The NTCIP Guide
The NTCIP Guide
September 1999
This is a draft document, which is distributed for review and comment purposes only. You may reproduce and distribute this
document to facilitate review and comment to the NTCIP Guide Project Manager through the NTCIP Coordinator. Please ensure
that all copies reproduced or distributed bear this legend. This document contains information that is subject to change.
Published by
Copyright 1999 by the American Association of State Highway and Transportation Officials (AASHTO), the Institute of
Transportation Engineers (ITE), and the National Electrical Manufacturers Association (NEMA). All intellectual property rights are
reserved, except as described as follows, by the copyright owners under the laws of the United States of America, the Universal
Copyright Convention, the Berne Convention, and the International and Pan American Copyright Conventions. Permission to freely
reproduce, distribute, and/or translate into other languages is granted provided that (1) this copyright notice appears on the front of
the document, (2) “© 1999 AASHTO, ITE, NEMA” appears on every page of the text, and (3) the text is not edited or used out of
context.
Acknowledgements
The NTCIP development effort is guided by the NTCIP Joint Committee, which consists of six
representatives each from the American Association of State Highway and Transportation
Officials (AASHTO), the Institute of Transportation Engineers (ITE), and the National Electrical
Manufacturers Association (NEMA). This NTCIP Guide is one of the many NTCIP documents
developed under a cooperative agreement among these organizations.
The previous edition of the NTCIP Guide was prepared in February 1997. Realizing that it had
become outdated, the NTCIP Joint Committee initiated a project to develop an updated guide
document. The NTCIP Guide Update Team has prepared this document as part of that project,
with direction from the NTCIP Joint Committee and input from a peer review team selected for
this effort.
At the time that this document was prepared, the following individuals were members of the
NTCIP Guide Update Team:
• G. Curtis Herrick, Project Manager and Principal Author
• Gary Duncan, Principal Author
• Craig C. Gardner, Principal Author
• Robert de Roche, Principal Author
• Kenneth L. Vaughn, Principal Author
• Paul Bell, Principal Author
• Warren A. Tighe, Principal Author
• Joe Stapleton, Peer Review Team Leader
In addition to the many volunteer efforts, recognition is also given to those organizations who
supported the efforts of the NTCIP Guide Update by providing guidance, comments and funding
for the effort:
• ARINC, Inc.
• California Department of Transportation
• City of Atlanta
• Connecticut Department of Transportation
• Eagle Traffic Control Systems, Inc.
• Econolite Control Products, Inc.
• Florida Department of Transportation
• Federal Highway Administration
• Gardner Transportation Systems, Inc.
• Georgia Department of Transportation
• Houston Metropolitan Transit Authority
• Image Sensing Systems, Inc.
• Kansas Department of Transportation
• Kentucky Transportation Center
• Minnesota Department of Transportation
• New York City Transit Authority
• New York Department of Transportation
• Odetics ITS, Inc.
• Ontario Ministry of Transportation
• P. B. Farradyne, Inc.
• PEEK Traffic Systems, Inc.
• Southwest Research Institute
• Texas Department of Transportation
• Texas Transportation Institute
• Virginia Department of Transportation
• Washington State Department of Transportation
CONTENTS
1 Foreword 1
1.1 Disclaimer ................................................................................................................................... 1
1.2 Purpose of the NTCIP Guide ....................................................................................................... 1
1.3 Organization of the NTCIP Guide ................................................................................................ 2
1.4 Additional Information.................................................................................................................. 3
2 Executive Summary 4
2.1 Introduction ................................................................................................................................. 4
2.2 Overview of NTCIP...................................................................................................................... 4
2.3 What is NTCIP? .......................................................................................................................... 6
2.4 Why Do We Need NTCIP? .......................................................................................................... 6
2.5 Lessons Learned......................................................................................................................... 7
2.6 Resources................................................................................................................................... 8
2.6.1 Training ............................................................................................................................... 8
2.6.2 Technical Abilities ................................................................................................................ 9
2.6.3 Projects ............................................................................................................................... 9
2.6.4 Compliance Testing ............................................................................................................. 9
3 Understanding NTCIP 10
3.1 Introduction ............................................................................................................................... 10
3.2 Benefits of NTCIP ..................................................................................................................... 10
3.2.1 Avoid Early Obsolescence ................................................................................................. 11
3.2.2 Provide Choice of Vendor .................................................................................................. 11
3.2.3 Enable Interagency Coordination ....................................................................................... 11
3.2.4 Use One Communications Network for All Purposes .......................................................... 12
3.3 Types of Systems and Devices Supported by NTCIP................................................................. 12
3.4 Applications Not Addressed by NTCIP....................................................................................... 14
3.5 The Levels or Modules Involved in NTCIP Communications ...................................................... 15
3.6 The NTCIP Framework.............................................................................................................. 16
3.7 NTCIP Standards and Protocol Stacks ...................................................................................... 19
3.8 Options and Conformance Levels.............................................................................................. 20
3.9 Center-to-Center Protocols........................................................................................................ 20
3.10 Center-to-Field Protocols ........................................................................................................ 22
3.11 Communications Infrastructure for Center-to-Field .................................................................. 23
3.12 Retrofitting Existing Center-to-Field Systems with NTCIP ........................................................ 24
4 Procuring NTCIP 26
4.1 Introduction ............................................................................................................................... 26
4.2 Procurement Roadmap ............................................................................................................. 27
4.2.1 Procurement Request ........................................................................................................ 28
4.2.2 Proposal Initiation .............................................................................................................. 28
4.2.3 Investigate Issues .............................................................................................................. 29
4.2.3.1 Requirements ............................................................................................................... 29
4.2.3.1.1 How NTCIP Standards Fit Together ......................................................................... 30
4.2.3.1.2 Selecting Standards and Conformance Statements.................................................. 32
4.2.3.1.3 Manufacturer Extensions.......................................................................................... 32
4.2.3.2 Implementation Alternatives .......................................................................................... 32
4.2.3.3 Other Factors................................................................................................................ 33
4.2.3.3.1 Stability of the Standard ........................................................................................... 34
4.2.3.3.2 Support of Amendments........................................................................................... 34
4.2.3.3.3 Agency / Developer Understanding .......................................................................... 34
4.2.3.3.4 Certification Process ................................................................................................ 34
4.2.3.3.5 Performance Issues ................................................................................................. 34
4.2.4 Proposal Submission ......................................................................................................... 35
4.2.5 Delivery / Acceptance Testing............................................................................................ 35
4.2.5.1 Unit Testing .................................................................................................................. 35
NTCIP Guide
1 FOREWORD
Interchangeability is defined as the capability to exchange devices of the same type (e.g., a signal
controller from different vendors) without changing the software. Interoperability is defined as
the capability to operate devices from different manufacturers, or different device types (e.g.,
signal controllers and dynamic message signs) on the same communications channel.
1.1 Disclaimer
It is well understood that, because of the need for technical precision, accuracy, and
completeness in standards documents, these documents are often very difficult to read. Thus this
NTCIP Guide is an educational tool that has been created to assist decision makers, planners,
specification writers, and implementers understand the various NTCIP standards documents and
how to use them, as well as the overall motivations behind the use of NTCIP. This document is
an NTCIP standards document, but it is not an NTCIP standard and must therefore not be
considered a binding specification. The NTCIP suite of standards documents is comprised of
numerous stand alone documents, some of which have been fully approved, some of which are in
the approval process, and some of which are still being drafted. Further, as the NTCIP concept
continues to grow in transportation community acceptance, the need will no doubt arise for
additional NTCIP standards documents, the subject of which has not yet been established. As a
result, there is a strong likelihood that at any given point in time this document may be out of
sync in some respects with the actual standards documents. While every reasonable effort will
be made to keep this document current, the reader should understand that, in writing
specifications or implementing systems, only the actual NTCIP standards documents govern, not
this NTCIP Guide.
The subject of communications protocols and standards is a challenging one, even for engineers
experienced in these issues. In the case of NTCIP, the level of difficulty is heightened by the
fact that NTCIP is a whole suite of documents and protocols aimed at meeting the
communications needs of the various fixed-point communications components of the National
ITS Architecture, not just a single one. This NTCIP Guide is an educational tool that has been
created to assist decision makers, planners, specification writers, and implementers understand
The Executive Summary of this NTCIP Guide is intended principally for decision makers. This
section provides a brief overview of the NTCIP as well as a discussion of the motivations behind
the use of these approaches, cast largely in the context of the National ITS Architecture. It also
discusses the issues associated with NTCIP use, as well as required resources, testing, and
configuration management issues.
The Understanding NTCIP section of this guide is intended principally for systems planners,
though it is also intended to be a general purpose technical overview of the issues associated with
the use of NTCIP, and is a good starting point for anyone wishing to become better informed on
the various technical aspects of the approach.
The Procuring NTCIP section is intended principally for specification writers. As the NTCIP
standards suite consists of many documents, and many have numerous optional requirements, it
is very important that specification writers have a good grasp of the decision process by which
these various options will be deemed necessary or unnecessary for any given planned
deployment. Satisfying the user agency in an NTCIP deployment requires a careful analysis of
the agency’s requirements up front, then a careful mapping of the various NTCIP options to
those requirements by way of a well written procurement specification. Further, this section
describes the need for and a means by which the technical requirements of the communications
infrastructure can be determined.
The Designing NTCIP section is intended principally for those faced with the task of designing
the communications element of transportation systems that utilize NTCIP protocols. This
section includes a detailed discussion on bandwidth analysis and system timing.
The Implementing NTCIP section is intended principally for the various systems implementers,
i.e., field equipment software and hardware developers, traffic management center software and
hardware developers, and systems integrators. Inasmuch as the principal authors of this NTCIP
Guide document consisted of field equipment and central traffic management center software
and hardware developers and integrators involved in actual NTCIP deployments, it is hoped that
this section will provide the necessary “read between the lines” type of insight often required to
achieve successful deployments. In particular, some of the lessons learned and common pitfalls
encountered during actual deployments will be discussed, with suggested solutions given.
The remaining sections provide a listing of terms, abbreviations, acronyms, and definitions. A
document listing of NTCIP standards and the status each document is also provided. Lastly,
example NTCIP stack selections are shown for center-to-field communications using routing and
non-routing protocols.
For more information about NTCIP standards, visit the NTCIP Web Site at http://www.ntcip.org.
For a hardcopy summary of NTCIP information, contact the NTCIP Coordinator at the following
address.
NTCIP Coordinator
National Electrical Manufacturers Association
1300 N.17th Street, Suite 1847
Rosslyn, Virginia 22209-3801
fax: (703) 841-3331
e-mail: ntcip@nema.org
In preparation of this NTCIP document, input of users and other interested parties was sought
and evaluated. Written inquires, comments, and proposed or recommended revisions should be
submitted to the NTCIP Coordinator, at the above address, in the following form:
Document Name:
Version Number:
Section Number:
Paragraph:
Comment:
2 EXECUTIVE SUMMARY
2.1 Introduction
A communications protocol is a set of rules for how messages are coded and transmitted between
electronic devices. The equipment at each end of a data transmission must use the same protocol
to successfully communicate. It is a bit like human languages that have an alphabet, vocabulary,
and grammar rules used by everyone speaking that language.
Historically, each vendor of microcomputer control devices and software used in management
systems adopted a different, proprietary protocol for data communications. This required
extensive integration projects to mix equipment and software from different vendors in the same
system and to communicate between systems operated by adjacent agencies. The National
Transportation Communications for ITS Protocol (NTCIP) provides common protocol standards
that can be used by all vendors and system developers to help overcome these differences.
NTCIP is a family of communications standards for transmitting primarily data and messages
between microcomputer control devices used in Intelligent Transportation Systems (ITS). An
example of such a system is a computer at city hall monitoring and controlling the operation of
microprocessor-based roadside controllers at traffic signals within a city. The computer may
send instructions to the traffic signal controllers to change signal timings as traffic conditions
change and the controllers send status and traffic flow information to the computer.
In another example, two transit management systems (computers) may need to exchange real-
time information about the location of transit vehicles bound for a shared timed-transfer center.
This allows each system to know instantly when one vehicle is running significantly behind
schedule and is unable to make the scheduled transfer time. Passengers can be notified
automatically, and the local traffic management center can be automatically requested to provide
priority at traffic signals for the delayed transit vehicle.
NTCIP is intended for use in all types of management systems dealing with the transportation
environment, including those for freeways, traffic signals, transit, emergency management,
traveler information, and data archiving. NTCIP is intended for use between computers in
different systems or different management centers, and between a computer and devices at the
roadside. The current NTCIP standards are not intended for use in devices owned by individual
travelers; other standards either currently exist or are in development for that purpose.
NTCIP provides communications standards for two fundamentally different types of ITS
communications. The first type is between a management system or center and multiple control
or monitoring devices managed by that system or center. Examples of this type of
communications include:
Since most applications of this type involve a computer at a management center communicating
with various devices at the roadside or on agency vehicles, this type is referred to as “center-to-
field”. The NTCIP protocols intended for this communications application are often used in an
environment in which a central management station routinely polls each field device, as in the
most common case of multiple field devices sharing a communications channel. This is called
an unbalanced, one-to-many network.
The second type of communication involves messages sent between two or more management
systems. Examples of this type of communication include:
NTCIP is a suite of communications protocols and data definitions that have been designed to
accommodate the diverse needs of various subsystems and user services of the National ITS
Architecture. It is intended principally to handle these needs in two areas: communications
between a management center and field devices, and communications between two or more
management centers. Examples of the first application include transfer of command and
configuration data between a transportation management center and field devices such as traffic
signal controllers, dynamic message signs, environmental sensor stations, ramp meters, etc.
Examples of the second application include transfer of data between multiple management
centers within one agency, as well as transfer of data between management centers operated by
different agencies.
NTCIP differs from past practice in defining communications protocols for management systems
in that it is not a single communications protocol designed for one purpose. Rather it consists of
a whole suite of protocols covering the spectrum from simple point-to-point command/response
protocols to quite sophisticated object oriented techniques. This is because of the diversity of the
applications into which NTCIP will be deployed, and the resulting diversity of application
specific characteristics such as type and quantity of data to be transferred, criticality of data
transfer times, acceptable cost of communications infrastructure, criticality of data security and
integrity issues, to name a few. Insofar as data definitions are concerned, NTCIP does not
completely define the functionality of the central or field devices to which it applies. It only
specifies the data objects to be transferred and limited functionality directly related to these
objects. For example, NTCIP does not define the details of how a traffic controller operates,
e.g., it does not define that a green must be terminated by a yellow and that a red must be
displayed after a yellow. However, it precisely defines the data that may be communicated
between traffic controllers and traffic management centers, and thereby defines the aspects of
functionality (e.g., it requires that the length of the yellow clearance interval must be as indicated
by the phaseYellowChange object).
There have been numerous problems historically associated with the deployments of
management systems. Before describing some of these issues we will first define two terms.
The term interchangeability reflects the ability to use multiple brands of a device on the same
communications channel, along with the ability to swap them out. For example, the ability to put
any brand of NTCIP compliant traffic signal controller in the same system at the same time
One common problem historically encountered results from the use of proprietary
communications protocols in management systems. These protocols are often proprietary to the
specific project, as well as to the specific manufacturers involved in the project. As a result,
expansion of the system after initial deployment can generally only be done using equipment of
the same type and brand as in the initial deployment. There is no opportunity for realistic
competitive bidding as additional field devices are added to the system (due to the lack of
interchangeability), nor is there any opportunity to add additional types of field devices to the
system (due to the lack of interoperability).
The proper use of NTCIP in a management system will allow the future expansion of the system
to benefit from true competitive bidding, as well as allow other types of field devices to be
added.
The Transportation Equity Act for the 21st Century (known as "TEA-21") requires that federally
funded ITS projects "conform" with the National ITS Architecture. As defined in TEA-21, the
term "intelligent transportation system" means “electronics, communications, or information
processing used singly or in combination to improve the efficiency or safety of a surface
transportation system”. The National ITS Architecture defines both the functions performed in
implementing ITS, and the information flows between transportation subsystems. In its October
2, 1998 report entitled “Interim Guidance on Conformity with the National lTS Architecture and
Standards”, the US DOT stated “Highway Trust Fund recipients shall take the appropriate
actions to ensure that development of the project(s): (a) engages a wide range of stakeholders, (b)
enables the appropriate electronic information sharing between shareholders, (c) facilitates future
ITS expansion, and (d) considers the use of applicable ITS standards.”
The terms interchangeability and interoperability are used throughout the TEA-21 legislation, but
interoperability is used extensively. While the simple view of NTCIP often focuses on
interchangeability, interoperability is actually far more important, for two reasons. First, since
the communications infrastructure is usually the most costly element in a new system, using this
infrastructure for multiple purposes lowers the overall cost of the system. Second, and more
important in terms of the TEA-21 legislation, interoperability suggests the sharing of data,
thereby enhancing the operators ability to efficiently manage these transportation systems, even
to the extent of sharing data across jurisdictional boundaries.
The principal issue associated with the use of NTCIP is that it is an emerging technology in
transportation. As is the case with most new or emerging technologies, the early implementers
were on the leading edge of specifying NTCIP. These early implementers often lacked
appropriate educational material on the best way to specify, procure, deploy, integrate, and test
The authors of this document include suppliers and integrators in early NTCIP deployments, and
this document reflects the lessons learned in these deployments. Further, this document has been
reviewed by a team of public sector reviewers to ensure it meets the needs of future
implementers.
The NTCIP has been designed based upon existing and widely supported industry standard
Internet communications protocol standards to the greatest extent possible, thus minimizing the
risk associated with the use of these protocols.
Furthermore, it may not be practical to retrofit NTCIP center-to-field protocol onto some older
traffic control equipment due to a lack of processing power and memory capacity. Agencies
should consider these issues when considering a system upgrade.
2.6 Resources
Agencies are often concerned with what resources they should bring to an NTCIP
implementation. This section of the NTCIP Guide offers some discussion on some of the
resources available for additional information on NTCIP.
2.6.1 Training
An understanding of the technical issues surrounding NTCIP will benefit agencies considering
deployment. Various training opportunities are available. Training seminars on NTCIP are
available from AASHTO, ITE, and NEMA. Further, numerous consulting firms offer in-depth
training services on this topic. General information on the subject of NTCIP is also available at
www.ntcip.org. Because the NTCIP suite of communications protocols draws heavily on the
Internet based protocols, books and other descriptive information are readily available from
public libraries, bookstores, and the World Wide Web to assist in the planning of training
programs.
While users of management systems need not understand the intricacies of the NTCIP protocols.
Others should have a basic understanding of the relevant NTCIP standards documents, this
NTCIP Guide document, and the referenced Internet protocols that are applicable to their
project. Those who need to have a basic understanding of NTCIP include specification writers,
system designers, integrators, suppliers, and persons responsible for testing.
2.6.3 Projects
It is highly recommended that projects using NTCIP include in their deliverables certain items
relating to NTCIP training and documentation. General NTCIP training for system operators and
administrators throughout the project would assist with an understanding of the benefits
associated with the use of NTCIP, as well as the opportunities and procedures for future
expansion and/or improvement of the system. It is further recommended that a project-specific
NTCIP manual should be included in the list of deliverables that thoroughly documents the
details associated with the various NTCIP options and features in the system. This document
will greatly facilitate any future work on the system, including improvements or expansions.
The lack of such a document in older proprietary systems has been a great deterrent to future
improvements.
3 UNDERSTANDING NTCIP
3.1 Introduction
This chapter is intended for those with interest in exploring NTCIP beyond the Executive
Summary, and particularly for those involved in planning ITS systems. It is assumed that the
reader has already read the Executive Summary which provides much of the basic information
about NTCIP that is not repeated here.
• Benefits of NTCIP
- Avoid Early Obsolescence
- Provide Choice of Vendor
- Enable Interagency Coordination
- Use One Communications Network for All Purposes
• Types of Systems and Devices Supported by NTCIP
• Applications Not Addressed by NTCIP
• The Levels or Modules Involved in Communications
- Information
- Application
- Transport
- Subnetwork
- Plant
• The NTCIP Framework
• NTCIP Standards and Protocol Stacks
• Options and Conformance Levels
• Center-to-Center Protocols
- Data Exchange Between Systems (DATEX)
- Common Object Request Broker Architecture (CORBA)
• Center-to-Field Protocols
- Simple Network Management Protocol
- Simple Transportation Management Protocol
• Communications Infrastructure for Center-to-Field
• Retrofitting Existing Center-to-Field Systems with NTCIP
NTCIP offers increased flexibility and choices for agencies operating transportation management
systems. It removes barriers to interagency coordination and allows equipment of different types
and manufacturers to be mixed on the same communications line. For these reasons, operating
agencies will benefit from specifying that NTCIP be included in all future purchases and
upgrades, even if NTCIP is not planned to be used initially.
Even though it may not be practical to retrofit NTCIP support in some old equipment, most
vendors will offer NTCIP support in current and future products. It is possible to operate a
mixture of NTCIP and non-NTCIP devices in the same system, although not on the same
communications line. Alternatively, equipment may continue to use a current protocol even
though it also supports NTCIP. In either case, an operating agency can ensure that its equipment
remains useful and compatible long into the future by requiring NTCIP support in all future
purchases and upgrades of transportation management systems, including purchases of computer
software, field masters, and controllers for any type of traffic or transit control or monitoring
device.
Buying a field device or central control system that has no software available to support NTCIP,
is like buying an incompatible computer that has no software available to access the Internet.
Even if purchasers do not use the Internet now, they surely will during the lifetime of the
computer.
Once an agency has a computer system that includes support for NTCIP, it can purchase other
systems, field devices, or software from any vendor offering NTCIP-compliant products, and
they will communicate with that system. Only products from the same vendor will be able to
fully use the features within the software or controller that are manufacturer specific, but basic
functionality will be available regardless of the manufacturer, provided the procurement
documents adequately specify the mandatory and optional conformance requirements that
support the agency’s functional requirements. However, NTCIP will make it easier for such an
agency to gradually change its software, controllers and other field devices from one vendor to
another in the future as part of a switch to a new vendor for the entire system.
NTCIP allows agencies to exchange information and (with authorization) basic commands that
enable any agency to monitor conditions in other agencies’ systems, and to implement
coordinated responses to incidents and other changes in field conditions when needed. Such data
exchange and coordinated response can be implemented either manually or automatically. One
agency can monitor, and issue basic commands to (if authorized), field devices operated by
another agency, even though those devices may be from a different vendor than those used by
the monitoring agency. Potential applications of interagency coordination include coordinating
timed transfers at a shared transit center, coordinating traffic signals across jurisdictional
boundaries, providing traffic signal priority for selected (e.g., behind schedule) transit vehicles,
providing real-time information to a shared traveler information center, monitoring traffic
volumes on another agency’s roadway, coordinating the operation of a freeway ramp meter with
NTCIP allows a management system to communicate with a mixture of device types on the same
communications channel. For example, with the addition of appropriate application software in
the system computer, a dynamic message sign could be installed near a signalized intersection,
and the computer could communicate with the sign controller using the communications channel
already in place for the traffic signal controller. Similarly, a wide area network interface
installed for communications with a system operated by another agency can be used for
communications with any number of other systems, of any type, if NTCIP is used. The
communications network is usually one of the most expensive components of a transportation
management system. NTCIP ensures maximum flexibility in future use of that major
investment.
NTCIP defines a family of general-purpose protocols that support all types of computer systems
and field devices used in transportation management. Applications for NTCIP are generally
divided into two categories – center-to-field and center-to-center. The former, normally involve
devices at the roadside or on agency-owned vehicles, communicating with management software
on a central computer. Center-to-center applications usually involve computer-to-computer
communications where the computers can be in the same room, in management centers operated
by adjacent agencies, or across the country. The role of NTCIP in the National ITS Architecture
is illustrated in Figure 3.1.
For both center-to-field and center-to-center applications, NTCIP supports systems and devices
used in both traffic, transit, emergency management, traveler information, and planning (data
archiving) systems. Figure 3.2 illustrates how various transportation management systems and
devices can be integrated using NTCIP.
Note that some computers involved in center-to-center communications may be located in the
field (e.g., kiosks, field masters, advanced controllers). NTCIP’s center-to-field and center-to-
center protocols have options to support dial-up communications links.
