NOGICD Act 2010: Schedule A Guide
NOGICD Act 2010: Schedule A Guide
SCHEDULE
Instruction to Users:
- This Sheet contains Schedule A of the NOGICD Act, 2010. Please refer to this as a guide for Nigerian Content (NC) targets where
Certificate (NCCC) has not been signed.
- Where the description of your activity is not on this list, please include the Description and Measured Unit
   ITEM No.
      1
       3
4
6
7
9
10
11
12
13
14
15
16
17
18
                                    Nigeria Oil and Gas Industry Content Development Act (NOGICD), 2010
                                                                 SCHEDULE
ruction to Users:
is Sheet contains Schedule A of the NOGICD Act, 2010. Please refer to this as a guide for Nigerian Content (NC) targets where a Nigerian Conten
 ificate (NCCC) has not been signed.
here the description of your activity is not on this list, please include the Description and Measured Unit
                                             DESCRIPTION
             FEED AND DETAILED ENGINEERING AND OTHER ENGINEERING SERVICE
             FEED and Detailed engineering on Onshore facilities
             FEED and Detailed engineering on Offshore facilities
             Shallow Water
             FEED and Detailed engineering on LNG Facility
             FEED and Detailed engineering on Gas gathering Facilities
             FEED and Detailed engineering on Deep offshore facilities - Hull and topside modules
             FEED and Detailed engineering on Deep offshore Floating concrete structure
Extended Well Test/Early Production Services including Provision of Floating or Jackup Production Unit
Provision of Catering, Cleaning, Office and Security Service at Location/Platform
Rental of Drill Pipe
Electric Open Hole
Electric Ceased Holes
Slickline
Well Head Safety Panels
CHEMICAL
Drilling, Process, Maintenance
Transportation/Supply/Disposal Services
Tugs / Remotely Operated Vehicle (ROV) support / diving support vessels
Barges
Accommodation platforms / vessels
Disposal / distribution and waste transport services
Rental of Cranes and Special Vehicles
Freight Forwarding/Logistics Management Services
Supply Base/Warehouse/Storage Services
Truck Package/Product Transportation Services
SURVEYING/POSITIONING SERVICES
Soil Investigation Services
Geotechnical Services
Geophysical and Hydrographic Site Survey
Oceanographic Services
Rig Positioning Services
Photogrammetric Surveying Services
Chart and Map Production Services
Rental of Surveying/Positioning Equipment Services
Survey and Positioning Support Services
Aeromagnetic Survey
Buildings including Services Stations Engineering Modification and Maintenance Services for a Site/Platform
SHIPPING
Domestic coastal carriage of petroleum products
Tow of oil & gas infrastructure & vessels conveying oil & gas products from or to any port or point in Nigerian
waters
Supply of very large crude carriers (VLCC)
OGICD), 2010
                 90%               Man-Hour
                 90%               Man-Hour
                 90%               Man-Hour
                 50%               Man-Hour
                 90%               Man-Hour
                 80%               Man-Hour
                 80%               Man-Hour
                 80%                Volume
                 75%                Tonnage
                 80%                Tonnage
                 60%                Tonnage
                 50%                Tonnage
                 70%                Tonnage
                 60%                Tonnage
                 100%               Tonnage
                 100%               Tonnage
                 50%                Tonnage
                 75%                Tonnage
                 55%                Tonnage
                 90%                 Length
                 45%                 Length
                 60%                Number
                 60%                Tonnage
                 80%                Tonnage
                 60%                Tonnage
                 50%                Number
                 60%                Tonnage
