Project Certificate No.: 1 Sheet 1 of 2

This document summarizes the work accomplished as of March 25, 2014 for a project to widen and improve Benigno S. Aquino Avenue. It details the original quantities and unit prices for various project items. As of the reporting date, work totaling 27.37% of the project had been completed, with 20.46% in previous periods and an additional 6.91% in the current period. The total financial accomplishment was over 18.5 million pesos.

Uploaded by

Wilbert Reuyan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
63 views18 pages

Project Certificate No.: 1 Sheet 1 of 2

This document summarizes the work accomplished as of March 25, 2014 for a project to widen and improve Benigno S. Aquino Avenue. It details the original quantities and unit prices for various project items. As of the reporting date, work totaling 27.37% of the project had been completed, with 20.46% in previous periods and an additional 6.91% in the current period. The total financial accomplishment was over 18.5 million pesos.

Uploaded by

Wilbert Reuyan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 18

STATEMENT OF WORK ACCOMPLISHED

As of March 25, 2014

Project Certificate No.: 1


Sheet 1 of 2
Project: WIDENING/IMPROVEMENT OF BENIGNO S. AQUINO AVENUE (ILOILO-JARO-DIVERSION ROAD) TO ILOILO CIT
CONTRACTOR: F. GURREA CONSTRUCTION, INC. Location: ILOILO CITY, STA. 3+000 - STA. 3+060 & STA. 4+400 - STA. 4+940
Bill No.: 1

ORIGINAL QUANTITY ACCOMPLISHMENT (Quantity) PERCENTAGE % FINANCIAL ACCOM


ITEM DESCRIPTION UNIT WT%
UNIT TOTAL
QTY PREV THIS PERIOD TO DATE PREVIOUS THIS PERIOD TO DATE PREVIOUS
PRICE AMOUNT

101(3a) Removal of Existing Concrete Pavement sq.m. 3,305.50 201.34 665,529.37 0.73% 145.15 204.85 350.00 0.03% 0.05% 0.08% 29,224.50
101(3b) Removal of Existing Asphalt Pavement sq.m. 360.00 104.95 37,782.00 0.04% 73.04 - 73.04 0.01% 0.00% 0.01% 7,665.55
102(2) Surplus Common Excavation cu.m 2,605.34 196.77 512,652.75 0.57% - 0.00% 0.00% 0.00% -
103 Structure Excavation cu.m 7,991.62 286.30 2,288,000.80 2.52% 2851.73 - 2,851.73 0.90% 0.00% 0.90% 816,450.30
104(1) Embankment cu.m 14,731.54 605.71 8,923,041.09 9.84% 10525.17 678.57 11,203.74 7.03% 0.45% 7.48% 6,375,200.72
105(1) Subgrade Preparation (common material) sq.m. 13,061.45 19.94 260,445.31 0.29% 2339.48 - 2,339.48 0.05% 0.00% 0.05% 46,649.23
200 Aggregate Sub-base Coarse cu.m 2,741.59 668.38 1,832,423.92 2.02% 1,624.75 192.37 1,817.12 1.20% 0.14% 1.34% 1,085,950.40
311(1a) PCC Pavement (0.30m thk) sq.m. 4,483.36 1,584.07 7,101,956.07 7.83% 2,161.22 - 2,161.22 3.77% 0.00% 3.77% 3,423,523.76
311(1b) PCC Pavement (0.23m thk) sq.m. 3,564.40 1,194.04 4,256,036.17 4.69% 240.80 276.18 516.98 0.32% 0.36% 0.68% 287,524.83
311(1c) PCC Pavement (0.15m thk) sq.m. 3,858.57 818.71 3,159,049.84 3.48% 455.74 900.26 1,356.00 0.41% 0.81% 1.22% 373,118.89
404 Reinforcing Steel (grade 40) kgs 275,683.65 70.17 19,344,721.72 21.33% 46,851.41 11,013.66 57,865.07 3.62% 0.85% 4.48% 3,287,563.44
405(a) Structural Concrete, Class "A" cu.m 1,986.78 5,569.86 11,066,086.45 12.20% 506.35 377.51 883.86 3.11% 2.32% 5.43% 2,820,298.61
Reinforced Concrete Pipe Culvert (1.22mØ,
500 (1)a RCPC) l.m 100.00 6,826.51 682,651.00 0.75% 10.00 10.00 0.00% 0.08% 0.08% -

600(2)a Mountable Concrete Gutter l.m 1,843.75 639.72 1,179,483.75 1.30% 553.13 553.13 0.00% 0.39% 0.39% -
600(3) Concrete Curb and Gutter, Type A l.m 2,116.07 866.17 1,832,876.35 2.02% 634.82 634.82 0.00% 0.61% 0.61% -
601 Sidewalk (150mm thk) sq.m. 2,320.80 800.65 1,858,148.52 2.05% 696.24 696.24 0.00% 0.61% 0.61% -
605(2b) Regulatory Signs (450x750) each 2.00 12,778.44 25,556.88 0.03% - 0.00% 0.00% 0.00% -
605(2c) Regulatory Signs (600x650) each 7.00 12,159.36 85,115.52 0.09% - 0.00% 0.00% 0.00%
605(2)d Regulatory Signs (600x900) each 1.00 12,595.78 12,595.78 0.01% - 0.00% 0.00% 0.00% -
605(3a) Informatory Signs (400x600) each 1.00 12,595.78 12,595.78 0.01% - 0.00% 0.00% 0.00% -
606(2) Pavement Markings sq.m. 151.44 650.33 98,485.97 0.11% - 0.00% 0.00% 0.00%
609 Sprigging sq.m. 3,179.84 957.30 3,044,060.83 3.36% 10.00 20.00 30.00 0.00% 0.02% 0.02%
611 Trees (Furnishing & Transplanting) each 229.00 10,392.60 2,379,905.40 2.62% 4.00 4.00 8.00 0.00% 0.05% 0.05%

612(1) Reflectorized Thermoplastic Pavement sq.m. 499.06 1,727.44 862,096.20 0.95% - 0.00% 0.00% 0.00%
Markings (White)
Reflectorized Thermoplastic Pavement
612(2) Markings (Yellow) sq.m. 24.84 1,766.30 43,874.89 0.05% - 0.00% 0.00% 0.00%

