Alfanar Co.: Site Test Report Sec-Eoa Name of Substation: Dammam Housing 115/13.8KV Substation # 1

This site test report summarizes testing of under and over voltage protection equipment at the Dammam Housing 115/13.8kV Substation #1. Key tests included: 1. Measuring DC operating current and verifying it was within limits. 2. Testing voltage measurement accuracy and ensuring errors were within specified percentages. 3. Functionally testing under and over voltage protection, including pick-up/drop-off points and trip time characteristics. 4. Checking LED indicators and input/output relays were operating correctly. 5. Making final settings and ensuring they were within catalog limits.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
249 views7 pages

Alfanar Co.: Site Test Report Sec-Eoa Name of Substation: Dammam Housing 115/13.8KV Substation # 1

This site test report summarizes testing of under and over voltage protection equipment at the Dammam Housing 115/13.8kV Substation #1. Key tests included: 1. Measuring DC operating current and verifying it was within limits. 2. Testing voltage measurement accuracy and ensuring errors were within specified percentages. 3. Functionally testing under and over voltage protection, including pick-up/drop-off points and trip time characteristics. 4. Checking LED indicators and input/output relays were operating correctly. 5. Making final settings and ensuring they were within catalog limits.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 7

SITE TEST REPORT Date :

Customer:
Contractor’s name:
SEC-EOA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
DESCRIPTION : UNDER/ OVER VOLTAGE ( REQ560 )
Page 1 of 7
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

1. GENERAL DATA AND INFORMATION

Make : Serial No. :

Type/Model No.: Rated Voltage :

Line/Bay : Aux. Voltage :

Panel No. : PTR Used :

ELECTRICAL TEST

3.1 OPERATING DC SUPPLY CURRENT:

DC VOLTAGE DC CURRENT DURING FAULT

LIMIT: (According to the Catalogue page no )

3.2 Voltage Measurement Accuracy Test:

Voltage Injected Voltage Measured Voltage % Error


Phase Terminal
Primary Secondary Primary Secondary
R

B
LIMIT: (According to the Catalogue page no )

DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
SEC-EOA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
DESCRIPTION : UNDER/ OVER VOLTAGE ( REQ560 )
Page 2 of 7
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

3.3 Functional testing

3.3.1 UNDER VOLTAGE TEST:


i) PICK-UP / DROP-OFF TEST:

S e tting Pic k up Dro p-o ff


(V) (V) (V)

LIMIT: (According to the Catalogue page no )

ii) TRIP TIME CHARACTERISTIC TEST:

a) INVERSE TIME CHARACTERISTIC:

OPER. TIME AT OPER. TIME AT


TMS S ETTING
CAL. ACT. (s) CAL. ACT. (s)

LIMIT: (According to the Catalogue page no )

DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
SEC-EOA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
DESCRIPTION : UNDER/ OVER VOLTAGE ( REQ560 )
Page 3 of 7
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

b) DEFINITE TIME CHARACTERISTICS:

OPERATING TIME (s)


SET TIME (s)
AT

LIMIT: (According to the Catalogue page no )

3.3.2 OVER VOLTAGE TEST:


i) PICK-UP / DROP-OFF TEST:

S e tting Pic k up Dro p-o ff


(V) (V) (V)

LIMIT: (According to the Catalogue page no )

ii) TRIP TIME CHARACTERISTIC TEST:


a) INVERSE TIME CHARACTERISTIC:

OPER. TIME AT OPER. TIME AT


TMS S ETTING
CAL. ACT. (s) CAL. ACT. (s)

LIMIT: (According to the Catalogue page no )

DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
SEC-EOA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
DESCRIPTION : UNDER/ OVER VOLTAGE ( REQ560 )
Page 4 of 7
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

b) DEIFINITE TIME CHARACTERISTICS:

OPERATING TIME (s)


SET TIME (s)
AT

LIMIT: (According to the Catalogue page no )

4. LED Checks:

LED no. Configured for Operation checked

4.1 Input/Relay output checks:

Inputs

Input 1
Input 2
Input 3
Input 4
Input 5

Output relays

Output 1
Output 2
Output 3

DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
SEC-EOA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
DESCRIPTION : UNDER/ OVER VOLTAGE ( REQ560 )
Page 5 of 7
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

Output 4
Output 5
Output 6
Output 7
Output 8

5) FINAL SETTING:
5.1 UNDER VOLTAGE TEST:
i) PICK-UP / DROP-OFF TEST:

S e tting Pic k up Dro p-o ff


Re ma rks
(V) (V) (V)

DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
SEC-EOA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
DESCRIPTION : UNDER/ OVER VOLTAGE ( REQ560 )
Page 6 of 7
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

ii) OPERATING TIME TEST:

TRIP TIME CHARACTERISTIC TEST:


a) INVERSE TIME CHARACTERISTIC:

b) DEIFINITE TIME CHARACTERISTICS:

S ET TIME (s) OPERATING TIME AT

5.2 OVER VOLTAGE TEST:


i) PICK-UP / DROP-OFF TEST:

S e tting Pic k up Dro p-o ff


Re ma rks
(V) (V) (V)

ii) OPERATING TIME TEST:

TRIP TIME CHARACTERISTIC TEST:


a) INVERSE TIME CHARACTERISTIC:

b) DEIFINITE TIME CHARACTERISTICS:

S ET TIME (s) OPERATING TIME AT

TEST EQUIPMENT USED:

DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
SEC-EOA
ALFANAR CO.
Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :
4400006262
DESCRIPTION : UNDER/ OVER VOLTAGE ( REQ560 )
Page 7 of 7
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

Equipment Calibration Calibration


Sl. No Description Make
Sl .No Date Due Date

DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________