternity and
accordingly design the facilities. This would also help achieve higher utilization of the infrastructure facilities.
Sports India
SI intends to upgrade the current facility at JLN stadium into a world class sports stadium in terms of
infrastructure and utilization. Below are some of the key objectives which SI aims to achieve7.
„ The stadium should address the needs of all sections of sports community.
„ The development should be financially self-sustainable
„ The design should incorporate hostel / hotel / service apartment accommodation requirement for
players and coaches (3 to 5 star accommodation).
„ The stadium should be able to house a footfall with 20 lakh viewers
„ The stadium should be open and accessible to all classes of people/ strata of society
„ Sporting facilities for senior athletes should not be impacted during construction phase
„ The design and operative mechanism of the stadium should encourage younger generation to use
the facilities
„ The stadium should adhere to international standards of athletic events
6
The analysis has been carried out based on secondary data collection from SI officials.
7
The objectives have been identified in consultation with SI and NITI Aayog for self-sustainable development of sports infrastructure
facility.
Page | 19
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
„ The sports facilities should be segregated for elite athletes and recreational sports
User Interaction
► Users’ perspective –
o 80% of the users use public transport to commute while few users use private vehicles, and
others residing in the nearby areas prefer to walk
o 70% of the users are attracted because it has experienced coaching staff
o 65% of the users have positive intentions towards new facilities such as 24x7 gyms and
swimming pools
o 90% of users believe that the facility is well run and maintained with minor issues pertaining
to location of washrooms and water coolers.
► Parents –
o 79% of the parents willing to send their children on account of any increases in tariff up to
Rs. 150 per month.
o 80% of the parents were satisfied with the current sports infrastructure. However, there are
no waiting area/hall for parents.
o One major concern highlighted during our interaction with parents was lack of adequate in
house medical facility.
► Coaches and Administrators –
o Archery and cricket facility is small in terms of area and needs to be expanded in order to
cater large number of users.
o No warm up area provided for basketball users while more futsal fields are required for
football.
o Badminton courts are not built as per international standards.
o Designated changing rooms and drinking water facility is required for the weightlifting facility.
o The administrators highlighted shortage in manpower and inadequate marketing campaigns
to promote existing schemes and benefits provided at the stadium.
The details of the primary survey conducted at JLN stadium is included in Annexure 2.
Page | 20
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
MARKET STUDY
Page | 21
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
3.Market Study
Market study is the most crucial aspect driving project conceptualization and feasibility assessment. It is
critical to understand the competitive assessment framework of the market in which the stadium is expected
to operate and expected footfall. The first key task for assessing potential development in these proposed
facilities is to determine the market demand for each offered sport as well as latent demand for new facilities.
This was undertaken through conducting a detailed site assessment and study the competitive developments
in the vicinity of the stadium. This section undertakes detailed assessment of competitive sports and retail
facilities in the vicinity of JLN stadium.
8
The assimilation of information was undertaken by consultant from information available in public domain through DDA website.
Page | 22
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
A comparative analysis between JLN Stadium, Siri Fort and Saket Sports Complex was done on the following
parameters:
Notes:
1. Sporting facilities includes cricket, football, athletics, wrestling, weightlifting, cycling, shooting,
badminton, lawn tennis etc.
2. Non – Sports facilities include aerobics, yoga, recreational games such as bowling, virtual games etc.
The figure illustrates the gap in non-sport activities that other competing sport complexes offer to its users
ultimately leading to an enhanced sport experience with other allied recreational activities. Effective land
utilization of JLNS is significantly lower as compared to Siri fort and Saket that have demonstrated
substantially higher utilization owing to their small area and no. of users availing higher number of facilities.
The higher number of offering of these sport complexes have significantly mobilized the youth in catchment
area to inculcate these sports/recreational activities in their daily life and therefore, sport complexes are now
a hub of youth affairs.
Page | 23
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
The land utilization ratio of Siri Fort is the highest as compared to the other two stadiums. It offers over 20
activities in less than 50% area of JLN.
B) User Profile
The primary survey conducted highlight that >70% % of users at JLN have an average annual income of 4 -
8 lakhs p.a., while for Siri Fort Sports and Saket Sports Complex is majority are high income group users.
C) Membership Options
The table compares the membership options available at the three stadiums.
JLN does not offer casual membership as well as corporate membership. This restricts the number of users
as compared to the other competing sports facilities. The minimum membership tenure is 1 year while the
other sports complex offer flexibility in defining the membership period. Also, the number of academies are
much lower as compared to Saket Sports Complex and Siri Fort Complex.
Page | 24
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
A catchment area assessment was conducted to determine the commercial retail rates of market areas in
the vicinity of JLN Stadium. This would help reflect the lease potential of any proposed commercial
development.
Page | 25
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
Page | 26
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
Hospitality in Vicinity
JLN falls in the proximity of Lutyen’s Delhi that is known for its hospitality to foreigners in form of various Five
Stars Hotels namely:
Page | 27
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
DEVELOPMENT OPTIONS
Page | 28
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
3.Development Concept
The development concept of the JLN stadium complex has been derived by keeping the objective of
introducing ‘Sports into the DNA of the nation’ as the pivotal point in establishing the context. A sports hub
envisaged to offer state of the art training facilities come and play schemes, sports practice, recreational
sports and competition based ecosystem to catalyze the development of sports at multiple levels. This
includes fitness as a way of living, accessibility to the best of facilities to all strata of the society, recreational
sports to encourage the spirit of sportsmanship and competition across the board, training national and
international level sports players as well as creating an infrastructure capable of hosting international sporting
events with supporting allied facilities. The same was arrived at through the following steps:
Sports Excellence
The stadium complex was analyzed, studying the existing infrastructure and the applicable development
regulations to optimize the potential of the facility with respect to up-gradation and addition of new facilities.
Following are the key points undertaken in the assessment
„ Studying & analyzing the planning norms and policies applicable to the site.
„ Analyzing the existing infrastructure of the stadium complex.
„ Analyzing the components and potential for up-gradation /optimizing of the existing infrastructure to
enhance sports facilities/ disciplines under come and play scheme as well as international level
training facility.
„ Benchmarking and analyzing best practice sports stadiums/ complexes (hosting major international
competitions) with allied facilities.