SPL-1 Unit Pavers sq.m. 7,638.76 1,890.37 14,440,082.74 15.92% 274.65 77.90 352.55 0.00% 0.16% 0.16%
SPL-2 Unit Pavers (Lining) sq.m. 2,040.28 1,890.37 3,856,884.10 4.25% 89.30 - 89.30 0.00% 0.00% 0.00%
SPL-3 Mobilization/Demobilization l.s. 1.00 666,886.90 666,886.90 0.74% 0.50 - 0.50 0.00% 0.00% 0.00%
SPL-4 Provide and Maintain Traffic Control l.s. 1.00 112,740.75 112,740.75 0.12% 0.50 - 0.50 0.00% 0.00% 0.00%
SPL-5 Project Billboard each 2.00 3,098.87 6,197.74 0.01% 2.00 2.00 0.00% 0.01% 0.01%
SPL-6 Construction Safety and Health l.s. 1.00 48,193.50 48,193.50 0.05% 0.50 - 0.50 0.00% 0.00% 0.00%

GRAND TOTAL 90,696,158.09 100.00% 20.46% 6.91% 27.37% 18,553,170.24

Prepared by: Checked by: Submitted by: Recommended by:

F. GURREA CONSTRUCTION, INC. LEO P. BIONAT JOSE AL V. FRUTO LEA N. DELFINADO, CES E
Contractor Project Engineer Chief, Planning & Design Division Asst. Regional Director
T OF WORK ACCOMPLISHED
As of March 25, 2014

G/IMPROVEMENT OF BENIGNO S. AQUINO AVENUE (ILOILO-JARO-DIVERSION ROAD) TO ILOILO CITY-PAVIA ROAD

18,553,170.24

FINANCIAL ACCOMPLISHMENT (Amount)

THIS PERIOD TO DATE

41,244.50 70,469.00
- 7,665.55
- -
- 816,450.30
411,016.63 6,786,217.35
- 46,649.23
128,576.26 1,214,526.66
- 3,423,523.76
329,769.97 617,294.80
737,051.86 1,110,170.76
772,828.52 4,060,391.96
2,102,677.85 4,922,976.46

68,265.10 68,265.10

353,845.13 353,845.13
549,862.91 549,862.91
557,444.56 557,444.56
- -
- -
- -
- -
- -
19,146.00 19,146.00
41,570.40 41,570.40

- -

- -

147,259.82 147,259.82
- -
- -
- -
6,197.74 6,197.74
- -

6,266,757.24 24,819,927.48

Approved by:

EDILBERTO D. TAYAO
Regional Director
STATEMENT OF WORK ACCOMPLISHED
For the Period:

Project Certificate No.: 1


Sheet 1 of 2
Project: WIDENING/IMPROVEMENT OF BENIGNO S. AQUINO AVENUE (ILOILO-JARO-DIVERSION ROAD) TO ILOILO CITY
CONTRACTOR: F. GURREA CONSTRUCTION, INC. Location: ILOILO CITY, STA. 3+000 - STA. 3+060 & STA. 4+400 - STA. 4+940
Bill No.: 1

ORIGINAL QUANTITY ACCOMPLISHMENT (Quantity) PERCENTAGE % FINANCIAL ACCOM


ITEM DESCRIPTION UNIT UNIT TOTAL WT%
QTY PREV THIS PERIOD TO DATE PREVIOUS THIS PERIOD TO DATE PREVIOUS
PRICE AMOUNT

101(3a) Removal of Existing Concrete Pavement sq.m. 3,305.50 201.34 665,529.37 0.73% 1,767.31 1,767.31 0.00% 0.39% 0.39% -
101(3b) Removal of Existing Asphalt Pavement sq.m. 360.00 104.95 37,782.00 0.04% 21.40 21.40 0.00% 0.00% 0.00% -
102(2) Surplus Common Excavation cu.m 2,605.34 196.77 512,652.75 0.57% - 0.00% 0.00% 0.00% -
103 Structure Excavation cu.m 7,991.62 286.30 2,288,000.80 2.52% 1009.49 4,852.31 5,861.80 0.32% 1.53% 1.85% 289,016.99
104(1) Embankment cu.m 14,731.54 605.71 8,923,041.09 9.84% 10403.09 400.65 10,803.74 6.95% 0.27% 7.22% 6,301,255.64
105(1) Subgrade Preparation (common material) sq.m. 13,061.45 19.94 260,445.31 0.29% 178.26 6,873.21 7,051.47 0.00% 0.15% 0.16% 3,554.50
200 Aggregate Sub-base Coarse cu.m 2,741.59 668.38 1,832,423.92 2.02% 1,127.57 1,064.07 2,191.64 0.83% 0.78% 1.62% 753,645.23
311(1a) PCC Pavement (0.30m thk) sq.m. 4,483.36 1,584.07 7,101,956.07 7.83% 849.22 849.22 0.00% 1.48% 1.48% -
311(1b) PCC Pavement (0.23m thk) sq.m. 3,564.40 1,194.04 4,256,036.17 4.69% 792.39 792.39 0.00% 1.04% 1.04% -
311(1c) PCC Pavement (0.15m thk) sq.m. 3,858.57 818.71 3,159,049.84 3.48% 207.60 1,619.10 1,826.70 0.19% 1.46% 1.65% 169,964.20
404 Reinforcing Steel (grade 40) kgs 275,683.65 70.17 19,344,721.72 21.33% 30,228.74 142,662.57 172,891.31 2.34% 11.04% 13.38% 2,121,150.69
405(a) Structural Concrete, Class "A" cu.m 1,986.78 5,569.86 11,066,086.45 12.20% 161.15 701.19 862.34 0.99% 4.31% 5.30% 897,582.94
Reinforced Concrete Pipe Culvert (1.22mØ,
500 (1)a RCPC) l.m 100.00 6,826.51 682,651.00 0.75% - 0.00% 0.00% 0.00% -

600(2)a Mountable Concrete Gutter l.m 1,843.75 639.72 1,179,483.75 1.30% - 0.00% 0.00% 0.00% -
600(3) Concrete Curb and Gutter, Type A l.m 2,116.07 866.17 1,832,876.35 2.02% 1,526.88 1,526.88 0.00% 1.46% 1.46% -
601 Sidewalk (150mm thk) sq.m. 2,320.80 800.65 1,858,148.52 2.05% 1,536.73 1,536.73 0.00% 1.36% 1.36% -
605(2b) Regulatory Signs (450x750) each 2.00 12,778.44 25,556.88 0.03% - 0.00% 0.00% 0.00% -
605(2c) Regulatory Signs (600x650) each 7.00 12,159.36 85,115.52 0.09% - 0.00% 0.00% 0.00% -
605(2)d Regulatory Signs (600x900) each 1.00 12,595.78 12,595.78 0.01% - 0.00% 0.00% 0.00% -
605(3a) Informatory Signs (400x600) each 1.00 12,595.78 12,595.78 0.01% - 0.00% 0.00% 0.00% -
606(2) Pavement Markings sq.m. 151.44 650.33 98,485.97 0.11% - 0.00% 0.00% 0.00% -
609 Sprigging sq.m. 3,179.84 957.30 3,044,060.83 3.36% - 0.00% 0.00% 0.00% -
611 Trees (Furnishing & Transplanting) each 229.00 10,392.60 2,379,905.40 2.62% - 0.00% 0.00% 0.00% -
Reflectorized Thermoplastic Pavement
612(1) Markings (White) sq.m. 499.06 1,727.44 862,096.20 0.95% - 0.00% 0.00% 0.00% -

