0% found this document useful (0 votes)
41 views3 pages

Problem 2 - 2: Week Crew Yards Installed

This document contains data on yards installed by construction crews over 6 weeks, with crew sizes ranging from 2 to 4 workers installing between 50 and 96 yards per week. It also includes output, workers, and materials used for 4 weeks of production. Finally, it lists the yards installed by different construction units with varying numbers of employees.

Uploaded by

Kahan Modi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views3 pages

Problem 2 - 2: Week Crew Yards Installed

This document contains data on yards installed by construction crews over 6 weeks, with crew sizes ranging from 2 to 4 workers installing between 50 and 96 yards per week. It also includes output, workers, and materials used for 4 weeks of production. Finally, it lists the yards installed by different construction units with varying numbers of employees.

Uploaded by

Kahan Modi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

PROBLEM 2 - 2

Yards
Week Crew Installed
1 4 96
2 3 72
3 4 92
4 2 50
5 3 69
6 2 52
PROBLEM 2 - 3

Output Materials
Week (Units) Workers (lbs)
1 30,000 6 450
2 33,600 7 470
3 32,200 7 460
4 35,400 8 480
PROBLEM 2 - 7

Yards
Unit Employees Installed
A 4 36
B 5 40
C 8 60
D 3 20