Sub-contract Pre-Mobilization Checklist
Project Date
Subcontractor Prepared By
Activity Designation
S# Activity Comments Completed N/A Initials
1.0 Risk Assessment
Risk Assessment for safety and environment submitted
1.1
to PM.
1.2 All activities addressed in the risk assessment.
1.3 HSE plan/ JSA’s competed and accepted by PM.
2.0 Inductions
2.1 All workers inducted for the project
3.0 Equipment
All equipment inspected and certified to be in safe
3.1
condition.
Where necessary, government compliance certificates
3.2
available.
3.3 Electrical equipment tested, tagged and colour coded.
3.4 Lifting equipment inspected and lifting gear colour coded
4.0 Hazardous Substances
4.1 Hazardous substances register available and complete.
4.2 MSDS available for all hazardous substances.
5.0 Certificates
Copy of certificates of competent persons supplied to
5.1
PM.
6.0 Communication
Name of representative for HSE committee supplied to
6.1
PM.
6.2 Evidence available for toolbox talks topics.
7.0 PPE
All necessary high visibility clothing and other PPE
7.1
available.
7.2 PPE is to the approved standards.
Authorized to commence work
Approved By Project Date
Remarks
Reset Print
OHS-C1-009-001-R00