0% found this document useful (0 votes)
63 views1 page

Khadim-E-Punjab Abe Sehat Project

The document outlines the table of contents for the PC-I form of the Khadim-e-Punjab Abe Sehat Project. It includes 9 annexures providing details on the project location, existing water supply systems, technical parameters and process flows, cost estimates, implementation activities, financial phasing, implementation plan, timelines, and water quality data. The project aims to improve water supply systems across 21 districts and 78 tehsils in Punjab province.

Uploaded by

FAHAD HASSAN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
63 views1 page

Khadim-E-Punjab Abe Sehat Project

The document outlines the table of contents for the PC-I form of the Khadim-e-Punjab Abe Sehat Project. It includes 9 annexures providing details on the project location, existing water supply systems, technical parameters and process flows, cost estimates, implementation activities, financial phasing, implementation plan, timelines, and water quality data. The project aims to improve water supply systems across 21 districts and 78 tehsils in Punjab province.

Uploaded by

FAHAD HASSAN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

KHADIM-E- PUNJAB ABE SEHAT PROJECT

PC – I
TABLE OF CONTENTS

PART DESCRIPTION

PART-A PC-I FORM

PART-B ANNEXURES

Annexure-A Project Location, Detail of 21 Districts and 78 Tehsils.

Annexure-B Detail of PHED Existing RWSS i/c Population, Plant type and capacities.
Project Technical Parameters, Process flow diagram for RO & UF Plants
Annexure-C
and Technical parameters used for decision of RO & UF
Project Cost Estimate including Operation Maintenance cost and PMU
running cost i/c Detailed TOR for Engineering Management Consultants,
Annexure-D
Project Management Consultants, Financial Management Consultants,
Third Party Validation and Resident Construction Supervision Consultants.
Annexure-E Detail of Component-Wise, Year Wise Physical activities

Annexure-F Detail of Year Wise / Component wise financial phasing


Project Implementation Plan i/c Project Implementation schedule, HR
Management, Procurement, Risk Mitigation, M & E Plan, Communication
Annexure-G
Framework, PMU organogram and Consultants Construction supervision
stage organogram.
Annexure-H Project Time lines

Annexure-I Water Quality Data and Source data of PHED Functional RWSS

You might also like