JUSTIFICACIÓN VELOCIDAD MENOR A 0,9 : EPA 1999; Metcalf y Eddy, 2003; GLUMRB, 2004 Rodriguez,
2019.
Metcalf & Eddy (2003) Wastewater Engineering: Collection, Treatment, Disposal , 4th ed., McGraw-Hill,
New York, pp. 315–344
Mackenzie L. Davis, P. D. (2010). HEADWORKS AND PRELIMINARY TREATMENT. McGraw-Hill Education:
New York, Chicago, San Francisco, Athens, London, Madrid, Mexico City, Milan, New Delhi,
Singapore, Sydney, Toronto. /content/book/9780071713849/chapter/chapter20
http://portal.unimap.edu.my/portal/page/portal30/Lecture%20Notes/School%20of
%20Environmental%20Engineering/Semester%201%20Sidang%20Akademik%2020152016/EAT
%20303%20WASTEWATER%20ENGINEERING/LECTURE%20NOTES/Chapter
%2020%20headworks_and_preliminary_treatment.pdf
Riffat, R. (2012). Fundamentals of Wastewater Treatment and Engineering. CRC Press.
https://books.google.com.co/books?
id=DnmCDU5YZXEC&pg=PA88&lpg=PA88&dq=Minimum+approach+velocity+in+the+bar+screen+c
hannel+is+0.45+m/s+to+prevent+grit+deposition&source=bl&ots=oI-
89OUlcT&sig=ACfU3U1MrEtGhCZYdezT4hcaeDUVv26w2w&hl=es&sa=X&ved=2ahUKEwj31uLhzqD
oAhVDMt8KHaPeBLQQ6AEwAHoECAoQAQ#v=onepage&q=Minimum%20approach%20velocity
%20in%20the%20bar%20screen%20channel%20is%200.45%20m%2Fs%20to%20prevent%20grit
%20deposition&f=false
GLUMRB (2004) Recommended Standards for Wastewater Facilities , Great Lakes–Upper Mississippi
River Board of State and Provincial Public Health and Environmental Managers, Health Education
Services, Albany, New York, pp. 60-1–60-9
http://shura.shu.ac.uk/20564/1/10701211.pdf
Justificación 0,81:
https://www.pseau.org/outils/ouvrages/moud_in_manual_on_sewerage_and_sewage_treatment
_part_a_engineering_2012.pdf; CAPÍTULO 5
Wastewater Treatment and Recycling Prof. Manoj Kumar Tiwari School of Water Resources Indian
Institute of Technology, Kharagpur:
https://nptel.ac.in/content/storage2/nptel_data3/html/mhrd/ict/text/105105178/lec24.pdf
Sin embargo, cuanto menor sea la velocidad, mayor
será la cantidad de
sólidos depositados en el canal
Velocidad critica 0,45
http://site.iugaza.edu.ps/anassar/files/2013/02/San-Lect-15-17.pdf
0,6 a 1 m/s
https://www.tpomag.com/uploads/downloads/Screening-
Considerations_Guide_Huber_180119_133914.pdf
largo del canal de 2 a 3 m
https://www.tandfonline.com/doi/pdf/10.1080/23311916.2020.1723782
HUBER Technology Inc. (s. f.). Recuperado 21 de marzo de 2020, de https://www.huber-
technology.com//
MANUAL ON SEWERAGE AND SEWAGE TREATMENT, PART A :
ENGINEERING. CHAPTER 5: DESIGN AND CONSTRUCTION OF SEWAGE
TREATMENT FACILITIES.