Traveler Center
Subsystems Subsystems
Remote Commercial
Transit Emergency Toll
Traveler Vehicle
Management Management Administration
Support Administration
Personal Information
Information Freight and Fleet Traffic Emissions Planning
Service
Access Management Management Management
Provider
Vehicle Roadway/
Wayside - to - Wayside
Dedicated Short Range
Railway
Vehicle - to - Vehicle
Communications
Communications
Commercial Parking
Vehicle Management
Emergency Commercial
Vehicle Vehicle Check
The following are examples of systems and devices that can take advantage of NTCIP:
• Center-to-Field
- Dynamic message signs
- Traffic signals
- On-board sensors and controllers
- Environmental sensors
- Ramp meters
- Vehicle detectors
- Closed circuit television cameras
- Audio message transmitters
- Any mix of the above
• Center-to-Center
- Traffic management (freeway/surface street, urban/rural)
- Transit management (bus/rail/other)
- Emergency management
- Parking management
- Traveler information (all modes)
C2F
Many applications of NTCIP are related to near real-time communications and involve
continuous, automated transmissions of data or commands. NTCIP also supports human-to-
remote-machine/system transmissions. Historical data can also be sent using NTCIP, but other
communication standards, especially electronic mail and file transfer protocols developed for the
Internet, are also suitable for this purpose. Human-to-human communications are generally
better served by fax/telephone and Internet protocols (e.g., e-mail, chat) but basic support is also
provided in the NTCIP center-to-center protocols.
Some of the data transfers involved in ITS have special needs that are the subject of other
standards development efforts. The NTCIP effort is coordinating with the activities of these
other groups to the extent practical. These other standards efforts include:
• A roadside device reading and/or writing to an electronic tag on a vehicle. This involves
very fast and compact wireless data transfers over short distances (a few meters) during
the few milliseconds that a passing vehicle’s tag is within reception range. However,
NTCIP is suited to communications between the roadside tag reader and a central
computer.
• Full motion video transmitted from a camera or recorded media. This involves
specialized protocols able to accommodate the large volume of continuous streaming
information making up a video signal, and several such standards already exist.
However, NTCIP is suited to transmission of video camera and switch control data using
a separate communications channel.
• Communications for financial transactions. This involves special security measures not
currently supported in NTCIP.
• In-vehicle communications for operation monitoring, and advanced vehicle control and
safety. This involves specialized protocols for very high speed and fail-safe
transmissions between devices housed on the same vehicle.
Other communications standards are available or under development to serve each of these
specialized needs.
NTCIP uses a layered or modular approach to communications standards, similar to the layering
approach adopted by the Internet and the International Standards Organization (ISO). In general,
data communications between two computers or other electronic devices can be considered to
involve the following primary layers, called “levels” in NTCIP to distinguish them from those
defined by ISO and the Internet:
• Information Level – This level provides standards for the data elements, objects, and
messages to be transmitted (e.g., TCIP, TS3.5, MS/ETMCC, etc.).
• Application Level – This level provides standards for the data packet structure and
session management. (e.g., SNMP, STMP, DATEX, CORBA, FTP, etc.).
• Transport Level – This level provides standards for data packet subdivision, packet
reassembly, and routing when needed (e.g., TCP, UDP, IP).
• Subnetwork Level – This level provides standards for the physical interface (e.g.,
modem, network interface card, CSU/DSU, etc.), and the data packet transmission
method (e.g., HDLC, PPP, Ethernet, ATM, etc.).
• Plant Level – This level consists of the physical transmission media used for
communications (e.g., copper wire, coaxial cable, fiber optic cable, wireless)
The information level standards used in Intelligent Transportation Systems (ITS) are unique to
the transportation industry. The National ITS Architecture and much of the on-going standards
development effort for ITS involve identification of required data elements and their compilation
into standard objects or message sets for all the different domains and functions within ITS (e.g.,
traffic, transit, traveler information, emergency management, etc.). For the subnetwork and
transport levels, ITS can generally use existing standards used by the broader computer and
telecommunications industries. NTCIP has not had to develop significantly new standards in
these areas, but has merely chosen which existing standards are to be used in ITS (the Internet
standards have been adopted where possible), and has specified which options to use where
alternatives are available in some standards.
The application level, is the primary focus of NTCIP. Although some existing standards are
useful here, ITS has special requirements that have necessitated the extension of existing
standards, or development of entirely new protocols for specific applications within ITS. Some
of the special communications requirements of ITS are:
• Continuous high volumes of real-time data sent to and from embedded processors in
roadside or on-vehicle equipment sharing the same, often low-speed, data channel and
requiring low latency.
Through a layered combination of existing communications standards and a few new standards
developed specifically for ITS, NTCIP provides a family of communications protocols that serve
most of the common needs in ITS.
Figure 3.3 illustrates the framework for NTCIP. The diagram shows the different standards that
can be chosen at each level (boxes) and which ones are compatible (lines connecting boxes). See
Section 7.2 for an explanation of the acronyms used in this diagram.
Files
Reference Model ITS Message Sets Dynamic Objects
Information Level Information Level
TCP UDP
NULL
IP
Transport Level Transport Level
SONET
V Series Modem FSK Modem
Subnetwork Level Subnetwork Level
The levels shown in the framework are somewhat different from communication stack layers
defined by the International Standards Organization (Open Systems Interconnect seven-layer
reference model) and other standards making organizations. This document describes the
NTCIP stack as extending beyond the communications stack to include informational data and
interfaces to the physical communications infrastructure. The levels and terminology used in
NTCIP were chosen for simplicity and ease of understanding by lay readers, and relevance to
typical applications in the transportation industry. The OSI layers and terminology are often
referenced in later technical sections of this guide and in many of the standards defined by
NTCIP.
TCP UDP
NULL
IP
Transport Level Transport Level
SONET
V Series Modem FSK Modem
Subnetwork Level Subnetwork Level
As explained above, most of the standards in the lower levels are existing standards used in the
telecommunications industry and were not developed by NTCIP (although NTCIP often
specifies which sub-options within those standards are to be used). The standards unique to
Intelligent Transportation Systems are found in the first two levels (Information and Application
levels) in Figures 3.3 and 3.4. Each NTCIP protocol stack involves a mixture of NTCIP-specific
standards at the upper levels and several existing standards at the lower levels.
The first NTCIP standards developed were those intended for center-to-field applications. This
involved a new application level standard called Simple Transportation Management Protocol
(STMP), and several sets of new standard data elements called “objects” at the information level.
The initial NTCIP center-to-field protocol development also involved specifications for using
two existing standards – the Simple Network Management Protocol (SNMP) standard at the
application level, and the High-level Data Link Control (HDLC) standard at the subnetwork
level.
In 1999, the approach for documenting NTCIP standards and protocol stacks has changed.
NTCIP currently defines the options at each level of a protocol stack using “profile” documents.
Each profile document specifies one or more standards to be used at a level, and the sub-options
allowed or required within each of those standards. A profile document typically references one
or more “base standard” documents – documents that contain the specifications for the
standard(s) being called out in the profile. A base standard may be an NTCIP document (if the
standard was developed by NTCIP) or a document developed by any other standards
development organization. The numbering scheme for NTCIP documents also changed, as
shown in the appended list of NTCIP documents.
There are different types of profile documents for the different levels of the stack, as follows:
• Information profiles
• Application profiles
• Transport profiles
• Subnetwork profiles
For a particular application of NTCIP, the user must select (in the procurement specifications)
which element(s) are desired at each level – i.e., select from the options called out in one or more
profile documents for each level. The set of selections for all levels is referred to here as a
“protocol stack”. Each NTCIP protocol stack will have different characteristics, and a stack that
works well for one application or communications environment may not suit another.
Standards that NTCIP has defined, or is in the process of defining, enable protocol stacks that
can be categorized as follows:
Simple Network Management Protocol (SNMP) – Stacks based on SNMP provide a simple, but
bandwidth inefficient, protocol for center-to-field applications, based on the Internet protocol of
the same name (SNMP). It is suitable only for networks with high bandwidth or low volumes of
messages. Options are available at the Transport level for routing messages using the Internet
Protocol if desired.
Data Exchange Between Systems (DATEX) – DATEX provides a general purpose center-to-
center data exchange protocol stack. It uses pre-defined messages transmitted by the base
Internet protocols (TCP/IP and UDP/IP) in a peer-to-peer network. The base standard at the
application level is an ISO standard (developed by an NTCIP working group) called DATEX-
ASN.
The standards that can be used in each of these categories of protocol stacks are highlighted in
Figure 3.3.
Two electronic devices will be able to communicate with each other if they use the same
protocol stack and implement the needed options within that stack.
In addition to specifying a protocol stack, the system designer must also choose between various
options and alternatives available in the selected stack. These options exist in both center-to-
center and center-to-field protocol stacks. Major options, such as which protocol(s) to support at
each level in the stack, are sometimes grouped according to conformance levels. Others are
individually selectable. [Most manufacturers and system suppliers typically offer features that
go beyond the standard. To make use of such features, it is necessary to specify the inclusion of
manufacturer specific objects or messages when procuring a system.]
Details on options and conformance levels, and how to specify your selection, are presented in
later sections of this Guide.
• Systems requiring real-time, fast data transfer (e.g. traffic signal status data)
• Systems with limited communications bandwidth but high data transfer load
• Systems with infrequent event driven exchanges over dial-up links
• Non-object oriented systems
Conversely, CORBA provides several features to support networks connecting object oriented
systems, and assuming sufficient processing power and communications bandwidth are provided,
it could be used for all applications between such systems. Object oriented software can take full
advantage of CORBA and implement it easily, traditional procedural software cannot.
It is expected that most systems will support DATEX, and may initially use it solely. Even if
some systems in the network are object oriented and use CORBA, they will likely also support
DATEX to allow interfaces with DATEX-only systems and to assist in real-time data exchange
needs. Over time, as a standardized reference model emerges, new object-oriented systems come
on line, and processing and communications resources are upgraded, more and more systems
may migrate to CORBA. Non-object-oriented systems that reside in large regions of
interconnected ITS systems may choose to wrap their interface and provide a CORBA interface
to leverage CORBA capabilities. These and other implementation issues are discussed in later
sections of this Guide.
Center-to-center networks allow each system to request any available information from any or all
other systems. Each system can be configured to either accept or reject any request. The “data”
sent can be informational or can constitute a “command” to take some action. Consider a
message sent from one traffic signal system to another and containing a signal timing pattern
number. In DATEX for example, depending on the message type, it could represent a command
to implement that timing pattern at a particular traffic signal or group of signals, or it could
represent a status report indicating that this timing pattern was just implemented at a particular
traffic signal or group of signals.
In either case, the user can establish standing subscriptions for data if it wants the same data sent
repeatedly. In DATEX, subscriptions can specify that data be sent one-time-only, periodically,
or repeatedly on occurrence of some event defined in the subscription. Each subscription
message has a corresponding publication message. Unless the subscription is a one-time request,
the data will continue to be automatically “published” repeatedly until the subscription is
cancelled, or until a predefined end date specified in the subscription. Using CORBA, a system
can automatically and dynamically “discover” data available from other systems.
NTCIP provides two closely related protocols choices for center-to-field communications. These
are based on the Simple Network Management Protocol (SNMP) and the Simple Transportation
Management Protocol (STMP). Both of these base protocols use the get/set messaging paradigm
used in the Internet’s Simple Network Management Protocol. Both choices use the same base
data objects, as defined in the NEMA TS 3.x series of documents. They differ in the level of
complexity to implement and the types of services offered. Table 3.1 summarizes the services
offered and implementation requirements.
SNMP STMP
The Simple Transportation Management Protocol (STMP) is the most bandwidth efficient option
and includes full support of SNMP for infrequent messaging demands. It includes SNMP as a
subset, so that any management system that implements STMP can also communicate with a
device that supports only SNMP. Occasional messages requiring additional security can be sent
using SNMP. The greatest advantage of STMP is its support for dynamic composite objects
which, combined with a more efficient encoding scheme, dramatically reduce the packet
overhead (relative to SNMP). Dynamic composite objects also enable users to define custom
messages that are composed of any number of individual data objects. It is the most flexible and
bandwidth efficient option.
Devices that use either the PMPP or Ethernet Subnetwork Level can share the same
communications line with other devices using the same subnetwork. It doesn’t matter if such
devices are from different manufacturers or are totally different devices (e.g., a traffic signal and
a dynamic message sign). Each device is assigned an address that is unique on that line or
channel. The management system can communicate with any of the devices at any time by
sending a message addressed to that device. However, it can communicate with only one of the
devices on the line or channel at a time. Devices can send a message to the management system
The NTCIP center-to-field protocol stacks can be used in management systems of any
configuration or complexity. There are options within each stack to add support for message
routing via intermediate communications hubs or field masters if needed. However, a particular
implementation of a center-to-field protocol stack may not provide support for such options
unless specifically requested at the time of procurement.
The communications link can use any medium, such as twisted wire pairs, coaxial cable, optical
fibers, or radio (e.g., narrow band, spread spectrum, microwave). It does not matter whether the
communications media is agency owned, leased, or dial-up. Multiplexers can be used to
combine multiple channels on one trunk link. Theoretically, any data transmission rate can be
used with NTCIP. However, field devices typically support transmission rates in the range of
1200 to 19,200 bits per second. The only requirement is that the time for transmission (including
any delay in intermediate relay devices) and the response time in the end device, be reasonable
and within the tolerances needed to allow all devices to communicate within the required time
frame. These requirements, together with the bit rate and quantity of information to be
transmitted, determine the maximum feasible number of devices on each communications
channel, as discussed below.
The first seven of these variables will determine the total time needed to communicate once with
each device. If this time is then treated as fixed (say T), the number of devices sharing the same
line or channel (say N) and the frequency of communication with each device (say P for polling
period, the inverse of frequency) are related by the equation; P = N x T. This is a very simplified
explanation of what can be a quite complex design issue that should be addressed early in project
planning.
Such implementation issues are discussed in more detail in later sections of this guide.
It may not be feasible to modify old versions of controllers or controller software to make them
NTCIP compatible. Constraints such as computing power, memory available, cost of
modification may well preclude such modifications. If such controllers or software cannot be
upgraded or replaced, traffic control systems that continue to make use of older equipment or
older software versions will likely have to continue using the protocols unique to
communications with those devices. However, current version controllers and software within
the system may be capable of modification to use NTCIP, and all future versions should be
NTCIP compatible. If in doubt, the equipment manufacturer should be contacted and asked if
upgrades for NTCIP compliance are available.
In general, NTCIP and non-NTCIP devices cannot be mixed on the same communications
channel. Therefore all devices sharing a channel must be upgraded simultaneously. A computer
or master that communicates with both NTCIP and non-NTCIP devices will need to use a
different communications port for NTCIP devices and for non-NTCIP devices, and will need to
support both protocols. In traditional closed-loop traffic signal systems, the most likely and
simplest solution is to limit each field master to one protocol. Only field masters with NTCIP-
compatible controllers would be upgraded to support NTCIP. This avoids the need for field
masters to simultaneously support two protocols on two separate ports.
In closed-loop traffic signal systems, the central computer could communicate with field masters
using a different protocol than that used by the field master to communicate with controllers. As
with the controller and the field master, the central computer software will need to be modified
to add support for an NTCIP protocol if NTCIP is to be used for communications with field
masters.
Any upgrade of an existing system to add support for NTCIP is probably best designed in
consultation with the system vendor. Each vendor will likely adopt an upgrade strategy that is
most efficient for the majority of its customers. If a particular customer wants a unique
One approach to the introduction of NTCIP in a center-to-field system is to operate two totally
separate systems - one NTCIP and one non-NTCIP - during a transition period. Field devices
can gradually be switched over from one to the other as they are replaced or their software is
upgraded. This may be the only choice if the current system is quite old and upgrading it for
NTCIP is not practical. Such a transition would logically be done as part of a general system
upgrade.
Even if a system continues to use a proprietary protocol, new controllers and masters, or new
software packages should include the appropriate NTCIP protocol stack as an option. Some
vendors will support both their existing protocols and NTCIP in the same software package.
Others will require a change of software to switch from one protocol to the other. Regardless of
how it is done, the owning agency should ensure that an appropriate NTCIP protocol stack is
available for future use even if it is not needed immediately. This will maximize the useful life
of the new equipment and enable introduction of NTCIP at any time in the future without further
upgrades. It also maximizes options and competition when choosing new equipment, since
different vendors' equipment can be mixed if needed (assuming support is available for
manufacturer-specific information).
4 PROCURING NTCIP
4.1 Introduction
The purpose of this section is to provide guidance to those who are responsible for developing
specifications for and procuring NTCIP compliant devices and systems. This section is written
specifically to target the systems planner/specification writer, or that person responsible for
preparing procurement and system design and specifications for NTCIP systems.
• Procurement Roadmap
- Procurement Request
- Proposal Initiation
- Investigate Issues
- Requirements
- How NTCIP Standards Fit Together
- Selecting Standards and Conformance Statements
- Manufacturer Extensions
- Implementation Alternatives
- Other Factors
- Stability of the Standard
- Support of Amendments
- Agency / Developer Understanding
- Certification Process
- Performance Issues
- Proposal Submission
- Delivery / Acceptance Testing
- Unit Testing
- Integration Testing
- System Testing
- Maintenance
- Design Requirements
- Testing Requirements
• Center-to-Field
- NTCIP Stack Options
- Available Resources for Additional Information
- NTCIP Specification Development Examples
- NTCIP Stack for Center-to-Field Traffic Signal Controller
- Conformance Group and Data Object Selection for Traffic Signal Controllers
- Object Range Values for an Actuated Traffic Signal Controller
• Center-to-Center
Systems and equipment procurement specifications sometimes include simply a sentence such as
“All components shall be NTCIP compliant,” or “The system shall use NTCIP as the
communications protocol.” These single statements provide no information to manufacturers or
systems integrators on the type, scope, and functionality of the system or hardware to be
implemented. Specifying detailed requirements for NTCIP is not a trivial task and requires a
great deal of study to develop a set of detailed specifications that will ultimately meet the
intended needs. This section is intended to guide the systems planner/specification writer
through the specification development process, pointing out key considerations along the way,
and provide additional understanding of NTCIP when coupled with the information provided in
previous sections.
It has been said on many occasions that there is no exact specification wording that can simply
be copied into procurement documents. The reason for this is that there is no single system
design that is standard across the country. Available resources and functionality needs vary from
agency to agency and as a result, system designs vary from agency to agency. Obviously,
defining a system that encompasses all the functionality and options that are available would be a
costly burden for smaller agencies to bear. And, defining a system with minimal functionality
would not meet the needs of many larger agencies. Therefore, this section will focus on the
presentation of a process to follow when developing procurement specifications for systems and
equipment using NTCIP.
There are certain steps that should be taken in any systems procurement project to successfully
meet the intended goals. It is especially critical to follow an orderly procedure when procuring
systems that are intended to meet standards. Figure 4.1 summarizes some of the more important
steps that should be followed by any organization considering the procurement of NTCIP
devices/software.
Consider
Proposal Other Factors Delivery and
Initiation Acceptance
Stability
of Standard
Investigate Unit
Issues Test
Support of
Amendments
Study Integration
Agency/Developer
Requirements Test
Understanding
Certification
Select Process System
Standards and Test
Conformance
Statements Performance
Requirements
Select
Manufacturer
Extensions
The procurement request can take many forms. Devices are often purchased through a low-bid
process administered by the agency. Software is routinely procured through service oriented
contracts. As such, the specifications and requirements that are made part of the procurement
package can range from detailed specifications to more general requirements documents. The
procurement of NTCIP compliant devices and software does not change the normal procurement
methods that most agencies use. Additional steps, however, may need to be added to traditional
procurement processes for NTCIP related procurements to ensure an adequate understanding of
the intended requirements and assurance of adherence to the standards and specifications.
There are two alternative approaches that can be used when considering the preparation of
procurement documents for NTCIP systems and devices. One approach might be for the agency
to solicit a proposal during the procurement process that allows the manufacturer, vendor,
developer, or systems integrator to present detailed information on how the intended system or
Both the agency and the systems developer or integrator must ensure that there is an adequate
understanding of the requirements set forth in the procurement request. Some requests to-date
have been very ambiguous, like "The device shall be NTCIP compliant.", others have been very
detailed and precise, and some have even had precise statements that conflicted with each other.
Thus, the agency should expect that a systems developer or integrator would first perform an
investigation to ensure a proper understanding of project needs. This should then be followed by
an investigation of how the system may be implemented while recognizing the development
risks that may be encountered.
It should be realized that this process often works best in an iterative fashion. This allows the
agency and the system developer or integrator to work together in developing a list of
requirements and a proposal that best matches everyone's needs. However, this is not always
possible due to the procurement regulations of some organizations.
4.2.3.1 Requirements
The first aspect of the investigation should be to determine the exact requirements for the system.
This will often require expanding the original request. For example, if the procurement request
is simply for an "NTCIP compliant device", the developer must determine what functionality the
device is supposed to support and then determine what NTCIP options might be appropriate.
An agency should understand that the developer might also need to modify or limit the original
procurement request in order to meet safety, schedule, or other concerns. For example, the
The result of this effort should be a detailed requirements document with which both the client
and developer can be satisfied. Additional details of this investigation are given below. As a
minimum, the document should address those issues identified throughout this section.
Ideally, there would only be one NTCIP standard that met everyone's needs. However, reality
requires a large number of options to meet the unique needs of specific sites. For example, some
agencies have a large amount of twisted pair copper that they want to continue to use. Other
agencies are installing new systems and want to take advantage of fiber optic cable and other
technologies. Likewise, some agencies have fairly simple data exchange needs with field
devices, whereas other centers need to exchange large amounts of information with other centers.
The NTCIP accommodates these various needs by providing a suite of standards, each providing
unique features.
Figure 4.2 depicts the NTCIP Standards Framework. The framework is based upon five levels
including Information, Application, Transport, Subnetwork, and Plant Levels. The middle three
of these five levels loosely relate to the various layers of the seven-layer OSI model. The Plant
Level is included as a reference to show the relationship to field infrastructure. The figure shows
all the various standards that reside on each level and represents the various choices that must be
made during the specification development process. The connecting lines represent the
compatibility linkages between the various standards.
• Information Level – Information Profiles define the meaning of data and messages and
generally deal with ITS information (rather than information about the communications
network). This is similar to defining a dictionary and phrase list within a language.
These standards are above the traditional ISO seven layer stack.
• Application Level – Application Profiles define the rules and procedures for exchanging
information data. The rules may include definitions of proper grammar and syntax of a
single statement as well as the sequence of allowed statements. This is similar to
combining words and phrases to form a sentence or a complete thought and defining the
rules for greeting each other and exchanging information. These standards are equivalent
to the Session, Presentation and Application Layers of the ISO seven layer stack.
• Transport Level – Transport Profiles define the rules and procedures for exchanging the
Application data between point 'A' and point 'X' on a network. This includes any
necessary routing, message disassembly/re-assembly and network management functions.
• Subnetwork Level – Subnetwork Profiles define the rules and procedures for exchanging
data between two 'adjacent' devices over some communications media. This is equivalent
to the rules used by the telephone company to exchange data over a cellular link versus
the rules used to exchange data over a twisted pair copper wire.
• Plant Level – The Plant Level is shown in the NTCIP Framework as a means of
providing a point of reference to those learning about NTCIP. The Plant Level includes
the communications infrastructure over which NTCIP communications are intended. The
NTCIP standards do not prescribe any one media type over another.
Files
Reference Model ITS Message Sets Dynamic Objects
Information Level Information Level
TCP UDP
NULL
IP
Transport Level Transport Level
SONET
V Series Modem FSK Modem
Subnetwork Level Subnetwork Level
Any data exchange requires the use of one standard taken from each of the five levels. In theory,
a profile from one level should be designed such that it can be combined with any profile from
another level; however, in practice, profiles will often require certain services from other levels.
Thus, only certain combinations are desirable and recognized by the NTCIP effort.
The selection of standards for implementation is largely dependent on the specific requirements
and design of each system. Subsequent sections in this chapter will provide some additional
insight as to how to select the applicable standards for implementation. As a matter or course,
agencies should work closely with systems developers and integrators to determine details
specific to particular implementations. One method for doing this is through the use of a
proposal response that is part of the procurement process. Essentially, an early deliverable in the
procurement process should be a proposal from the systems developer or integrator showing
applicable details specific to the procurement. The proposal topics should cover the specific
standards to be implemented, applicable conformance groups, applicable data objects and their
associated range values, and any other information pertinent to the procurement or
implementation. The agency should provide an approval of the proposal prior to proceeding
with device or software development and delivery.
In many cases the standard may not support all of the features supported by a manufacturer's
device or software. The NTCIP has been explicitly designed to allow for innovations and it is
recognized that the NTCIP standards do not currently define standardized objects for every
feature of every device. Thus, there could be special features or requirements in the procurement
that are not standardized by the NTCIP. If such features are present, then the systems developer
or integrator will need to determine precisely how these features will be supported without
conflicting with the standardized implementations. Usually, this is accomplished by simply
defining additional objects under a developer specific node for the manufacturer specific MIB
extensions. It is important that the agency be aware of the use of manufacturer extensions and
request that the systems developers or integrators clearly identify these in their proposal.