Planning Norms
Name Description
Zonal Development Plan D
Use Zone Designated Public Semi Public
Sub category PS-3
Sports Facilities / Complex /
Stadium
Ground Coverage 20% (including Amenities)
FAR 0.4
ECS 2 ECS/ 100 Sq. M
The stadium complex falls under Zone D of the Zonal Development plan under Master plan Development
2021. It is categorized as PS-3 under Public Semi- Public Zone which includes Sports Facilities / complex/
Stadium/ Sports Centre. The category of Sports Facilities was updated from Recreational Category to the
Public- Semi Public category to ensure building of stadiums and facilities capable of hosting International /
Mega Sporting Events like the Common Wealth Games. With an FAR (Floor Area Ratio) of 40 applicable
under this category, ground coverage of 20 % is allowed as per the existing bye laws.
Page | 29
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
As defined in figure below, the total area demarcated as the stadium complex is 95 Acres or 38 Hectares.
With a built up of 40 available, 60 % of the applicable FAR has already been consumed in making various
sports facilities. Similarly, nearly 70 % of the total applicable Ground coverage is consumed in the existing
facilities, not including open to air field- of- play and other facilities. This gives a total of 62000 Sq. Meters of
remaining Built up and 6 Acres of remaining ground coverage to build additional facilities.
Page | 30
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
As per MPD -2021 under PS-3 following activities are permitted presently, including 5 % Sports related
commercial, Multi use stadium for exhibitions, trade shows, Banquets, Multiple sports related events,
Extreme Sports, Academies, Sports Medicine, Water slides, wave pools, hydrotherapy, Akhara, Residential
accommodation like hostels, Ward residences etc. keeping the usage Sports relevant.
# Description
1 Sports related commercial @ 5%
2 Multi use stadium
3 Aquatic Centre
4 Outdoor sports/ extreme sports
5 Sports academy
6 Sports medicine
7 Residential accommodation
8 Playground
As per the National Transit oriented development policy, TOD needs to integrate land use and transport
planning and aims to develop planned sustainable urban growth centers, having walk able and livable
communes with high density mixed land-use. Citizens have access to open green and public spaces and at
the same time transit facilities are efficiently utilized.
It focuses on creation of high density mixed land use development in the influence zone of transit stations,
i.e. within the walking distance of (500-800 m) transit station or along the corridor in case the station spacing
is about 1km and advocates pedestrian trips to access various facilities such as shopping, entertainment and
work. Literature study for ToD is attached as Annexure A.5.
Figure 8: JLN Stadium Complex–Metro station distance
Page | 31
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
Apart from the existing sports facilities scattered across the 95 Acre campus, to make the campus a holistic
fitness cum sports center for training and come and play basis, following components have been identified
for come and play and general fitness purposes.
An additional multi use indoor sports hall without seating capacity to accommodate one 1 indoor Basketball
ball court or 2 Badminton Courts or 4 Table Tennis Court has been proposed to ensure National / International
level indoor training venue for the said sports. A 10 m shooting academy is also proposed as along with
Archery that is one sport which is picked up by amateurs across the age groups. A 50 m Olympic size pool
for fitness and recreational purposes has also been identified. A state of the art fitness center/ gymnasium
specially made available for the elite athletes as well as for come and play on differential timing is also a part
of the programme. A cafeteria with an attached nutritionist to monitor the diet intake for the athletes is tabled
under up gradation of facilities. The total investment totals up to 73 crores including contingencies and taxes.
Page | 32
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
Sports stadiums and infrastructure remains the pride of the nation and become the much needed symbol of
constructive young India. These stadiums not only provide match playing venues but also becomes centers
of training and excellence in sports. Already with the training programme and come and play schemes, most
of the Sports India Stadiums extensively support sports in the country. Being the kind of large infrastructure
needed to host international events, maintaining these stadiums/ venues after the events are over or in
between events remains a challenge across the world. We have studied best practices in stadiums via-a –
vis Olympic & world cup requirements to host a match. For Olympic venues, Athletics and football stadiums
have been studied. World cup venues for football, the redevelopment plans after the events, the viability
plans for maintaining sports with an added product mix and stadiums fallen to disrepair & disuse due to lack
of foresight across many venues have all been studied to understand the life cycle of a stadium, the
international match holding capability and the much needed sustainability of the project via supporting
functions. A list of major sports international events which could be held in the stadium have also been
identified along with their requirements. Details on best practices sports stadium with allied facilities and
support infrastructure as enclosed in Annexure A.
In case of 400 FAR, the areas under the stands which have been identified for sports retail can also be
completely left vacant for international matches and set up as the built up area available is sufficient to
accommodate the component of retail and sports related commercial.
Page | 33
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
As a first step towards creation of a sports ecosystem Identification and utilization of the unused spaces
within the stadium complex was done for Sports related retail, commercial and relevant functions to ensure
footfall and generate revenues.
The floor area available under the stands is a potential area which is presently not being optimally utilized.
The entire premise of getting in maximum footfall also needs to include sports supporting activities like sports
retail with Decathlon, Nike, Adidas, local sports equipment & sports fitness retailers, fine dining and health &
nutrition based restaurants, food court, health cafes, workshops, sports club, Library, Museum, fitness Centre
and we work offices/ sports media offices for the entire complex to get activated with footfalls and as
spectators to the practicing athletes/ sports players.
Of the total floor plates available on each floor under the stands, the following table shows the area which
has been identified as areas which may be used for Sports retail and sports commercial purposes. The
maximum floor areas are available on the ground and first floor of the stadium.
JLN Stadium
Area Statement under the Stadium (In Sq. M)
Floors Built up Area (Sq.) Available Area (Sq.)
Ground Floor 25,000 11,830
Part A 4,875
Part B 5,890
Part C 295
Part D 770
First Floor 16,900 10,620
Second Floor 11,660 7,630
Concourse 12,570 9,220
Page | 34
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
Figure 10: Floor wise utilizable area and total floor area
Due to the geometry & layout of the Stadium, the concourse has presently not been utilized for commercial
purposes. The ground, first and second has been utilized for various functions as detailed below. The list of
areas that are getting utilized for commercial/ retail purposes on various floors have been segregated & listed
below with the original functions as used during the common wealth games 2010.
Page | 35
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
Page | 36
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
Page | 37
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
A total of 29,000 Sq. Meters of Area under the stands has been identified as potentially leasable areas for
various sports related activities.