Reflectorized Thermoplastic Pavement


612(2) Markings (Yellow) sq.m. 24.84 1,766.30 43,874.89 0.05% - 0.00% 0.00% 0.00% -
SPL-1 Unit Pavers sq.m. 7,638.76 1,890.37 14,440,082.74 15.92% 5,392.54 5,392.54 0.00% 11.24% 11.24% -
SPL-2 Unit Pavers (Lining) sq.m. 2,040.28 1,890.37 3,856,884.10 4.25% 951.16 951.16 0.00% 1.98% 1.98% -
SPL-3 Mobilization/Demobilization l.s. 1.00 666,886.90 666,886.90 0.74% 0.50 - 0.50 0.37% 0.00% 0.37% 333,443.45
SPL-4 Provide and Maintain Traffic Control l.s. 1.00 112,740.75 112,740.75 0.12% 0.50 - 0.50 0.06% 0.00% 0.06% 56,370.38
SPL-5 Project Billboard each 2.00 3,098.87 6,197.74 0.01% - 0.00% 0.00% 0.00% -
SPL-6 Construction Safety and Health l.s. 1.00 48,193.50 48,193.50 0.05% - 0.00% 0.00% 0.00% -

GRAND TOTAL 90,696,158.09 100.00% 12.05% 38.50% 50.54% 10,925,984.01

Prepared by: Checked by: Submitted by: Recommended by:

F. GURREA CONSTRUCTION, INC. LEO P. BIONAT JOSE AL V. FRUTO LEA N. DELFINADO, CES E
Contractor Project Engineer Chief, Planning & Design Division Asst. Regional Director
T OF WORK ACCOMPLISHED
For the Period:

G/IMPROVEMENT OF BENIGNO S. AQUINO AVENUE (ILOILO-JARO-DIVERSION ROAD) TO ILOILO CITY-PAVIA ROAD

10,925,984.01

FINANCIAL ACCOMPLISHMENT (Amount)

THIS PERIOD TO DATE

355,830.20 355,830.20
2,245.93 2,245.93
- -
1,389,216.35 1,678,233.34
242,677.71 6,543,933.35
137,051.81 140,606.31
711,203.10 1,464,848.34
1,345,223.92 1,345,223.92
946,145.35 946,145.35
1,325,573.36 1,495,537.55
10,010,632.54 12,131,783.22
3,905,530.13 4,803,113.07

- -

- -
1,322,537.65 1,322,537.65
1,230,382.87 1,230,382.87
- -
- -
- -
- -
- -
- -
- -

- -

- -
10,193,895.84 10,193,895.84
1,798,044.33 1,798,044.33
- 333,443.45
- 56,370.38
- -
- -

34,916,191.09 45,842,175.11

Approved by:

EDILBERTO D. TAYAO
Regional Director
STATEMENT OF WORK ACCOMPLISHED
For the Period:

Project Certificate No.: 3


Sheet 1 of 1
Project: WIDENING/IMPROVEMENT OF BENIGNO S. AQUINO AVENUE (ILOILO-JARO-DIVERSION ROAD) TO ILOILO CITY-PAVIA ROAD
CONTRACTOR: F. GURREA CONSTRUCTION, INC. Location: ILOILO CITY, STA. 3+000 - STA. 3+060 & STA. 4+400 - STA. 4+940
Bill No.: 1 9,392,247.26

ORIGINAL QUANTITY ACCOMPLISHMENT (Quantity) PERCENTAGE % FINANCIAL ACCOMPLISHMENT (Am


ITEM DESCRIPTION UNIT WT%
UNIT TOTAL
QTY PREV THIS PERIOD TO DATE PREVIOUS THIS PERIOD TO DATE PREVIOUS THIS PERIOD
PRICE AMOUNT

101(3a) Removal of Existing Concrete Pavement sq.m. 3,305.50 201.34 665,529.37 0.73% 145.15 75.00 220.15 0.03% 0.02% 0.05% 29,224.50 15,100.50
101(3b) Removal of Existing Asphalt Pavement sq.m. 360.00 104.95 37,782.00 0.04% 73.04 - 73.04 0.01% 0.00% 0.01% 7,665.55 -
102(2) Surplus Common Excavation cu.m 2,605.34 196.77 512,652.75 0.57% - 0.00% 0.00% 0.00% - -
103 Structure Excavation cu.m 7,991.62 286.30 2,288,000.80 2.52% 2030.5 896.88 2,927.38 0.64% 0.28% 0.92% 581,332.15 256,776.74
104(1) Embankment cu.m 14,731.54 605.71 8,923,041.09 9.84% 122.08 - 122.08 0.08% 0.00% 0.08% 73,945.08 -
105(1) Subgrade Preparation (common material) sq.m. 13,061.45 19.94 260,445.31 0.29% 2356.12 488.40 2,844.52 0.05% 0.01% 0.06% 46,981.03 9,738.70
200 Aggregate Sub-base Coarse cu.m 2,741.59 668.38 1,832,423.92 2.02% 946.43 494.60 1,441.03 0.70% 0.36% 1.06% 632,574.88 330,580.75
311(1a) PCC Pavement (0.30m thk) sq.m. 4,483.36 1,584.07 7,101,956.07 7.83% 2,345.14 487.20 2,832.34 4.10% 0.85% 4.95% 3,714,865.92 771,758.90
311(1b) PCC Pavement (0.23m thk) sq.m. 3,564.40 1,194.04 4,256,036.17 4.69% 240.80 - 240.80 0.32% 0.00% 0.32% 287,524.83 -
311(1c) PCC Pavement (0.15m thk) sq.m. 3,858.57 818.71 3,159,049.84 3.48% 503.07 592.40 1,095.47 0.45% 0.53% 0.99% 411,868.44 485,003.80
404 Reinforcing Steel (grade 40) kgs 275,683.65 70.17 19,344,721.72 21.33% 18,591.15 9,959.55 28,550.70 1.44% 0.77% 2.21% 1,304,541.00 698,861.62
405(a) Structural Concrete, Class "A" cu.m 1,986.78 5,569.86 11,066,086.45 12.20% 226.86 118.78 345.64 1.39% 0.73% 2.12% 1,263,578.44 661,587.97
Reinforced Concrete Pipe Culvert (1.22mØ,
500 (1)a RCPC) l.m 100.00 6,826.51 682,651.00 0.75% - 0.00% 0.00% 0.00% - -