                 60%                 Liters
                 60%                Tonnage
75%         Spend
80%         Spend
45%         Spend
60%       Man-Hour
70%       Man-Hour
85%       Man-Hour
90%        Length
85%       Man-Hour
85%       Man-Hour
85%       Man-Hour
100%      Man-Hour
100%      Man-Hour
85%       Man-Hour
90%       Man-Hour
70%       Man-Hour
75%       Man-Hour
75%       Man-Hour
95%       Man-Hour
80%        Man-Hour
95%        Man-Hour
90%        Man-Hour
90%        Man-Hour
80%        Man-Hour
75%    Volume/Man-Hour
50%         Spend
80%         Spend
75%         Spend
45%         Spend
100%        Spend
100%        Spend
100%        Spend
90% Spend
60%         Spend
80%         Spend
75%         Spend
75%         Spend
100%    Spend
55%     Spend
100%    Spend
90%     Spend
80%     Spend
90%     Spend
90%     Spend
55%     Spend
60%    Man-Hour
55%    Man-Hour
70%    Man-Hour
70%     Spend
80%     Spend
55%     Spend
100%    Spend
100%    Spend
100%    Spend
55%     Spend
70%    Man-Hour
65%     Spend
95%     Spend
90%     Spend
100%    Spend
75%     Spend
65%     Spend
70%     Spend
100%    Spend
100%   Man-Hour
45%     Spend
65%    Man-Hour
50%    Man-Hour
85%    Man-Hour
100%   Man-Hour
100%   Man-Hour
100%    Spend
90%    Man-Hour
95%    Man-Hour
75%     Spend
      80%        Spend
      100%       Spend
      100%       Spend
      95%        Spend
      60%        Spend
      75%        Spend
      85%        Spend
      90%    Man-Hour/Spend
CES
      85%        Spend
      45%        Spend
      51%        Spend
      51%        Spend
      51%        Spend
      50%        Spend
      50%        Spend
      60%        Spend
      70%        Spend
      50%        Spend
      50%        Spend
      50%        Spend
      60%        Spend
      60%        Spend
      75%        Spend
      85%        Spend
      95%        Spend
      75%        Spend
      90%      Man-Hour
      80%      Man-Hour
      70%      Man-Hour
      75%      Man-Hour
      55%      Man-Hour
      65%      Man-Hour
      45%      Man-Hour
      55%      Man-Hour
      60%      Man-Hour
      50%      Man-Hour
      85%      Man-Hour
      90%      Man-Hour
      100%   Man-Hour/Spend
45%       Man-Hour/Spend
55%           Spend
30%           Spend
60%           Spend
40%           Spend
40%           Spend
30%           Spend
100%          Usage
70%           Usage
50%        Loan Amount
100%          Spend
70%           Spend
70%         Man-hours
100%          Spend
100%          Spend
100%          Spend
70%           Spend
100%          Spend
80%          Man-Hour
45%          Man-Hour
75%          Man-Hour
45%          Man-Hour
45%          Man-Hour
50%          Man-Hour
75%          Man-Hour
45%          Man-Hour
100%         Man-Hour
85%          Man-Hour
75%          Man-Hour
70%          Man-Hour
60%          Man-Hour
65%          Man-Hour
80%          Man-Hour
85%        Man-Hour
85%        Man-Hour
80%       Man-Hour/Rate
80%    Man-Hour/Tonnage Rate
50%         Man-Hour
100%        Man-Hour
100%          Man-Hour
65%         Man-Hour/Spend
45%         Man-Hour/Spend
70%         Man-Hour/Spend
75%         Man-Hour/Spend
85%         Man-Hour/Spend
90%         Man-Hour/Spend
75%             Spend
55%             Spend
65%             Spend
85%           Man-Hour
60%           Man-Hour
85%          Man-Hour/Rate
90%           Man-Hour
90%            Man-Hour
85%            Man-Hour
75%            Man-Hour
65%             Man-Hour
55%             Man-Hour
45%             Man-Hour
45%             Man-Hour
45%             Man-Hour
55%    Nos. of Certificate Obtained
45%             Nos.
45%             Nos.
45%             Nos.
50%             Nos.
45%            Man-Hour
45%            Numbers
50%              Nos.
50%              Nos.
65%              Spend
45%              Nos.
45%              Nos.
45%              Nos.
45%               Nos.
45%               Nos.
45%               Nos.
50%               Nos.
45%               Nos.
50%               Nos.
45%      Nos.
50%      Nos.
50%      Nos.
49%      Nos.