Delhi as a city lacks any avenues for Adventure sports or Endurance /Obstacle courses kind of training or
recreational facilities which are much in demand and people often travel to nearby states during weekends
and otherwise to avail the same experience. We have identified a set of 8 Sports Adventure zones which are
recreational in nature but still remain competitive in spirit. The idea is to generate the JLNS Adventure hub
as a weekend get away with Virtual Reality games, Go Karting tracks, Yoga- Zumba /Meditation, Zip lining,
Climb Central kind of activities which require more open areas and very little built infrastructure. In the
background of the stadium, surrounded by Elite Athletes, it is an ambience one cannot match. Getting the
footfalls for this and the sports clubs too may eventually lead to a wider pool of sports players, Athletes to
choose from.
Page | 38
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
S. No Activities
2 Zip lining
4 Bowling Alley
5 Virtual Reality Arcade
6 Go Karting
Sports Club
To be designed/ planned as a support activity to the Sports Club or as an independent activity could be left
to the discretion of the developer. The prime purpose of introducing Sports retail/ food court within the entire
planning matrix is to charge and activate the sporting areas during the non-sports event days which tend to
go passive otherwise. Also a revenue generation and support to the maintenance of the sports infrastructure
could be looked at, based on the financial feasibility of the project. Chess club, Snooker, pool, Squash courts,
Tennis etc. could easily become a part of the program and lead to indirect increase of foot falls.
Studying some of the top sports Academies and Sports Universities across the world, a career in Sports
Journalism, coaching, sports medicine, sports Sciences, Research in the same field, nutrition, bio mechanics,
performance analysis etc. lacks in the country on a holistic level. Also to be included in the University
curriculum is a basic graduation/post-graduation course with highest applicable sports Quota in the country.
A compilation of top sports courses and Universities across the world and India is compiled below. Such a
program not just brings in revenues but also provides the much needed base resource for training coaches,
indigenous research, performance management, nutrition rehabilitation etc. both as career options in sports
as well as trained skillset in the sports sector of India
The Retail zone would be designed as per the commercial viability of the project and anticipating the
recreational and entertainment need of the residents, the zone could also include a shopping plaza/ arcade,
spa, salon, health and fitness equipment stores , and other recreation facilities which are sports centric or
relevant.
The retail sector could also could have a supermarket or hyper-mart, large grocery shops, shops selling
sports branded goods, consumer durable outlets, postal services, retail banks, fine dining restaurants or
popular food chains, Sports club, clinics, medical stores etc.
Page | 39
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
Being centrally located, there already exist many government / semi government offices in and around JLN
stadium. Scope Complex, IHC, NBCC and many other government and semi government departments have
been the area for decades and there is demand for more. Presently Income tax department already occupies
the 2nd floor of the JLN stadium. Similar Government department are expected to occupy the office sector
with substantial revenue generation.
Commercial offices
To infuse young India, young energy and sports into the DNA of the system, there are also collaborative
offices spaces like ‘We work’ set ups identified for the area. Also sports related media, publication, talent
hunt agencies, Sports events, studios are expected to be set up in the premises.
Residential zone
The residential zone is envisaged as one which is relevant to the activities taking place in the stadium
complex. A combination of Hostels, Service apartments and Hotels makes up the residential zone as
compared to typical housing of the government / private sector.
Hostels
Hostels are already a requirement due to the presence of sports academies, university, training camps and
coaching which takes place round the year. Elite Amateur Sports players in various disciplines could be
accommodated here during the training period. A 500-600 capacity hostel can be planned.
Service Apartments
1 BHK or 2 BHK service apartments could be constructed to accommodate athletes and coaches from
outside the country.
The stadium complex is envisaged as a hub of international sports events and also sports training. Apart
from local sports players and the elite athletes already training and staying in sports hostels, we anticipate
sports conferences and conventions taking place here apart from Sports performance and management
training. Players, coaches, sports officials, sports & fitness enthusiasts from across the country and world
are expected to travel here for recreational, matches and sports medicine, injury, rehabilitation and training
purposes. To accommodate the same, the component of Hotels, Hostels and Service apartments as
components add more to the program than a conventional housing set up. 1, 4 star hotel with 250 keys and
1, 3 star hotel with approximately 200 keys can be proposed.
Support infrastructure
Apart from the allied infrastructure such as parking ECS accommodation, waste and water management, this
section lists out the other support infrastructure for the sports component.
To start with the road sections; the main road leading up to the stadium complex and the parking should
cater to the influx of spectators in their numbers calculated individually as vehicular and pedestrians. For this
the road sections should be in adherence to the National building codes and the local byelaws, should be
appropriately marked with signage and markings that should be clearly visible in the night and day. A clear
and appropriate designing of the wide pavements meant to cater to the large number of spectators during
the sporting events is a must should be adhered to. A clear division of service lines such as power, storm
Page | 40
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
water and sewer should be planned as per NBC and the local byelaws with appropriate provisions for easy
maintenance time to time.
Apart from the above, easy access for old and handicapped, benches, dustbins, ticket vending shelters
should be equally and appropriately distributed for a hassle free and smooth operations during any large
sporting event within the stadium complex.
The entire development is interspersed with large tracts of green spaces distinguished as green belts, visual
greens, and recreational greens. The zone is planned with amenities and utilities designed to conform to
internationally accepted standards, integrating latest technology, and addressing environmental concerns to
ensure quality sports facilities and quality of life.
Page | 41
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
The Mandala: The concept plan of the stadium complex development is derived from the symbol of Sri
Chakra or the primordial energy source out of which all creation emanates. A trinity of Gyan Shakti
(Knowledge), Ichcha Shakti (Will) and Kriya Shakti (Action) pertaining to sports , knowledge, education,
sciences, sports academies, sports university, competitions, training, performance management, coaching,
sporting events and excellence in sports is what this complete Mandala intents to complete in the sports life
cycle. The 8 petalled Mandala with its Centre being the source of energy represents the stadium at the Centre
with its 8 hubs created around the stadium supporting & augmenting the energy of Young India energy and
sports excellence. We can provide the best of facilities but they are built around human beings at the core.