600(2)a Mountable Concrete Gutter l.m 1,843.75 639.72 1,179,483.75 1.30% - 0.00% 0.00% 0.00% - -
600(3) Concrete Curb and Gutter, Type A l.m 2,116.07 866.17 1,832,876.35 2.02% 345.20 - 345.20 0.33% 0.00% 0.33% 299,001.88 -
601 Sidewalk (150mm thk) sq.m. 2,320.80 800.65 1,858,148.52 2.05% - 0.00% 0.00% 0.00% - -
605(2b) Regulatory Signs (450x750) each 2.00 12,778.44 25,556.88 0.03% - 0.00% 0.00% 0.00% - -
605(2c) Regulatory Signs (600x650) each 7.00 12,159.36 85,115.52 0.09% - 0.00% 0.00% 0.00% -
605(2)d Regulatory Signs (600x900) each 1.00 12,595.78 12,595.78 0.01% - 0.00% 0.00% 0.00% - -
605(3a) Informatory Signs (400x600) each 1.00 12,595.78 12,595.78 0.01% - 0.00% 0.00% 0.00% - -
606(2) Pavement Markings sq.m. 151.44 650.33 98,485.97 0.11% - 0.00% 0.00% 0.00% - -
609 Sprigging sq.m. 3,179.84 957.30 3,044,060.83 3.36% 10.00 - 10.00 0.01% 0.00% 0.01% 9,573.00 -
611 Trees (Furnishing & Transplanting) each 229.00 10,392.60 2,379,905.40 2.62% 4.00 - 4.00 0.05% 0.00% 0.05% 41,570.40 -
Reflectorized Thermoplastic Pavement
612(1) Markings (White) sq.m. 499.06 1,727.44 862,096.20 0.95% - 0.00% 0.00% 0.00% - -

612(2) Reflectorized Thermoplastic Pavement sq.m. 24.84 1,766.30 43,874.89 0.05% - 0.00% 0.00% 0.00% - -
Markings (Yellow)
SPL-1 Unit Pavers sq.m. 7,638.76 1,890.37 14,440,082.74 15.92% 274.65 311.58 586.23 0.57% 0.65% 1.22% 519,190.12 589,001.48
SPL-2 Unit Pavers (Lining) sq.m. 2,040.28 1,890.37 3,856,884.10 4.25% 89.30 133.25 222.55 0.19% 0.28% 0.46% 168,810.04 251,891.80
SPL-3 Mobilization/Demobilization l.s. 1.00 666,886.90 666,886.90 0.74% - 0.00% 0.00% 0.00% - -
SPL-4 Provide and Maintain Traffic Control l.s. 1.00 112,740.75 112,740.75 0.12% - 0.00% 0.00% 0.00% - -
SPL-5 Project Billboard each 2.00 3,098.87 6,197.74 0.01% - 0.00% 0.00% 0.00% - -
SPL-6 Construction Safety and Health l.s. 1.00 48,193.50 48,193.50 0.05% - 0.00% 0.00% 0.00% -
Additional Works
Unsuitable Excavation cu.m 0.00% 21.99 21.99 0.00% 0.00% 0.00% - -
Backfilling cu.m 0.00% 347.67 347.67 0.00% 0.00% 0.00% -

GRAND TOTAL 90,696,158.09 100.00% 10.36% 4.49% 14.84% 9,392,247.26 4,070,302.27

Prepared by: Checked by: Submitted by: Recommended by: Approve

F. GURREA CONSTRUCTION, INC. LEO P. BIONAT JOSE AL V. FRUTO LEA N. DELFINADO, CES E EDILBERTO D
Contractor Project Engineer Chief, Planning & Design Division Asst. Regional Director Regional D
WORK ACCOMPLISHED
r the Period:

MPROVEMENT OF BENIGNO S. AQUINO AVENUE (ILOILO-JARO-DIVERSION ROAD) TO ILOILO CITY-PAVIA ROAD

FINANCIAL ACCOMPLISHMENT (Amount)

TO DATE

44,325.00
7,665.55
-
838,108.89
73,945.08
56,719.73
963,155.63
4,486,624.82
287,524.83
896,872.24
2,003,402.62
1,925,166.41

-
299,001.88
-
-
-
-
-
-
9,573.00
41,570.40

1,108,191.61
420,701.84
-
-
-
-

-
-

13,462,549.53

Approved by:

EDILBERTO D. TAYAO
Regional Director
STATEMENT OF WORK ACCOMPLISHED
For the Period:

Project Certificate No.: 3


Sheet 1 of 1
433.69 Project: WIDENING/IMPROVEMENT OF BENIGNO S. AQUINO AVENUE (ILOILO-JARO-DIVERSION ROAD) TO ILOILO CITY-PAVIA ROAD
CONTRACTOR: F. GURREA CONSTRUCTION, INC. Location: ILOILO CITY, STA. 3+000 - STA. 3+060 & STA. 4+400 - STA. 4+940
Bill No.: 1 -

ORIGINAL QUANTITY ACCOMPLISHMENT (Quantity) PERCENTAGE % FINANCIAL ACCOMPLISHMENT (Am


ITEM DESCRIPTION UNIT WT%
UNIT TOTAL
QTY PREV THIS PERIOD TO DATE PREVIOUS THIS PERIOD TO DATE PREVIOUS THIS PERIOD
PRICE AMOUNT

