Item Rule Time Required: A53 Work Statutory Authorities/undertakers

1. The document outlines various types of nominated sub-contractors' work and suppliers' materials that may be included in a construction project, such as scaffolding, access roads, hardstandings, positioning, storage, power, and temperature/humidity control. 2. Details are provided on measurement and payment for fixing items, work by statutory authorities/undertakers, provisional work, and dayworks covering labor, materials, and plant. 3. Rates and costs are to be provided for items including the sub-contractor's work, the main contractor's profit and overheads, and any special attendance requirements.

Uploaded by

Vimal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12K views1 page

Item Rule Time Required: A53 Work Statutory Authorities/undertakers

1. The document outlines various types of nominated sub-contractors' work and suppliers' materials that may be included in a construction project, such as scaffolding, access roads, hardstandings, positioning, storage, power, and temperature/humidity control. 2. Details are provided on measurement and payment for fixing items, work by statutory authorities/undertakers, provisional work, and dayworks covering labor, materials, and plant. 3. Rates and costs are to be provided for items including the sub-contractor's work, the main contractor's profit and overheads, and any special attendance requirements.

Uploaded by

Vimal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

A51 Nominated sub-contractors

1 Nominated sub-contractors 1 Sub-contractor's work 1 Description stated in pc M2 General attendance on


accordance with General sum sub-contractor's work is
Rule 10.3 measured in Section A42

2 Main contractor's prottt %

3 Main contractor's overheads % 08 Scaffolding under this


rule is special scaffolding,
4 Special attendance, 1 Scaffolding item 1 Fixed charge scaffolding additional to the
details stated 2 Time related charge Contractor's standing
2 Access roads
scaffolding, or standing
3 Hardstandings scaffolding required to be
4 Positioning altered or retained
5 Storage 09 Positioning includes
unloading, distributing,
6 Power hoisting and placing in
7 Temperature and humidity position giving in the case of
significant items the weight
8 Others
and/or size and position
relative to ground level or
other datum

C5 Fixing only such S1 Particulars of any


A52 Nominated suppliers items is deemed to
costs to be paid of
include unloading. conveying goods and
1 Nominated suppliers 1 Supplier's materials 1 Description stated pc M3 Fixing only such items is storing. hoisting the materials to the site
sum measured in the appropriate goods and materials and/or of any special
Work Section and returning packing or similar
packaging materials to
% requirements
2 Main contractor's profit the nominated supplier
carriage paid and
A53 Work by statutory authorities/undertakers obtaining credits
therefor

1 Work by statutory 1 Work by the local authority prov 010 Work by statulory
authorities sum authorities includes work by
2 Work by statutory public companies
undertakers responsible for statutory
work when executing their
statutory duty

A54 Provisional work

1 Provisional work 1 Defined prov 011 For defined and


sum undefined provisional sums
2 Undefined see General Rule 10

ASS Dayworks

1 Dayworks 1 Labour prov


2 Materials sum
3 Plant