To generate a sports culture which pulls in a wider pool of athletes, a wider pool of access as well as relevant
activities need to be curated. After all, talent does not differentiate between classes. To ensure the same,
the programme of the non-professional sports has been designed to bring in people across the strata of the
society. It caters to low income group as well as high income group without differentiating. These hubs create
environments which even through recreational sports keep the spirit of competition and excellence alive.
The Observing how parents of these future athletes in both IG & JLN stadium complexes spend time while
their wards train and practice, it makes sense to in some ways include them in the process as they remain
highly invested. It could be on the lines of skill based certification courses or workshops of short duration run
by National Institute of Sports.
Page | 42
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
In the case of 400 FAR as per TOD Zone a mix of Sports Adventure hub, University, Academies, Retail,
Commercial offices, Government offices.
8 Government offices
3,09,842 667
9 Semi Government offices
Page | 43
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
Sports Complex under PPP Mode
Regulatory compliances
This section highlights the regulatory compliances required for the re-development of JLN stadium. This
includes details regarding the concerned regulatory bodies as well as the critical approvals that need to be
obtained for the successful implementation of the recommended project.
JLN stadium
South Delhi Municipal Corporation
National Monument Authority(A.S.I)
Page | 44
FINANCIAL ANALYSIS
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
4.Financial Analysis
Project Structure
A wide spectrum of models have emerged in development and management of infrastructure facilities which
enable private sector participation through guided risk sharing mechanism in providing efficient level of
services. As per World Bank report on models in PPP, the project structuring vary from short-term simple
management contracts (with or without investment requirements), long-term and very complex BOT form, to
divestiture. These models vary mainly by:
Various states in India such as Gujarat and Rajasthan, have delineated the role of PPP in their sports policy
while other states such as Madhya Pradesh have already started development of sports cities via the PPP
mode. The sports policy of Haryana, a leading sporting state, defines in depth the need for development of
sports facilities when developing new commercial/ residential spaces. 9 Keeping in mind the need of
developing places for development and promotion of sports. Such provisions can have a long term impact
on improving the sports culture in every state. Timely planning and development of sports infrastructure
seems to the current problem. PPP as an enabler in sports infrastructure has been further discussed in
Annexure A.6.
9 Development of Sports & Sports Infrastructure: A Roadmap – Assocham - Yes Bank, February 2014
Page | 46
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
sports facility and commercialization of the project commercial space. The objectives of the proposed model
involve the following:
► To upgrade current sports facilities and operate and maintain the facilities for 30 years as per
specified performance standards.
► Further additionally develop additional sporting facilities and operate and maintain these facilities for
30 years
► Develop, operate and maintain commercial areas as per applicable laws for [45 (30+15) - 60 (30+30)
yrs.].
► Sports SI facilities to be regulated by SI but operated and maintained by private sector
Given the current investment climate in India, the project structure has been widely used across various
infrastructure sector such as roads, power & transmission and airports wherein it provides the developer the
opportunity by entering into financing agreements with lenders and equity investors in the form of support
during the construction and operation phases. The supporting revenue returns realized from commercial
development shall be well accepted by developers/Investors. Hence it is recommended to adopt a similar
project structure for JLN stadium. The consultant further analyzed best international practices for evaluating
different project structures followed under PPP to implement and manage such infrastructure facilities. The
best international practices are covered in Annexure A.7.
Page | 47
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
Risk Allocation
Contractual structure are influenced by a number of factors. If the fundamentals of a PPP transaction are
well thought through, particularly in relation to risk allocation, it is possible to finance and execute such
transactions that represent value despite current challenges in funding and execution.
Cost and time overruns will largely be driven by the type of contract used and by the experience and
competency of the contractor. It is important that the contractual structure protects the public sector from the
financial consequence of delays in the delivery of proposed infrastructure. The various risks associated with
the different phases of the project life cycle and the mitigation strategies have been tabulated in table 32
below.
Page | 48
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
Key Stakeholders
As mentioned earlier, the proposed project structure clearly defines relationships between key project
stakeholders. The key stakeholders relevant to the project will be:
For the purpose of this analysis, it is assumed that the selected private partner (and therefore the project
SPV) will act as a main developer, i.e. the SPV will engage in development of the entire facility i.e. sports
facility and commercial establishments. Since a PPP project always entails that the private entity is best
suited to undertake the project; hereafter mentioned are the roles and responsibilities between SI and the
developer.
Page | 49
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
4 Collection of revenues √
Accordingly, financial analysis has been carried out to arrive at range of realizable premium after factoring in
the project cost and other applicable terms of the project. The principle followed in assessing the premium/
amount to be realized to SI is how much selected developer would be required from the project after meeting
all capital and operating expenses including debt service cost and after retaining an equity return of
approximately 18% from the project.
The financial analysis has been undertaken for proposed development plan options of 40 FAR and 400 FAR
as discussed in Section 4: Development options.
Area Statement
In order to suggest a suitable product mix, it has been kept in mind that the revenue potential for the
development should be maximum. On the basis of Master Plan for Delhi 2021, the following area statement
has been considered for analysis.
Page | 50
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
Probable loss on built-up area due to TOD influence zone & ASI norms
-
@up to 50%
Net available Built-up on TOD (probable) 14,56,378
Key Assumptions
The financial analysis is based on set of assumptions and inputs from our analysis. These set of assumptions
are based on the secondary researches, industry benchmarks and EY’s experience of sector knowledge.
These sets of assumptions & inputs are given below:
Concession period
The concession period considered is 45 years for commercial development and 30 years for stadia’s
operation and maintenance which is inclusive of 24 months of construction period.
Cost inputs
The construction cost has been assumed on the basis of discussion and inputs as per the prevailing market
condition. Annual escalation rate is based on last ten years long term WPI index as published by GOI.
Page | 51
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
Project phasing
Major financing assumptions including debt-equity ratio, cost of debt and equity etc. are considered on the
basis of other infrastructure development sectors like roads, ports, railways as well as inputs from financial
institutions such World Bank during consultation for financial appraisal of similar projects.