101(3a) Removal of Existing Concrete Pavement sq.m. 3,305.50 105.18 347,672.49 0.58% 145.15 145.15 0.00% 0.03% 0.03% - 15,266.88
101(3b) Removal of Existing Asphalt Pavement sq.m. 360.00 48.84 17,582.40 0.03% 73.04 73.04 0.00% 0.01% 0.01% - 3,567.27
102(2) Surplus Common Excavation cu.m 2,605.34 130.68 340,465.83 0.57% 0.00% 0.00% 0.00% - -
103 Structure Excavation cu.m 7,991.62 156.67 1,252,047.11 2.09% 2,030.50 2,927.38 0.00% 0.53% 0.53% - 318,118.44
104(1) Embankment cu.m 14,731.54 347.67 5,121,714.51 8.53% 122.08 122.08 0.00% 0.07% 0.07% - 42,443.55
105(1) Subgrade Preparation (common material) sq.m. 13,061.45 14.78 193,048.23 0.32% 2,356.12 2,844.52 0.00% 0.06% 0.06% - 34,823.45
200 Aggregate Sub-base Coarse cu.m 2,741.59 333.61 914,621.84 1.52% 946.43 1,441.03 0.00% 0.53% 0.53% - 315,738.51
311(1a) PCC Pavement (0.30m thk) sq.m. 4,483.36 1,100.03 4,931,830.50 8.22% 2,345.14 2,832.34 0.00% 4.30% 4.30% - 2,579,724.35
311(1b) PCC Pavement (0.23m thk) sq.m. 3,564.40 856.84 3,054,120.50 5.09% 240.80 240.80 0.00% 0.34% 0.34% - 206,327.07
311(1c) PCC Pavement (0.15m thk) sq.m. 3,858.57 577.47 2,228,208.42 3.71% 503.07 1,095.47 0.00% 0.48% 0.48% - 290,507.83
404 Reinforcing Steel (grade 40) kgs 275,683.65 43.56 12,008,779.79 20.01% 18,591.15 28,550.70 0.00% 1.35% 1.35% - 809,830.49
405(a) Structural Concrete, Class "A" cu.m 1,986.78 4,600.00 9,139,188.00 15.23% 226.86 345.64 0.00% 1.74% 1.74% - 1,043,556.00
Reinforced Concrete Pipe Culvert (1.22mØ,
500 (1)a RCPC) l.m 100.00 4,905.56 490,556.00 0.82% 0.00% 0.00% 0.00% - -

600(2)a Mountable Concrete Gutter l.m 1,843.75 369.39 681,062.81 1.13% 0.00% 0.00% 0.00% - -
600(3) Concrete Curb and Gutter, Type A l.m 2,116.07 572.08 1,210,561.33 2.02% 345.20 345.20 0.00% 0.33% 0.33% - 197,482.02
601 Sidewalk (150mm thk) sq.m. 2,320.80 581.81 1,350,264.65 2.25% 0.00% 0.00% 0.00% - -
605(2b) Regulatory Signs (450x750) each 2.00 8,356.47 16,712.94 0.03% 0.00% 0.00% 0.00% - -
605(2c) Regulatory Signs (600x650) each 7.00 9,076.47 63,535.29 0.11% 0.00% 0.00% 0.00% -
605(2)d Regulatory Signs (600x900) each 1.00 11,582.04 11,582.04 0.02% 0.00% 0.00% 0.00% - -
605(3a) Informatory Signs (400x600) each 1.00 12,082.04 12,082.04 0.02% 0.00% 0.00% 0.00% - -
606(2) Pavement Markings sq.m. 151.44 483.02 73,148.55 0.12% 0.00% 0.00% 0.00% - -
609 Sprigging sq.m. 3,179.84 572.08 1,819,122.87 3.03% 10.00 10.00 0.00% 0.01% 0.01% - 5,720.80
611 Trees (Furnishing & Transplanting) each 229.00 4,584.72 1,049,900.88 1.75% 4.00 4.00 0.00% 0.03% 0.03% - 18,338.88
Reflectorized Thermoplastic Pavement
612(1) Markings (White) sq.m. 499.06 743.96 371,280.68 0.62% 0.00% 0.00% 0.00% - -

612(2) Reflectorized Thermoplastic Pavement sq.m. 24.84 1,073.07 26,655.06 0.04% 0.00% 0.00% 0.00% - -
Markings (Yellow)
SPL-1 Unit Pavers sq.m. 7,638.76 1,346.00 10,281,770.96 17.13% 274.65 586.23 0.00% 0.62% 0.62% - 369,678.90
SPL-2 Unit Pavers (Lining) sq.m. 2,040.28 1,346.00 2,746,216.88 4.58% 89.30 222.55 0.00% 0.20% 0.20% - 120,197.80
SPL-3 Mobilization/Demobilization l.s. 1.00 105,500.00 105,500.00 0.18% 0.00% 0.00% 0.00% - -
SPL-4 Provide and Maintain Traffic Control l.s. 1.00 115,700.00 115,700.00 0.19% 0.00% 0.00% 0.00% - -
SPL-5 Project Billboard each 2.00 2,321.25 4,642.50 0.01% 0.00% 0.00% 0.00% - -
SPL-6 Construction Safety and Health l.s. 1.00 36,100.00 36,100.00 0.06% 0.00% 0.00% 0.00% -
Additional Works
Unsuitable Excavation cu.m 0.00% 21.99 0.00% 0.00% 0.00% - -
Backfilling cu.m 0.00% 347.67 0.00% 0.00% 0.00% -

GRAND TOTAL 60,015,675.09 100.00% 0.00% 10.62% 10.62% - 6,371,322.25

Prepared by: Checked by: Submitted by: Recommended by: Approve

F. GURREA CONSTRUCTION, INC. LEO P. BIONAT JOSE AL V. FRUTO LEA N. DELFINADO, CES E EDILBERTO D
Contractor Project Engineer Chief, Planning & Design Division Asst. Regional Director Regional D
WORK ACCOMPLISHED
r the Period:

MPROVEMENT OF BENIGNO S. AQUINO AVENUE (ILOILO-JARO-DIVERSION ROAD) TO ILOILO CITY-PAVIA ROAD

FINANCIAL ACCOMPLISHMENT (Amount)

TO DATE

15,266.88
3,567.27
-
318,118.44
42,443.55
34,823.45
315,738.51
2,579,724.35
206,327.07
290,507.83
809,830.49
1,043,556.00

-
197,482.02
-
-
-
-
-
-
5,720.80
18,338.88

369,678.90
120,197.80
-
-
-
-

-
-

6,371,322.25

Approved by:

EDILBERTO D. TAYAO
Regional Director
STATEMENT OF WORK ACCOMPLISHED
For the Period:

Project Certificate No.: 3


Sheet 1 of 1
Project: WIDENING/IMPROVEMENT OF BENIGNO S. AQUINO AVENUE (ILOILO-JARO-DIVERSION ROAD) TO ILOILO CITY-PAVIA ROAD
CONTRACTOR: F. GURREA CONSTRUCTION, INC. Location: ILOILO CITY, STA. 3+000 - STA. 3+060 & STA. 4+400 - STA. 4+940
Bill No.: 1 6,371,322.25

ORIGINAL QUANTITY ACCOMPLISHMENT (Quantity) PERCENTAGE % FINANCIAL ACCOMPLISHMENT (Amount


ITEM DESCRIPTION UNIT WT%
UNIT TOTAL
QTY PREV THIS PERIOD TO DATE PREVIOUS THIS PERIOD TO DATE PREVIOUS THIS PERIOD
PRICE AMOUNT