The agency should be aware that systems developers and integrators have a variety of resources
available to implement desired features and the proposal should address these alternatives. For
example, the developer may be able to acquire off-the-shelf software to minimize the effort
required to implement the features. A layered design will minimize the effort required to
maintain the code and to implement different profiles in the future. However, these benefits may
impose other constraints on the system.
The NTCIP has used widely recognized standards whenever possible. For example, the NTCIP
standards reference the Transmission Control Protocol (TCP), Internet Protocol (IP), Simple
Network Management Protocol (SNMP), Common Object Request Broker Architecture
(CORBA), and High Level Data Link Control Protocol (HDLC) standards to name just a few.
In many cases, the private industry has developed off-the-shelf tools to aid system developers in
implementing these protocols. Being aware of what products are available and for what costs
will allow the developer to provide a more realistic estimate of development costs. For example,
most developers use an off-the-shelf implementation of TCP/IP rather than creating their own.
Standards for which there are known products include:
While off-the-shelf software can save a considerable amount of development time and greatly
simplify maintenance of the software, it may not always provide the most efficient
implementation. Off-the-shelf software has generally been designed in a very layered fashion for
easy maintenance and fully generic use; however, real-time system performance can frequently
be improved by violating the rules of a true layered design and by embedding customized code
for a specific purpose. The agency should be aware of the benefits and detriments of each
approach before determining the development approach and cost estimate.
It should also be recognized that the availability of off-the-shelf tools might affect the selection
of features to be included in the requirements document.
There may be a variety of other factors that may need to be considered in order to finalize a
proposal. Each of these issues may impact the proposed budget, schedule, and/or scope.
Therefore, they should be explicitly addressed in the proposal in order to manage expectations.
Without the management of expectations early in the process, a product, which the developer
believes is compliant, may be perceived to be lacking by the client. A sample of these issues is
provided in the following subsections.
The NTCIP standards are still relatively new and all standards are subject to amendments.
Amendments typically result from developers attempting to implement the subject standard and
recognizing either a technical problem with the specification or ambiguous wording. Thus, new
standards are frequently amended to solve these problems and the standards become more and
more stable over time. Requiring the use of unproved standards can be risky and agencies
should work closely with systems integrators and developers if they intend to pursue early
implementation of standards.
Because the standards are relatively new, the agency must consider what will happen if an
amendment to the standard is approved during the life of the project. As a general rule, it may be
difficult to require developers to support amendments that are made late in the procurement life
cycle. However, many times, a draft amendment may be present during the initial procurement
stages and the agency should expect developer proposals to address the existence of any
amendments or proposed amendments.
Another factor to consider is whether or not the procurement documents provide realistic
expectations. While the NTCIP provides a standardized interface that is flexible enough to meet
various needs, it may be more bandwidth intensive than previous systems and/or it may use a
slightly different database design. It is important to make sure that there are realistic
expectations at the start of the project in order to ensure that the project will be perceived as a
success.
The agency must also consider how the procured devices and software are to be tested and
certified as being NTCIP compliant. While a rigid certification process will undoubtedly provide
a greater assurance to the client, it will also increase costs. Many agencies perform in-house
testing, or the certification of NTCIP compliance may be outsourced as part of the procurement
(e.g., through hiring an independent testing lab).
The agency should also realize that the flexibility of NTCIP also comes at the price of a more
complex system than the industry has traditionally used. Therefore, the system may require
more sophisticated processors or better communication facilities than traditional systems in order
to achieve the same performance level (e.g., response times, etc.). If the agency overlooks these
In order to ensure a thorough understanding of the procurement requirements, the agency should
request that the systems developer or integrator submit a proposal for approval that
acknowledges the various issues addressed in this procurement roadmap. This proposal should
also specifically address issues such as conformance statements and range values as appropriate.
Additionally, any requirements that are unique to the specific procurement or implementation
should also be addressed in the proposal. The proposal provides an opportunity for both the
agency and the systems developer or integrator to form a better understanding of the NTCIP
implementation and reach consensus on issues that might be unique to the specific procurement.
Another important aspect of the procurement process is deliver and acceptance testing. The
agency should be aware of any time constraints that might be required for the development of
new software as a result of implementing a new standard.
Upon delivery, the agency should conduct acceptance testing to ensure that the device or
software conforms to the procurement requirements and is compliant with the applicable
standards. The agency should require that acceptance testing be covered in the system
developer’s or integrator’s proposal. It should be realized that the NTCIP is a very complex set
of standards and it is impractical to perform comprehensive testing. However, well designed test
plans can be produced to provide a high level of confidence for a reasonable cost. In some cases,
the agency may want to include any applicable test plans as part of the procurement documents.
In general, there are three levels of testing: unit testing, integration testing, and system testing.
Unit testing focuses on comparing an implementation against the standard. This may be
performed by inspecting the code or with the use of "proven" software to send test messages to
the device. This process should be formalized by documenting a specific test procedure that will
be followed and during the test, the result of each step of the procedure should be recorded.
Unit testing provides a basic level of assurance that a product is compliant to a standard. Many
times, the test plan will be designed such that the failure of one procedure will provide a clear
indication of what problem resides within the implementation; thereby minimizing the cost of
finding the 'bug'. A device that fails such a test plan would almost certainly not be able to
Integration testing consists of connecting two or more devices together and having them
exchange data. Assuming the individual devices have previously passed a sufficiently designed
unit test plan and the two devices support the same features, the devices should integrate together
fairly easily. However, there are a few problems that may arise during this phase. Examples
include two different interpretations of a specific requirement (typically a problem of newer
standards) and problems related to system timing between the two implementations.
In theory, the unit test should be thorough enough to prevent any problems in integration testing;
however, the integration testing provides a higher level of confidence that nothing has been
overlooked.
A final level of testing is system testing. At this level, each device on the system is integrated
together to form the final system. This level of testing could identify global problems such as
modem carriers being left on (i.e., preventing other devices from talking) or system timing issues
(e.g., too many signals on a channel to maintain a desired once-per-second poll rate).
Once again, in theory, devices that successfully pass unit testing and integration testing should
pass this system level testing as well, given that the system was properly designed. However, the
final check is only provided when this system test is performed and it is not infrequent that
problems arise at this stage.
4.2.6 Maintenance
Agencies should be aware of the fact that procurement requirements may need to address
maintenance and subsequent device and/or software upgrades. In general, it should be
recognized that the NTCIP standards are still relatively new and thus changes may occur to the
standards. Further, as there are relatively few implementations available, ambiguities may still
be discovered in the standard and the standards may be modified in order to correct these
problems. Any such change may require a modification to deployed equipment if the equipment
is to maintain compatibility with the new version of the standard. A basic understanding of
requirements for maintenance and subsequent upgrades should be addressed early during the
procurement process with the systems developer or integrator.
The systems planner/specification writer should consider the various levels of the NTCIP
Framework when preparing procurement specifications. Appropriate choices from each of the
five levels that make up the NTCIP Framework will need to be made sometime during either the
specification development process or the procurement process. One alternative that has been
presented in this section, places much of the burden on the systems developer or integrator to
assist in making the appropriate standards selections and presents a mechanism for agency
approval. Another alternative puts the burden for detailed specification development on the
agency.
The systems planner/specification writer should consider the communication needs and available
resources specific to the system being deployed in order to effectively provide detailed
specifications for an NTCIP compliant system. Important considerations for determining
specific communications needs include communications data and timing, channel loading, and
device latency issues. An entire NTCIP Stack should be defined, along with an identification of
standards required at each level.
The next step in the process would then be to determine the required optional and mandatory
Conformance Groups within each standard that are needed to ensure that the intended
functionality needs are met. Additionally, realistic Range Values need to be defined for each of
the data elements (or objects) within each of the Management Information Bases (MIBs), based
Procurement specifications should also include information related to hardware and/or devices,
systems integration, testing, and device configuration.
Testing for NTCIP compliance is a subject that has been on the minds of many of those going
through the process of implementing NTCIP. The biggest question that often arises is, How do I
know that my device is NTCIP compliant? Other concerns include, how to do testing and what
tools are available for testing. Testing is an important part of any procurement and should not be
overlooked.
Essentially, testing for NTCIP compliance can take several forms, from the simple perspective of
determining if a device will accept objects transmitted using NTCIP to the more complex notion
of ensuring that the device provides the appropriate functional response for the message that was
received. While it is not the purpose of this document to define functionality or specific testing
procedures, the authors feel that it is important for procuring agencies to rigorously test devices
and systems to ensure NTCIP compliance. Early testing will avoid future heartache when the
need for interoperability or interchangeability arises. Testing for NTCIP compliance will likely
need to address message structure and content, as well as the appropriate functionality responses
to the messages transmitted.
One tool that is available for use in NTCIP testing is the NTCIP Exerciser. This software tool
was developed for the purpose of testing the ability to transmit and receive NTCIP objects. The
tool is designed to verify the communications process by allowing the user to determine if the
messages are in an NTCIP format and are transportable. Functionality testing to determine if the
appropriate operations occur as a result of the transmitted message is left to the user and is not a
function of the Exerciser. It should be stressed that the NTCIP Exerciser is simply one tool at
the disposal of testing agencies for use in a comprehensive testing program.
4.3 Center-to-Field
Table 4.2 builds on the previous discussion by expanding on the considerations that should be
addressed during the initial planning and development stages for procurement documents. These
are items that the systems developer or integrator should provide as part of their proposal
submission, or in the case of an agency pursuing the detailed specification route these should be
addressed in the procurement documents. The table also points to additional resources that are
available in further refining detailed specifications.
This example shows one possible path through the NTCIP Framework for the
commonly referred to and published Class B Profile. It should be noted that the
preferred terminology for this path is STACK, rather than profile.
Figure 4.3 depicts an example center-to-field NTCIP Stack and is one variation of what was
published as the Class B Profile. The Stack is shown as it relates to the NTCIP Standards
Framework. The Stack is created by combining appropriate selections from each of the
Information, Application, Transport, Subnetwork, and Plant Levels. The figure shows the
choices at each NTCIP Framework level that are required to create one variation of Class B, as it
is now published. For example, the SNMP protocol selection is made at the Application Level
within the NTCIP Stack. It should be noted that the trend is moving away from denoting the
various stacks with alphanumeric characters and is moving towards the designation of specific
standards at each level within the NTCIP Framework. As a result, Class B should be regarded as
a legacy term that will ultimately be abandoned in-lieu of an array of specific NTCIP Framework
level standards.
The Class B stack that was originally published includes only the Application, Transport, and
Subnetwork Levels of the NTCIP Framework. The choices that are offered at the Application
Level include SNMP and STMP. The only choice that is defined for the Transport Level is
NULL. The Subnetwork Level option includes Point to Multi-Point, using either EIA 232 or
FSK-1200bps modems. The Plant Level is assumed to be agency owned twisted pair wire.
TCP UDP
NULL
IP
Transport Level Transport Level
SONET
V Series Modem FSK Modem
Subnetwork Level Subnetwork Level
In working through this example it is easy to see that these options are quite limited.
Extrapolating for all the various system configurations, one can easily see that publishing distinct
documents for all possible system configurations could be quite exhausting. As a result, the
presentation of NTCIP standards have moved away from the Class Profile presentation and
toward a presentation of standards specific to each Stack layer. This enables the user to better
specify choices specific to the system being deployed.
The Information, Application, Transport, Subnetwork, and Plant Levels of the NTCIP
Framework present a variety of options that can be selected to form an NTCIP stack. Table 4.3
presents an expanded view of the available center-to-field options that are available at the time
this Guide was prepared.
At the Transport Level the options are essentially comprised of a choice between the use of
routing protocols or not. A Null Transport Level is used with non-routing protocols. In the case
of routing protocols and additional choice is required between connection-oriented and
connectionless. The Transmission Control Protocol (TCP) is connection-oriented protocol that is
used in conjunction with the internetworking protocol simply know as Internet Protocol (IP).
The User Datagram Protocol (UDP) is a connectionless protocol that is also used in conjunction
with the Internet Protocol (IP).
The Plant Level of the NTCIP Framework are not specific NTCIP communications standards,
but offers a complete relationship to the physical infrastructure that would typically be deployed
in modern systems. The Plant Level includes fiber, coax, twisted pair wire, telco lines, and
wireless options.
In the cases of protocol selection, it would be advisable to consult equipment and system
manufacturers for assistance in the selection of the most appropriate supported Protocol(s) that
meet the overall requirements of the applicable system. STMP should be considered essential
for traffic signal systems operating over traditional media, but other devices may not need it.
o Information Level
o Select applicable standards
o TS 3.4 – Global Object Definitions
o Device specific
o Specify Conformance Groups
o Mandatory
o Optional
o Based upon device functionality
o Specify Data Objects
o Mandatory
o Optional
o Determine appropriate Range Values
o Application Level
o Simple Network Management Protocol
o Internet Standard
o Support is Mandatory in Conformance Level 1 and 2
o Simple Transportation Management Protocol
o More efficient protocol
o Defines dynamic objects (multiple object request in single message)
o Support is Mandatory in Conformance Level 2
o Transport Level
o TCP
o IP
o UDP
o IP
o Null
o Subnetwork Level
o ATM
o SONET
o FDDI
o Ethernet
o SLIP
o V Series Modem
o FSK Modem
o PPP
o V Series Modem
o FSK Modem
o PMPP
o V Series Modem
o FSK Modem
o Plant Level
o Fiber
o Coax
o Twisted Pair
o Telco Line
o Wireless
The functionality needs of particular devices, equipment, and systems are important when
considering the selection of appropriate conformance statements. While the NTCIP
communication standards do not specifically prescribe functionality requirements, such can be
inferred by data object construction. The NTCIP communications requirements should be
consistent with the functional specifications for the device. As in the case of a center-to-field
traffic signal system, a selection of appropriate standard data object sets that yield the
functionality required for a specific implementation might include data objects from two NTCIP
standards, Global Object Definitions and Actuated Signal Control Objects. Table 4.4 lists the
NTCIP standards that are published at the time this Guide document was produced. Lastly,
* publication in progress
Please note that the above Standard number designations refer to those documents that have been published to-
date. The numbering scheme for NTCIP documents has been revised and the new designations are shown in
Section 9 of this NTCIP Guide.
Upon reviewing standards that might be applicable to a specific implementation, attention should
be drawn to the Conformance Statement section of the document. Data objects are arranged in
groupings based upon the data associated with various levels of functionality. Some groups are
mandatory and some are optional. Specific data objects within each group may also be
mandatory or optional. The specific implementation and functionality requirements will dictate
the selection of appropriate conformance groups and data objects. Once the Data Objects are
identified, a determination of appropriate range values can be assigned to each to represent the
desired level of functionality.
It would be advisable to consult equipment and system manufacturers for assistance in the
selection of the most appropriate supported Conformance Groups and Data Objects that meet the
overall requirements of the specific procurement or implementation.
Ultimately, specifying NTCIP does not make life easier for the systems planner and specification
writer. Detailed specifications must be carefully thought out and a more thorough knowledge of
operation and functionality is needed early on (in the specification preparation stage) in order to
adequately specify equipment and systems that meet the required needs. For these reasons, a
preferred method of procurement might be the issuance of a more generalized requirements
document that outlines the desired functionality as part of the procurement package and solicit a
proposal from the manufacturer, vendor, developer, or integrator addressing the specific
implementation details.
There are a variety of resources available for the user when preparing NTCIP specification. The
NTCIP web site is a valuable tool for reviewing what standards are now available and any
amendments that might be associated with those standards. The various sections of this Guide
Ongoing NTCIP deployments are a valuable resource for learning what works and what doesn’t.
There is an ongoing effort to capture some of this information specific to deployments using
NTCIP, in the form of Case Studies. These Case Studies will focus on lessons learned from
recent deployments.
There are also a variety of companies, groups, and individuals involved in the development of
NTCIP standards that can provide additional information.
This section is devoted to examples of how the system planner/specification writer would step
through a process to develop detailed procurement specifications for NTCIP systems. Examples
are provided for determining an appropriate NTCIP Stack based upon the NTCIP Framework,
determining appropriate optional and mandatory conformance groups and objects needed to
achieve a desired functionality, and determining the range values that might be needed for a
specific implementation.
Example 4.1 An appropriate NTCIP Stack is needed for a typical traffic signal
controller application. In this example, the controller is to be located in a field
cabinet and is one device on a multi-drop communication channel. The central
transportation management system constantly communicates directly to the traffic
signal controller(s) over agency owned twisted wire pair cable.
The system planner/specification writer can start by determining the appropriate selections for
each level using the NTCIP Framework, as shown in Table 4.5. It is a given that an agency
owned twisted wire pair communications plant will provide the physical infrastructure for
Center-to-Field communications. The selection at the Plant Level should reflect the selection of
twisted wire pair cable.
The selections made at the Transport and Subnetwork Levels can now be made based upon the
type of communications desired between the central transportation management system and the
field traffic signal controller(s). In this example, a dedicated point-to-multipoint
communications link without routing through higher level devices is the desired alternative. As
such, the selections of PMPP and FSK Modem can be made at the Subnetwork Level. And, the
selection of Null can be made at the Transport Level.
For the appropriate selections at the Application Level the system planner/specification writer is
referred to the NTCIP documents describing the Simple Transportation Management Framework
(STMF). The Simple Transportation Management Framework document describes two
• Conformance Level 1
- Simple Network Management Protocol (SNMP)
• Conformance Level 2
- Simple Network Management Protocol (SNMP)
- Simple Transportation Management Protocol (STMP)
SNMP is a commonly used Internet Standard that is very well supported. STMP is a more
efficient protocol for use by the transportation industry that allows the use of dynamic objects.
The preferred selection at the Application Level for traffic signal systems is STMP because of
the low data rates that are common to most traffic systems.
The selection of Information Level standards, conformance groups, and data objects is based
upon the desired functionality of the system being implemented. In the case of this example
where a traffic signal system is being implemented, the system planner/specification writer will
need to look specifically at the requirements of TS 3.5 – Object Definitions for Actuated Traffic
Signal Controller Units standard for specific conformance criteria and data objects.
Additionally, the TS 3.4 – Global Object Definitions standard defines a series of cross-cutting
data objects for configuration, database management, time management, timebase event
schedules, reports, STMP, and PMPP. As a result, standards for both Global Object Definitions
and Actuated Signal Control will be needed to achieve the desired level of functionality. These
standards define a series of optional and mandatory conformance groups and data objects. The
appropriate selection criteria for these optional and mandatory conformance groups and data
objects will be the subject of subsequent examples.
Table 4.5 NTCIP Framework Example for a Center-to-Field Traffic Signal Controller
o Information Level
o Select applicable standards
o TS 3.4 – Global Object Definitions
o Device specific
o TS 3.5 – Object Definitions for Actuated Traffic Signal Controller Units (ASC)
o Specify Conformance Groups
o Mandatory
o Optional
o Based upon device functionality
o Specify Data Objects
o Mandatory
o Optional
o Determine appropriate Range Values
o Application Level
o Simple Network Management Protocol
o Simple Transportation Management Protocol
o Transport Level
o TCP
o IP
o UDP
o IP
o Null
o Subnetwork Level
o ATM
o SONET
o FDDI
o Ethernet
o SLIP
o V Series Modem
o FSK Modem
o PPP
o V Series Modem
o FSK Modem
o PMPP
o V Series Modem
o FSK Modem
o Plant Level
o Fiber
o Coax
o Twisted Pair
o Telco Line
o Wireless
4.3.2.1.2 Conformance Group and Data Object Selection for Traffic Signal
Controllers
The NEMA TS 2 – 1998 Standard for Traffic Controller Assemblies describes a functional
specification for traffic controller assemblies, including the controller unit, malfunction
management unit, terminals and facilities, auxiliary devices, cabinet, and bus interface unit. The
NEMA TS 2 – 1998 describes traffic signal controllers in terms of being either Actuated or
Pretimed. Also, there are two interface options cited as Type 1 and Type 2. The Type 1
interface is a new performance based standard using serial communications and the Type 2
interface utilizes the MS A, B, and C connectors to provide backwards compatibility to TS – 1
style cabinets.
NEMA
TS 2 (A2N)
Conformance M – Mandatory
Conformance Group/Object Reference
Requirement O – Optional
Level 1 Level 2
Configuration TS 3.4 Mandatory Group M M
globalSetIDParameter TS 3.4 Optional O M
globalMaxModules TS 3.4 Mandatory M M
globalModuleTable TS 3.4 Mandatory M M
moduleNumber TS 3.4 Mandatory M M
moduleDeviceNode TS 3.4 Mandatory M M
moduleMake TS 3.4 Mandatory M M
moduleModel TS 3.4 Mandatory M M
moduleVersion TS 3.4 Mandatory M M
moduleType TS 3.4 Mandatory M M
Database Management TS 3.4 Optional Group O M
dBCreationTransaction TS 3.4 Mandatory O M
dBErrorType TS 3.4 Mandatory O M
dBErrorID TS 3.4 Mandatory O M
dBTransactionID TS 3.4 Mandatory O M
dBMakeID TS 3.4 Optional O M
Time Management TS 3.4 Optional Group O M
globalTime TS 3.4 Mandatory O M
globalDaylightSaving TS 3.4 Mandatory O M
Timebase Event Schedule TS 3.4 Optional Group O M
maxTimeBaseScheduleEntries TS 3.4 Mandatory O M
timeBaseScheduleTable TS 3.4 Mandatory O M
timeBaseScheduleNumber TS 3.4 Mandatory O M
timeBaseScheduleMonth TS 3.4 Mandatory O M
timeBaseScheduleDay TS 3.4 Mandatory O M
timeBaseScheduleDate TS 3.4 Mandatory O M
timeBaseScheduleDayPlan TS 3.4 Mandatory O M
maxDayPlans TS 3.4 Mandatory O M
maxDayPlanEvents TS 3.4 Mandatory O M
timeBaseDay PlanTable TS 3.4 Mandatory O M
dayPlanNumber TS 3.4 Mandatory O M
dayPlanEventNumber TS 3.4 Mandatory O M
dayPlanHour TS 3.4 Mandatory O M
dayPlanMinute TS 3.4 Mandatory O M
dayPlanActionNumberOID TS 3.4 Mandatory O M
dayPlanStatus TS 3.4 Mandatory O M
NEMA
TS 2 (A2N)
Conformance M – Mandatory
Conformance Group/Object Reference
Requirement O – Optional
Level 1 Level 2
Report TS 3.4 Optional Group O M
maxEventLogConfigs TS 3.4 Mandatory O M
eventLogConfigTable TS 3.4 Mandatory O M
eventConfigID TS 3.4 Mandatory O M
eventConfigClass TS 3.4 Mandatory O M
eventConfigMode TS 3.4 Mandatory O M
eventConfigCompareValue TS 3.4 Mandatory O M
eventConfigCompareValue2 TS 3.4 Mandatory O M
eventConfigCompareOID TS 3.4 Mandatory O M
eventConfigLogOID TS 3.4 Optional O M
eventConfigAction TS 3.4 Optional O M
maxEventLogSize TS 3.4 Mandatory O M
eventLogTable TS 3.4 Mandatory O M
eventLogClass TS 3.4 Mandatory O M
eventLogNumber TS 3.4 Mandatory O M
eventLogID TS 3.4 Mandatory O M
eventLogTime TS 3.4 Mandatory O M
eventLogValue TS 3.4 Mandatory O M
maxEventClasses TS 3.4 Mandatory O M
eventClassTable TS 3.4 Mandatory O M
eventClassNumber TS 3.4 Mandatory O M
eventClassLimit TS 3.4 Mandatory O M
eventClassClearTime TS 3.4 Mandatory O M
EventClassDescription TS 3.4 Optional O M
eventClassNumRowsInLog TS 3.4 Mandatory O M
STMP TS 3.4 Optional Group O M
dynamicObjectPersistence TS 3.4 Mandatory O M
PMPP TS 3.4 Optional Group O M
maxGroupAddresses TS 3.4 Mandatory O M
hdlcGroupAddressTable TS 3.4 Mandatory O M
hdlcGroupAddressIndex TS 3.4 Mandatory O M
hdlcGroupAddress TS 3.4 Mandatory O M
Tables 4.6 and 4.7 show how the NTCIP group and data object conformance statements relate to
the NEMA TS 2 – 1998 Standard for Traffic Controller Assemblies. The Level 1 actuated TS 2
traffic controller is intended to support only the mandatory NTCIP objects from TS 3.4 – Global
Object Definitions and TS 3.5 – Actuated Signal Control. The mandatory objects of these two
NTCIP standards to not address the advanced functions relative to coordination, time base,
preemption, system control, overlaps, or the TS 2 port 1. A user requesting Level 1 conformance
should not expect these features unless the user specification includes a definition of additional
conformance groups from the standard, or defines and lists specific alternates. A user specifying
Level 2 conformance is requesting that all of the mandatory and most of the optional data objects
within the NTCIP standards TS 3.4 – Global Object Definitions and TS 3.5 – Actuated Signal
Control be supported.