Terms of Debt
1 Interest Rate (per annum) 10%
2 Principal Moratorium (yrs.) 2
3 Repayment period 10
Equity
1 Cost of Equity 18%
2 Debt to Equity Ratio 65:35
3 Weighted Average Cost of Capital (WACC) 10.5%
Taxation
1 Income Tax Rate 34.90%
2 MAT Rate 21.30%
3 Carry forward of losses (yrs.) 8
4 Carry forward of MAT (yrs.) 15
Considering long term concession period, it has been assumed that developer would be able to enter into
arrangement with end users on long term lease/ sale basis of retail asset class. Therefore Operation &
Maintenance (O&M) expenses have not been considered for the same. Major components of O&M cost
estimates considering first year of operations are illustrated in the table below:
Page | 52
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
# Assumptions Remarks
4 security 0.33
Revenue assumptions
The proposed development options involves exploring various opportunities which complement in the
revenue generation. Such development formats may include commercial, office space, retail space, hotels
and residential including service apartments.
10
Information from Sports India and EY Analysis
11
EY Analysis
Page | 53
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
Page | 54
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
Project revenues
Snapshot of the project revenues for development at 40 and 400 FAR is elucidated in table below:
Revenues in INR Cr
50,000
45,000
40,000
35,000
30,000
25,000 Total Revenues @ 40 FAR
20,000 Total Revenues @ 400 FAR
15,000
10,000
5,000
0
Financing structure
For the purpose of building the financial model we have assumed the tax and depreciation rates as provided
in the Income Tax Act and the Companies Act 2013.
Page | 55
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
Outputs
Key financial indicators have been summarized in the table below:
Page | 56
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
ANNEXURE
Page | 57
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
Ministry of Youth Affairs of Sports (MYAS) - The Ministry of Youth Affairs and Sports acts as the apex
government body for sports in India. It is primarily responsible for formulation of sports development
programmes, development of sports infrastructure in the country.
Sports India (SI) – SI is responsible to implement the objectives laid out by the MYAS. It releases funds
sanctioned by MYAS to NSFs and manage sports training and institution centers.
National Sports Federations (NSFs) – these are autonomous bodies responsible for promoting their
respective sports and organizing tournaments. These organizations are assisted by state and district sports
associations to meet the required goals and objectives. NSFs play at pivotal role in developing a sport with
their close association with base level authorities that promotes a sports right from school and village levels
up to the national level. The below figure illustrates sports ecosystem along with roles and responsibilities of
stakeholders.
Page | 58
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
In order to promote sports centric activities in India, the GoI has undertaken key initiatives for use by public.
The below table illustrates schemes currently being undertaken by SI to promote sports in India.
Age
Scheme Objective No. of center
Group
Extension
Develop schools and colleges having 70 centers, 1183 trainees
Centers of STC/ 12 – 18
adequate infrastructure (775 boys, 408 girls)
SAG Schemes
Page | 59
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
3. Mode of transport
4. Experience of Infrastructure
The analysis depicts the experience of current infrastructure at
JLNS. Since all the infrastructure was revamped during Common
Wealth games 2010, fair amount of the users think the current
facility is good in terms of infrastructure.
Page | 60
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
8. Willingness to pay
When asked about the increment in tariff of the facilities
majority of the users were comfortable in an increase less
than 5%. This points to fact that many users currently
coming to JLNS are price sensitive. While some of the
users were not concerned by the tariff increase, they would
still continue to use the facilities offered by JLNS.
Page | 61
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
Uses: The stadium is mainly abode to pay and play users, but apart from that it also hosts badminton and
squash games. It hosted 2014 Thomas and Uber cup for Badminton.
The Saket Sports Complex was developed by the DDA in 1990. It is spread over 18.5 acres in the area
between varying land use pattern.
Facilities Available: Aerobics, Badminton, Billiards/Snooker, Children’s park, Cricket, Dance, Fitness
Centre/Multi-Gym, Football, Jogging Track , Skating, Snack Bar, Squash, Swimming, Table Tennis,
taekwondo, Tennis, Western Dance, Yoga.
Page | 62
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
Meherchand Market
Ansal Plaza
Page | 63
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
Defence Colony
South Extension
Lajpat Nagar
Jor Bagh
Jor Bagh market is located close to Lodhi road post office and is also
within walking distance from Jor Bagh metro station. The market
houses a blend of regular shops such as convenience stores,
grocery shops and high end retail stores in terms of clothes,
accessories and electronics. This market is mostly frequented by the
nearby residents of INA, AIIMS and Jor Bagh. The market also
consists of banks and a bookstore.
Page | 64
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
Page | 65
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
It focuses on creation of high density mixed land use development in the influence zone of transit stations,
i.e. within the walking distance of (500-800 m) transit station or along the corridor in case the station spacing
is about 1km and advocates pedestrian trips to access various facilities such as shopping, entertainment and
work.
It also increases the accessibility of the transit stations by creating pedestrian and Non-Motorized Transport
(NMT) friendly infrastructure that benefits large number of people, thereby increasing the ridership of the
transit facility and improving the economic and financial viability of the system. Since the transit corridor has
mixed land-use, where the transit stations are either origin (housing) or destination (work), the corridor
experiencing peak hour traffic in both directions would optimize the use of the transit system
Page | 66
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
Delhi’s recent investments in Public Transport Systems which include a world class Metro System and a
planned BRT Network, Delhi has been unable to deliver efficient, comfortable and affordable mobility options
to its citizens. The current lack of connectivity, subsidized parking options as well as a lack of safety for
walkers, cyclists and women in the city has resulted in ever increasing number of private vehicles in the city.
Total vehicular emissions contribute to 70% of the air pollution in Delhi multiple respiratory ailments and
deaths. The objective of TOD is to restructure and redefine how a city works, lives and finds means of
recreation
Zone 1 : Intense Zone Zone 2: Standard TOD Zone Zone 3: TOD Transition Zone
Page | 67
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
The development in TOD is categorized under 3 Zones namely intense, standard and transition zones within
300 M, 800 M and 2000 Meter radius from the Metro Stations
case of JLN stadium, Jangpura stadium open to the East Gate of the stadium and more than 50 % of the
area falls under the 500 Meter radius from the Metro station. From the JLN Metro station on the same Violet
line, the Zone of influence covers more than 50 % of the complex area under the 800 Meter radius zone.
Since there are no protected monuments amongst the 52 A.S.I enlisted monuments in the vicinity of the
stadium complex, full utilization of TOD norms should be applicable to JLN Stadium Complex. The TOD
policy in Delhi is under review presently and is presently being scrutinized on project basis as well.
Page | 68
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
The existing stadiums in Delhi NCR have also been studied with their facilities to understand in case of a
major international sports event, how JLN stadium could be placed.
