0% found this document useful (0 votes)
761 views1 page

Sub-Contract Pre-Mobilization Checklist: Reset Print

This document is a pre-mobilization checklist for subcontractors working on a project. It contains sections to verify that the subcontractor has completed a risk assessment, inducted all workers, inspected and certified equipment is safe, has hazardous substance registers and MSDS available, supplied certificates of competent persons, identified HSE representatives, provided evidence of toolbox talks, and has the necessary PPE available that meets approved standards. Upon completing all items, the project manager will authorize work to commence.

Uploaded by

pandu_chemeng
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
761 views1 page

Sub-Contract Pre-Mobilization Checklist: Reset Print

This document is a pre-mobilization checklist for subcontractors working on a project. It contains sections to verify that the subcontractor has completed a risk assessment, inducted all workers, inspected and certified equipment is safe, has hazardous substance registers and MSDS available, supplied certificates of competent persons, identified HSE representatives, provided evidence of toolbox talks, and has the necessary PPE available that meets approved standards. Upon completing all items, the project manager will authorize work to commence.

Uploaded by

pandu_chemeng
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Sub-contract Pre-Mobilization Checklist

Project Date

Subcontractor Prepared By

Activity Designation

S# Activity Comments Completed N/A Initials

1.0 Risk Assessment


Risk Assessment for safety and environment submitted
1.1
to PM.
1.2 All activities addressed in the risk assessment.

1.3 HSE plan/ JSA’s competed and accepted by PM.

2.0 Inductions

2.1 All workers inducted for the project

3.0 Equipment
All equipment inspected and certified to be in safe
3.1
condition.
Where necessary, government compliance certificates
3.2
available.
3.3 Electrical equipment tested, tagged and colour coded.

3.4 Lifting equipment inspected and lifting gear colour coded

4.0 Hazardous Substances

4.1 Hazardous substances register available and complete.

4.2 MSDS available for all hazardous substances.

5.0 Certificates
Copy of certificates of competent persons supplied to
5.1
PM.
6.0 Communication
Name of representative for HSE committee supplied to
6.1
PM.
6.2 Evidence available for toolbox talks topics.

7.0 PPE
All necessary high visibility clothing and other PPE
7.1
available.
7.2 PPE is to the approved standards.

Authorized to commence work