Table 4.7 Actuated Traffic Signal Controller Unit Object Definitions Conformance Table
NEMA
TS 2 (A2N)
Conformance M – Mandatory
Conformance Group/Object Reference
Requirement O – Optional
Level 1 Level 2
Configuration TS 3.4 Mandatory Group M M
Database Management TS 3.4 Optional Group O M
Time Management TS 3.4 Optional Group O M
Timebase Event Schedule TS 3.4 Optional Group O M
Report TS 3.4 Optional Group O M
STMP TS 3.4 Optional Group O M
PMPP TS 3.4 Optional Group O M
Phase TS 3.5 Mandatory Group M M
maxPhases TS 3.5 Mandatory M M
phaseTable TS 3.5 Mandatory M M
phaseNumber TS 3.5 Mandatory M M
phaseWalk TS 3.5 Mandatory M M
phasePedestrianClear TS 3.5 Mandatory M M
phaseMinimumGreen TS 3.5 Mandatory M M
phasePassage TS 3.5 Mandatory M M
phaseMaximum1 TS 3.5 Mandatory M M
phaseMaximum2 TS 3.5 Mandatory M M
phaseYellowChage TS 3.5 Mandatory M M
phaseRedClear TS 3.5 Mandatory M M
phaseRedRevert TS 3.5 Optional O O
phaseAddedInitial TS 3.5 Mandatory M M
phaseMaximumInitial TS 3.5 Mandatory M M
phaseTimeBeforeReduction TS 3.5 Mandatory M M
phaseCarsBeforeReduction TS 3.5 Optional O O
phaseTimeToReduce TS 3.5 Mandatory M M
phaseReduceBy TS 3.5 Mandatory M O
phaseMinimumGap TS 3.5 Mandatory M M
phaseDynamicMaxLimit TS 3.5 Optional O O
phaseDynamicMaxStep TS 3.5 Optional O O
phaseStartup TS 3.5 Mandatory M M
phaseOptions TS 3.5 Mandatory M M
phaseRing TS 3.5 Mandatory M M
phaseConcurrency TS 3.5 Mandatory M M
maxPhaseGroups TS 3.5 Mandatory M M
phaseStatusGroupTable TS 3.5 Mandatory M M
phaseStatusGroupNumber TS 3.5 Mandatory M M
phaseStatusGroupReds TS 3.5 Mandatory M M
phaseStatusGroupYellows TS 3.5 Mandatory M M
phaseStatusGroupGreens TS 3.5 Mandatory M M
phaseStatusGroupDontWalks TS 3.5 Mandatory M M
phaseStatusGroupPedClears TS 3.5 Mandatory M M
phaseStatusGroupWalks TS 3.5 Mandatory M M
phaseStatusGroupVehCalls TS 3.5 Mandatory M M
phaseStatusGroupPedCalls TS 3.5 Mandatory M M
phaseStatusGroupPhaseOns TS 3.5 Mandatory M M
phaseStatusGroupPhaseNexts TS 3.5 Mandatory M M
phaseControlGroupTable TS 3.5 Optional O M
phaseControlGroupNumber TS 3.5 Mandatory O M
phaseControlGroupPhaseOmit TS 3.5 Mandatory O M
phaseControlGroupPedOmit TS 3.5 Mandatory O M
phaseControlGroupHold TS 3.5 Mandatory O M
phaseControlGroupForceOff TS 3.5 Optional O O
phaseControlGroupVehCall TS 3.5 Mandatory O M
phaseControlGroupPedCall TS 3.5 Mandatory O M
Table 4.7 Actuated Traffic Signal Controller Unit Object Definitions Conformance Table
NEMA
TS 2 (A2N)
Conformance M – Mandatory
Conformance Group/Object Reference
Requirement O – Optional
Level 1 Level 2
Detector TS 3.5 Mandatory Group M M
maxVehicleDetectors TS 3.5 Mandatory M M
vehicleDetectorTable TS 3.5 Mandatory M M
vehicleDetectorNumber TS 3.5 Mandatory M M
vehicleDetectorOptions TS 3.5 Mandatory M M
vehicleDetectorCallPhase TS 3.5 Mandatory M M
vehicleDetectorSwitchPhase TS 3.5 Mandatory M M
vehicleDetectorDelay TS 3.5 Mandatory M M
vehicleDetectorExtend TS 3.5 Mandatory M M
vehicleDetectorQueueLimit TS 3.5 Optional O M
vehicleDetectorNoActivity TS 3.5 Mandatory M M
vehicleDetectorMaxPresence TS 3.5 Mandatory M M
vehicleDetectorErraticCounts TS 3.5 Mandatory M M
vehicleDetectorFailTime TS 3.5 Optional O M
vehicleDetectorAlarms TS 3.5 Mandatory M M
vehicleDetectorReportedAlarms TS 3.5 Optional O M
vehicleDetectorReset TS 3.5 Mandatory M M
maxVehicleDetectorStatusGroups TS 3.5 Mandatory M M
vehicleDetectorStatusGroupTable TS 3.5 Mandatory M M
vehicleDetectorStatusGroupNumber TS 3.5 Mandatory M M
vehicleDetectorStatusGroupActive TS 3.5 Mandatory M M
vehicleDetectorStatusGroupAlarms TS 3.5 Mandatory M M
maxPedestrianDetectors TS 3.5 Mandatory M M
pedestrianDetectorTable TS 3.5 Mandatory M M
pedestrianDetectorNumber TS 3.5 Mandatory M M
pedestrianDetectorCallPhase TS 3.5 Mandatory M M
pedestrianDetectorNoActivity TS 3.5 Mandatory M M
pedestrianDetectorMaxPresence TS 3.5 Mandatory M M
pedestrianDetectorErraticCounts TS 3.5 Mandatory M M
pedestrianDetectorAlarms TS 3.5 Mandatory M M
Volume Occupancy Report TS 3.5 Optional Group O M
volumeOccupancySequence TS 3.5 Mandatory O M
volumeOccupancyPeriod TS 3.5 Mandatory O M
activeVolumeOccupancyDetectors TS 3.5 Mandatory O M
volumeOccupancyTable TS 3.5 Mandatory O M
detectorVolume TS 3.5 Mandatory O M
detectorOccupancy TS 3.5 Mandatory O M
Unit TS 3.5 Optional Group O M
unitStartUpFlash TS 3.5 Mandatory O M
unitAutoPedestrianClear TS 3.5 Mandatory O M
unitBackupTime TS 3.5 Mandatory O M
unitRedRevert TS 3.5 Mandatory O M
unitControlStatus TS 3.5 Mandatory O M
unitFlashStatus TS 3.5 Mandatory O M
unitAlarmStatus2 TS 3.5 Mandatory O M
unitAlarmStatus1 TS 3.5 Mandatory O M
shortAlarmStatus TS 3.5 Mandatory O M
unitControl TS 3.5 Mandatory O M
maxAlarmGroups TS 3.5 Optional O M
alarmGroupTable TS 3.5 Mandatory O M
alarmGroupNumber TS 3.5 Mandatory O M
alarmGroupState TS 3.5 Mandatory O M
Special Function TS 3.5 Optional Group O M
maxSpecialFunctionOutputs TS 3.5 Mandatory O M
specialFunctionOutputTable TS 3.5 Optional O M
specialFunctionOutputNumber TS 3.5 Mandatory O M
specialFunctionOutputState TS 3.5 Mandatory O M
Table 4.7 Actuated Traffic Signal Controller Unit Object Definitions Conformance Table
NEMA
TS 2 (A2N)
Conformance M – Mandatory
Conformance Group/Object Reference
Requirement O – Optional
Level 1 Level 2
Coordination TS 3.5 Optional Group O M
coordOperationalMode TS 3.5 Mandatory O M
coordCorrectionMode TS 3.5 Mandatory O M
coordMaximumMode TS 3.5 Mandatory O M
coordForceMode TS 3.5 Mandatory O M
maxPatterns TS 3.5 Mandatory O M
patternTableType TS 3.5 Mandatory O M
patternTable TS 3.5 Mandatory O M
patternNumber TS 3.5 Mandatory O M
patternCycleTime TS 3.5 Mandatory O M
patternOffsetTime TS 3.5 Mandatory O M
patternSplitNumber TS 3.5 Mandatory O M
patternSequenceNumber TS 3.5 Mandatory O M
maxSplits TS 3.5 Mandatory O M
splitTable TS 3.5 Mandatory O M
splitNumber TS 3.5 Mandatory O M
splitPhase TS 3.5 Mandatory O M
splitTime TS 3.5 Mandatory O M
splitMode TS 3.5 Mandatory O M
splitCoordPhase TS 3.5 Mandatory O M
coordPatternStatus TS 3.5 Mandatory O M
localFreeStatus TS 3.5 Mandatory O M
coordCycleStatus TS 3.5 Mandatory O M
coordSyncStatus TS 3.5 Mandatory O M
systemPatternControl TS 3.5 Mandatory O M
systemSyncControl TS 3.5 Mandatory O M
Time Base TS 3.5 Optional Group O M
Time Management Conformance Group TS 3.4 Mandatory O M
timebasePatternSync TS 3.5 Mandatory O M
maxTimebaseAscActions TS 3.5 Mandatory O M
timebaseAscActionTable TS 3.5 Mandatory O M
timebaseAscActionNumber TS 3.5 Mandatory O M
timebaseAscActionPattern TS 3.5 Mandatory O M
timebaseAscActionAuxillaryFunction TS 3.5 Mandatory O M
timebaseAscActionSpecialFunction TS 3.5 Mandatory O M
timebaseAscActionStatus TS 3.5 Mandatory O M
Preempt TS 3.5 Optional Group O M
maxpreempts TS 3.5 Mandatory O M
preemptTable TS 3.5 Mandatory O M
preemptNumber TS 3.5 Mandatory O M
preemptControl TS 3.5 Mandatory O M
preemptLink TS 3.5 Mandatory O M
preemptDelay TS 3.5 Mandatory O M
preemptMinimumDuration TS 3.5 Mandatory O M
preemptMinimumGreen TS 3.5 Optional O M
preemptMinimumWalk TS 3.5 Optional O M
preemptEnterPedClear TS 3.5 Optional O M
preemptTrackGreen TS 3.5 Mandatory O M
preemptDwellGreen TS 3.5 Mandatory O M
preemptMaximumPresence TS 3.5 Mandatory O M
preemptTrackPhase TS 3.5 Mandatory O M
preemptDwellPhase TS 3.5 Mandatory O M
preemptDwellPed TS 3.5 Optional O O
preemptExitPhase TS 3.5 Mandatory O M
preemptState TS 3.5 Optional O M
preemptControlTable TS 3.5 Optional O M
preemptControlNumber TS 3.5 Mandatory O M
preemptControlState TS 3.5 Mandatory O M
Table 4.7 Actuated Traffic Signal Controller Unit Object Definitions Conformance Table
NEMA
TS 2 (A2N)
Conformance M – Mandatory
Conformance Group/Object Reference
Requirement O – Optional
Level 1 Level 2
Ring TS 3.5 Optional Group O M
maxRings TS 3.5 Mandatory O M
maxSequences TS 3.5 Mandatory O M
sequenceTable TS 3.5 Mandatory O M
sequenceNumber TS 3.5 Mandatory O M
sequenceRingNumber TS 3.5 Mandatory O M
sequenceData TS 3.5 Mandatory O M
maxRingControlGroups TS 3.5 Mandatory O M
ringControlGroupTable TS 3.5 Mandatory O M
ringControlGroupNumber TS 3.5 Mandatory O M
ringControlGroupStopTime TS 3.5 Mandatory O M
ringControlGroupForceOff TS 3.5 Mandatory O M
ringControlGroupMax2 TS 3.5 Optional O M
ringControlGroupMaxInhibit TS 3.5 Optional O M
ringControlGroupPedRecycle TS 3.5 Mandatory O M
ringControlGroupRedRest TS 3.5 Optional O M
ringControlGroupOmitRedClear TS 3.5 Optional O M
Channel TS 3.5 Optional Group O M
maxChannels TS 3.5 Mandatory O M
channelTable TS 3.5 Mandatory O M
channelNumber TS 3.5 Mandatory O M
channelControlSource TS 3.5 Mandatory O M
channelControlType TS 3.5 Mandatory O M
channelFlash TS 3.5 Mandatory O M
channelDim TS 3.5 Mandatory O M
maxChannelStatusGroups TS 3.5 Mandatory O M
channelStatusGroupTable TS 3.5 Mandatory O M
channelStatusGroupNumber TS 3.5 Mandatory O M
channelStatusGroupReds TS 3.5 Mandatory O M
channelStatusGroupYellows TS 3.5 Mandatory O M
channelStatusGroupGreens TS 3.5 Mandatory O M
Overlap TS 3.5 Optional Group O M
maxOverlaps TS 3.5 Mandatory O M
overlapTable TS 3.5 Mandatory O M
OverlapNumber TS 3.5 Mandatory O M
OverlapType TS 3.5 Mandatory O M
overlapIncludedPhases TS 3.5 Mandatory O M
overlapModifierPhases TS 3.5 Mandatory O M
overlapTrailGreen TS 3.5 Mandatory O M
overlapTrailYellow TS 3.5 Mandatory O M
overlapTrailRed TS 3.5 Mandatory O M
maxOverlapStatusGroups TS 3.5 Mandatory O M
overlapStatusGroupTable TS 3.5 Mandatory O M
overlapStatusGroupNumber TS 3.5 Mandatory O M
overlapStatusGroupReds TS 3.5 Mandatory O M
overlapStatusGroupYellows TS 3.5 Mandatory O M
overlapStatusGroupGreens TS 3.5 Mandatory O M
TS 2 Port 1 TS 3.5 Optional Group O M
maxPort1Addresses TS 3.5 Mandatory O M
port1Table TS 3.5 Mandatory O M
port1Number TS 3.5 Mandatory O M
port1DevicePresent TS 3.5 Mandatory O M
port1Frame40Enable TS 3.5 Mandatory O M
port1Status TS 3.5 Mandatory O M
port1FaultFrame TS 3.5 Mandatory O M
Example 4.3 An appropriate selection of range values are needed for a typical
traffic signal controller application. In this example, the controller will be an 8 –
Phase controller based upon the NEMA TS-2-Type2 Actuated Traffic Controller
standards.
As in Example 4.2, reference is made to the NEMA TS 2 – 1998 Standard for Traffic Controller
Assemblies. The NEMA TS 2 – 1998 standard provides a listing of minimum NTCIP data
object range values to be supported by the compliant traffic signal controller.
Table 4.8 shows a typical data object from the NTCIP TS 3.5 – Actuated Signal Control
standard. The data object shown is the Maximum Number of Phases from the mandatory Phase
Parameters conformance group. The Maximum Phases data object has a status of mandatory.
The range value of this data object is denoted as integer values from 0 to 255. This means that
the device may support any value within that range. Additionally, the data object indicates that
this is a read-only object, where writing a new value is prohibited. Also, included in the data
object is a description of what this object means.
maxPhases OBJECT-TYPE
SYNTAX INTEGER (0..255)
ACCESS read-only
STATUS mandatory
DESCRIPTION
“The Maximum Number of Phases this Actuated Controller
Unit supports. This object indicates the maximum rows which
shall appear in the phaseTable object.”
::={phase1}
Table 4.9 shows all of the minimum ranges values that are defined as part of the NEMA TS 2 –
1998 Traffic Controller Assembly Standard. The range values shown are based upon the
minimum functionality requirements of the NEMA standard. In the case of the Maximum
Phases value, we can see that the minimum range value to be supported is 8. The NEMA
standard requires a minimum of 8 phases to meet the functionality requirements of the NEMA
TS 2 – 1998 standard. As such, the value to be communicated using NTCIP for the Maximum
Number of Phases would be 8. Similarly, other range values can be related to the level of
functionality that is either required by specification or provided by the manufacturer.
Table 4.9 Object Range Values for Actuated Traffic Signal Controller Units
moduleType Value 3
dBCreateTransaction All Values
dBErrorType All Values
globalDaylightSaving Values 2 and 3
maxTimeBaseScheduleEntries 16
maxDayPlans 15
maxDayEvents 10
maxEventLogCongifs 50
mventConfigMode Values 2 thru 5
mventConfigAction Values 2 and 3
maxEventLogSize 255
MaxEventClasses 7
maxGroupAddress 2
NTCIP defines two application level protocols for communications between computers – Data
Exchange in ASN.1 (DATEX-ASN, commonly referred to as simply DATEX), and Common
Object Request Broker Architecture (CORBA). Both protocols provide the same basic
functionality, but they differ in the method of implementation and each has some unique features
(see Chapter 3). A particular system may support either or both of these protocols. Gateways or
translators can pass messages between the two when necessary. The Internet Protocol (IP) and
both UDP and TCP are used at the transport level.
Various object models are in development for use with CORBA, but no standard models have
yet been published.
The choice of protocol and message sets/object model depends on the application and
environment. The following factors are relevant:
Note: The reader is reminded that center-to-center communications take place between
computer systems, and those computers or systems may be within the same “center” or in
separate centers. The following questions really apply to each system, including multiple
systems within one center where relevant.
If multiple centers are to have center-to-center support added as part of the procurement, or in
the near future, these questions need to be considered for each such center. It is desirable for
agencies within a region to jointly consider these issues and make coordinated procurements
where feasible to minimize costs and facilitate rapid achievement of all needed center-to-center
links in the region.
Ultimately, it is hoped that all centers and systems for transportation management will have a
DATEX and/or CORBA interface, just as virtually all computers now have standard protocol
support for commonly used Internet communications, such as e-mail, web access, and file
transfer. Systems with center-to-center protocol support will be able to automatically exchange
transportation data with any other system with the same protocol, using the Internet or a private
Internet Protocol based communications network.
The NTCIP center-to-center protocols and related message sets and object models are necessary,
but not sufficient for two centers to usefully exchange data. Application software is needed to
gather, process, display, interpret, act on, and generate the incoming or outgoing data. The same
is true of any protocol. For example, the Internet’s Simple Mail Transfer Protocol is a standard
for e-mail transfer between computers, but a computer needs more than the protocol, it also
needs an e-mail program that enables a user to compose and send mail, retrieve and read mail, to
archive both sent and received messages, etc.
Center-to-center communications between computer systems will work only if the computers
have suitable application software. This software does not have to be standardized, just as
Microsoft’s Outlook e-mail program works quite differently from Netscape’s Communicator
program, but e-mail can be sent between the two because they both use the Simple Mail Transfer
Protocol.
Some of the functions that a center may need in a center-to-center communications management
software package include the following:
• User interface (e.g., subscription form, data display, status reports, etc.)
• Interpretation and appropriate disposition of incoming messages
• Databases for storing subscriptions and other administrative data
• Interfaces with existing transportation databases and programs
• Network performance monitoring and management
• Event logging and reporting, etc.
None of these functions are specified or provided by the center-to-center protocols or message
sets, since they do not have to be standardized. But at least some will need to be provided for a
system to manage and make use of center-to-center communications. A system may choose to
obtain a very elaborate and sophisticated center-to-center communications management package,
or a basic one. The former will provide more functions and be easier to use, but will cost more.
Adding center-to-center software to an existing system can be achieved in either of two basic
ways:
• Keep the center-to-center protocol and management software separate from the existing
transportation management software – usually on a separate computer and with a separate
user interface. This involves a loosely coupled connection between the two software
packages, which may make use of an existing data interface available in the
transportation management system, thus avoiding or minimizing the need for changes to
the existing software.
• Tightly couple the center-to-center protocol and management software with the existing
transportation management software – usually on the same computer, and usually with an
integrated user interface. This involves alteration of the existing software to provide the
integration. This option provides a more integrated application for ease of use and added
functionality, but costs more.
The loosely coupled option allows use of a generic center-to-center “server” software package
that can be replicated at multiple centers, with different interfaces to each local system. This
may minimize costs, but it will likely mean users have to deal with two separate user interfaces,
incoming data may not be viewable on the same dynamic displays as local data, data from other
centers may not be able to be easily combined with local data in analysis and reports, and some
remote control functions may not be supported. The tightly coupled approach and its functional
benefits can often be obtained much more economically if it is provided as part of a new system
development or upgrade and is part of the overall system requirements and specifications.
Eventually, each center will ideally support both the CORBA and DATEX protocols and all
standard message sets and object models. If it is not practical to add support for both protocols, a
center should provide, if feasible, the one that other centers in the area are already using or have
planned, if any, and otherwise choose the one most suited to its abilities and needs. For example,
object oriented systems will probably implement CORBA because it will be easier and more
capable. Non-object oriented systems will probably implement DATEX because CORBA will
be awkward for them. It is anticipated that state, regional, and large transportation management
centers will support both protocols and also provide a regional translation or bridging service to
enable data exchange between local systems with single but different protocols.
5 DESIGNING NTCIP
5.1 Introduction
The NTCIP Standards do not address issues related to specifying bandwidth requirements or how
bandwidth is allocated. Bandwidth is basically how much information can be sent through a
The typical subnetwork consists of a local area network adapter that operates at 10 Mbits-per-
second (Mbps). In an office environment, even 100 Mbps is readily available. Point-to-point
dialup and dedicated external links run at a minimum of 56 Kbits-per-second (Kbps). Most
importantly to a planner or implementer is that there are plenty of information resources
available. Network and communications consultants abound. In today's business environment,
there is usually a computer guru or network administrator that can help understand and quantify
bandwidth and allocations issues.
In a center-to-center environment, the computers that run the transportation applications are
typically just users of the "network" or communication links. Other applications such as e-mail,
database management, graphics design, and word processing may also users of the network.
This has a big advantage when it comes to design and implementation. A network specialist
usually handles its design and implementation. However, they expect the transportation system
designer or implementer to be able to quantify what demands will be placed on the network.
The NTCIP center-to-center protocols (DATEX and CORBA) are used for two basic types of
message exchange. The first type involves a human operator at a center requesting information
on a one-time basis from another center. Since a human is in the loop, the volume of such
messages is small, and they are unlikely to be critical in any network design. The other type of
messaging occurs when an operator at a center sets up a permanent subscription for data to be
It may be difficult for a system designer to anticipate all the different types of data that may be
subscribed for between each pair of centers. It is recommended that designers gather actual
operating experience from exiting center-to-center networks to help make such estimates. One
important consideration is the frequency of change in status or other data at each center, since
changes are what other centers will be interested in monitoring. For example, a center that
manages only incidents and related information is not likely to generate as much message traffic
on the network as one that manages 200 traffic signals each of which changes status every few
seconds.
It is possible to perform a worst case analysis by considering the frequency, or quantity per
second, of useful information generation at each center, estimate which other centers will have
an interest in receiving that information, and assign the message loads to network links
accordingly. Some messages will not require a confirmation or other response message, but
many will. These need to be allowed for as well. CORBA also uses various administrative and
exchange initiation messages that can add more traffic on the channel. Further allowance needs
to be made for retries when a message is not delivered successfully on the first attempt.
For DATEX, each IP packet containing data (a publication message – the most common type)
will contain at least 70 bytes of overhead information (including the IP header), plus the actual
encoded data. Most messages will contain only a relatively small quantity of actual data – say 20
to 100 bytes. An average DATEX-generated IP packet might contain 150 bytes. At this rate, a
full duplex 56 Kbps wide area network link could support in the order of 30 messages per second
in each direction. This will be sufficient for some centers, such as the incident management
center, but may not be sufficient for others such as the large traffic signal system, or a center that
wants to obtain a lot of data from other centers.
Figure 5.1 illustrates all the typical fields and values used in sending a set globalTime message
over a typical office environment, network communications stack. The message is sent via the
SNMP Application Profile over a UDP/IP Transport Profile over an Ethernet Subnetwork
Profile. Figure 5.2 illustrates the same globalTime message sent via the STMP Application
Profile over the same transport and subnetwork.
The two analyses will be used to discuss a few of the many alternative techniques that can be
used in a center-to-field multi-drop communications system using NTCIP. Examples (by no
means a complete list) of options available include:
• Use SNMP for all or some messages
• Use STMP for all or some messages
• Use only standard objects, or also use some manufacturer specific objects
• Use a bit rate of 1200, 2400, 4800, 9600, 19200, or other
• Use half duplex or full duplex communications
• For full duplex, overlap or don’t overlap outgoing with incoming messages
• Use twisted pair, fiber, radio, leased lines, or other media
• For twisted pair and leased lines, use one or two pairs per channel
• Use modems that are fast or slow to reach ready state when needed
• Limit the maximum number of devices on a channel to 2, 4, 6, 8, 10, or other number
• Gather detector data on a clock time basis (e.g. every minute) or signal cycle basis
• Request each type of data every second, every minute, or every hour, etc.