A list of major sports international events which could be held in the stadium have also been identified along
with their requirements.
In case of 400 FAR, the areas under the stands which have been identified for sports retail can also be
completely left vacant for international matches and set up as the built up area available is sufficient to
accommodate the component of retail and sports related commercial.
Major sports disciplines and facilities have been identified which can be upgraded to bring sports training
courts like the Basketball, badminton, Table Tennis, Handball etc. can be played under international match
playing conditions.
Jawaharlal Athletics/
Common Wealth
1 Nehru Sports Delhi 60,000 SAI Football/
games
Complex Weightlifting.
Indira
Cycling,
Gandhi Common Wealth
2 Delhi 14,348 SAI gymnastics,
Sports games
Wrestling.
Complex
Thyagraj
Govt of Common Wealth
3 Sports Delhi 4,494 Netball
NCT games
Complex
Talkatora
Common Wealth
4 Sports Delhi 3,035 NDMC Boxing
games
Complex
Page | 69
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
Common Wealth
R.K. Khanna
games, Fed Cup,
5 Tennis Delhi 5,015 DLTA Tennis
Davis cup, Indian
Stadium
open
Tennis,
Badminton, Table
Netaji
Tennis, Billiards /
Subhash
7 Delhi DDA Snooker / Pool, Training
Sports
Basket Ball,
Complex
Cricket, Football,
Squash
Common Wealth
Shivaji
8 Delhi 7,000 NDMC Hockey games Practice
Stadium
venue
Nawab
Mansur Ali
Badminton/
Khan Jamia
9 Delhi Basketball/ Table Training
Pataudi University
Tennis
Sports
Complex
Yamuna
Archery, Table Common Wealth
10 Sports Delhi 4,297 DDA
Tennis games
Complex
Jawaharlal
Nehru Cricket, Football,
11 Delhi 2,500 JNU Training
University Hockey
Stadium
National Kabaddi
Championship,
Athletics/
Karnail National Weightlifting
Football/ Cricket/
12 Singh Delhi 5,000 Railways Championship,
Hockey/
Stadium Women’s Cricket
Badminton.
world cup, ODI
cricket match
Page | 70
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
Siri Fort
13 Swimming Delhi DDA Swimming' Training
Pool
Aerobics/
Badminton/
Billiards /
CWG Village Snooker/ Commonwealth
14 Sports Delhi DDA Football/ Games Training
Complex Swimming/ Table Centre
Tennis/
Taekwondo/
Yoga
Surjit Singh
15 Badminton Delhi 200 Badminton Training
Academy
Siri Fort
Squash, Common Wealth
16 Sports Delhi 5,000 DDA
Badminton games, Thomas cup
Complex
Central
Reserve
Police Force Common Wealth
17 Khardarpur 345 CRPF Shooting
(CRPF) games
Shooting
Range
Dr. S.P.
Swimming,
Mukherjee Common Wealth
18 Delhi 5,178 SAI Diving, Water
Swimming games
polo
Stadium
Dr. Karni
Singh Common Wealth
19 Delhi 2,000 SAI Shooting
Shooting games
Range
Major Dhyan
Chand Common Wealth
20 Delhi 19,118 SAI Hockey
National games
Stadium
Page | 71
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
Delhi
Common Wealth
21 University Delhi 10,132 Rugby Seven
games
Stadium
Sr. No. Name and Sports Infrastructure Sports/ Non-Sports/ Real Estate
Location Components
Sports Capacity
Components
Sports Academies -
and Excellence
centres
Sports Clinic -
Page | 72
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
Sports Clinic -
Page | 73
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
wheelchair
basketball)
Page | 74
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
Sr. No. Name and Sports Infrastructure Sports/ Non-Sports/ Real Estate
Location Components
Sports Capacity
Components
Indoor hall
Page | 75
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
13 Athens Spyros Louis 72,000 Home pitch for AEK F.C., Greek national
Olympic Athens Olympic football team
Sports Stadium
Complex
Nikos Galis Olympic 19,250 Home court for Panathinaikos B.C.,
Indoor Hall Greek National Basketball Team
Studying some of the top sports Academies and Sports Universities across the world, a career in Sports
Journalism, coaching, sports medicine, sports Sciences, Research in the same field, nutrition, bio mechanics,
performance analysis etc. lacks in the country on a holistic level. Also to be included in the University
curriculum is a basic graduation/post-graduation course with highest applicable sports Quota in the country.
A compilation of top sports courses and Universities across the world and India is compiled below. Such a
program not just brings in revenues but also provides the much needed base resource for training coaches,
indigenous research, performance management, nutrition rehabilitation etc. both as career options in sports
as well as trained skillset in the sports sector of India
Page | 76
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
Loughborough University
Courses Description
sports management
Exercise As Medicine
Exercise Physiology
Sport Biomechanics
Sports Management
Mechanics of biochemical
Page | 77
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
Sport business
Sport marketing
Courses
sports journalism
Page | 78
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
Social science
30 yard indoor track for conditioning, strength, agility and speed training
Programs
Satellite personal training is perfect for accountable and highly motivated long
12 week program distance clients that are serious about reaching their performance and
transformation goals.
Athletic
development Training, nutritional plan, supplement plan, sport specific conditioning,
Program
Page | 79
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
Establishing a vision for redevelopment of any existing sports infrastructure shall typically address three key
questions.
What do we WANT?
This question deals with understanding the preliminary thoughts and ideas that lead to emergence of this
project concept. The thoughts at this stage are more focused towards building a “dream project” and
analyzing the international best practices to be brought into the current scenario. The stage brings in an
idealistic scenario which possible options. However it is important to study the operative environment by
adding realistic approach to the thought process, which leads us to our next question.
What do we NEED?
It is important to align our thought process of an “ideal stadium” with the current environment in which the
stadium operates. Development of a stadium or expanding the scope of an existing facility is related to many
factors like regulatory policies, political stability, market dynamics, usage patterns and many others. Thinking
of creating infrastructure in isolation or skipping any such factor may lead to ambiguity in successful results.
The final question relates to the extent we would want to explore the possible options. Every project faces
multiple constraints while structuring the options. These constraints could be financial, political, fundamental,
operational etc. in nature. Analysis of all the options considered at stage I, while creating our idea of an ideal
scenario should now be restricted to realistic and attainable options.
