0% found this document useful (0 votes)
82 views1 page

Initiation/Administration: Specifications, or Other Supporting Documents in This Column)

This document contains a work estimation table that outlines the phases, activities, and tasks for a project with optimistic, most likely, and pessimistic effort hour estimates. However, all of the effort hour estimates in the table are currently set to 0.00 hours, indicating that work estimates have not yet been determined for any of the project phases, activities, or tasks. Supporting document links are also included but are currently blank.

Uploaded by

vishalmate10
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
82 views1 page

Initiation/Administration: Specifications, or Other Supporting Documents in This Column)

This document contains a work estimation table that outlines the phases, activities, and tasks for a project with optimistic, most likely, and pessimistic effort hour estimates. However, all of the effort hour estimates in the table are currently set to 0.00 hours, indicating that work estimates have not yet been determined for any of the project phases, activities, or tasks. Supporting document links are also included but are currently blank.

Uploaded by

vishalmate10
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

Work Estimation Details Optimistic Most Likely Pessimistic Confidence 75% 85% 95% 99.

5%
Supporting Document Links: (Enter Links to Requirements,
SDLC Phases Activity/Task Effort Hrs Effort Hrs Effort Hrs Factor Confidence Confidence Confidence Confidence Specifications, or other supporting documents in this column)
Initiation/Administration 0.00 0.00 0.00 0.00 0.00
Status Meetings 0.00 0.00 0.00 0.00 0.00
Status Reporting 0.00 0.00 0.00 0.00 0.00
Planning 0.00 0.00 0.00 0.00 0.00
Requirements/Scope Review 0.00 0.00 0.00 0.00 0.00
Resource Requirements Review 0.00 0.00 0.00 0.00 0.00
Assumptions and Constraints Specification
0.00 0.00 0.00 0.00 0.00
Analysis 0.00 0.00 0.00 0.00 0.00
Functional Impact Analysis 0.00 0.00 0.00 0.00 0.00
Process Model Review and Update
0.00 0.00 0.00 0.00 0.00
Functional Requirements Specification 0.00 0.00 0.00 0.00 0.00
Application Impact Analysis 0.00 0.00 0.00 0.00 0.00
Design 0.00 0.00 0.00 0.00 0.00
Technical Design Development 0.00 0.00 0.00 0.00 0.00
Logical Database Design 0.00 0.00 0.00 0.00 0.00
Prototype Presentation 0.00 0.00 0.00 0.00 0.00
Design Acceptance 0.00 0.00 0.00 0.00 0.00
Construction 0.00 0.00 0.00 0.00 0.00
Coding 0.00 0.00 0.00 0.00 0.00
Unit Testing 0.00 0.00 0.00 0.00 0.00
Test Plan Updates 0.00 0.00 0.00 0.00 0.00
Test Data Validation 0.00 0.00 0.00 0.00 0.00
Software Configuration Management 0.00 0.00 0.00 0.00 0.00
Release/Build Updates 0.00 0.00 0.00 0.00 0.00
Technical Documentation 0.00 0.00 0.00 0.00 0.00
User Documentation 0.00 0.00 0.00 0.00 0.00
Testing 0.00 0.00 0.00 0.00 0.00
Test Environment Setup 0.00 0.00 0.00 0.00 0.00
Test Plan Finalization 0.00 0.00 0.00 0.00 0.00
QA Testing 0.00 0.00 0.00 0.00 0.00
Documentation Validation 0.00 0.00 0.00 0.00 0.00
Integration Testing 0.00 0.00 0.00 0.00 0.00
Performance Testing 0.00 0.00 0.00 0.00 0.00
Implementation 0.00 0.00 0.00 0.00 0.00
Final Documentation Review 0.00 0.00 0.00 0.00 0.00
Deployment Dress Rehearsal 0.00 0.00 0.00 0.00 0.00
Internal Staff Training 0.00 0.00 0.00 0.00 0.00
Deployment Support 0.00 0.00 0.00 0.00 0.00
Support 0.00 0.00 0.00 0.00 0.00
Post Production Warranty Support 0.00 0.00 0.00 0.00 0.00
Post Implementation Reviews 0.00 0.00 0.00 0.00
Work Estimate Totals 0.00 0.00 0.00 0.00 0.00 0.00 0.00