101(3a) Removal of Existing Concrete Pavement sq.m. 3,305.50 105.18 347,672.49 0.58% 145.15 141.80 286.95 0.03% 0.02% 0.05% 15,266.88 14,914.52

101(3b) Removal of Existing Asphalt Pavement sq.m. 360.00 48.84 17,582.40 0.03% 73.04 73.04 0.01% 0.00% 0.01% 3,567.27 -

102(2) Surplus Common Excavation cu.m 2,605.34 130.68 340,465.83 0.57% 675.87 675.87 0.00% 0.15% 0.15% - 88,322.69

103 Structure Excavation cu.m 7,991.62 156.67 1,252,047.11 2.09% 2030.5 2,030.50 0.53% 0.00% 0.53% 318,118.44 -

104(1) Embankment cu.m 14,731.54 347.67 5,121,714.51 8.53% 122.08 37.54 159.62 0.07% 0.02% 0.09% 42,443.55 13,051.53

105(1) Subgrade Preparation (common material) sq.m. 13,061.45 14.78 193,048.23 0.32% 2356.12 217.41 2,573.53 0.06% 0.01% 0.06% 34,823.45 3,213.32

200 Aggregate Sub-base Coarse cu.m 2,741.59 333.61 914,621.84 1.52% 946.43 946.43 0.53% 0.00% 0.53% 315,738.51 -

311(1a) PCC Pavement (0.30m thk) sq.m. 4,483.36 1,100.03 4,931,830.50 8.22% 2,345.14 516.73 2,861.87 4.30% 0.95% 5.25% 2,579,724.35 568,418.50

311(1b) PCC Pavement (0.23m thk) sq.m. 3,564.40 856.84 3,054,120.50 5.09% 240.80 240.80 0.34% 0.00% 0.34% 206,327.07 -

311(1c) PCC Pavement (0.15m thk) sq.m. 3,858.57 577.47 2,228,208.42 3.71% 503.07 503.07 0.48% 0.00% 0.48% 290,507.83 -

404 Reinforcing Steel (grade 40) kgs 275,683.65 43.56 12,008,779.79 20.01% 18,591.15 11,675.12 30,266.27 1.35% 0.85% 2.20% 809,830.49 508,568.23

405(a) Structural Concrete, Class "A" cu.m 1,986.78 4,600.00 9,139,188.00 15.23% 226.86 77.71 304.57 1.74% 0.60% 2.33% 1,043,556.00 357,466.00

500 (1)a Reinforced Concrete Pipe Culvert (1.22mØ, l.m 100.00 4,905.56 490,556.00 0.82% - 0.00% 0.00% 0.00% - -
RCPC)
600(2)a Mountable Concrete Gutter l.m 1,843.75 369.39 681,062.81 1.13% - 0.00% 0.00% 0.00% - -

600(3) Concrete Curb and Gutter, Type A l.m 2,116.07 572.08 1,210,561.33 2.02% 345.20 345.20 0.33% 0.00% 0.33% 197,482.02 -

601 Sidewalk (150mm thk) sq.m. 2,320.80 581.81 1,350,264.65 2.25% 906.20 906.20 0.00% 0.88% 0.88% - 527,236.22

605(2b) Regulatory Signs (450x750) each 2.00 8,356.47 16,712.94 0.03% - 0.00% 0.00% 0.00% - -

605(2c) Regulatory Signs (600x650) each 7.00 9,076.47 63,535.29 0.11% - 0.00% 0.00% 0.00% -

605(2)d Regulatory Signs (600x900) each 1.00 11,582.04 11,582.04 0.02% - 0.00% 0.00% 0.00% - -

605(3a) Informatory Signs (400x600) each 1.00 12,082.04 12,082.04 0.02% - 0.00% 0.00% 0.00% - -

606(2) Pavement Markings sq.m. 151.44 483.02 73,148.55 0.12% - 0.00% 0.00% 0.00% - -

609 Sprigging sq.m. 3,179.84 572.08 1,819,122.87 3.03% 10.00 10.00 0.01% 0.00% 0.01% 5,720.80 -

611 Trees (Furnishing & Transplanting) each 229.00 4,584.72 1,049,900.88 1.75% 4.00 4.00 0.03% 0.00% 0.03% 18,338.88 -

612(1) Reflectorized Thermoplastic Pavement sq.m. 499.06 743.96 371,280.68 0.62% - 0.00% 0.00% 0.00% - -
Markings (White)
612(2) Reflectorized Thermoplastic Pavement sq.m. 24.84 1,073.07 26,655.06 0.04% - 0.00% 0.00% 0.00% - -
Markings (Yellow)
SPL-1 Unit Pavers sq.m. 7,638.76 1,346.00 10,281,770.96 17.13% 274.65 585.13 859.78 0.62% 1.31% 1.93% 369,678.90 787,584.98

SPL-2 Unit Pavers (Lining) sq.m. 2,040.28 1,346.00 2,746,216.88 4.58% 89.30 302.97 392.27 0.20% 0.68% 0.88% 120,197.80 407,797.62

SPL-3 Mobilization/Demobilization l.s. 1.00 105,500.00 105,500.00 0.18% - 0.00% 0.00% 0.00% - -
SPL-4 Provide and Maintain Traffic Control l.s. 1.00 115,700.00 115,700.00 0.19% - 0.00% 0.00% 0.00% - -

SPL-5 Project Billboard each 2.00 2,321.25 4,642.50 0.01% - 0.00% 0.00% 0.00% - -

SPL-6 Construction Safety and Health l.s. 1.00 36,100.00 36,100.00 0.06% - 0.00% 0.00% 0.00% -

Additional Works -

Unsuitable Excavation cu.m 0.00% - 0.00% 0.00% 0.00% - -

Aggregate Base Course cu.m 0.00% - 0.00% 0.00% 0.00% -

Removal of Trees (Largea 501 -750 mm)

Dropped Inlet

Concrete Curb

Concrete Lining
Fabrication & Installation of Bollard (G.I.
Pipe)

GRAND TOTAL 60,015,675.09 100.00% 10.62% 5.46% 16.08% 6,371,322.25 3,276,573.62

Prepared by: Checked by: Submitted by: Recommended by: Approved b

F. GURREA CONSTRUCTION, INC. LEO P. BIONAT JOSE AL V. FRUTO LEA N. DELFINADO, CES E EDILBERTO D. T
GNO S. AQUINO AVENUE (ILOILO-JARO-DIVERSION ROAD) TO ILOILO CITY-PAVIA ROAD

