KUDALGI TORANAGAL
CU
L
Co VER
n T
Wid dition DET
:Go A
Typ e:3.5 od ILS:-
X
Bed e:Box 3.00
RB
L c u 0M
Inv e
ert vel: 1 lvert
Ro
ad Level 046.9
Top :10 80
Lev 49.7
el :1 07
050
.32
RB
6
School
Temple RB RB
DETAILS:-
CULVERT
ood
Condition:G
0M Dia
Wide:1X0.90 ert
e:P ipe culv
Typ
Lev el: 1054.771
Bed
rt Lev el :1054.481
Inve 5.280
Level :105
Road Top
DATE: 30/10/2010 - 11:47amPATH: C:\Documents and Settings\saran\Desktop\AP & LS Final Package- 2 B1 (27-09-10) on cad5\165 to 170 Km AP & LS (()).dwg
Proposed Roadway Bund Top Hecto metre Stone Water Tap PROJECT : CLIENT :
Infrastructure Development ALIGNMENT PLAN AND
Proposed Center Line Electric Pole Temporary Bench Mark Sign Board Development Of Road From
Corporation Karnataka (Ltd.) LONGITUDINAL SECTION
Existing Roadway Telephone Pole Kilometer Stone Building , Hut Kudligi - Sandur - Toranagal From Ch: 169000.000 to Ch: 170000.000
(iDeck)
Existing Center Line Transformer Trees Bore Well
CONSULTANT :
Proposed ROW Line Name Board Temple,Church Bridge, Culvert Feasibility Study For The Development of SCALE: Hor - 1:3700 DRG. NO. : SAI-2935/2010/Package-2B1/DPR/AP&LS-05
Fence Line OFC Stone Hand Pump Bus Shelter Shivamoga - Harihar - Harappanahalli Road Ver - 1:370
Sheet : 05 of 50
Compound Wall
(SH-25 & 2) and Other Connecting Roads REVISION : PC