Addressing these questions will help us formularize a vision for this project and form a pragmatic approach
towards structuring of this report. The objective of this feasibility study is to outline the potential options for
increasing the utilization of this expansive and world-class infrastructure on a PPP mode. Methodology
proposed involves a combination of options including providing more facilities to the existing user groups
and/or targeting potential user groups for this facility. Another purpose of entering into a PPP to maximizing
both sustainable revenue, and ensuring access to citizens at large. However. It is a predetermined condition
for any options, to ensure that training and coaching for sportspersons with potential to contend for medals
at all levels shall continue unhindered. The prime motive is to unify sports with non-sports activities and
provide splendid experience to the sportspersons and other user groups involved.
Page | 80
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
The sports policy of most states is formed with the same objectives of `sports for all' and achieving 'excellence
in sports'. However, the micro aspects under various categories contribute towards the diversity in
performance by different states. However, over the last few years, sports industry has witnessed a
transformation at the back of factors like growing sophistication in infrastructure needs, increased visibility of
competitive sports, emergence of sports as a business proposition and proactive efforts of India to host
numerous mega sporting events. The launch of Khelo India initiative by the Government focusses on
developing sports infrastructure, encouraging a sporting culture through competitions and identifying and
nurturing young talent. However, there is a need for greater involvement of the private sector in sports
infrastructure development in India due to limitation of funds to develop and maintain the sports facilities as
well as lack of technical and management proficiency. There is a need for private funding, management,
skills and subsidies to further the national sports goals, as well as to develop a high potential and robust
domain with immense opportunities in the short and long term.
In developed economies, stadiums have been designed as multi-functional facilities which are capable of
hosting various sporting events, concerts and other types of entertainment as well. Such development have
resulted not only in effective utilization of facility, but also act as a catalyst for urban growth in the region.
Various states in India such as Gujarat and Rajasthan, have delineated the role of PPP in their sports policy
while other states such as Madhya Pradesh have already started development of sports cities via the PPP
mode. The sports policy of Haryana, a leading sporting state, defines in depth the need for development of
sports facilities when developing new commercial/residential spaces. 12 Keeping in mind the need of
developing places for development and promotion of sports. Such provisions can have a long term impact
12 Development of Sports & Sports Infrastructure: A Roadmap – Assocham - Yes Bank, February 2014
Page | 81
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
on improving the sports culture in every state. Timely planning and development of sports infrastructure
seems to the current problem.
Favorable PPP policy and direction/incentive for PPP in sports from the central government: The Union
Budget 2016 focused on reviving PPP for infrastructure creation through action for ensuring improved
liquidity, easier credit rating mechanism, and boosting (Real Estate Investment Trusts (REITs) and
Infrastructure Investment Trusts (InvITs), further easing fund flows. In addition, the central government may
develop guidelines for PPP in sports policy for states to adopt and make available case studies of successful
implementation of PPP by states in India. The center may incentivize states to adopt PPP to spur
infrastructure creation by using the same as a criteria for allotment of national games.
Case study: Envisaging and defining the role of PPPs for sports infrastructure development in
Andhra Pradesh
On account of Andhra Pradesh being selected to host the national games 2018-19, the State Government
has enhanced the budget for development of sports infrastructure. The Government of Andhra Pradesh
expects to make an allocation of almost INR1,000 crore for developing stadia in difference districts. The
objective of using PPP for sports infrastructure development stems from the flexibility it allows the
government to focus entirely on recruiting top physical education trainers and coaches to train youth in
different sports activities while the private players focus on the revenue aspect.
Source: Andhra Pradesh to allocate 1,000 crore for sports infrastructure, The Hindu
The State Government believes taking up the PPP mode would allow for the incorporation of a provision
for setting up shopping complexes and other infrastructure in the stadium. This would not only help in
effective maintenance of the stadium but would also make the stadium self-sufficient in terms of revenue.
PPP initiative, private players would be allowed to open these facilities for the citizens on payment of fees
and the stadium can be put to use all year round, driving sporting culture. Once built, the stadium could
also double as a venue for business activities, annual general meeting, school games, sports functions,
regional games, music concerts, live performances, etc.
Page | 82
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
In a typical PPP structure, the project company may engage a subcontractor to operate and maintain those
facilities to enable the procuring authority to carry out its business at the facilities. However, this project is
unusual as the project company is also charged with running the day to day activities at the facilities in a way
that complements the procuring authority broader objective of facilitating and encouraging sport in Singapore.
Another unique element of the project relates to the fact that the project company not only receives a monthly
tariff in respect of the basic steady-state operation but is also incentivized to maximize the usage of the
facilities and ensure a vibrant calendar of events. These incentives come in the form of a sharing mechanism
with the authority in respect of third party revenues generated at the venues, whether through ticket sales,
venue hiring income, commercial rights income, car park charges or retail rental fees.
Key learnings
u Engaging multi-faceted participation of PPP Co. with global experience in operating and maintaining the
facility
u Freedom to PPP for design of facility
u Performance based revenue mechanism on construction and O&M activities
u Defect liability and deduction on payment mechanism for non-performance on O&M works
u Incentivize the PPP Co for maximizing the usage of the facility
u Promoting participation in sports activities through marketing major marquee events
u Exploiting commercial rights to maximize project revenue
Page | 83
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
Amsterdam ArenA
In the case of Amsterdam ArenA, due to the significant investment costs and the willingness of the City of
Amsterdam to delegate operational tasks to other parties, a public-private partnership was structured. The
vision of the Amsterdam ArenA’s stakeholders was to create a venue capable of hosting world class sporting
and non-sporting events, open seven days a week and with the potential to become like a second city center
of Amsterdam. AFC Ajax the football Club invested only in football-related development (its core business)
as it is the main tenant and the most important user of the ArenA. The stadium was leased to Ajax as an off-
balance way of financing with zero cash transactions. Eight major private companies, the so called
“founders”, invested in the project in exchange for sponsorship and exclusive hospitality rights for a ten year
period. The commercial partners became the first choice suppliers of different goods and services and they
all received the rights to a private sky lounge. However, they do not have any stake in the stadium ownership.