80%    Man-Hour
80%    Man-Hour
45%    Man-Hour
45%    Man-Hour
45%    Man-Hour
45%    Man-Hour
50%    Contracts
75%    Man-Hour
75%    Man-Hour
85%    Man-Hour
80%    Man-Hour
75%    Man-Hour
45%    Man-Hour
45%    Man-Hour
45%    Man-Hour
50%     Spend
65%     Spend
90%     Spend
55%     Spend
80%     Spend
90%     Spend
85%    Man-Hour
50%     Spend
45%     Spend
70%     Spend
80%     Spend
55%     Spend
65%     Spend
80%     Spend
60%     Spend
100%    Spend
60%     Spend
65%     Spend
45%     Spend
45%     Spend
45%   Spend
75%   Spend
45%    Area
90%   Spend
90%   Spend
55%   Spend
80%   Spend
65%   Spend
80%    Spend
75%    Spend
45%    Spend
60%    Spend
49%   Tonnage
51%   Tonnage
70%   Volume
80%    Spend
65%   Tonnage
80%   Tonnage
70%   Tonnage
90% N/A
60% Spend
90%   Spend
90%   Spend
                         Name of Company :
                         Registered Address :
                       Period of Submission :
                            Project Title/No :
                                    Client :
                         Project Start Date:
                  Project Completion Date:
               NCDF 1% Remittance & Date:
Instruction to Users:
- This Sheet is used to obtain a General Overview of the project. Please note that all fields are mandatory
- Bullet points may be used to provide information on Scope
- Filling out your Project Details at the head of this sheet populates the information for all the other sheets
            List of Contractor(s)
              Sample
              123, Sample, Lagos
              Quarter 4 Sample
              Sample
              Sample
              The contract effective start date (CED)
              Company’s stewardship date
              Actual NCDF( 1% of paid invoice) paid into NCDF account by Company (Project Start to Date)
General Overview of the project. Please note that all fields are mandatory
rovide information on Scope
s at the head of this sheet populates the information for all the other sheets
GENERAL OVERVIEW
                                                                                                     Project Scope
                                          Main Scope of Work                               (Provide a description of scope in
                                                                                                     the contract)
L OVERVIEW
WORK BREAKDOWN
1 MOBILIZATION
                 (a) Engineering
                 (b) Procurement
                 (c) Equipment (Crane, Truck or Service Rig etc.)
                 (d) Transportation (Plant, Equipment and Materials)
                 (e) Transportation of Personnel
                 (f) Security
                 (g) Facilities and Infrastructure (including Site and Camp)
      2       PROJECT MANAGEMENT
                (a) Project & Site management
                (b) Office & Field Personnel
                (c) Legal / Finance
WORK BREAKDOWN
4 FABRICATION
      5       PROCUREMENT
              (a)   Materials
              (b)   Procurement Services
              (c)   Local Transport
              (d)   Custom Clearing
              (e)   Fixed Platforms
              (f)    Steel Structures (Piles, Anchors, Etc.)
              (g)   Process Equip
              (h)   Pressure Vessels
              (i)     Storage Tanks
              (j)     FPSO Integration
              (k)    Drilling Equip
              (l)     Compressors & Accessories
Instruction to Users:
- This Sheet is used to obtain information on the Nigerian Content percentage planned for each aspect of the project (based on cont
- Please edit the details under the Description column to match your contractual Scope of Work
- If your Unit of Measurement (UoM) is not in the drop down menu please select other and explain the remarks column
WORK BREAKDOWN
      7       SERVICES
              (a)   Seismic Data Processing
              (b)   Reservoir Management Services
              (c)   Calibration Services
              (d)   Construction Services
              (e)   Consultancy Services
              (f)    Diving Services
              (g)   Dredging Services
              (h)   Drilling Services
              (i)    Equip Supply Services
Instruction to Users:
- This Sheet is used to obtain information on the Nigerian Content percentage planned for each aspect of the project (based on cont
- Please edit the details under the Description column to match your contractual Scope of Work
- If your Unit of Measurement (UoM) is not in the drop down menu please select other and explain the remarks column
WORK BREAKDOWN
      8       EQUIPMENT
              Service Equipment
              Completion Equipment
     10       DEMOBILIZATION
                (a) Construction Equipment
                (b) Transportation
                (c) Site & Camp Facilities
WORK BREAKDOWN
WORK BREAKDOWN
WORK BREAKDOWN
WORK BREAKDOWN
Instruction to Users:
- This Activity Breakdown Sheet is used to obtain information on the initial/planned Contract and Nigerian Content value at the sta
- Please also provide information on the cumulative value of work done (VOWD) and Nigerian Content value achieved to date
PROJECT ACTIVITIES
PLAN
                                                               F US $                     F US $
Scope 1
Scope 2
Scope 3
Scope 4
Scope 5
Scope 6
Scope 7
Scope 8
Scope 9
Scope 10
Scope 11
ny (Project Start to Date)
IES
                                               `
   Company : Sample