• Use a fixed or variable polling cycle duration
• Use a fixed or variable device sequence in the polling cycle
• Use a fixed or variable message sequence for each device
• Wait for response in same poll or get it in next poll
• Interleave upload /download messages or suspend status and “get it over with ASAP”
• Use the same status message all the time, or different status messages
• Insert occasional non-status requests in place of or in addition to status request
• Allow spare time in a polling cycle for additional non-status messages, or allow the cycle
to expand when non-status messages added
With the exception of manufacturer-specific data objects, any controller that meets all
mandatory, optional, and recommended requirements of the relevant NTCIP center-to-field
standards for that field device type, will support all of the relevant functions and operations
suggested above and many more, without any software change.
For purposes of discussion, lets say it is desired to use NTCIP center-to-field communications in
an imaginary traffic control system. The system consists of a central management application
that is used to setup, monitor, and control a network of intersection traffic signal controllers. The
primary communications requirements of the imaginary system are:
The first step in this analysis is to define what information exchanges will be used to meet the
required functionality and how often they occur.
To synchronize the time and date in all field devices, the following object from TS 3.4 will be
used:
globalTime - Section 2.4.1
This object can be used in a message to set or retrieve the current date and time in a remote
device. Typical usage is to send the command to all intersections at least once a day. The time
in each individual intersection is checked (read) at least once a day, as well.
To provide a map display of an intersection the following objects defined in TS 3.5 will be used:
phaseStatusGroupGreens - Section 2.2.4.4
phaseStatusGroupYellows - Section 2.2.4.3
phaseStatusGroupWalks - Section 2.2.4.7
phaseStatusGroupPedClrs - Section 2.2.4.6
phaseStatusGroupVehCalls - Section 2.2.4.8
phaseStatusGroupPedCalls - Section 2.2.4.9
overlapStatusGroupGreens - Section 2.10.4.4
overlapStatusGroupYellows - Section 2.10.4.3
cordPatternStatus - Section 2.5.10
shortAlarmStatus - Section 2.4.9
To control the timing pattern to put into effect and turn on and off the lane closed signs, the
following objects from TS 3.5 will be used:
systemPatternControl - Section 2.5.14
specialFunctionOutputState (1) - Section 2.4.14.2
specialFunctionOutputState (2) - Section 2.4.14.2
This information is intended to be sent to all intersections about once per minute.
To retrieve volume and occupancy data from 2 volume / occupancy detectors at a time, the
following objects from TS 3.5 will be used:
volumeOccupencySequence - Section 2.3.5.1
detectorVolume (1) - Section 2.3.5.4
detectorOccupency (1) - Section 2.3.5.4
detectorVolume (2) - Section 2.3.5.4
detectorOccupency (2) - Section 2.3.5.4
The volume and occupancy data would be read approximately once-per-minute. It is typical to
have "count stations" spread out over several intersections. This type of information would be
asked for from the intersections that have one or more count stations.
To provide additional information about the status of an intersection, the following objects will
be used:
unitAlarmStatus1 - Section 2.4.8
localFreeStatus - Section 2.5.11
These objects are to read only when the shortAlarmStatus indicates some type of fault condition.
They provide more detail about any potential fault condition. Typically this would occur no
more than once-per-hour.
In the course of fine tuning an intersection, numerous programming entries for phase timing and
coordination might be sent once or twice a day. The following objects would be typical:
phaseWalk - Section 2.2.2.2
phaseMinumumGreen - Section 2.2.2.4
phasePassage - Section 2.2.2.5
patternCycleTime - Section 2.5.7.2
patternOffsetTime - Section 2.5.7.3
splitTime - Section 2.5.9.2
The typical intersection is set up for 5-phase operation and has only 6 timing patterns defined. It
is assumed that only one phase or pattern would be adjusted at any one time. Therefore, the
number of objects associated with this type of operation is assumed to be 5.
The following table summarizes the messages and the how often they occur.
The following two rules of thumb can be used to estimate SNMP and STMP messages:
These rules are approximations and do not include lower layer protocol overhead. The rules are
based upon the assumption that most exchanges deal with status and control objects that can be
expressed in one byte. The majority of set up objects can also be expressed in one byte. The
rules of thumb would not apply to exchanges involving OCTET STRINGs or OBJECT
IDENTIFIERs. If you are willing to accept the rules as such, you can skip the next two sections.
If you're into technical details, then the following sections provide an in depth explanation on
how exact sizes of messages can be derived. It is very detailed and not for the faint of heart.
The actual bits and bytes of an SNMP message are defined using the Tag-Length-Value
representation method defined in ISO 8825, Basic Encoding Rules (BER). All objects can be
expressed as Tag (or Type) of either SEQUENCE, INTEGER, OCTET STRING, or OBJECT
IDENTIFIER. The Tag indicates how to think of the Value component. It indicates that it may
be number, string (or text), or the identifier of something. It can also indicate that what follows
is a series of data that is expressed as a Tag-Length-Value of something. There are several
derived types that represent subsets of SEQUENCE, INTEGER, OCTET STRING, or OBJECT
IDENTIFIER but any derived type resolves to one of the aforementioned ones. The second
component of an object is its Length. For example, the Length of the INTEGER "1" when
represented in computer terminology technology is one. It represents how many bytes it takes to
store "1" in memory. The OCTET STRING "public" has a Length of 6 because it is expressed
in 6 bytes . The third component of an object is its Value. The Value of INTEGER "112" is
expressed as 0x70 in computer terminology [decimal 112 = 70 hexadecimal = 0111 0000
binary]. The OCTET STRING "p" is also expressed as Value 0x70. The reason a computer can
differentiate the 0x70 as either "112" or "p" is because of the Tag.
An SNMP message is defined as a SEQUENCE and Length of two predefined fields that
describe the protocol plus a field that defines the data carried by the protocol. The predefined
fields consist of version and community name. Both the version and community name
expressed in the Tag-Length-Value form. A data field that follows it describes the operation that
is to be performed. The SetRequest PDU field at the end of row is expanded in the row below.
This is illustrated in the SNMP Message Fields row of Figure 5.1.
Note that the expanded SetRequest PDU field starts with the Tag of the operation, is followed by
the Length of the data that follows, and consists of Values of three Tag-Length-Value fields. The
last field of SetRequest PDU consists of the Variable Bindings field. It is expanded on the next
row.
From the communications perspective, each of the objects defined in one of the Object
Definitions Standards such as TS 3.4 or TS 3.5 has two components: an identity and a value.
The identity part of the globalTime object is its OBJECT IDENTIFIER (OID). The full OID of
globalTime is:
<iso.org.dod.internet.private.enterprises.nema.transportation.devices.global.globalTimeManagement.1>
or
<1.3.6.1.4.1.1206.4.2.6.3.1.0>
The value component of globalTime is an INTEGER with a value such as 925997608. This
particular value represents May 6, 1999 at 2:33 PM UCT expressed as the seconds since
Midnight January 1, 1970. For a more detailed discussion on OID, please refer to Section 6.
The actual number of bytes that are used to encode the identity and value of the globalTime
object varies with protocols used. For SNMP, each component of the object is expressed in the
form of (you guessed it) Tag-Length-Value. For globalTime, the identity Tag is OID (0x06).
The identify Length value is 13 (0x0D). The identity Value is 1.3.6.1.4.1.1206.4.2.6.3.1.0
(0x2B060104018936040206030100). For the value component, the value Tag is INTEGER
(0x02). The value Length is 4 (0x04). The value Value is 925997608 (0x37319A28).
If one goes through this exercise with various objects, one can derive some general
characteristics about the objects used in this analysis. Most objects are organized into tables and
the OIDs of these objects are 15 to 16 bytes long. Unlike globalTime, most objects are defined
as INTEGERs that, in the traffic signal controller application, have a value between 0 and
255. Most values are therefore expressed in one or two bytes. Compared to the example of
globalTime, a typical identity would 2-3 bytes longer and the value would be 2-3 bytes shorter.
The average binding for an individual object is therefore 23 bytes, as shown in Figure 5.1. The
fixed overhead of SNMP messages that are used to get or set one or more objects is 26 bytes, as
shown in Figure 5.1.
Information Field
IPI SNMP Message
C1
IPI =
SNMP/STMP
SetRequest PDU
PDU PDU Request ID Error Status Error Index Variable Bindings
Type Length
A3 22 02 01 00 02 01 00 02 01 00
PDU Tag Length of Integer Tag Integer Tag Integer Tag
what Length Value Length Value Length Value
follows ID = 0 Status = 0 Index = 0
= 34
Variable Bindings
Sequence of Length Bindings
30 17
Seq Tag Length of all Bindings
Binding
Sequence Length Identity Value
30 15 06 0D 2B 06 01 04 01 89 36 04 02 06 03 01 00 02 04 37 31 9A 28
Seq Tag Length of identity OID Length Identity = 1.3.6.1.4.1.1206.4.2.6.3.1.0 Integer Length Value =
- value pair = 21 Tag = 13 globalTime tag = 4 925997608
The actual bits and bytes of an STMP message are defined using Octet Encoding Rules (OER),
as described in NTCIP 1102 – NTCIP Octet Encoding Rules (OER). Because the content of an
STMP message is defined prior to being sent, it is possible to eliminate a number of fields and
reduce overhead significantly. OER starts out with the Tag-Length-Value representation method
used by SNMP. However, if the Tag, Length, or Value is known, the component is eliminated.
If an object is always an INTERGER, the fact that it is an INTEGER is not sent. If an object is
always 2 bytes long, the fact that it is 2 bytes long is not sent. Since all data are expressed as a
In Figure 5.1, the Binding for globalTime consisted of Sequence, Length, and Value of the
Identity and Value pair where the Identity and Value pair were each encoded as Tag-Length-
Value. The Binding in STMP would be the Value-Value or simply 0x37319A28 as shown in the
last row of Figure 5.3. It is worth noting here that the same principle of eliminating any known
Tag, Length, or Value was applied to the SNMP Message Fields, Set Request PDU, and Variable
Bindings fields in Figure 5.1. This resulted in the one-byte STMP Message Fields and Set
Request PDU field shown in Figure 5.2
Information Field
Initial STMP Message
Protocol ID
C1
IPI = SNMP/
STMP
Binding
Value
37 31 9A 28
Time Value =
925997608
In any exchange of messages, one has to consider the size of both the command and response. In
SNMP, the size of the command and response are approximately the same size. In STMP, the
size of the command and response are very different. The following two sections discuss the
details.
Using the SNMP rule of thumb, one can estimate the size of an SNMP message and exchanges
by the number of objects that are contained in them. The following table summarizes the
messages in the example, how many objects are in the message, the command size in bytes, and
the size of an exchange.
In SNMP, typical commands and the responses have about the same number of bytes. A
getRequest command will contain placeholders for values that would be contained in a response
to it. In a setRequest, the values of objects that are to be set are contained in the set command.
In the corresponding setResponse, the same values would also be included to indicate what the
objects were actually set to. Therefore, in an SNMP exchange, the number of bytes is equal to
two times the message size.
The rule of thumb for estimating STMP message size is 1 byte + 1 byte per object. To estimate
message exchanges, however, one has to understand that only a command or response contains
the value(s) of any associated object(s). To eliminate as much overhead as possible, a
management application can also send a command where no reply is necessary. An STMP
getRequest, getNext, and setResponse do not contain any object values. An STMP
setRquestNoReply does not return any response. The following table summarizes the typical
command and responses:
Command Response
getRequest GetResponse + value
The next table shows what commands will be used to set or get the objects. It also lists the size
for each command and response. By summing the size of the command and response, the size of
the message exchange can be derived.
Size
# of
Dynamic Message Command Objects
Command Response Exchange
Date and Time setRequestNoReply 1 2 - 2*
Tuning N/A - - - -
* As with any rule of thumb, it does not always apply. The actual sizes are 5 and 6, respectively.
The setting of Date and Time and Pattern Command will be handled with the
setRequestNoReply commands. Retrieving of Date and Time will be handled with a getRequest
command and getResponse reply. The Intersection Map Data, Detector Data, and Detailed
Status will be handled with the getRequest command and getResponse response. Several Upload
Download messages could, in theory, be defined as Dynamic Objects. However, the limited
number of definable Dynamic Objects (13) would tend to preclude this. Some implementations
may specifically prohibit this, as well. The Tuning message while easily defined in SNMP
cannot be predefined in STMP because various phases and patterns would have to be indexed.
The Point-to-MultiPoint (PMPP) and Point-to-Point Protocols (PPP) share a common header
structure that has 6 fields associated with it. These fields consist of starting flag, address,
control, information, checksum, and a closing flag. The address field in PMPP is typically one
byte but could be extended. The address field in PPP is always 0xFF and is one byte. The fields
are illustrated in Figure 5.1, in the PMPP Frame Fields row.
The first field in the Information Field indicates the next higher level protocol to process the
information. This field is referred to as the Initial Protocol Identifier (IPI). For non-networked
communications, a "null" or no transport or network protocol is used. The IPI in this case is
0xC1 and indicates that the information should be passed directly to SNMP or STMP.
It is very likely that, in the future, field devices will support true networked communications.
Messages and exchanges could be routed from workstations on a local area network through a
communications server or field processor to a device. In this scenario the Internet UDP/IP
Protocols would be used. Figure 5.3 illustrates all the typical fields and values used in sending a
set globalTime message over a typical office environment, network communications stack. The
message is sent via the SNMP Application Profile over a UDP/IP Transport Profile over an
Ethernet Subnetwork Profile. The use of UDP/IP has an overhead of 28 bytes. A typical
Ethernet Frame has an overhead of 24 bytes.
It is also possible to send STMP over UDP/IP over Ethernet. Figure 5.4 illustrates the same
globalTime message sent via the STMP Application Profile over the same transport and
subnetwork. Note that the only difference in transport and subnetwork layers is the value of the
Destination Port in the UDP Header. SNMP uses the value 161 (0x00A1) and STMP uses the
value 501 (0x1F5).
The following table summarizes the overhead for the various transport and subnetwork
protocols.
Overhead Overhead
Transport and
per per
Subnetwork Protocol
Message Exchange
Null over PMPP 7 14
IP Header
Ver IHL Type of Service Total Length 45 00 00 7C
Source Address 84 A3 80 04
Destination Address 84 A3 01 0A
UDP Header
Source Port Destination Port 0C A2 00 A1
Length Checksum 00 39 00 00
SetRequest PDU
PDU Type Request ID Error Status Error Index Variable Bindings
A3 22 02 01 00 02 01 00 02 01 00
PDU Length = 34 Int Len Value same as same as
Tag (# bytes Tag = 1 = 0 Request ID Request ID
that follow)
Variable Bindings
SEQUENCE OF VarBinds
30 17
Seq Length = 23 (# bytes in
Tag all following Bindings)
Variable Binding
SEQUENCE Identity Value
30 15 06 0D 2B 06 01 04 01 89 36 04 02 06 03 01 00 02 04 37 31 9A 28
Seq Length = 21 (# bytes OID Length Identity = 1.3.6.1.4.1.1206.4.2.6.3.1.0 Integer Length Value =
Tag in this Binding) Tag = 13 globalTime Tag = 4 925997608
Information Field
IP Header
UDP Header
In performing a bandwidth analysis, there are numerous timing factors that come into play.
Processing delays, modem response, and duplexing mode may need to be considered. One can
intuitively understand that the response to a command asking for 100 objects will take longer to
process than one that only asks for 1 object. Once a message is received, the device will need to
parse it in order to understand what is being asked for or what is being sent. Once it understands
what, it must then either gather the data or store away each data. It is very important to
understand that processing delays will vary according to message content and implementation.
network
or
manager media agent
getResponse
time
Modem detect and turnoff delays can be as high as 2 or 3 seconds. The typical 56Kbps modem
that one might use to log into the Internet takes several seconds to "train" or adjust to the
wireline characteristics. These may be suitable for point-to-point operation, but in a multi-drop
environment, a "fast" turn-on / turn-off type modem is the only practical choice. For the sake of
this analysis, it is assumed that a "fast" modem will be used and that the turn-on and turn-off
delays are on the order of 10 milliseconds each.
network
or
manager media agent
getRequest
processing delay
getRequest getResponse
processing delay
getResponse
time
The duplexing mode of operation can have a significant impact on timing. In full-duplex mode,
commands and responses can overlap. A second command can be sent while the response to a
previous one is being received. In half-duplex mode, a second command can not be sent until
the response to the first is received. Full-duplexing can effectively cut the data rate requirements
significantly. The following summarizes the delays that will be used in what follows.
Delays Time
Processing Delay 10 ms
Total 30 ms
5.2.3.6 Modems
Center-to-field communications have traditionally used 1200 bps FSK (Frequency Shift Keying)
modems for wireline communications. These modems come in different versions for different
applications, such as half or full duplex, leased telephone lines (Bell 3002 voice circuit) or
agency-owned twisted pair cable, internal or external to the device, support RS 232 flow control
or not, etc. In analyzing bandwidth requirements for copper communications plant and
attempting to increase modem bit rate, it is important to remember that not all modems and bit
rates may be practical for a given implementation environment. In particular, the following
issues need to be considered:
• Consumer modems used for general purpose computer communications (e.g., V.90
56kbps) cannot be used in multi-drop field implementations because they are too slow to
reach ready state prior to each transmission (they require “training” time).
• Consumer modems and modems designed for indoor use may not operate reliably in the
temperature and humidity extremes encountered in field applications.
• The fastest modems currently available for agency-owned twisted pair multi-drop
applications operate at up to 9600 bps.
• Currently, modems suitable for multi-drop operation over leased telephone lines (Bell
3002 analog voice circuits) cannot support 9600 bps unless "a metallic circuit" is
provided.
• There is a limit to the distance that a modem can operate on agency-owned twisted pair
cable. The maximum distance reduces as the bit rate increases and as the number of
devices on the channel increases.
• There is no distance limit on leased telephone lines.
• Modems from different manufacturers can vary greatly in their features and operational
characteristics. A thorough test of the actual modem planned for use (in a real-world
long distance multi-drop environment) should be made before committing to its use.
• Most field devices do not yet have a 9600 bps internal modem option.
• Modems that are external to the field device (connected by a serial cable) require a
dedicated suitable RS 232 port on the field device, in addition to any serial port(s) used
for other purposes (e.g., laptop computer connection).
• Asynchronous modems add a start and at least one stop bit for every byte (8 bits)
transmitted; synchronous modems do not. This equates to 25% additional overhead.
There are similar but different lists of constraints and considerations for modems or transceivers
for other types of plant such as fiber and radio.
The maximum number of modems on a wireline channel due to electrical limitations is an issue
of modem sensitivity, the desired signal-to-noise ratio for a given bit-error-rate, and the
characteristics of the wire and interface. The Communications Handbook for Traffic Control
Following the example in the handbook, the calculations for any modem technology that uses a
wireline (twisted pair) medium would apply. The formula for determining maximum number of
drops is:
Number of Drops = (Sensitivity - Cable Loss - S/N Ratio) / Insertion Loss per Drop
The following are hypothetical characteristics of a 9600 bps modem and wiring that is to be used
in a multi-drop configuration.
Parameter Value
Distance 8 miles
The modulation technique used by a modem is not necessarily Frequency Shift Keying (FSK).
Phase Shift Keying (PSK) and Quadrature Amplitude Modulation (QAM) are typically
employed to increase throughput without necessarily increasing the signaling frequency. The
operating mode of the 9600 bps modem is assumed to be full duplex using two wire pairs. This
configuration minimizes distortion from line reflections and the turnaround times associated with
switching from transmit to receive. The signaling frequencies are assumed to be 9600 Hz. The
signaling frequencies will vary with modulation techniques but must be quantified because they
will determine the cable losses. Receiver sensitivity is an indication of how well a modem is at
picking up weak signals and signal-to-noise ratio is the ability of a modem to pick out a signal
with back ground noise (static, etc.). Insertion loss comes from a manufacturer's data sheet.
There is always some type of loss associated with the connection to the wire. Usually this is due
to slight impedance mismatches and physically routing the signal through a connector to the
modem electronics. For a given signaling frequency, the size of the interconnect wire will define
1
Communication Handbook for Traffic Control Systems, Federal Highway Administration Report FHWA-SA-93-
052, April 1993
Number of Drops = (Sensitivity - Cable Loss - S/N Ratio) / Insertion Loss per Drop
Number of Drops = (39 dBM - (8 miles x 3.3 dB per mile) - 15 dB) / .5 dB
Number of Drops = (39 dBM - 19.8 dB - 15 dB) / .5 dB
Number of Drops = 8.2
Rounding down the value we find that the maximum number of drops for this example is 8, from
a purely electrical point of view.
The above discussion shows how to calculate the electrical limitations using modem and wireline
techniques. It does not address the logical aspects of organizing a system into communications
channels, defining what information is sent on each channel, or ensuring each channel can carry
the desired information. What follows are the procedures and calculations to define the number
of channels and drops per channel based on the message exchange requirements.
1. Size of the message exchanges and how often they will occur.
SNMP STMP
Message Exchange Frequency Exchange Exchange
(bytes) (bytes)
Date and Time 1 per day - all 98 2
Delays Time
Processing Delay 10 ms
Total 30 ms
The processing delay of traffic signal controllers is highly variable, with actual response times
varying from 10 ms to 50 ms. Achieving response times at the lower end of this range, as shown
in Table 5.10, may require the use of techniques such as asynchronous messaging whereby the
response to a request is placed in a buffer for immediate transmission at the next poll.
At this point, we need to choose specific protocols to analyze and then normalize the data
exchanges and delays to some common time interval. For SNMP over Null over PMPP we have:
Message
Message Exchange Frequency Exchange Messages Bytes
Size Bytes per day per day
Date and Time 1 per day - all 112 24 2688
Normalizing the bytes per day to bits per second, we calculate the total system bandwidth
required as:
1094470944 bytes per day x 10 bits per byte / 86400 seconds per day = 12667.49 bits in one
second
The value 126675 is the average number of bits that are required to transmit all message
exchanges to and from the 24 intersection controllers in one second.
Given a specific modem speed, we can calculate a first order approximation of the number of
drops per channel and channels. For a 9600 bps modem, this is calculated as:
126670 bits overall / 9600 desired bits per channel = 13.19 channels
And
24 intersections / 13.19 channels = 1.82 drops per channel
Rounding both of these figures downward, the use of 9600 bps modems would only work if there
was a single modem and drop dedicated to each intersection. There are some systems that use a
dedicated modem and cabling arrangement. If this is feasible, a second order approximation
should be performed. A second order approximation accounts for the changes in the number of
drops and the need to send broadcast messages on each channel. The impact of any delays must
also be considered. Since the steps are same for any protocol combination, only the reiterations
for STMP over Null over PMPP using 1200 bps modems will be illustrated.
The STMP and PMPP Protocols were designed to be open to address diverse communications
need yet be very efficient to meet the limited bandwidth capability of current systems. A typical
traffic control system of today that controls 24 intersections uses a proprietary communications
scheme, is usually configured as 2 groups of 12 intersections or 3 groups of 8 intersections and
uses internal 1200 bps FSK modems. Conversion of these systems to NTCIP may impact the
existing configuration and require the use of higher speed modems. The following calculations
for STMP over Null over PMPP should help understand what the potential impact may be.
For this NTCIP Stack, Table 5.12 summarizes the messages, frequency, and sizes of the message
exchanges. As before, we begin by looking at the system as 24 intersections on a single drop and
normalize the total exchanges to a per day basis.
Message
Message Messages per Bytes
Frequency Exchange
Exchange day per day
Size Bytes
Date and Time (set) 1 per day - all 16 1 16
54185320 bytes per day x 10 bits per byte / 86400 seconds per day = 6271.45 bps
The value 6271.45 bps is the average data rate required to transmit all message exchanges to and
from the 24 intersection controllers
These seem to be a reasonable values, so we need to perform a second order approximation. For
this iteration, a configuration of 6 channels of 4 drops per channels will be used. The frequency
of some of the messages will be adjusted accordingly.
Message
Message Exchange Frequency Exchange Messages Bytes
Size Bytes per day per day
9072516 bytes per day x 10 bits per byte / 86400 seconds per day = 1050.06 bps
The value 1050.06 bps is the average data rate required to transmit all message exchanges to and
from the 4 intersection controllers
This appears to be a reasonable value but delays must be taken into account. Any delays will
take away from the time that is available to be actually transmitting data. Total delay per second
is calculated as:
349949 messages per day X .03 seconds delay per message / 86400 seconds per day = 0.122 sec.
