OBSERVATION & TABULATION:
Brand Model : DUI, 2 Stage Measuring Area : 0.5 x 0.5 m2
Power : 5HP, Three phase Energymeter constant : Ref/kW-hr
Datum head Z = 0.7m
Sl.No. Pressure Gauge Reading Vacuum Head Time for Time for Discharge Input Output Efficiency
gauge 2 rev of 100mm
reading EM rise
1st stage 2nd Stage H te tm Q IP OP η
kg/cm2 kg/cm2 V m sec sec x10-3m2/sec kW kW %
1. 0 0.5 620 13.512 29.53 6.68 3.740 1.950 0.496 25.43
2. 0 1.0 620 18.512 27.22 7.12 3.500 2.116 0.636 30.04
3. 0.1 1.25 580 19.508 26.63 7.25 3.448 2.163 0.660 30.50
4. 0.3 1.5 460 18.496 28.06 8.78 2.847 2.053 0.517 25.16
5. 0.4 1.6 400 17.740 29.90 8.97 2.787 1.926 0.485 25.18
Average 27.26
[25]