ed Address : 123, Sample, Lagos
Submission : Quarter 4 Sample
 ct Title/No : Sample
       Client : Sample
 t Start Date: The contract effective start date (CED)
  letion Date: Company’s stewardship date
   ce & Date: Actual NCDF( 1% of paid invoice) paid into NCDF account by Company (Project Start to Date)
            Instruction to Users:
            - This Sheet is used to obtain information on Manpower working on the project
            - Please provide periodic information on all personnel Headcount, Man-hours and Spend on Man-hours
            Permanent Personnel
            Contract Personnel
            Expatriates
            Permanent Personnel
            Contract Personnel
             Personnel (Others/HCDI)
            Nigerians
            Permanent Personnel
            Contract Personnel
            Total Personnel
            Permanent Personnel
            Contract Personnel
            S/Total Expatriates
            Permanent Personnel
            Contract Personnel
            Personnel (Others/HCDI)
            S/Total Nigerians
Permanent Personnel
Contract Personnel
Total Man-hours
Permanent Personnel
Contract Personnel
S/Total Expatriates
Permanent Personnel
Contract Personnel
Personnel (Others/HCDI)
S/Total Nigerians
Permanent Personnel
Contract Personnel
oject
urs and Spend on Man-hours
MAN
As at Dec 2013 As at Dec 2014 As at Dec 2015 As at Dec 2016 As at Dec 2017 As at Dec 2018
                 As at Dec 2013   As at Dec 2014   As at Dec 2015   As at Dec 2016   As at Dec 2017   As at Dec 2018
As at Dec 2013   As at Dec 2014   As at Dec 2015   As at Dec 2016   As at Dec 2017   As at Dec 2018
         MANPOWER
                                                         -
                                                         -
                                                         -
                                                         -
                                                         -
                                                       TOTAL
Jul-19   Aug-19   Sep-19   Oct-19   Nov-19   Dec-19
                                                        2019
                                                      TOTAL
Jul-19   Aug-19   Sep-19   Oct-19   Nov-19   Dec-19
                                                       2019
 TOTAL
AVERAGE
   -
   -
   -
   -
   -
   -
 TOTAL
PROJECT
 TOTAL
PROJECT
     Name of Company : Sample
     Registered Address : 123, Sample, Lagos
   Period of Submission : Quarter 4 Sample
        Project Title/No : Sample
                  Client : Sample
       Project Start Date: The contract effective start date (CED)
Project Completion Date: Company’s stewardship date
F 1% Remittance & Date: Actual NCDF( 1% of paid invoice) paid into NCDF account by Company (Project Start to Date)
Instruction to Users:
- This Sheet is used to obtain information on Engineering Scope, Man-hours and Spend
- All fields are mandatory. Bullet points may be used to provide information on Scope
                                                                                                      ENGINEERING
                                                                                                          Scope
                                          Contractor                  Description of Project Engineering Scope
         S/No
                       1
                       2
                       3
                       4
                       5
                       6
                       7
                       8
                       9
                      10
                      11
                      12
Man-Hours
                                                                                    Total Project
         S/No                             Contractor
                                                                               Engineering Man-Hours
                       1 Contractor 1
                       2 Contractor 2
        3 Contractor 3
        4 Contractor 4
        5 Contractor 5
        6 Contractor 6
        7
        8
        9
       10
       11
       12
Spend
        1 Contractor 1
        2 Contractor 2
        3 Contractor 3
        4 Contractor 4
        5 Contractor 5
        6 Contractor 6
        7
        8
        9
       10
       11
       12
Start to Date)
ENGINEERING
    Scope
                                                                                          Description of Eng. NC Achieved
                   Description of Eng. NC Scope        Description of Eng. non-NC Scope
                                                                                                       to Date
Man-Hours
                                                               In-Country                        Out-Country
                                  Total Project Eng.     Man-Hours Utilized to Date         Man-Hours Utilized to Date
                 Eng. NC Scope
                                     Man-Hours
                  Man-Hours
                                   Utilized to Date
                                                         Expatriate        Nigerian          Expatriate      Nigerian
                                                           MH                MH                MH              MH
Spend
                                              In-Country Engineering   Out-Country Engineering
   Total NC Engineering   Total Project           Spend to Date             Spend to Date
           Cost         Engineering Spend