The value 0.122 seconds is the average delay per second. We calculate the modem speed to
transmit 1050 bits in the remaining time as:
Therefore, 4 drops per channel at 1200 bps is a suitable configuration. If more drops per channel
are desired, the data rate can be increased to possibly 4800 or 9600 bits per second, by using
faster modems.
In the previous scenario, the emphasis was on acquiring once-per-second data from all
intersections. This may not necessarily apply to all situations. In applications other than traffic
signal control this would certainly not be the case. The following scenario addresses the same
requirements as before except for map display. In this case, the map display is only for one
intersection at a time. In general, this scenario might apply to cases where there is a requirement
for real-time (once-per-second) data from a single device but system data can be exchanged on a
once-per-minute or longer basis. The communications requirements are summarized as:
1. Synchronize the time and date in all field devices.
2. Provide a map display of the status of one intersection.
3. Control the overall timing pattern to be put into effect.
4. Control the operation of 2 lane-closed signs.
5. Monitor all intersections for any abnormal conditions.
6. Accumulate volume and occupancy data for 16 detectors to perform off-line
optimization.
7. Provide full upload and download of the complete database or programming data in each
field device.
8. Support 24 intersections.
In this scenario, all the previous messages will be used but a new one will be added. Since the
map display information will only be gathered from one intersection, the status of the other
intersections will be monitored by an "Intersection Status" set of objects.
To provide indications of what coordination timing pattern is in effect and any abnormal
condition at an intersection, the following objects defined in TS 3.5 will be used:
systemPatternStatus - Section 2.5.10
shortAlarmStatus - Section 2.4.9
These are the same objects used in the map display. However, the intersection map display is
intended to be gathered from only one intersection at a time. These objects would be used to
monitor the other intersections in the system. For the purposes of monitoring, these would be
read from each intersection approximately once-per-minute.
The following table summarizes the new set of messages and the how often they occur:
Command /
SNMP Message Exchange
Objects Response
Overhead Size
Size
Date and Time 1 49 98
Intersection Map Data 10 256 512
Intersection Status 2 72 144
Pattern Command 3 95 190
Detector Data 5 141 282
Detailed Status 2 72 144
Upload Download 1 + bytes 59 - 177 118 - 254
Tuning 5 141 282
The following is an update to Table 5.4. The only difference is the addition of the Intersection
Status exchange.
Size
# of
Dynamic Message Command
Objects Command Response Exchange
Tuning N/A - - - -
In this example, the estimates for transport and subnetwork protocols remain the same. The
timing factors and delays apply, as well.
The only new topic to be considered in the alternate example is the concept of communications
slots. The number of communications slots per channel can best be thought of as the number of
opportunities to communicate in any time period. It is not necessarily equal to the number of
drops per channel. For example, assume that there are 8 drops per channel. If one needed to
communicate with each drop once every minute, there could be 8 slots. The width of each slot in
this case would be 7.5 second. An arrangement of 60 slots, each 1 second wide, would be just
as suitable if all exchanges took less than 1 second. If this were the case, 52 slots would be
available for other uses.
In the alternate example only one message exchange needs to take place on a once-per-second
basis. All other exchanges take place on a once-per-minute, once-per-hour, or one-per-day basis.
If the once-per-second exchange could be completed in less than one-half second, and all of the
other exchanges could each be completed in less than one-half second, the concept sloting
arrangement could be used. There could be two slots one-half second wide. The first slot would
be reserved for the once per second exchange. The second slot would be used to perform all the
other exchanges but on a rotating basis.
At this point we are ready to perform the timing analysis. As before, it necessary to pick a
specific NTCIP Stack. In the following examples, the transport and subnetwork protocols are
assumed to be Null and PMPP. The following table summarizes the frequency and all overhead
associated with the message exchanges.
SNMP
STMP
Message
Message Exchange Frequency Exchange
Exchange
Bytes
Bytes
Date and Time 1 per day - all 112 15
Since the "system requirements" require communications to 24 intersection controllers, the use
of the PMPP and "fast" modems would allow multiple secondary devices to share a
communication link. However, the characteristics of wire and the distances between
intersections may place an upper limit on how many devices can share a communications link.
For the sake of this analysis, the maximum number of drops is assumed to be 9. This would
allow a management application and 8 intersections to share a channel. The network of 24
intersections is assumed to be organized into 3 drops of 8. The revised message frequency and
size per channel would then be:
SNMP
STMP
Message
Exchange
Exchange
Message Exchange Frequency Bytes
Bytes
Date and Time 1 per day - all 112 15
Next, we analyze the exchanges to gauge the impact of multiple secondary devices and the
frequency of the exchanges. In this example the assumption is that the user wants to see the
Intersection Map Data with some accuracy. Two back-to-back samples of the signal display
would not be the same as two spaced exactly one second apart.
Considering this, the Intersection Map Data exchange should take place once every second on
the second. Since all other exchanges take place on a minute, hour or day basis, the Intersection
Map Data could be requested every second and all other exchanges requested on a rotating basis.
To do this would require that the Intersection Map Data and the largest other exchange take place
within one second. The largest exchange other than Intersection Map Data is the Tuning
exchange. After summing up the size of the exchanges and processing delays, we can then
compute the required data rate as:
The following table summarizes the overhead and delays associated with the Intersection Map
Data and the Tuning message exchanges.
Delays and
Size Processing
Slot Exchange
(bytes) (ms)
1 Intersection Map Data 526 70
2 Tuning 526 70
This results in a requirement to transmit 1052 bytes in one second with 140 ms of delays. The
required data rate is computed as:
This number is too high for readily available "fast" multi-drop modems, so a new approach will
be considered. Since the Tuning exchanges are meant to change the timing characteristics of the
system and need to be performed manually, we can make the assumption that it does not have to
run concurrently with the Intersection Map Data exchange. If we consider the next largest
exchange, Detector Data, we come up with:
This value is still too high to consider 9600 bps modems. It is always a good engineering rule of
thumb have some margin for error. To gain some margin one could consider the use of fiber
optic modems. The carrier turn-on and turn-off delays could be significantly less than 20 ms. If
an intersection did not have pedestrian movements, dropping them from the Intersection Map
Data Exchange could reduce the data rate to 8341bps. Minimizing carrier turn-on and turn-off
delays could be also be accomplished by use of a simple full-duplex operation. The primary's
carrier is always on and any secondary turns on it carrier as soon as it recognizes that it needs to
Looking at the other exchanges, they could be mapped in to the second slot on a rotating basis as
follows:
17 Status - Intersection 8
18 Pattern Command - Intersection 1
19 Pattern Command - Intersection 2
20 Pattern Command - Intersection 3
21 Pattern Command - Intersection 4
22 Pattern Command - Intersection 5
23 Pattern Command - Intersection 6
24 Pattern Command - Intersection 7
25 Pattern Command - Intersection 8
26 Spare
… …
30 Spare
Assuming a total of 30 slots, each of these exchanges would have a resolution of once every 30
seconds. The only concern in this arrangement is that a new pattern command might not
transmitted until 29 seconds after it was selected. Since there are spare time slots, one approach
could be to send any new Pattern Command as it occurs. In this case, however, it would be sent
to all intersections using a group address.
The above example shows that while SNMP could be used for some real-time applications, it
may require higher data rates than traditional 1200 bps, FSK modems support. For these
applications, STMP is more suited. The following illustrates how to calculate the bandwidth
requirements for an STMP over Null over PMPP stack.
In this example, the messages are defined as dynamic objects. The OIDs of the objects that
comprise the messages are downloaded to Dynamic Objects 1 - 6 as follows:
Dynamic Object 1 = Time and Date
Dynamic Object 2 = Intersection Map Data
Dynamic Object 3 = Intersection Status
Dynamic Object 4 = Pattern Command
Dynamic Object 5 = Detector Data
Dynamic Object 6 = Detailed Status
2 Detector Data 21 60
Totals 47 120
Since this is well under the 1200 bps data rate that is typically available, we might want to
consider sending a Pattern Command every second, as well. This would result in overhead and
delays as follows.
2 Pattern Command 18 20
3 Detector Data 21 70
Totals 65 160
[Note that the Delay and Processing for a Pattern Command is only 20 ms. Since this is sent as a
setRequestNoReply, there should not be any internal processing required.]
As in the SNMP example, the other exchanges could be mapped in to the third slot on a rotating
basis as shown in Figure 5.22.
6 IMPLEMENTING NTCIP
6.1 Introduction
This chapter describes the various issues related to implementing the NTCIP in a device or
central system. The primary audiences for this chapter are the system/device developers and
system implementers. Readers should already be familiar with the concepts presented in
Chapters 1-4 of this Guide, especially the concepts related to system design and specification as
presented in Chapters 3 and 4.
• Implementation Roadmap
- Initial Request
- Investigate Issues
- Device and/or System Requirements
- How NTCIP Standards Fit Together
- Selecting Standards for an Implementation
- Selecting Manufacturer Extensions
- Implementation Alternatives
- Other Factors
- Stability of the Standard
- Support of Amendments
- Interpretation Resolution
- Client / Developer Understanding
- Certification Process
- Integration with Other Components
- Performance Issues
- Maintenance / Future Upgrades
- Development
- Delivery / Acceptance Testing
- Unit Testing
- Integration Testing
- System Testing
- Maintenance
• Example Implementation Process
• Example Byte Streams
- The NTCIP Database
- Encoding the NTCIP Database for Transmission
- Encoding an Object with Its Value
- Encoding the SNMP Data Packet
- The Transport Profile
- The Subnetwork Profile
• Defining New Objects
• Examples of Implementation Problems
This chapter is intended to be germane to all of the NTCIP standards. As such, the concepts are
presented at a high level. However, one detailed example is given at the end of the chapter in
order to explain the concepts more fully.
The reader is warned not to rely on this interpretation of the NTCIP for development purposes.
A system or device developer will need to review the relevant NTCIP standards in order to
implement them properly.
This document is updated from time to time to reflect changes in NTCIP. To check whether this
is the current version of this document, access the NTCIP home page on the World Wide Web at
http://www.ntcip.org.
There are certain steps that should be taken in any systems development project. It is especially
critical to follow these steps when developing systems that are intended to meet standards.
Figure 6.1 summarizes some of the more important steps that should be followed by any
organization considering the development of NTCIP software.
Consider
Investigate Other Factors Delivery and
Issues Acceptance
Stability
of Standard
Study Unit
Requirements Support of Test
Amendments
Interpretation
Select
Resolution Integration
Standards
Test
Client/Developer
Understanding
Select System
Manufacturer Certification Test
Extensions Process
Integration
Requirements
Performance
Requirements
Maintenance
and Upgrades
The developer must ensure that there is an adequate understanding of the request. Some requests
may be very ambiguous (i.e., "The device shall be NTCIP-compliant."), others may be very
It should be realized that this process works best in an iterative fashion. This allows the client
and the developer to work together in developing a list of requirements and a proposal that best
matches everyone's needs. However, this is not always possible due to the procurement
regulations of some organizations.
The first aspect of the investigation should be to determine the exact requirements for the system.
This will often require expanding the original request. For example, if the request is simply for
an "NTCIP compliant device", the developer must determine what functionality the device is
supposed to support and then determine what NTCIP options might be appropriate.
The developer may also need to modify or limit the original request in order to meet safety,
schedule, budget, market or other concerns. For example, the request may be for a signal
controller and require "support for the full range of all objects." However, for safety and liability
reasons, the developer may want to develop his software to limit the valid values for the yellow
clearance interval to 3.0 to 5.0 seconds. It is important to identify any such variances from the
request as early as possible so that the expectations for the resulting product are properly
managed.
The result of this effort should be a detailed requirements document with which both the client
and developer can be satisfied. Additional details of this investigation are given below. As a
minimum, the document should address those issues identified in Chapter 4 of this Guide.
Ideally, there would only be one NTCIP standard that met everyone's needs. However, reality
requires a large number of options to meet the unique needs of specific sites. For example, some
agencies have a large amount of twisted pair copper that they want to continue to use. Other
agencies are installing new systems and want to take advantage of fiber optic cable and other
technologies. Likewise, some agencies have fairly simple data exchange needs with field
devices, whereas other centers need to exchange large amounts of information with other centers.
The NTCIP accommodates these various needs by providing a suite of standards, each providing
unique features.
NTCIP standards are based on a layered approach that is similar to those used by the
International Organization for Standardization (ISO) and the Internet community. There are four
primary levels of the NTCIP stack:
• Application – Application Profiles define the rules and procedures for exchanging
information data. The rules may include definitions of proper grammar and syntax of a
single statement as well as the sequence of allowed statements. This is similar to
combining words and phrases to form a sentence or a complete thought and defining the
rules for greeting each other and exchanging information. These standards are equivalent
to the Session, Presentation and Application Layers of the ISO seven layer stack.
• Transport – Transport Profiles define the rules and procedures for exchanging the
Application data between point 'A' and point 'X' on a network. This includes any
necessary routing, message disassembly/re-assembly and network management functions.
This is similar to the rules and procedures used by the telephone company to connect two
remotely located phones.
• Subnetwork – Subnetwork Profiles define the rules and procedures for exchanging data
between two 'adjacent' devices over some communications media. This is equivalent to
the rules used by the telephone company to exchange data over a cellular link versus the
rules used to exchange data over a twisted pair copper wire.
Any data exchange requires the use of one standard taken from each of the four levels. In theory,
a profile from one level should be designed such that it can be combined with any profile from
another level; however, in practice, profiles will often require certain services from other levels.
Thus, only certain combinations are desirable and recognized by the NTCIP effort. These
combinations are depicted in Figure 6.2.
Files
Reference Model ITS Message Sets Dynamic Objects
Information Level Information Level
TCP UDP
NULL
IP
Transport Level Transport Level
SONET
V Series Modem FSK Modem
Subnetwork Level Subnetwork Level
The client may inform the developer which standards to use in the request; however, even in this
case, the developer must be familiar with the standards enough to ensure that the request is
consistent with the intended purpose of the standard. For example, the CORBA standard is not
intended for field device communications using the "object definition standards." If a developer
receives such a request, he should contact the client to ensure that there is an appropriate
understanding of what is required.
During this phase of the investigation, the developer should also consider the general market
applicability of the selected standards. For example, if the developer believes that the
marketplace will seldom request the selected combination, the bulk of the implementation costs
will have to be borne by the one client. Thus, it may be appropriate to suggest a more common
combination of standards in order to spread the development costs over multiple clients.
Finally, the developer must determine whether or not the standard supports all of the features
supported by the manufacturer's device. The NTCIP has been explicitly designed to allow for
innovations and it is recognized that the NTCIP standards do not currently define standardized
objects for every feature of every device. Thus, the developer must determine if there are special
features of the subject device that are not standardized by the NTCIP. If such features are
present, then the developer will need to determine precisely how these features will be supported
without conflicting with the standardized implementations. Usually, this is simply defining
additional objects under a developer specific node. Once defined, the developer may want to
publish these objects to the transportation community in order to promote this design as the
defacto standard for the given feature.
Once there is a clear understanding of the project requirements, the developer can investigate
ways to implement the desired features. For example, the developer may be able to acquire off-
the-shelf software to minimize the effort required to implement the features. A layered design
will minimize the effort required to maintain the code and to implement different profiles in the
future. However, these benefits may impose other constraints on the system.
The NTCIP has used widely recognized standards whenever possible. For example, the NTCIP
standards reference the Transmission Control Protocol (TCP), Internet Protocol (IP), Simple
Network Management Protocol (SNMP), Common Object Request Broker Architecture
(CORBA), and High Level Data Link Control Protocol (HDLC) standards to name just a few.
In many cases, the private industry has developed off-the-shelf tools to aid system developers in
implementing these protocols. Being aware of what products are available and for what costs
will allow the developer to provide a more realistic estimate of development costs. For example,
most developers use an off-the-shelf implementation of TCP/IP rather than creating their own.
Standards for which there are known products include:
While off-the-shelf software can save a considerable amount of development time and greatly
simplify maintenance of the software; it may not always provide the most efficient
implementation. Off-the-shelf software has generally been designed in a very layered fashion for
easy maintenance and fully generic use; however, real-time system performance can frequently
It should also be recognized that the availability of off-the-shelf tools may affect the selection of
features to be included in the requirements document.
There may be a variety of other factors that may need to be considered in order to finalize a
proposal. Each of these issues may impact the proposed budget, schedule, and/or scope.
Therefore, they should be explicitly addressed in the proposal in order to manage expectations.
Without the management of expectations early in the process, a product, which the developer
believes is compliant, may be perceived to be lacking by the client. A sample of these issues is
provided in the following subclauses.
The NTCIP standards are still relatively new and all standards are subject to amendments.
Amendments typically result from developers attempting to implement the subject standard and
recognizing either a technical problem with the specification or ambiguous wording. Thus, new
standards are frequently amended to solve these problems and the standards become more and
more stable over time. Thus, from a developers perspective, there is greater risk in implementing
new standards; however, typically the first manufacturers to implement are the manufacturers
who establish the greatest market share. Thus, these trade-offs must be considered in any
implementation.
Because the standards are relatively new, the developer must consider what will happen if an
amendment to the standard is approved during the development period of the product. As a
general rule, it may be difficult to support amendments that are made after the product design is
finalized and coding has begun. However, many times, a draft amendment may be present
during design and the issues identified in the draft can be incorporated. In any case, the proposal
should explicitly state whether or not amendments will be included for the proposed price and
whether or not there is a cut-off date for such amendments.
If a developer is implementing a relatively new standard, he should ensure that there is a clear
understanding of how interpretation problems will be addressed. For example, one could
propose that any interpretation compliant with the wording is valid for acceptance. This would
Another factor to consider is whether or not the client has realistic expectations. While the
NTCIP provides a standardized interface that is flexible enough to meet various needs, it may be
more bandwidth intensive than what the client's previous systems and/or it may use a slightly
different database design. It is important to make sure that the client has realistic expectations at
the start of the project in order to ensure that the project will be perceived as a success. A
thorough understanding of the expectations on the part of both the client and developer is
important to the success of any project.
The developer must also consider the certification process for the product. While a rigid
certification process will undoubtedly provide a greater assurance to the client, it will also
increase costs. These costs are especially important to consider if the developer is responsible
for any testing costs (e.g., through hiring an independent lab).
The developer may also be required to ensure that his device works with other components
within a larger system. Such integration may reveal problems that do not appear during product
certification and thus may also affect the project costs.
The developer should also realize that the flexibility of NTCIP also comes at the price of a more
complex system than the industry has traditionally used. Therefore, the system may require
more sophisticated processors or better communication facilities than traditional systems in order
to achieve the same performance level (e.g., response times, etc.). If the developer overlooks
these issues at the design time, there could be significant costs imposed at the end of the project
in order to provide the necessary performance. The client should also be informed of
performance tradeoffs.
A final issue to consider is whether or not the client desires extended maintenance or future
upgrades. Such services may be very appropriate given that the standards may change based on
other deployment projects; but clearly such a service will increase the costs associated with the
project.
6.2.3 Development
If the proposal is accepted, the development phase will begin. This will include finalizing the
development approach, building the prototypes and internally testing the units.
Once the developer is satisfied with the quality of his implementation, it is ready for delivery to
the client. At this point, the client will perform an acceptance test. The type of acceptance test
should be specified in the proposal process as this may affect the cost of the delivered product. It
should be realized that the NTCIP is a very complex set of standards and it is impractical to
perform comprehensive testing. However, well designed test plans can be produced to provide a
high level of confidence for a reasonable cost.
In general, there are three levels of testing: unit testing, integration testing, and system testing.
Unit testing focuses on comparing an implementation against the standard. This may be
performed by inspecting the code or with the use of "proven" software to send test messages to
the device. This process should be formalized by documenting a specific test procedure that will
be followed and during the test, the result of each step of the procedure should be recorded.
Unit testing provides a basic level of assurance that a product is compliant to a standard. Many
times, the test plan will be designed such that the failure of one procedure will provide a clear
indication of what problem resides within the implementation; thereby minimizing the cost of
finding the 'bug'. A device that fails such a test plan would almost certainly not be able to
interoperate with other systems. A device that passes such a test has a reasonable probability of
interoperating.
Integration testing consists of connecting two or more devices together and having them
exchange data. Assuming the individual devices have previously passed a sufficiently designed
unit test plan and the two devices support the same features, the devices should integrate together
In theory, the unit test should be thorough enough to prevent any problems in integration testing;
however, the integration testing provides a higher level of confidence that nothing has been
overlooked.
A final level of testing is system testing. At this level, each device on the system is integrated
together to form the final system. This level of testing could identify problems such as modem
carriers being left on (i.e., preventing other devices from talking) or system timing issues (e.g.,
too many signals on a channel to maintain a desired once-per-second poll rate).
Once again, in theory, devices that successfully pass unit testing and integration testing should
pass this level as well as long as the system was properly designed. However, the final check is
only provided when this test is performed and it is not infrequent that problems arise at this
stage.
6.2.5 Maintenance
The developer should also be aware of any requirements for maintenance and upgrades as these
will affect the overall costs of the project. In general, it should be recognized that the NTCIP
standards are still relatively new and thus changes may occur to the standards. Further, as there
are relatively few implementations available, ambiguities may still be discovered in the standard
and the standards may be modified in order to correct these problems. Any such change may
require a modification to deployed equipment if the equipment is to maintain compatibility with
the new version of the standard.
This section provides an example of the various decisions that must be made during an
implementation project. In the following example represents a procedure that a manufacturer or
developer might use to develop an NTCIP compliant device. In this case, the device is a
dynamic message sign.
For the purposes of this example, we will assume that the client has issued an Invitation For Bid
for a dynamic message sign and controller (DMS) containing the following statements:
While the above request provides a fair amount of detail as to the required functionality of the
sign, the information is not presented in a format that directly relates to NTCIP requirements and
there are several issues on which the request is silent. The first task of the investigation is to
determine exactly what the requirements are and to then investigate the other related issues. The
discussion presented here only focuses on the NTCIP issues; however, a real investigation would
clearly have to investigate hardware issues as well.
6.3.2.1 Requirements
The first task is to provide an interpretation of each requirement of the request. In this case,
there is a fair description of the desired functionality, thus, this task is a matter of mapping the
functions to specific NTCIP features. In other cases, the developer may have to work more
closely with the client to develop the functional requirements. Once the initial interpretation is
performed, the developer may have a list of questions for the client.
6.3.2.1.1 Interpretation
The list below interprets the above requirements into specific NTCIP requirements. Normal text
indicates the original statement. Text in italics indicates the NTCIP interpretation. Text in bold
indicates significant statements that may impact costs and/or may impact the user's expectations.
A. The DMS shall be a full matrix capable of displaying three lines of text with 20 characters
per line when 18 inch characters are utilized. Full matrix display shall be capable of
displaying other size characters and other number of lines depending on the height of
characters utilized. The sign shall be designed to provide 2 pixels of spacing between lines of
During the above analysis, there were three significant issues that should ideally be clarified
prior to providing a bid estimate. However, in some cases it may not be possible to ask such
questions. In these cases, the developer may wish to prepare a bid that documents other options.
A second iteration through this process would include questions arising from the text below,
namely:
Once the initial requirements are known, the developer can determine the best approach to
developing the system; this in turn will allow the developer to start estimating the costs
associated with the project.
Products are readily available from multiple vendors for a standard implementation of SNMP,
UDP/IP, and PPP; thus, in this case, the developer would likely choose to use a great deal of off-
the-shelf software. This would allow the developer to focus on the actual functionality of the
objects rather than spending a large amount of time on the protocols.
As mentioned above, there are a variety of other factors to consider as well. The following text
describes how these factors might affect the example project.
In this case, the developer will have to implement the following standards:
These standards are somewhat stable, but could change to some degree. The standards
referenced by these standards (i.e., the protocols) are widely deployed and are very stable.
Given this design, the developer would probably want to state that the project will use off-the-
shelf software for the protocols and will be compliant with the current version of the Profiles.
Given the stability of these base standards, this design should be fully compatible with the final
version of the Profile documents. If, however, amendments are made to the profiles that are not
compatible to the traditional use of the base standards, additional costs may be incurred.
The developer would need to develop the software for the objects internally. As such, the
developer would probably indicate that he will support all defined features and all approved
amendments up to a certain date (perhaps six months after award). If an amendment is approved
after this date, additional costs may be incurred.
In this case, the developer would probably want protocol issues to be resolved by the Internet
community and object definitions to be resolved by the NTCIP community. Thus, the proposal
should include a statement indicating that the relevant working group shall be contacted to
provide any necessary clarification of the standard. If the resolution is simply a clarification and
does not require a normative change to the standard, the decision of the working group shall be
implemented. If the decision results in an effort to amend the standard and the amendment is not
approved by the indicated date, the client and developer will negotiate what the appropriate
solution might be and how that solution might impact the schedule and budget of the project.
