0% found this document useful (0 votes)
41 views2 pages

Construction Check Sheet I-037A: Instrument Instrument Loop Wiring Continuity Test Record

This document records the results of an instrument loop wiring continuity test. It lists the loop and diagram numbers, component test statuses, cable and device tag numbers, and continuity test results between tags. Any bonding, cable earth continuity, polarity, or isolation checks are also noted. The test equipment used is documented, along with approval signatures from the contractor, Jacobs, and Chemetall accepting the test results.

Uploaded by

hrimklim
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views2 pages

Construction Check Sheet I-037A: Instrument Instrument Loop Wiring Continuity Test Record

This document records the results of an instrument loop wiring continuity test. It lists the loop and diagram numbers, component test statuses, cable and device tag numbers, and continuity test results between tags. Any bonding, cable earth continuity, polarity, or isolation checks are also noted. The test equipment used is documented, along with approval signatures from the contractor, Jacobs, and Chemetall accepting the test results.

Uploaded by

hrimklim
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

CONSTRUCTION CHECK SHEET I-037A

INSTRUMENT
INSTRUMENT LOOP WIRING CONTINUITY TEST RECORD
PROJECT DESCRIPTION PROJECT No.
SYSTEM DESCRIPTION SYSTEM No.
SERVICE DESCRIPTION TAG No.

Loop No: Loop Diagram No:


Reviewed Inspection/Test status of each loop components, found satisfactory and records are available:

bonding(Ω)Cable earth
Continuity/Polarity Test *Isolation Checks (by multi meter)

All wires reconnected


Secondary Cable Tag Interface Cabinet Tag
Instrument Tag Number JB Tag Number Main Cable Tag Number Shield
Number Number (+) to (-) to (+) to (-) to
(+) (-) Shield
Shield Shield Ground Ground
to
Ground

Remarks: RELEASED FOR LOOP CHECKING :

Test Equipment Type: Make: Model No: Sl.No: Cal Due Date:
*Results should be open circuit.
COMPLETED BY CONTRACTOR APPROVED BY JACOBS ACCEPTED BY CHEMETALL
NAME NAME NAME
COMPANY COMPANY REF. IND.
CONSTRUCTION CHECK SHEET I-037A
INSTRUMENT
INSTRUMENT LOOP WIRING CONTINUITY TEST RECORD
PROJECT DESCRIPTION PROJECT No.
SYSTEM DESCRIPTION SYSTEM No.
SERVICE DESCRIPTION TAG No.

SIGN & DATE SIGN & DATE SIGN & DATE

You might also like