SITE TEST REPORT Date :
Customer:
Contractor’s name:
SEC-EOA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
DESCRIPTION : UNDER/ OVER VOLTAGE ( REQ560 )
Page 1 of 7
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:
1. GENERAL DATA AND INFORMATION
Make : Serial No. :
Type/Model No.: Rated Voltage :
Line/Bay : Aux. Voltage :
Panel No. : PTR Used :
ELECTRICAL TEST
3.1 OPERATING DC SUPPLY CURRENT:
DC VOLTAGE DC CURRENT DURING FAULT
LIMIT: (According to the Catalogue page no )
3.2 Voltage Measurement Accuracy Test:
Voltage Injected Voltage Measured Voltage % Error
Phase Terminal
Primary Secondary Primary Secondary
R
B
LIMIT: (According to the Catalogue page no )
DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
SEC-EOA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
DESCRIPTION : UNDER/ OVER VOLTAGE ( REQ560 )
Page 2 of 7
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:
3.3 Functional testing
3.3.1 UNDER VOLTAGE TEST:
i) PICK-UP / DROP-OFF TEST:
S e tting Pic k up Dro p-o ff
(V) (V) (V)
LIMIT: (According to the Catalogue page no )
ii) TRIP TIME CHARACTERISTIC TEST:
a) INVERSE TIME CHARACTERISTIC:
OPER. TIME AT OPER. TIME AT
TMS S ETTING
CAL. ACT. (s) CAL. ACT. (s)
LIMIT: (According to the Catalogue page no )
DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
SEC-EOA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
DESCRIPTION : UNDER/ OVER VOLTAGE ( REQ560 )
Page 3 of 7
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:
b) DEFINITE TIME CHARACTERISTICS:
OPERATING TIME (s)
SET TIME (s)
AT
LIMIT: (According to the Catalogue page no )
3.3.2 OVER VOLTAGE TEST:
i) PICK-UP / DROP-OFF TEST:
S e tting Pic k up Dro p-o ff
(V) (V) (V)
LIMIT: (According to the Catalogue page no )
ii) TRIP TIME CHARACTERISTIC TEST:
a) INVERSE TIME CHARACTERISTIC:
OPER. TIME AT OPER. TIME AT
TMS S ETTING
CAL. ACT. (s) CAL. ACT. (s)
LIMIT: (According to the Catalogue page no )
DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
SEC-EOA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
DESCRIPTION : UNDER/ OVER VOLTAGE ( REQ560 )
Page 4 of 7
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:
b) DEIFINITE TIME CHARACTERISTICS:
OPERATING TIME (s)
SET TIME (s)
AT
LIMIT: (According to the Catalogue page no )
4. LED Checks:
LED no. Configured for Operation checked
4.1 Input/Relay output checks:
Inputs
Input 1
Input 2
Input 3
Input 4
Input 5
Output relays
Output 1
Output 2
Output 3
DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
SEC-EOA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
DESCRIPTION : UNDER/ OVER VOLTAGE ( REQ560 )
Page 5 of 7
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:
Output 4
Output 5
Output 6
Output 7
Output 8
5) FINAL SETTING:
5.1 UNDER VOLTAGE TEST:
i) PICK-UP / DROP-OFF TEST:
S e tting Pic k up Dro p-o ff
Re ma rks
(V) (V) (V)
DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
SEC-EOA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
DESCRIPTION : UNDER/ OVER VOLTAGE ( REQ560 )
Page 6 of 7
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:
ii) OPERATING TIME TEST:
TRIP TIME CHARACTERISTIC TEST:
a) INVERSE TIME CHARACTERISTIC:
b) DEIFINITE TIME CHARACTERISTICS:
S ET TIME (s) OPERATING TIME AT
5.2 OVER VOLTAGE TEST:
i) PICK-UP / DROP-OFF TEST:
S e tting Pic k up Dro p-o ff
Re ma rks
(V) (V) (V)
ii) OPERATING TIME TEST:
TRIP TIME CHARACTERISTIC TEST:
a) INVERSE TIME CHARACTERISTIC:
b) DEIFINITE TIME CHARACTERISTICS:
S ET TIME (s) OPERATING TIME AT
TEST EQUIPMENT USED:
DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
SEC-EOA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
DESCRIPTION : UNDER/ OVER VOLTAGE ( REQ560 )
Page 7 of 7
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:
Equipment Calibration Calibration
Sl. No Description Make
Sl .No Date Due Date
DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________