           F$                to Date        Expatriate      Nigerian   Expatriate    Nigerian
                                            MH Spend        MH Spend   MH Spend      MH Spend
     Name of Company : Sample
     Registered Address : 123, Sample, Lagos
   Period of Submission : Quarter 4 Sample
        Project Title/No : Sample
                  Client : Sample
       Project Start Date: The contract effective start date (CED)
Project Completion Date: Company’s stewardship date
F 1% Remittance & Date: Actual NCDF( 1% of paid invoice) paid into NCDF account by Company (Project Start to Date)
Instruction to Users:
- This Sheet is used to obtain information on the Project Management Team
- Please provide information per personnel
PM Personnel
                                                                            Permanent          Contract
oject Start to Date)
                                                                                         In-Country
                 Total Project Management Man-Hours   Total Project Management     Man-Hours Utilized to Date
                                (Plan)                     NC Scope (Plan)
                                 MH                              MH
                                                                                  Expatriate         Nigerian
                                                                                    MH                 MH
MT RESOURCES
Spend
Instruction to Users: This Sheet is used to obtain information on Fabrication and Construction. Kindly note that only the Manhour
           1             DRILLING MODULES/PACKAGES
                         PILES, ANCHORS, BUOYS, JACKETS,
           2             BRIDGES, FLARE BOOMS, STORAGE
                         TANKS, PRESSURE VESSELS
3 UMBILICAL
y note that only the Manhour cost makes up the Spend. The Spend on all Materials (direct and indirect) should be recorded in the Materials shee
                                                             TOTAL
              TOTAL EXECUTED          EXECUTED NC                                NC SCOPE          TOTAL PROJECT
                                                            PROJECT
                 TONNAGE               TONNAGE                                 (MAN-HOURS)        SPEND TO DATE ($)
                                                           MAN-HOURS
d be recorded in the Materials sheets
                                        NAME/LOCATION
              TOTAL NC SPEND TO
                                        OF FABRICATION   REMARKS
                  DATE ($)
                                             YARD
   Company : Sample
ed Address : 123, Sample, Lagos
Submission : Quarter 4 Sample
 ct Title/No : Sample
       Client : Sample
 t Start Date: The contract effective start date (CED)
  letion Date: Company’s stewardship date
   ce & Date: Actual NCDF( 1% of paid invoice) paid into NCDF account by Company (Project Start to Date)
                                                                                                                     MATERIAL
                                                                       Vendor NCEC
                                                                         Category
    S/No.                    Material Description
                                                                    (Select from Category
                                                                        A,B or None)
pany (Project Start to Date)
nstruction to Users: This Sheet is used to obtain information on Free Issued Materials. Spend on all free-issued Materials (direct and indirect) sh
                                                                                                          Original
                                          Name of Procurement Source
                                                                                                        Manufacturer
ued Materials (direct and indirect) should be recorded in this sheet
CEPTION TO DATE)
                 Measured        Amount
                                                       1% NCDF Remitted   Last Date of Remittance
                   Unit             USD $
Comments
Name of Company : Sample
Registered Address : 123, Sample, Lagos
riod of Submission : Quarter 4 Sample
   Project Title/No : Sample
             Client : Sample
  Project Start Date: The contract effective start date (CED)
ct Completion Date: Company’s stewardship date
  emittance & Date: Actual NCDF( 1% of paid invoice) paid into NCDF account by Company (Project Start to Date)
Instructio
                                                                                                                 MATERIALS
                                                                   Vendor NCEC
                                                                     Category
       S/No.                   Material Description
                                                                (Select from Category
                                                                    A, B or None)
unt by Company (Project Start to Date)
                                                                                                          Original
                                             Procurement Source
                                                                                                        Manufacturer
n Materials.