Given the initial set of requirements provided by the client, it is likely that the client is only
aware of the NTCIP and is unfamiliar with the details. Thus, the developer should budget
resources during the project to ensure that he is able to properly manage expectations. This may
include a meeting during the initial stages of the project to clearly present the features of the end
product and how this may be different than what the client expects.
The initial requirements did not indicate any certification process. However, it is likely in the
developer's best interest to indicate what sort of compliance testing would be appropriate. In the
case of this project, the proposal might suggest that the developer also prepare a test plan, to be
approved by the client, and the test will be performed in front of the client.
The initial requirements did not indicate whether this sign would be integrated with other
components, but one would assume that a management station would be used. Thus, the
developer may wish to suggest that the procurement will include a central system to control the
sign.
The original specification did not include any requirement for performance. The developer may
want to provide a statement in the proposal that the sign will produce a response to a get global
time request within one second and a set activate message request within two seconds (measured
from last byte in to first byte out). However, ideally, the client should specify the performance
requirements [this can be an important issue for traffic signal systems].
The initial requirements are silent as to maintenance and upgrades. The developer may decide to
minimize risks and not include any such features in the proposal, or the developer may decide
that the product will have to be maintained for other clients anyway and thus include the estimate
in the proposal. In the latter case, the developer would likely want to encourage the client to
include maintenance and upgrades in the requirements for the bid by asking a question to that
effect.
6.3.3 Proposal
Once all of these issues are resolved, the developer is able to prepare a proposal. For this
example, the following text may be included in the proposal.
Display Requirements
The DMS display shall be full matrix and contain 120 pixels wide by 27 pixels
high. The pixels shall be evenly spaced both horizontally and vertically.
In addition, the sign will support the following objects, as defined in NEMA TS
3.6-1997:
• defaultFlashOn
• defaultFlashOff
• defaultFont
• defaultJustificationLine
• defaultPageOnTime
• defaultPageOffTime
TS 3.4-1996
TS 3.6-1997
Number Fonts 5
Non-Volatile Memory 5 KB
The current buffer of the message table shall be stored in non-volatile memory.
This will enable the controller to redisplay the last message after a power outage,
if so selected by the dmsShortPowerRecoveryMessage and/or
dmsLongPowerRecoveryMessage.
In addition, the sign shall support the following manufacturer-specific objects:
• Maximum Allowed Sign Housing Temperature
• Sign Housing Temperature Exceeded Trap
• IP v6 Address
The software shall implement the following tags (opening and closing where
defined) of MULTI as defined in NEMA TS 3.6-1997.
• Flash ('fl')
• Font ('fo')
• Justification Line ('jl')
TCP UDP
NULL
IP
Transport Level Transport Level
SONET
V Series Modem FSK Modem
Subnetwork Level Subnetwork Level
Acceptance
A test plan shall be provided to the client for approval. Upon delivery of the sign,
the test plan will be performed in the presence of the client to demonstrate
conformance to the standard.
Maintenance / Upgrades
This contract does not include maintenance or upgrade support.
This section will provide the reader with a basic understanding of how the NTCIP works in a
center-to-field environment.
Transportation devices need to store and communicate constants, parameters, and collected data.
Examples include minimum cycle time for a traffic signal, text for a dynamic message sign,
vehicles per hour for a count station, and current wind speed from a weather station.
NTCIP is intended for many types of transportation devices, each with different database
requirements. NTCIP relies on the SNMP approach to database management. SNMP uses an
industry-standard get/set paradigm to read and write data in a database. Data elements in the
database are called “managed objects” or just “objects” for short. The database is a group of
related objects and is called a “management information base” or MIB. The entity that manages
the MIB within a device is called an agent. The concept is that a management application sends
messages to the agent to fetch or modify the values of objects stored within the MIB. When
MIB values change, the transportation device responds as defined in its programming. The agent
works at the application layer in the protocol, but is itself not the application. The agent does not
care whether the MIB represents a traffic controller or dynamic message sign or any other
device.
STMP works in the same way as does SNMP and uses the same objects. STMP simply provides
a more bandwidth efficient, but more processor intensive, solution to the same problem.
An object is a type of data. Within an agent, one or more instances of the object may exist.
Different instances are identified by their index, as discussed below. An object instance must be
transported as a whole. As an example, an object may define the current time, say 12:15:30.
Since this object is defined as hours, minutes and seconds, it can not be used to transport just
seconds. Alternatively, time could be defined as three separate objects, one each for hours,
minutes, and seconds; in this case, a request could deal with any one of the three objects or
simultaneously access all three. A third alternative would be to define both of these
representations of time (for a total of four objects). It may be convenient to have access to
different forms of the same data in the same MIB but it is not very efficient, since extra objects
require more computer memory. Thus, when designing objects, the designer must consider the
trade-offs of each approach.
To standardize some of the commonly needed objects, the NTCIP defines a global objects MIB
module. The global MIB module contains definitions of commonly needed objects that are basic
to the NTCIP, such as the name and versions of the MIBs supported by an agent.
A MIB and its objects are defined using Abstract Syntax Notation One (ASN.1). "Abstract
syntax" means that the manner used to define the data is independent of the procedure for
encoding the data into binary form. The MIB is a text document that can be read by a human
and compiled by computer. A management application must have a copy of the MIB employed
by the managed agent. The MIB is transferred to a management application via a text file on a
floppy disk. This is usually performed when the device is first installed. However, other
methods could be used for MIB transfer.
Example 6.1:
Consider the example above where the device includes a clock. The management
application will need to set the clock periodically to ensure that all devices are
synchronized. The MIB defined in Global Object Definitions (TS 3.4-1996 and
Amendment 1), includes an object called "globalTime." Below is the ASN.1
definition of this object.
globalTime OBJECT-TYPE
SYNTAX Counter
ACCESS read-write
STATUS mandatory
DESCRIPTION “The current time in seconds since the epoch 00:00:00
(midnight) January 1, 1970 UTC (a.k.a. Zulu).”
::={globalTimeManagement 1}
The first line is the name of the object, followed by the formal invocation of the OBJECT-TYPE
macro.
The STATUS line is provided to simplify conformance statements. At the end of each object
standard, conformance groups are defined. For a device to claim conformance to a conformance
group, it must support all "mandatory" objects within that group. It may also support "optional"
objects within the group. For a device to claim conformance to a standard, it must support all
"mandatory" conformance groups defined by the standard, and may optionally support "optional"
conformance groups.
The Description line provides a human readable description of the object. This object represents
the current time as represented in seconds since midnight January 1, 1970 in Greenwich,
England. Many objects specify some sort of functionality; in this case, this object requires the
device to increment the value of this object by one at a rate of exactly once a second.
The last line indicates that the location of this object on the ISO Global Naming tree. In this
case, the object is the first node under the globalTimeManagement node. Earlier within the
standard, the globalTimeManagement node was defined to be underneath the global node. This
referencing continues within the standard all the way back to the ISO root node.
Table 6.3 Some Common ASN.1 / NTCIP Terms for Object Definitions
INTEGER (-128..127)
INTEGER (0..255)
SYNTAX Object data type INTEGER (0..4294967295)
OCTET STRING - a string of bytes, such as ASCII
text
read-only
ACCESS Determines read/write capabilities read-write
not-accessible
Table 6.3 lists some common ASN.1 terms used for object definitions. Since this is an
incomplete list, refer to ISO 8824 and the NTCIP documents for more information. The NTCIP
also defines additional limitations to ASN.1. These limitations are defined in a section called the
NEMA Structure and Identification of Management Information (NEMA_SMI). The
NEMA_SMI is not a MIB but is added to all NTCIP MIBs.
The ASN.1 macro language is very powerful, even with the restrictions imposed by SNMP. A
MIB may define a new syntax by combining basic (primitive) data types. Likewise, a MIB can
define a one or multi-dimensional table using the SEQUENCE operator. Default values and
ranges for objects can also be defined in the MIB. The robustness of the ASN.1 language allows
for the modeling of virtually any database likely to be encountered in ITS field devices.
The MIB objects are related by device type (e.g., a traffic controller MIB or a message sign
MIB). These device MIBs are called modules. NTCIP has MIB modules for actuated traffic
Objects in the MIB are arranged in a tree structure, and objects are named by the path along the
branches of the tree to the object. The path starts at the trunk of the tree, and a node identifier is
added at each branch until the object is reached. The node identifiers are unsigned integers and
are frequently documented in text as dot separated (e.g., "1.3.6.1.4.1.1206"). The tree structure
is formally defined by ISO and CCITT. An entire MIB module will hang off this global name
tree. Below is a diagram showing the tree structure from its root to the NEMA node. All
standardized NTCIP MIB modules will be attached to the NEMA node.
All objects in the NEMA NTCIP MIB modules will start with 1.3.6.1.4.1.1206 or
(iso.org.dod.internet.private.enterprises.nema). NEMA has further divided the 1206 node into
four subgroups.
Everything below the transportation node constitutes the TMIB. Within the TMIB there are
protocol, device, and tcip object groups. The device group has subtrees for each of the supported
devices: asc, ramp meter, dms, cctv, ess, global, etc. Branches are added as new devices are
included in NTCIP.
Example 6.2:
Consider our globalTime object in example 6.1. The object identifier for
globalTime is defined as globalTimeManagement 1. GlobalTimeManagement is
previously defined as global 3. Finally, the header of the MIB contains the
following:
When using STMP, this 13-node identifier (OID) can be pre-configured to minimize bandwidth
consumption on frequently transmitted messages.
The databases for NTCIP devices are defined using ASN.1, which provides a standard method
for object definition, organization, and identification. We have examined how to define an
object and identify the path to the object using this standard. Next, we examine how the object
identifier or path and the value of the object are encoded into binary data for transmission.
To transmit an object we first need to select the protocols that we will use for transmission. In
the DMS example, we indicated that we would support the minimal requirements of the STMF,
Internet and PPP profiles; these protocols were identified in Figure 6.3. Thus, in this example,
we use an application layer of SNMP.
For SNMP, we need to encode the object’s identifier (data type, length, and value) and the
object's value (data type, length, and value). SNMP uses a standard set of rules for encoding
called, Basic Encoding Rules (BER) (ISO 8825-1).
Using the object from example 6.1, we need to encode the object's identifier and value
Identifier
Type OBJECT IDENTIFIER
Length The number of octets (i.e., bytes) used to encode the value of the identifier
Value 1.3.6.1.4.1.1206.4.2.6.3.1.0
Value
Type Counter
Length The number of octets used to encode the value of the identifier
Value 915148800 (i.e., 00:00:00, 1 January 1999 UTC)
According to the rules of BER, the first two components of an OBJECT IDENTIFIER are
combined using the formula (40X)+Y to form the first subidentifier. Each subsequent
component forms the next subidentifier. Each subidentifier is encoded as a non-negative integer
using as few seven bit blocks as possible. The blocks are packed into octets, with the first bit of
each octet set to a 1 except for the last octet of each subidentifier. Thus, the object identifier
(OID), {1.3.6.1.4.1.1206.4.2.6.3.1.0} is encoded as follows:
6 (dod) 6 [06]
1 (internet) 1 [01]
4 (private) 4 [04]
1 (enterprises) 1 [01]
1206 (nema) 1206 10010110110 bin [89][36]
4 (transportation) 4 [04]
2 (devices) 2 [02]
6 (global) 6 [06]
3(globalTimeManagement) 3 [03]
1 (globalTime) 1 [01]
0 (instance 0) 0 [00]
Adding the OBJECT IDENTIFIER type of [06] and a length of [0D] or (13 decimal) yields the
following byte sequence:
[06][0D][2B][06][01][04][01][89][36][04][02][06][03][01][00]
Next, we encode the data value, which is 915148800. BER encodes Counters in the same way as
it encodes INTEGERs, with a two’s complement representation using the minimum number of
octets (note - this means the value 255 would be encoded in two bytes, [00][FF], so that the high
order bit is set to zero indicating a positive number). Thus, the byte sequence of would be:
[36][8C][10][00]
Thus, our object value with a type of [41] and a length of [04] would become:
[41][04][36][8C][10][00]
The combined byte SEQUENCE (Type [30]) for the OID and value has a length of 21 ([15]).
Thus, the entire encoding for this object is:
[30][15][06][0D][2B][06][01][04][01][89][36][04][02][06][03][01][00][41][04][36][8C][10][00]
If STMP was used, a dynamic object could be configured to include this object. In this case,
only the object identifier would not be transmitted (because each end of the link would already
be aware of what data to expect next). Further, the data value would be encoded using Octet
Encoding Rules (OER), which is more efficient than BER. Thus, an STMP dynamic object
would encode the above information in 4 bytes instead of the 23 bytes shown (i.e., 21 plus type
and length of the sequence). However, STMP only supports thirteen dynamic objects; thus, this
benefit is not achieved on every exchange.
Example 6.3 examined only two data types that can be encoded with BER. BER contains
encoding rules for all ASN.1 types.
We have created an object using ASN.1, placed it in a tree structure, gave it a real value, and
finally encoded the object and its value using BER. Now this information must be given in a
context. For example, is this a request to set the time, or is it a response to a get request? The
context is given by the surrounding structure of the data packet, as defined by the rules of
SNMP.
SNMP uses a get/set/trap paradigm. The table below lists the SNMP message types, purposes
and originators.
Get Request Contains a list of objects, the agent is to return the values Management Application
Contains a list of objects, the agent is to return the values of the next
Get Next Request Management Application
sequential object from those indicated.
Contains a list of objects and values, the agent is to set the values in its
Set Request Management Application
MIB per this message
'Get' Response Agent response to either a Get or a Set request Agent Application
SEQUENCE {
name OBJECT IDENTIFIER,
value ObjectSyntax -- i.e., the SYNTAX of the selected object
}
Thus, we now have to add the rest of the components of the data packet. In this case, we will
assume the data packet is a get response for a get request of both the globalTime object as well
as the globalDaylightSavings object, as follows:
error-index [02][01][00]
value [41][04][36][8C][10][00]
SEQUENCE [30][12]
name [06][0D][2B][06][01][04][01] [89][36][04][02][06][03][02][00]
value [02][01][03]
The Get Request would be nearly identical. The data type would be [A0] rather than [A2] and
the value fields would be NULL (i.e., Type 5 and zero length, [05][00]).
The above structure defines the encoding of the Application Layer. This data must now be
prepared for transmission through the network. In general, this consists of transmitting the data
from one device (IP Address) to another device (IP Address). The data stream defined above is
then packaged into the network datagram required for transmission across this network. Based
Once the IP packet is ready for transmission, it must be prepared for transmission across the next
link (i.e., the subnetwork). Based on the decision to use the PPP Subnetwork Profile, this entails
encapsulating the IP packet into a PPP frame and ensuring that the PPP session is properly
established before the frame is transmitted. Likewise, at some point after transmission, the link
should be closed.
AASHTO, ITE and NEMA have defined an open and expandable protocol. NTCIP permits
completely open database definitions without precluding completely proprietary (closed) ones.
NTCIP will serve both open and closed databases on the same network. Users are encouraged to
review the existing MIB object definitions before attempting to add new ones.
The creation of a new MIB module can be quite easy. This is especially true if the device to be
supported already has a list of defined requirements and database. Start by rewriting the existing
database using ASN.1. Next, define the necessary objects for the device and attempt to organize
them in a subtree. Obtain from NEMA, a root node for the subtree under the NEMA private or
experimental node. Seek comments from NEMA, manufacturers, and users of similar devices.
In the early stages of NTCIP development, it may be sufficient to list the needed objects by name
and proposed data types (submit them to the Joint NTCIP Standards Committee for further
development). Above all, try to use the existing object definitions as much as possible; this will
further compatibility between devices.
A number of issues arose during the integration of the various components of the NTCIP
demonstration, which was unveiled at TRB in January 1996. These issues are documented here
to provide future implementers and integrators information for their design consideration.
Implementing a standard requires careful examination of a large amount of text within the
standards. A number of the problems discovered during the integration work related to invalid
interpretation of the specifications, especially relating to those clauses that reference other
specifications without providing significant detail. In order to minimize the number of these
conflicts in the future, a discussion of some of these issues is provided below.
Bit and byte order in a computer are not necessarily the same as the bit and byte order on the
transmission medium. The transmission order varies in accordance with the guidelines of
international standards. Implementations should ensure that the representation of the most and
least significant bits and bytes in the computer accurately reflect what is sent and received on the
transmission media.
There has been some confusion about how large of a high-level data link control (HDLC)
address must be supported. For both of the PMPP and PPP Subnetwork Profiles, NTCIP devices
are required to fully support one-byte addresses and to accept incoming frames with two-byte
addresses to the device address. Production of frames with two-byte addresses is optional as is
support for configuring the device to an address greater than 63.
All addresses are odd; if the first byte of an address is even, then the address is multibyte.
Many existing field devices use proprietary protocols that expect incoming messages to be a
series of bytes with minimal delay between the bytes. They will time out as an end of message
when a byte is not received in 15 ms for 1,200-bps communications. This means that
consecutive messages must be separated by about 30 ms at 1,200 bps. With the simultaneous use
of soft carrier turnoff this gap must be increased by the soft carrier turnoff time. At higher
transmission rates these times are proportionally reduced.
Because of the desire for full-duplex communications, devices conforming to the PMPP Profile
should be designed to support much greater durations between successive bytes as suggested in
the NTCIP documents. In short, the only distinguishing limit of a message is the 0x7E flag.
The public domain code that is available was developed using DOS and Windows; in both cases
the serial port interrupt is only checked every 50 ms. Thus, these systems do not perform quite
as well as desired; however, this was not an issue for the demonstration.
A real product should use a serial port driver to achieve the desired performance. The desired
performance is system dependent and is stored in the T2 [the maximum time that a device is
allowed to take before starting to send a response] object. In a multi-drop environment it is
desirable to minimize the duration of the T2 timer. A T2 value of 20 ms or less is desirable, but
PMPP includes support for three control byte values. A primary can transmit an unnumbered
poll (0x33), an unnumbered information command with the poll bit set (0x13), or an unnumbered
information command without the poll bit set (0x03). The secondary must respond to every
frame received with the poll bit set (i.e., either 0x33 or 0x13); the response frame must be an
unnumbered information response with the final bit set (0x13). The secondary may not transmit
at any other time. (Note that these values are presented according to Internet encoding rules.)
PPP devices are peer devices (i.e., either the management station or the field device may
communicate at any time because they are the only devices on the 4-wire link). In this
environment, there is no need to give permission to the other device, nor is there a need to force
a data link response. As such, the PPP Profile only uses the unnumbered information command
without the poll bit set for both ends of the link. This byte may be omitted, if such operation has
previously been negotiated (see the PPP Subnetwork Profile and the PPP RFC).
In PMPP systems, the primary may constantly poll each device in order to determine whether it
has any information to report. If the primary station has information to transmit with this poll
(e.g., a request), it encapsulates this data in an unnumbered information command with the poll
bit set. If there is not any information to send, it sends an “empty” frame of six bytes called an
unnumbered poll frame. If the primary station has information to send, but does not want to give
the opportunity for the receiving device to respond (e.g., a broadcast), it sends the data in an
unnumbered information frame without the poll bit set.
When a secondary station receives an unnumbered information frame with the poll bit set or an
unnumbered poll, it responds with an unnumbered information frame with the final bit set. If the
secondary has any data to send with this frame, it is encapsulated within the frame. If the
secondary does not have any data to send, it should send an empty frame.
When a secondary station receives an information command without the poll bit set (e.g. a
broadcast message), it does not respond.
It should be further noted that these rules only deal with the data link layer. For example, a
central system may send a broadcast message without a poll at the data link layer, while
requesting a response at the application layer. The remote device would prepare a response at
the application layer that would then be stored in the device’s data link layer. This response
could only be sent out after the device has received a frame with the poll bit set.
For example, if dynamic object 1 had been defined to be the time object, central could send the
following byte stream:
The address indicates that it is received by everyone and the control byte prevents anyone from
responding on the wire; however, the STMP byte is a SET with response. Thus, all of the
devices generate responses at the application layer and they are sent to the data link layer to be
transmitted. Then, the data link layer waits until permission is granted for the device to speak
(e.g., an unnumbered poll frame). In this way, a central system can broadcast the time and then
go back and ensure that all the devices received the message.
If the secondary has a pending response waiting at the data link layer, it should send the response
immediately upon receiving a frame with the poll bit set. If the incoming frame contains
information, the information should be processed. This might entail producing a new response
that will be sent to the data link layer, where it will reside until the next poll is received.
A device is responsible for storing one response frame at the data link layer. If a second
response is generated before the first is sent, the first response should be overwritten.
Examples of how to code the cyclical redundancy check (CRC) algorithm can be found in the
AB3418 code and the FHWA code used the demonstration. This same algorithm is used in both
PMPP and PPP.
In both PMPP and PPP, when a device receives an invalid frame it should just discard the frame.
Invalid frames include those with invalid CRCs, invalid initial protocol identifiers, etc. Devices
should not provide any response to invalid frames.
To see how the STMP Message Type Byte is coded and used, see NEMA Standards Publication
TS 3.2, National Transportation Communications for ITS Protocol, Simple Transportation
Management Framework, page 5-1.
The exact meaning of this field (i.e., which bytes are included in the count) has led to some
confusion. The count value does not include the count byte in the count (i.e., the count starts the
byte after the count byte).
In addition to those issues raised about the interpretation of the specifications, there were also
issues over how systems should be designed and what should be required in procurement
specifications to achieve the goal of systems interoperability. This section provides some
guidance on how to approach these issues.
6.6.2.1 Carriers
It is very important that secondary stations on multidrop lines turn off their modem carriers when
not sending data. After responding to a poll, the carrier must be removed from the line so that
other stations may respond.
The input impedance of the transmission output circuit in the field device modems limits the
maximum number of field devices that can reliably be supported on a single modem channel.
Each of these outputs is a load on the field device transmission line. A practical upper limit is
somewhere around 15 field devices for the current technology 202 modems. Advanced 202
modems can be used that will isolate the individual transmission circuits unless the modem is
actively transmitting. In a system with only four to seven field devices per channel this
consideration can usually be neglected, since communications timing is usually the determining
factor in the maximum number of devices per channel. Section 5 provides a more detailed
explanation for determining the maximum number of devices per channel.
All NTCIP procurements should specify that the manufacturers/developers must provide the
devices' MIB module(s) to the purchasing agency, with rights to distribute to their agents (e.g.,
those persons acting on behalf of the agency). The MIBs should be provided in ASCII format on
the medium of the procuring agency's choice. The MIBs should include all Simple Network
Management Protocol (SNMP)/Simple Transportation Management Protocol (STMP) objects
that the device(s) support.
There are a wide variety of resources available that relate to the NTCIP. This section lists some
of the resource materials that have been used in the development process and early
implementations, as well as the location of developed materials.
A wide range of documentation is available on the World Wide Web NTCIP Home Page located
at: http://www.ntcip.org
The official web site for NTCIP and related documents and
NTCIP http://www.ntcip.org/
information.
DATEX-ASN http://www.viggen.com/ntcip/datex/index.htm The web site for DATEX-ASN documents and information
The home page for ISO Technical Committee 204 (i.e., the
ISO TC204 http://www.sae.org/TECHCMTE/204.htm
committee for ITS standards).
RFC Index http://www.nexor.com/public/rfc/index/rfc.html A search engine for all of the Internet RFCs.
There are two basic prototype implementations of NTCIP software. Neither of these packages
were designed to operate a real system; rather, they were designed to provide tools to the
industry to test equipment submitted as being compliant to a specific protocol. Unfortunately,
there is no ongoing program to maintain these packages.
This NTCIP Exerciser is able to read in any properly formatted management information base
(MIB) from a floppy disk and support the exchange of fully compliant NTCIP messages under
the direction of the operator. The package supports the creation of simple macros to enable the
user to perform a number of operations sequentially and to record the results. The current
version supports the simulation of either a management station (funded by the FHWA) or an
agent (funded by Virginia DOT). It currently supports the STMF Application Profile (SNMP
only, the STMF portion is out of date), Null Transport Profile, and both the PMPP-232
Subnetwork Profile and the PPP Subnetwork Profile. The most recent version of this software is
available for free on the NTCIP Web Site. It is designed for Windows NT.
The FHWA also developed a DOS based program to emulate a field device that supports the
objects contained in the Global Object Definitions. This program supports the STMF
Application Profile (SNMP-only, the STMF code is out of date), the Null Transport Profile, and
the PMPP-232 Subnetwork Profile.
6.7.3 Books
During the development of the standards and prototypes, a number of books were consulted;
including the following:
In addition, there are articles in the December 1995, January 1996, and April 1996 issues of the
ITE Journal. There are periodic releases of NTCIPNews, a newsletter produced by the NTCIP
Joint Committee. Finally, there are updates of ITS standards in each Journal.
