Steel Structure Fabrication Report
Page 1/1
Consultant : PTT POLYETHYLENE COMPANY CTD. Job No. : PL-5104
Client : TOYO THAI CORPORATION LTD. Report No. : FIR-001
Project Name : PTTPE LLDPF PROJECT (D- 138) Date :
INSPECTOR NAME : Mr. SURAT MUNKONG
Prece Mark No. QTY SIZE LENGTH FIT-Up WELDING BOLT HOLE GUSSET PL. STRAIGHTEN BASE. Pt DATE NDE. WPS NO. WELDER.
COMPLETED BY Sub Contractor TTCL Client Reprsentative
COMPANY Pilin-Project Co.,LTD.
SIGNATURE
NAME Mr. RAMIN YODSIRI Mr. SURAT MUNKONG
DATE
85
Steel Structure Fabrication Report
Page 2/3
Consultant : PTT POLYETHYLENE COMPANY CTD. Job No. : PL-5104
Client : TOYO THAI CORPORATION LTD. Report No. : FIR-001
Project Name : PTTPE LLDPF PROJECT (D- 138) Date : 7/1/2008
INSPECTOR NAME : Mr. SURAT MUNKONG
Prece Mark No. QTY SIZE LENGTH FIT-Up WELDING BOLT HOLE GUSSET PL. STRAIGHTEN BASE. Pt DATE NDE. WPS NO.
COMPLETED BY Sub Contractor TTCL Client Reprsentative
COMPANY Pilin-Project Co.,LTD.
SIGNATURE
NAME Mr. RAMIN CHAROENPOL Mr. SURAT MUNKONG
DATE
Page 2/3
WELDER.
ative
Steel Structure Fabrication Report
Page 3/3
Consultant : PTT POLYETHYLENE COMPANY CTD. Job No. : PL-5104
Client : TOYO THAI CORPORATION LTD. Report No. : FIR-001
Project Name : PTTPE LLDPF PROJECT (D- 138) Date : 6/30/2008
INSPECTOR NAME : Mr. SURAT MUNKONG
BOLT GUSSET STRAIGHT
Prece Mark No. QTY SIZE LENGTH FIT-Up WELDING BASE. Pt DATE NDE. WPS NO. WELDER.
HOLE PL. EN
COMPLETED BY Sub Contractor TTCL Client Reprsentative
COMPANY Pilin-Project Co.,LTD.
SIGNATURE
NAME Mr. RAMIN CHAROENPOL Mr. SURAT MUNKONG
DATE