TION TO DATE)
               Measured
                          Amount   USD $   1% NCDF Remitted   Last Date of Remittance
                 Unit
Comments
                      Name of Company : Sample
                      Registered Address : 123, Sample, Lagos
                    Period of Submission : Quarter 4 Sample
                         Project Title/No : Sample
                                   Client : Sample
                        Project Start Date: The contract effective start date (CED)
                 Project Completion Date: Company’s stewardship date
              NCDF 1% Remittance & Date: Actual NCDF( 1% of paid invoice) paid into NCDF account by Company (Project Sta
SU
S/No.
FABRICATION
               S/No.
WELL & DRILLING SERVICES / PETROLEUM TECHNOLOGY
S/No.
S/No.
TRANSPORTATION/SUPPLY/DISPOSAL SERVICES
               S/No.
QHSE
S/No.
INFORMATION SYSTEMS/TECHNOLOGY/COMMUNICATION
S/No.
               S/No.
FINANCE AND INSURANCE
S/No.
S/No.
               S/No.
SURVERYING & POSITIONING
S/No.
S/No.
SHIPPING
               S/No.
act effective start date (CED)
 s stewardship date
CDF( 1% of paid invoice) paid into NCDF account by Company (Project Start to Date)
Instruction to Users: This Sheet is used to obtain information on all Sub-contracts and Services
SUB-CONTRACT / SERVICES
In Country
Total 0
0 - -
EQUI
                                              Equipment
                                            Owner Category
      S/No.            Project Number
                                              (Select from
                                            Category C, D or
                                                 None)
ce) paid into NCDF account by Company (Project Start to Date)
Instruction to Users: This Sheet is used to obtain information on all leased Equipment
EQUIPMENT LISTING
Engineering
Project Management
                                                     Page 113
                       13NC Capacity Building Training
Supply Management
Construction
Fabrication/Welding
0 0
                                  Page 114
                                                     13NC Capacity Building Training
ct Start to Date)
Yes No
                                                                Page 115
13NC Capacity Building Training
0 0
           Page 116
          13NC Capacity Building Training
COMMENT
             Supply Management
             Construction
             Fabrication/Welding
             Other NC Commitments
                     Page 117
           13NC Capacity Building Training
A
Engineering
Project Management
HSE & Security
Supply Management
Construction
Fabrication/Welding
Other Training Types
                       Page 118
    Name of Company : Sample
    Registered Address : 123, Sample, Lagos
 Period of Submission : Quarter 4 Sample
       Project Title/No : Sample
                 Client : Sample
      Project Start Date: The contract effective start date (CED)
roject Completion Date: Company’s stewardship date
1% Remittance & Date: Actual NCDF( 1% of paid invoice) paid into NCDF account by Company (Project Start to Date)
                                                Activity Description
        S/No.
                            (List as Milestones and provide key activites per Milestone)
by Company (Project Start to Date)
rs: This Sheet is used to obtain information on Research and Development Activities
                 Vendors/ Contractors      Planned Expenditure      Actual Expenditure to Date   Planned Completion Date
   Percentage
Completion (based
 on Work Plan)
 e of Company : Sample
stered Address : 123, Sample, Lagos
of Submission : Quarter 4 Sample
roject Title/No : Sample
         Client : Sample
oject Start Date: The contract effective start date (CED)
ompletion Date: Company’s stewardship date
  ttance & Date: Actual NCDF( 1% of paid invoice) paid into NCDF account by Company (Project Start to Date)
                                            Activity Description
     S/No.              (List as Milestones and provide key activites per Milestone)
mpany (Project Start to Date)