Key learnings
u The Government investment in the ArenA act as an catalyst to encourage urban renewal and growth in
the region
u Concession of the site was granted for a fairly low minimal price in order to lower the financial burden
u Government income generated through real estate project developed in the region in the subsequent
years
u AFC Ajax invested only in football related development as its main tenant and user of Arena
u Investment of commercial partners in exchange for sponsorship and exclusive hospitality rights for a ten
year period
u The earlier sale of the depositary receipts, or “certificates of share”
u Stadium tour and museum serving as an important revenue sources for the operator.
u The parking complex under the stadium, the Transferium, is owned and operated directly by the
Municipal Authority.
Page | 84
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
Perth Arena
The keystone event behind the decision to
build the Arena was the Hopman Cup tennis
tournament. However, to be successful, the
Arena hosts a range of other events. The
procurement options analyzed and identified
that for the stadium and sports precinct works
in package, a Design, Build, Finance and
Maintain (DBFM) model was undertaken to
best balance the control of project cost and risk
with the achievement of the project objectives,
and most likely to maximize value-for-money
(VFM) outcomes for the state. The state also
selected to make a capital contribution of 60% of the construction cost. Whereas, payment during the
operating phase is in the form of a Monthly Service Payment (MSP) calculated in accordance with the Project
Agreement and paid in arrears. The MSP covers the remainder of the construction costs, financing costs and
maintenance costs including lifecycle replacement. The MSP is subject to abatement in accordance with the
abatement regime set out in the Project Agreement. The state retains the responsibility, through the
appointment of a stadium operator, for the day-to-day operation of the stadium and sports precinct. The state
also retains ownership of the stadium and sports precinct.
Key learnings
Page | 85
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium
under PPP Mode
Transstadia
The stadium has been developed with a
project cost ~INR 540 Cr on a land area of ~
10 acre. The stadium consists of
development of 16 sports & entertainment,
hospitality, retail etc. with an objective based
on "utilization model". The emphasis was on
to create a facility wherein each part will
contribute to the revenue. But this model
requires that the facility be situated within the
city. It is being developed on PPP model land
lease model with a concession period of 35
years, extendable for a further 35 years, with
two percent revenue sharing for sports development in the country. The Arena boasts of a FIFA standard
natural turf with a seating capacity of 20,000, including patented expertise that enables the conversion of a
section of the stadium into a 4,000 capacity pillar-less multi-purpose indoor venue, creating an optimum
spectator experience. Not only can the latter can be utilized for 12 indoor sports, it can further increase the
revenue by hosting exhibitions, social functions, conventions and corporate events. The facility also house a
'members only' Eka Club, which will become a fitness and entertainment hub for the city.
Key learning
u Use of technology for effective utilization of land which can be transformed in activity hub
u Use of space in non-sports activities are essential as they contribute to large scale revenue expectations
u Longer land lease concession period enable the PPP Co. to develop stable cash flow
u Membership program for non-sport activities such as club, fitness and entertainment hub to support
revenue potential for PPP Co.
u Marketing initiative such as leasing branding rights, major marquee events can promote sports facility
u Commercial sports activities through such as Pro-Kabaddi, sports retail brands are other potential
avenue of revenues.
Page | 86
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium under PPP Mode
Page | 87
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium under PPP Mode
Page | 88
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium under PPP Mode
Page | 89
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium under PPP Mode
Page | 90
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium under PPP Mode
Page | 91
Pre - Feasibility Study for Redevelopment of Jawaharlal Nehru Stadium under PPP Mode
Page | 92
Our offices
Ahmedabad Delhi NCR Kolkata
2nd floor, Shivalik Ishaan Golf View Corporate Tower B 22 Camac Street
Near C.N. Vidhyalaya Sector 42, Sector Road 3rd Floor, Block ‘C’
Ambawadi Gurgaon - 122 002 Kolkata - 700 016
Ahmedabad - 380 015 Tel: + 91 124 464 4000 Tel: + 91 33 6615 3400
Tel: + 91 79 6608 3800 Fax: + 91 124 464 4050 Fax: + 91 33 2281 7750
Fax: + 91 79 6608 3900
3rd & 6th Floor, Worldmark-1 Mumbai
Bengaluru IGI Airport Hospitality District 14th Floor, The Ruby
6th, 12th & 13th floor Aerocity, New Delhi - 110 037 29 Senapati Bapat Marg
“UB City”, Canberra Block Tel: + 91 11 6671 8000 Dadar (W), Mumbai - 400 028
No.24 Vittal Mallya Road Fax + 91 11 6671 9999 Tel: + 91 22 6192 0000
Bengaluru - 560 001 Fax: + 91 22 6192 1000
Tel: + 91 80 4027 5000 4th & 5th Floor, Plot No 2B
+ 91 80 6727 5000 Tower 2, Sector 126 5th Floor, Block B-2
+ 91 80 2224 0696 NOIDA - 201 304 Nirlon Knowledge Park
Fax: + 91 80 2210 6000 Gautam Budh Nagar, U.P. Off. Western Express Highway
Tel: + 91 120 671 7000 Goregaon (E)
Ground Floor, ‘A’ wing Fax: + 91 120 671 7171 Mumbai - 400 063
Divyasree Chambers Tel: + 91 22 6192 0000
# 11, O’Shaughnessy Road Hyderabad Fax: + 91 22 6192 3000
Langford Gardens Oval Office, 18, iLabs Centre
Bengaluru - 560 025 Hitech City, Madhapur Pune
Tel: +91 80 6727 5000 Hyderabad - 500 081 C-401, 4th floor
Fax: +91 80 2222 9914 Tel: + 91 40 6736 2000 Panchshil Tech Park
Fax: + 91 40 6736 2200 Yerwada
Chandigarh (Near Don Bosco School)
1st Floor, SCO: 166-167 Jamshedpur Pune - 411 006
Sector 9-C, Madhya Marg 1st Floor, Shantiniketan Building Tel: + 91 20 6603 6000
Chandigarh - 160 009 Holding No. 1, SB Shop Area Fax: + 91 20 6601 5900
Tel: +91 172 331 7800 Bistupur, Jamshedpur – 831 001
Fax: +91 172 331 7888 Tel: +91 657 663 1000
BSNL: +91 657 223 0441
Chennai
Tidel Park, 6th & 7th Floor Kochi
A Block (Module 601,701- 9th Floor, ABAD Nucleus