Construction Cost Breakdown

The document appears to be a bid comparison between two contractors, PE's Estimate and Ayush Nirman Sewa, for various construction and maintenance projects. It includes 9 line items with descriptions, quantities, units, rates, and amounts for each contractor. Ayush Nirman Sewa provided lower total bids of Rs. 1,484,839.20 compared to PE's Estimate total of Rs. 1,970,517.24, resulting in Ayush Nirman Sewa being ranked first.

Uploaded by

nitish Jha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views4 pages

Construction Cost Breakdown

The document appears to be a bid comparison between two contractors, PE's Estimate and Ayush Nirman Sewa, for various construction and maintenance projects. It includes 9 line items with descriptions, quantities, units, rates, and amounts for each contractor. Ayush Nirman Sewa provided lower total bids of Rs. 1,484,839.20 compared to PE's Estimate total of Rs. 1,970,517.24, resulting in Ayush Nirman Sewa being ranked first.

Uploaded by

nitish Jha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

SL.

NO Category Hierarchy

1 Provisional Sum #[XXX0001]>

2 General works>

3 General works>

4 MINOR MAINTAINANCE (Parapet wall Culvert Safety Barriars etc.)>

5 MINOR MAINTAINANCE (Parapet wall Culvert Safety Barriars etc.)>

6 MINOR MAINTAINANCE (Parapet wall Culvert Safety Barriars etc.)>

7 MINOR MAINTAINANCE (Parapet wall Culvert Safety Barriars etc.)>

8 Painting Works>

9 Painting Works>
Total Price (Without VAT and PS)
Discount
Discounted Total
Rank
PE's Estimate
Item Name & Description
Quantity Unit
NA 1 PS

Insurance for the loss or damage to works,


plants, material, equipment and personal
injury of death. (Clause No. 14 of
Condition of Contract) 1 Job

Maintain traffic flow either by diversion or


traffic control and provide safety measures
during working hours as instructed by the
engineer.(SS 102) 1 Job

Providing and laying of Plain/Reinforced


Cement Concrete in Foundation complete
as per Drawing and Technical
Specifications. PCC Grade M 15. etc. all
complete as per specification and drawing. 28.28 cu.m

Providing,repairing and laying Random


Rubble Stone Masonry work in cement
mortar1:4 in structure complete as per
Drawing and Technical Specifications 32.94 cu.m

Providing ,repairung and laying Brick


Masonry Work in Cement mortar in
Foundation / structure complete excluding
Pointing and Plastering, as per Drawing
and Technical Specifications Cement sand
mortar (1:4) 19.2 cu.m

Providing and applying 12.5 mm thick


Plaster with cement mortar on brick work
structure as per Technical Specifications
Cement sand mortar (1:4) 51.84 Sq.m
Double coat whitewash on new surface
including supply of materials all complete. 710.64 Sq.m
Single coat enamel paint with primer
including supply of materials all complete. 3830.64 Sq.m
PE's Estimate ayush nirman sewa
Official Rate (NRs) Amount Rate
0 0 0

10000 10000 25000

25000 25000 20000

10845.83 306720.07 16000

9862.48 324870.09 10000

16242.28 311851.78 14000

307.47 15939.24 250

52.52 37322.81 300

245.08 938813.25 150

1970517.24
0
1970517.24
NA
h nirman sewa Mohan Nirman Sewa 1
Amount Rate Amount
0 0 0

25000 15000 15000

20000 10000 10000

452480 8500 240380

329400 8000 263520

268800 9500 182400

12960 250 12960

213192 100 71064

574596 180 689515.2

1896428 1484839.2
0 0
1896428 1484839.2
2 1