6.8 Summary
Transportation devices, like any other computer device, require databases, processors, and
interfaces. If the device intends to share its data with other devices, a communication protocol is
required. NTCIP fulfills the requirement for a set of communication protocols that are flexible
enough to support the variety of fixed-point communications systems within ITS.
7 GLOSSARY
7.1 Acronyms
Acronym/Abbreviation Definition
IP Internet Protocol
Acronym/Abbreviation Definition
7.2 Definitions
Term/Abbreviation
Definition
Acronym
agent An STMF entity that receives commands and transmits responses to the received commands.
American National Standards Institute, a standardization group that develops or adopts standards for the
ANSI
United States.
application services The services collectively offered by the upper four layers of the OSI model.
Applications Programmer
A set of calling conventions defining how a service is invoked through a software package.
Interface (API)
American Standard Code for Information Interchange. A 7-bit binary code representation of letters, numbers,
ASCII
and special characters. It is universally supported in computer data transfer.
Abstract Syntax Notation One, a formal language for describing information to be processed by computer, an
ASN.1
ISO standard.
Data transmission in which the actual data is preceded by a start bit and followed by a stop bit since the time
asynchronous
between transmitted characters varies. Compare with Synchronous.
authentication The process whereby a message is associated with a particular originating entity.
authorization The process whereby an access policy determines whether an entity is allowed to perform an operation.
The range of frequencies that can be used for transmitting information on a channel, equal to the difference
bandwidth in Hertz (Hz) between the highest and lowest frequencies available on that channel. Indicates the
transmission-carrying capacity of a channel.
A series of procedures for describing transfer syntax of types specified with ASN.1. Transfer syntax is the
Basic Encoding Rules (BER)
actual representation of octets to be sent from one network entity to another.
The number of discrete signal events per second occurring on a communications channel. It is often
Baud Rate interchanged with bits per second (bps), which is technically inaccurate but widely accepted for slower bit
rates.
bit Binary digit. A single basic computer signal consisting of a value of 0 or 1, off or on.
The number of bits transmitted incorrectly. In digital applications it is the ratio of bits received in error to
Bit error rate (BER)
bits sent.
bps Bits per second, transmission rate (speed) of data
bridge A means for connecting two networks at the data link layer.
broadcast address An address referring to all stations on a medium.
A group of bits acted upon as a group, which may have a readable ASCII value as a letter or number or some
byte
other coded meaning to the computer. it is commonly used to refer to 8-bit groups.
(AB3418) California Assembly A bill that requires all new or upgraded traffic signal controllers installed in California after January 1, 1996,
Bill No. 3418 to incorporate a standard communications protocol. Caltrans has published this specification for developers.
A continuous frequency capable of being either modulated or impressed with another information-carrying
carrier signal. Carriers are generated and maintained by modems via the transmission lines of the telephone
companies.
checksum An arithmetic sum used to verify data integrity.
Cyclical Redundancy Check. An error-detection technique consisting of a cyclic algorithm performed on
Cyclical Redundancy Check each “block” of data at the sending and receiving end of the transmission. As each block is received, the
CRC value is checked against the CRC value sent along with the block.
data Information before it is interpreted.
An organized listing of all data elements that are essential to the system, with precise, definitions so that both
data dictionary the user and the system developer will have a common understanding of input, output, components of
storage, and intermediate calculations.
The description of information movement and the transforms that are applied as the data moves from input to
data flow
output.
Layer 2 of the OSI Reference Model; it is responsible for transmission, framing, and error control over a
Data Link Layer
single communications link.
datagram A self-contained unit of data transmitted independently of other datagrams.
Term/Abbreviation
Definition
Acronym
Data Terminal Equipment. The device that is the originator or destination of the data sent by a modem. (An
DTE
EIA/TIA – 232 – E signal)
Data Terminal Ready. A signal generated by most modems indicating a connection between the DTE
DTR
(computer) and the modem. When DTR is high, the computer is connected. (An EIA/TIA – 232 – E signal)
Electronic Industries Association/Telecommunications Industries Association specification that defines the
EIA/TIA-232-E
serial port on a PC.
end-to-end services The services collectively offered by the lower three layers of the OSI model.
A mechanism that compensates for differences in the flow of data to and output from a modem or computer.
Either hardware or software can be used for this control to prevent data loss. Hardware flow control using
flow control
the modem makes use of a buffer to store data to be sent and data received. Flow control is necessary if the
communications port is locked at a higher rate than the connection rate.
FSK modem interface Typical method of traffic control system communications, phone line, or twisted wire based.
Signal flow in both directions at the same time. It is sometimes used to refer to the suppression of on-line
full duplex
local echo and allowing the remote system to provide a remote echo.
A router and translater between protocols; also, (imprecise usage) an entity responsible for complex topology
gateway
mappings.
Signal flow in both directions, but only one way at a time. It is sometimes used to refer to activation of local
half duplex
echo which causes a copy of sent data to be displayed on the sending display.
HDLC Generalized network approach: high-level data link control
Low-powered AM or FM stations that broadcast brief messages to standard car radios from small
Highway Advisory Radio (HAR)
transmitters placed near highways.
host (Internet usage) an endsystem.
IETF lnternet Engineering Task Force, a group chartered by the IAB to develop certain RFCs for standardization .
indirect routing The process of sending a network message to a router for forwarding.
This refers to all fixed components to a transportation system such as rights of way, tracks, equipment,
infrastructure
stations, parking/park-n-ride lots, signalization equipment, maintenance facilities.
A major national initiative to improve information, communication, and control technologies in order to
improve the efficiency of surface transportation. Technological innovations that apply direct
Intelligent Transportation
communications and information processing to improve the efficiency and safety of surface transportation
Systems (ITS)
systems. These include on-board navigation for vehicles, emergency communications systems, electronic
toll/fare collections, traffic management centers, etc.
A network device performing functions from the lower three layers of the OSI model. Intermediate systems
intermediate system
are commonly thought of as routing data for end systems.
Intermodal Surface Federal authorizing legislation for highways, transit, and other surface transportation programs. Established
Transportation Efficiency Act of intermodal objectives for national transportation system to achieve efficiency, air quality, and environmental
1991 (ISTEA) quality.
intermodalism The use and coordination of more than one mode of transportation.
International Organization for An international standards organization. ANSI is the primary interface to ISO within the United States. Often
Standardization (ISO) thought to be International Standards Organization because of the usage ISO for short.
A large collection of connected networks, primarily in the United States, running the Internet suite of
Internet protocols. Sometimes referred to as the DARPA Intemet, NSF/DARPA, Intemet, or the Federal Research
Intemet.
Internet Protocol (IP) The network protocol offering a connection less mode network service in the Internet suite of protocols.
Internet suite of protocols A collection of computer-communication protocols originally developed under DARPA sponsorship.
IP address A 32-bit quantity used to represent a point of attachment in an internet. An Internet Protocol Address.
Internet Activities Board, group in charge of authorizing RFCs for the purpose of standardizing Internet
lAB
operations.
IANA Internet Assigned Numbers Authority, group in charge of assigning Internet addresses.
Any one of a number of technologies providing high speed, low-latency transfer and being limited in
Local Area Network (LAN)
geographic size.
Management Information Base A collection of objects defined using Abstract Syntax Notation One (ASN.1) that can be accessed via a
(MIB) network management protocol. (See Structure of Management Information.)
manager The entity that sends commands to entries and processes their responses.
maximum transmission unit The largest amount of user data that can be sent in a single frame on a particular medium.
network A collection of subnetworks connected by intermediate systems and populated by end systems.
network identifier That portion of an IP address corresponding to a network in an internet.
Term/Abbreviation
Definition
Acronym
That portion of an OSI system responsible for data transfer across the network, independent of both the
Network Layer
media comprising the underlying subnetworks and the topology of those subnetworks.
The technology used to manage a network. Usually referring to the management of networking specific
network management devices such as routers. In the context of the NTCIP, refers to all devices including end systems that are
present on the network or inter network.
National Transportation Communication for ITS Protocol, communications protocol under development.
NTCIP The development effort is being spearheaded by FHWA, NEMA, and the NTCIP Joint Standards
Committee.
Site on the World Wide Web where one may obtain the latest NTCIP information. The address is
NTCIP Home Page
http://www.ntcip.org
NTCIP Steering Group A public/private advisory group composed of ITS experts that guides the development of the NTCIP.
object A representation of a data element that is managed.
A unique name (identifier) that is associated with each type of object in a MIB. This is a defined ASN.1
object identifier
type.
The macro defined in RFC-1212 which is the format used to define SNMP objects. In STMF, the OBJECT-
TYPE macro consists of five fields:
Object Name
OBJECT-TYPE Syntax
Description
Access
Status.
Open Systems Interconnection An international effort to facilitate communications among computers of different manufacture and
(OSI) technology.
A simple error detection method used in both communications and computer memory checking to determine
parity
character validity.
Packed Encoding Rules, a variation of BER developed for use on low bandwidth communications links,
PER
specified in NEMA TS-3.2.
physical address The address of a physical interface.
Physical Layer That portion of an OSI system responsible for the electro-mechanical interface to the communications media.
Point-to-Point Protocol (PPP) Transmission of data between two and only two stations on a point to point link.
Point-to-Multi-Point Protocol
Transmission of data between multiple stations or nodes (i.e., one primary and multiple secondaries).
(PMPP)
Identifies an application-entry to a transport service in the Internet suite of protocols. The concept of ports
port number are often present in OSI literature, however, ports are not Internet standard, but exists as local network
conventions only.
Presentation Layer That portion of an OSI system responsible for adding structure to the units of data that are exchanged.
A node on a link which controls the polling to and from secondary nodes on that link and controls the
primary
communications from the secondary nodes on that link.
profile The defined protocol at each of the seven OSI layers.
A formal set of conventions governing the format and relative timing of message exchange between two
protocol communicating processes. A system of rules and procedures governing communications between two
devices.
A part of transmitted data that contains information used by the protocol at a particular layer in the OSI
Protocol Data Unit (PDU)
stack.
proxy agent A device which receives and responds to network management commands on behalf of another entity.
RFC Request for Comments, the name given to correspondence and standards by the IAB.
router A level 3 (network layer) relay
secondary A node on a link that is controlled by the primary node in terms of polling and communications.
service primitive An artifact modeling how a service is requested or accepted by a user
Session Layer That portion of an OSI system responsible for adding control mechanisms to the data exchange.
Simple Transportation Simple Transportation Management Framework, describes the organization of the information within
Management Framework devices and the methods of retrieving or modifying any informaiton within the device. STMF also explains
(STMF) how to generate and utilize computer readable information organization descriptions.
Simple Transportation Simple Transportation Management Protocol, a variation of SNMP developed by NEMA to address low
Management Protocol (STMP) bandwidth communication links and real time device monitoring.
Structure of Management Information, a definition of how to create management objects and a hierarchical
SMI
(tree like) definition of nodes where management objects will be attached for unique identification.
Term/Abbreviation
Definition
Acronym
Simple Network Management Protocol, a communications protocol developed by the IETF, used for
SNMP
configuration and monitoring of network devices.
Simple Network Management Protocol version 2, recent modification of SNMP that is undergoing
SNMPv2
evaluation by the Internet community.
socket A pairing of IP address and a port number
Transit Communications Interface Protocol – A subset of NTCIP protocols which are specific to the transit
TCIP
community.
TCP/IP Transmission Control Protocol/Internet Protocol (protocol addressing both the network and transport layers)
TLV Tag, Length, Value – the form used in SNMP encoding.
Traffic Management
Based on the AB3418, TMC E1 is a specified protocol that allows basic communication messages to be sent
Experimental Protocol (TMC
between TMCs on the same communications channel.
E1)
Traffic Management
An enhancement of TMC E1, TMC E1.2 is a specified protocol that allows basic communication messages
Experimental Protocol (TMC
to be sent between multiple TMCs using IP for routing services.
E1.2)
Transmission Control Protocol
The transport protocol offering a connection-oriented transport service in the Internet suite of protocols.
(TCP)
That portion of an OSI system responsible for reliability and multiplexing of data transfer across the network
Transport Layer
(over and above that provided by the network layer) to the level required by the application.
transport-stack The combination of protocols, at the transport layer and below, used in a given context.
Conceptually, the part of a protocol data unit used to transparently communicate information between the
user data
users of the protocol. Prefixed by the protocol control information.
User Datagram Protocol (UDP) The transport protocol offering a connectionless mode transport service in the Internet suite of protocols.
Variable Message Sign
Based on AB3418, a specified protocol that allows basic communication messages to be sent to and from
Experimental Protocol Version
multiple VMS on the same communications channel, even if the signs are from different manufacturers.
1.0 (VMS E1)
Variable Message Sign
An enhancement of VMS E1, a specified protocol that allows the VMS messages to be routed using the IP
Experimental Protocol Version
protocol.
1.2 (VMS E1.2)
Wide Area Network (WAN) Any one of a number of technologies that provide geographically distant transfer.
8 BIBLIOGRAPHY
Subject Reference
Understanding SNMP MIBS, 1997, D. Perkins and E. McGinnis, Prentice Hall, Inc., ISBN 0-13-437708-7
Object Definition
ASN.1: The Tutorial & Reference, 1993, D. Steedman, Technology Appraisals Ltd., ISBN 1-871802-06-7
SNMP, SNMPv2, and CMIP, 1993, W. Stallings, Addison-Wesley Publishing Company, Inc., ISBN 0-201-
63331-0
SNMP, SNMPv2 and RMON, 1996, W. Stallings, Addision-Wesley Publishing Company, Inc., ISBN 0-201-
SNMP Protocol 63479-1
Managing Internetworks with SNMP, 1995, M. Miller, M&T Books, ISBN 1-5581-304-3
SNMP: A Guide To Network Management, 1995, S. Feit, McGraw Hill, Inc., ISBN 0-07-020359-8
Internetworking with TCP/IP, 1995, D. Comer, Prentice Hall, Inc., ISBN 0-13-216987-8
TCP/IP: Architecture, Protocols, and Implementation, 1993, S. Feit, McGraw Hill, Inc., ISBN 0-07-020346-
6
TCP/IP Illustrated, Volume 1, The Protocols, W. R. Stevens, 1994, Addison Wesley Publishing Co.
TCP,UDP, IP and PPP Protocols
TCP/IP Isslustrated, Volume 2, The Implementation, G. R. Wright and W. R. Stevens, 1995, Addison
Wesley Publishing Co.
TCP/IP Tutorial and Technical Overview, International Technical Support Center, Raleigh, NC, 1990,
Document Number GC24-3376-01, IBM Corp.
The Ethernet Management Guide, 1995, M. Nemzow, McGraw-Hill, Inc., ISBN 0-07-046380-8
Network Interfaces
The Token-Ring Management Guide, 1995, M. Nemzow, McGraw-Hill, Inc, ISBN 0-07-046321-2
Telecommunications Network Management into the 21st Century, 1994, S. Aidarous and T. Plevyak, IEEE
OSI Network Management
Press, New York, NY
OSI Understanding OSI, 1994, J. Larmouth, http://www.salford.ac.uk/iti/books/osi.htm, 1997
CORBA for Dummies, J. schettino, L. O’Hara, R S. Hohman, IDG Books, 1998
Instant CORBA, R. Orfali, D. Harkey, and J. Edwards, et al, John Wiley & Sons, 1997, ISBN 0471183334
CORBA Fundamentals & Programming, J. Siegel, Object Management Group, Inc., 1996
CORBA
Object-Oriented Systems Design: An Integrated Approach, E. Yourdon, Yourdon Press Computing Systems
(Prentice Hall), 1994, ISBN 0136363253
Object Lessons: Lessons in Object-Oriented Development Projects, SIGS Books, 1993, ISBN 0962747734
Guide to Open System Specifications, European Workshop for Open Systems,
http://www.ewos.be/goss/top.htm, 1997
Profiles US-DOD Internet Related Standardized Profiles, DISA Internet Librarian, http://www-
library.itsi.disa.mil/org/mil_std.html, 1997
Several potential NTCIP Implementations are presented in this section as examples of how the
various Information, Application, Transport, Subnetwork, and Plant Levels may be combined.
The following examples will occasionally make reference to legacy terminology such as Class
Profiles. Rather than developing a different Class Profile for each possible combination of
alternative selections at the various NTCIP Stack Levels, the NTCIP Joint Committee has chosen
to deprecate the use of alphanumeric class profile designations in lieu of individual standards at
each level. The user is now able to create an NTCIP Stack by selecting the appropriate standards
at each Level that is applicable for the application and system design. This approach enables the
user to better specify choices specific to the system being deployed.
9.1 Center-to-Field
Figure 9.1 depicts a common example of a center-to-field NTCIP Implementation where routing
through an intermediate device is not needed. In this example the Transport Level is NUL
because there is no need for a routing protocol.
The example NTCIP implementation illustrated in Figure 9.1 highlights one implementation
subset of the NTCIP Framework. The figure shows the standard(s) implemented at each NTCIP
Framework Level. The example shows the implementation of both STMP and SNMP at the
Application Level and NULL at the Transport Level. Together, these standards provide services
for an NTCIP system, such as a traffic signal system, that does not involve routing through
intermediate devices. The example shows the selection of both STMP and SNMP at the
Application Level within the NTCIP Stack since this will be a common implementation many
systems, such as traffic signal systems, that use dynamic objects.
The implementation subset of the NTCIP Framework shown in this example is similar to that
once known as the Class B Profile. It should be noted that the trend is moving away from
denoting the various stacks with alphanumeric characters and is moving towards the designation
of specific standards at each level within the NTCIP Framework. As a result, Class B should be
regarded as a legacy term that will ultimately be abandoned in-lieu of an array of specific NTCIP
Framework level standards.
TCP UDP
NULL
IP
Transport Level Transport Level
SONET
V Series Modem FSK Modem
Subnetwork Level Subnetwork Level
The Subnetwork Level standard selected in this example is Point to Multi-Point, FSK modems.
The Plant Level in this example NTCIP implementation is shown to be agency owned twisted
pair wire, but any suitable media can be used.
Figure 9.2 depicts a common example of a center-to-field NTCIP Implementation where routing
through an intermediate device is needed. The routing can take either the form of connectionless
or connection-oriented transport delivery services depending on the selection at the Transport
Level. For connectionless transport delivery services, the selection of User Datagram Protocol
The example NTCIP implementation illustrated in Figure 9.2 highlights one implementation
subset of the NTCIP Framework. The figure shows the standard(s) implemented at each NTCIP
Framework Level. The example shows the implementation of both STMP and SNMP at the
Application Level and TCP, UDP/IP at the Transport Level. Together, these standards provide
services for an NTCIP system, such as a traffic signal system, that involves intermediate routing.
The implementation subset of the NTCIP Framework shown in this example is similar to that
once known as the Class C Profile. It should be noted that the trend is moving away from
denoting the various stacks with alphanumeric characters and is moving towards the designation
of specific standards at each level within the NTCIP Framework. As a result, Class A and Class
C should be regarded as a legacy term that will ultimately be abandoned in-lieu of an array of
specific NTCIP Framework level standards.
TCP UDP
NULL
IP
Transport Level Transport Level
SONET
V Series Modem FSK Modem
Subnetwork Level Subnetwork Level
9.2 Center-to-Center
TCP UDP
NULL
IP
Transport Level Transport Level
SONET
V Series Modem FSK Modem
Subnetwork Level Subnetwork Level
The example NTCIP implementation illustrated in Figure 9.3 highlights one implementation
subset of the NTCIP Framework for center-to-center communications. The figure shows the
standard(s) implemented at each NTCIP Framework Level for using DATEX at the Application
Level within the NTCIP Framework.
For center-to-center communications, the choices that are offered at the Application Level
include DATEX and CORBA. The choices that are defined for the Transport Level are the User
Datagram Protocol over Internet Protocol (UDP/IP) for connectionless transport services and
Transmission Control Protocol over Internet Protocol (TCP/IP) for connection-oriented transport
delivery services. The Subnetwork Level options include a variety of high bandwidth options,
such as ATM, FDDI, Ethernet, and PPP. In this case, an example might be to use Frame Relay
with a Point-to-Point Protocol (PPP) at the Subnetwork Level. The Plant Level can include a
variety of options such as telco lines, as in this example, or fiber.
Figure 9.4 depicts an example center-to-center NTCIP implementation and is one variation of an
approach using CORBA. This NTCIP implementation example is intended for connection-
oriented transport delivery services from a transportation management center to field devices.
The example NTCIP implementation illustrated in Figure 9.4 highlights one implementation
subset of the NTCIP Framework for center-to-center communications. The figure shows the
standard(s) implemented at each NTCIP Framework Level for using CORBA at the Application
Level within the NTCIP Framework.
For center-to-center communications, the choices that are offered at the Application Level
include DATEX and CORBA. The choices that are defined for the Transport Level are the User
Datagram Protocol over Internet Protocol (UDP/IP) for connectionless transport services and
Transmission Control Protocol over Internet Protocol (TCP/IP) for connection-oriented transport
delivery services. The Subnetwork Level options include a variety of high bandwidth options,
such as ATM, FDDI, Ethernet, and PPP. In this case, an example might be to use ATM at the
Subnetwork Level, although other options might also be appropriate. The Plant Level can
include a variety of options such as fiber, as in this example, or telco lines.
TCP UDP
NULL
IP
Transport Level Transport Level
SONET
V Series Modem FSK Modem
Subnetwork Level Subnetwork Level
10 NTICP DOCUMENTS
1101 TS 3.2-1996 NTCIP Simple Transpn. Mgmt. Framework (STMF) Base Standard Published with NEMA cover; Amended
1102 OER NTCIP Octet Encoding Rules (OER) Base Standard User Comment Draft
1103 STMP NTCIP Simple Transpn. Mgmt. Protocol (STMP) Base Standard WG Draft
1201 TS 3.4-1996 NTCIP Global Object (GO) Definitions Device Data Dictionary Published with NEMA cover; Amended
1202 TS 3.5-1996 NTCIP Objects for ASC Device Data Dictionary Published with NEMA cover; Amended
1203 TS 3.6-1997 NTCIP Objects for Dynamic Message Signs (DMS) Device Data Dictionary Approved by 3 SDOs
1204 TS 3.7-1998 NTCIP Objects for Environmental (ESS) Device Data Dictionary Approved by 3 SDOs
1205 TS 3.CCTV NTCIP Objects for CCTV Camera Control Device Data Dictionary Recommended Standard
1206 TS 3.DCM NTCIP Objects for Data Collectn. (DCM) Device Data Dictionary WG Draft
1207 TS 3.RMC NTCIP Objects for Ramp Meter Control (RMC) Device Data Dictionary WG Draft
1208 TS 3.SWITCH NTCIP Objects for Video Switches Device Data Dictionary User Comment Draft
1209 TS 3.TSS NTCIP Objects for Transp. Sensor Sys. (TSS) Device Data Dictionary User Comment Draft
1400 TCIP-FRAME TCIP Framework Standard Process & Control Recommended Standard
1401 TCIP-CPT TCIP Common Public Transpn. (CPT) Objects Device Data Dictionary Recommended Standard
1402 TCIP-IM TCIP Incident Management (IM) Bus. Area Std. Device Data Dictionary Recommended Standard
1403 TCIP-PI TCIP Passenger Information (PI) Bus. Area Std Device Data Dictionary Recommended Standard
1404 TCIP-SCH TCIP Scheduling/Runcutting (SCH) Bus. Area St Device Data Dictionary Recommended Standard
1405 TCIP-SP TCIP Spatial Representation (SP) Bus. Area S Device Data Dictionary Recommended Standard
1406 TCIP-OB TCIP On-Board (OB) Objects Device Data Dictionary Recommended Standard
1407 TCIP-CC TCIP Control Center (CC) Objects Device Data Dictionary User Comment Draft
1408 TCIP-FC TCIP Fare Collection (FC) Objects Device Data Dictionary User Comment Draft
2001 TS 3.3-1996 NTCIP Class B Profile Profile - Other Published with NEMA cover; Amended
2002 CP-CLA NTCIP Class A and C Profiles Profile - Other Withdrawn
2101 SP-PMPP/RS232 NTCIP SP-PMPP/RS232 Subnet Profile User Comment Draft
2102 SP-PMPP/FSK NTCIP SP-PMPP/FSK Subnet Profile Proposed New Work Item
2103 SP-PPP/RS232 NTCIP SP-PPP/RS232 Subnet Profile WG Draft
2104 SP-Ethernet NTCIP SP-Ethernet Subnet Profile WG Draft
2201 TP-Null NTCIP TP-Null Transport Profile Proposed New Work Item
2202 TP-INTERNET NTCIP TP-Internet (TCP/IP and UDP/IP) Transport Profile Recommended Standard
2301 AP-STMF NTCIP AP-STMF Application Profile Recommended Standard