FINANCIAL ACCOMPLISHMENT (Amount)


Control Qty amount bal qty bal qty
TO DATE

30,181.40
762.75 80,226.05 475.80 50,044.64
3,567.27
798.4 38,993.86 725.36 35,426.58
88,322.69
2770.36 362,030.64 2,094.49 273,707.95
318,118.44
865.86 135,654.29 (1,164.64) (182,464.15)
55,495.09
729.18 253,514.01 569.56 198,018.93
38,036.77
2573.53 38,036.77 - -
315,738.51
462.3 154,227.90 (484.13) (161,510.61)
3,148,142.86
2861.87 3,148,142.86 - -
206,327.07
- (240.80) (206,327.07)
290,507.83
- (503.07) (290,507.83)
1,318,398.72
30266.27 1,318,398.72 - -
1,401,022.00
304.57 1,401,022.00 - -
-
- - -
-
- - -
197,482.02
399.2 228,374.34 54.00 30,892.32
527,236.22
1839.96 1,070,507.13 933.76 543,270.91
-
- - -
-
- - -
-
- - -
-
- - -
-
- - -
5,720.80
621 355,261.68 611.00 349,540.88
18,338.88
- (4.00) (18,338.88)
-
- - -
-
- - -
1,157,263.88
1185.59 1,595,804.14 325.81 438,540.26
527,995.42
654.37 880,782.02 262.10 352,786.60
-
- - -
-
- - -
-
- - -
-
- - -

- - -
-
- - -
-
- - -

- - -

- - -

- - -

- - -

- - -
- -
9,647,895.87 11,060,976.40 1,413,080.53

Approved by:

EDILBERTO D. TAYAO
STATEMENT OF WORK ACCOMPLISHED
For the Period:

Project Certificate No.: 3


Sheet 1 of 1
Project: WIDENING/IMPROVEMENT OF BENIGNO S. AQUINO AVENUE (ILOILO-JARO-DIVERSION ROAD) TO ILOILO CITY-PAVIA ROAD
CONTRACTOR: F. GURREA CONSTRUCTION, INC. Location: ILOILO CITY, STA. 3+000 - STA. 3+060 & STA. 4+400 - STA. 4+940
Bill No.: 1 6,371,322.25

ORIGINAL QUANTITY ACCOMPLISHMENT (Quantity) PERCENTAGE % FINANCIAL ACCOMPLISHMENT (Amount


ITEM DESCRIPTION UNIT WT%
UNIT TOTAL
QTY PREV THIS PERIOD TO DATE PREVIOUS THIS PERIOD TO DATE PREVIOUS THIS PERIOD
PRICE AMOUNT

101(3a) Removal of Existing Concrete Pavement sq.m. 3,305.50 105.18 347,672.49 0.58% 145.15 141.80 286.95 0.03% 0.02% 0.05% 15,266.88 14,914.52

101(3b) Removal of Existing Asphalt Pavement sq.m. 360.00 48.84 17,582.40 0.03% 73.04 73.04 0.01% 0.00% 0.01% 3,567.27 -

102(2) Surplus Common Excavation cu.m 2,605.34 130.68 340,465.83 0.57% 675.87 675.87 0.00% 0.15% 0.15% - 88,322.69

103 Structure Excavation cu.m 7,991.62 156.67 1,252,047.11 2.09% 2030.5 (1,164.64) 865.86 0.53% -0.30% 0.23% 318,118.44 (182,464.15)

104(1) Embankment cu.m 14,731.54 347.67 5,121,714.51 8.53% 122.08 37.54 159.62 0.07% 0.02% 0.09% 42,443.55 13,051.53

105(1) Subgrade Preparation (common material) sq.m. 13,061.45 14.78 193,048.23 0.32% 2356.12 217.41 2,573.53 0.06% 0.01% 0.06% 34,823.45 3,213.32

200 Aggregate Sub-base Coarse cu.m 2,741.59 333.61 914,621.84 1.52% 946.43 (484.13) 462.30 0.53% -0.27% 0.26% 315,738.51 (161,510.61)

311(1a) PCC Pavement (0.30m thk) sq.m. 4,483.36 1,100.03 4,931,830.50 8.22% 2,345.14 516.73 2,861.87 4.30% 0.95% 5.25% 2,579,724.35 568,418.50

311(1b) PCC Pavement (0.23m thk) sq.m. 3,564.40 856.84 3,054,120.50 5.09% 240.80 (240.80) - 0.34% -0.34% 0.00% 206,327.07 (206,327.07)

311(1c) PCC Pavement (0.15m thk) sq.m. 3,858.57 577.47 2,228,208.42 3.71% 503.07 (503.07) - 0.48% -0.48% 0.00% 290,507.83 (290,507.83)

404 Reinforcing Steel (grade 40) kgs 275,683.65 43.56 12,008,779.79 20.01% 18,591.15 11,675.12 30,266.27 1.35% 0.85% 2.20% 809,830.49 508,568.23

405(a) Structural Concrete, Class "A" cu.m 1,986.78 4,600.00 9,139,188.00 15.23% 226.86 77.71 304.57 1.74% 0.60% 2.33% 1,043,556.00 357,466.00

500 (1)a Reinforced Concrete Pipe Culvert (1.22mØ, l.m 100.00 4,905.56 490,556.00 0.82% - 0.00% 0.00% 0.00% - -
RCPC)
600(2)a Mountable Concrete Gutter l.m 1,843.75 369.39 681,062.81 1.13% - 0.00% 0.00% 0.00% - -

600(3) Concrete Curb and Gutter, Type A l.m 2,116.07 572.08 1,210,561.33 2.02% 345.20 345.20 0.33% 0.00% 0.33% 197,482.02 -

601 Sidewalk (150mm thk) sq.m. 2,320.80 581.81 1,350,264.65 2.25% 906.20 906.20 0.00% 0.88% 0.88% - 527,236.22

605(2b) Regulatory Signs (450x750) each 2.00 8,356.47 16,712.94 0.03% - 0.00% 0.00% 0.00% - -

605(2c) Regulatory Signs (600x650) each 7.00 9,076.47 63,535.29 0.11% - 0.00% 0.00% 0.00% -

605(2)d Regulatory Signs (600x900) each 1.00 11,582.04 11,582.04 0.02% - 0.00% 0.00% 0.00% - -

605(3a) Informatory Signs (400x600) each 1.00 12,082.04 12,082.04 0.02% - 0.00% 0.00% 0.00% - -

606(2) Pavement Markings sq.m. 151.44 483.02 73,148.55 0.12% - 0.00% 0.00% 0.00% - -

609 Sprigging sq.m. 3,179.84 572.08 1,819,122.87 3.03% 10.00 10.00 0.01% 0.00% 0.01% 5,720.80 -

611 Trees (Furnishing & Transplanting) each 229.00 4,584.72 1,049,900.88 1.75% 4.00 (4.00) - 0.03% -0.03% 0.00% 18,338.88 (18,338.88)

612(1) Reflectorized Thermoplastic Pavement sq.m. 499.06 743.96 371,280.68 0.62% - 0.00% 0.00% 0.00% - -
Markings (White)
612(2) Reflectorized Thermoplastic Pavement sq.m. 24.84 1,073.07 26,655.06 0.04% - 0.00% 0.00% 0.00% - -
Markings (Yellow)
SPL-1 Unit Pavers sq.m. 7,638.76 1,346.00 10,281,770.96 17.13% 274.65 585.13 859.78 0.62% 1.31% 1.93% 369,678.90 787,584.98

SPL-2 Unit Pavers (Lining) sq.m. 2,040.28 1,346.00 2,746,216.88 4.58% 89.30 302.97 392.27 0.20% 0.68% 0.88% 120,197.80 407,797.62

SPL-3 Mobilization/Demobilization l.s. 1.00 105,500.00 105,500.00 0.18% - 0.00% 0.00% 0.00% - -
SPL-4 Provide and Maintain Traffic Control l.s. 1.00 115,700.00 115,700.00 0.19% - 0.00% 0.00% 0.00% - -

SPL-5 Project Billboard each 2.00 2,321.25 4,642.50 0.01% - 0.00% 0.00% 0.00% - -

SPL-6 Construction Safety and Health l.s. 1.00 36,100.00 36,100.00 0.06% - 0.00% 0.00% 0.00% -

Additional Works -

Unsuitable Excavation cu.m 0.00% - 0.00% 0.00% 0.00% - -

Aggregate Base Course cu.m 0.00% - 0.00% 0.00% 0.00% -

Removal of Trees (Largea 501 -750 mm)

Dropped Inlet

Concrete Curb

Concrete Lining
Fabrication & Installation of Bollard (G.I.
Pipe)

GRAND TOTAL 60,015,675.09 100.00% 10.62% 4.03% 14.64% 6,371,322.25 2,417,425.08

Prepared by: Checked by: Submitted by: Recommended by: Approved b

F. GURREA CONSTRUCTION, INC. LEO P. BIONAT JOSE AL V. FRUTO LEA N. DELFINADO, CES E EDILBERTO D. T
NO S. AQUINO AVENUE (ILOILO-JARO-DIVERSION ROAD) TO ILOILO CITY-PAVIA ROAD

FINANCIAL ACCOMPLISHMENT (Amount)


Control Qty amount bal qty bal qty
TO DATE

30,181.40
762.75 80,226.05 475.80 50,044.64
3,567.27
798.4 38,993.86 725.36 35,426.58
88,322.69
2770.36 362,030.64 2,094.49 273,707.95
135,654.29
865.86 135,654.29 - -
55,495.09
729.18 253,514.01 569.56 198,018.93
38,036.77
2573.53 38,036.77 - -
154,227.90
462.3 154,227.90 - -
3,148,142.86
2861.87 3,148,142.86 - -
-
- - -
-
- - -
1,318,398.72
30266.27 1,318,398.72 - -
1,401,022.00
304.57 1,401,022.00 - -
-
- - -
-
- - -
197,482.02
399.2 228,374.34 54.00 30,892.32
527,236.22
1839.96 1,070,507.13 933.76 543,270.91
-
- - -
-
- - -
-
- - -
-
- - -
-
- - -
5,720.80
621 355,261.68 611.00 349,540.88
-
- - -
-
- - -
-
- - -
1,157,263.88
1185.59 1,595,804.14 325.81 438,540.26
527,995.42
654.37 880,782.02 262.10 352,786.60
-
- - -
-
- - -
-
- - -
-
- - -

- - -
-
- - -
-
- - -

- - -

- - -

- - -

- - -

- - -
- -
8,788,747.33 11,060,976.40 2,272,229.07

Approved by:

EDILBERTO D. TAYAO
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE REGIONAL DIRECTOR
REGION VI - WESTERN VISAYAS
Fort San Pedro, Iloilo City

PROJECT: WIDENING/IMPROVEMENT OF BENIGNO S. AQUINO AVENUE


(ILOILO-JARO-DIVERSION ROAD) TO ILOILO CITY-PAVIA ROAD
ILOILO CITY, STA. 3+000 - STA. 3+060 & STA. 4+400 - STA. 4+940
CONTRACTOR: F. GURREA CONSTRUCTION, INC.

STATEMENT OF TIME ELAPSED AND PERCENTAGE OF WORK ACCOMPLISHED


For the period of: May 21 - June 30, 2014

1. ORIGINAL CONTRACT TIME 274 CD

2. DATE OF EFFECTIVITY OF CONTRACT January 9, 2014

3. ORIGINAL CONTRACT AMOUNT #REF!

4. REVISED CONTRACT AMOUNT DUE TO APPROVED


CHANGE ORDER/EXTRA WORK ORDER None

5. ORIGINAL EXPIRY DATE : October 9, 2014

6. APPROVED TIME EXTENSION None

7. SHUTDOWN DUE TO SUSPENSION WORK : None

8. TOTAL TIME EXTENSION AND SHUTDOWN : None

9. TOTAL CALENDAR DAYS ELAPSED TO DATE : 173 CD

10. CONTRACT TIME ELAPSED (AFTER EXTENSION AND SUSPENSION) : None

11. REVISED EXPIRY DATE DUE TO EXTENSION : None

12. PERCENTAGE OF TIME ELAPSED 63.14%

13. PERCENTAGE OF WORK ACCOMPLISHED #REF!

14. SLIPPAGE #REF! SCHEDULE 60.99%


ACTUAL #REF!

Submitted by: Approved by:

SEVERO A. RUIZ JOSE AL V. FRUTO


Project Engineer Chief, Planning & Design Section
CONTRACT BILL 1
MONTH DAYS ORIG % days %
jan 9-31 23 2.41 23 2.41
feb 1-28 28 5.03 28 5.03
march 1-31 31 6.23 31 6.23
apr 1-30 30 12.48 30 12.48
may 1-31 31 14.89 31 14.89
June 1-30 30 19.95 30 19.95
july 1-31 31 16.89 0
aug 1-31 31 14.74 0
sep 1-30 30 5.19 0
oct 1-9 9 2.19 0
nov
274 100 173 60.99