1) The document appears to be a proposal from the Gram Panchayat of Village A for a plantation project named 'Narmada' taking place in 2020-21. 2) It includes details of the excavation and plantation work to be done including digging pits and trenches, planting 200 plants, watering and maintaining them. 3) It provides estimates for the labor and material costs including excavation, plantation, transportation of plants, wages for a watchman and costs for photography. The total estimated cost is Rs. 94,152.09 or Rs. 0.94 lakhs.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
79 views5 pages

Fodkl (K.M C.MK &tuin 'Kkgtgkwiqja: Title Page

1) The document appears to be a proposal from the Gram Panchayat of Village A for a plantation project named 'Narmada' taking place in 2020-21. 2) It includes details of the excavation and plantation work to be done including digging pits and trenches, planting 200 plants, watering and maintaining them. 3) It provides estimates for the labor and material costs including excavation, plantation, transportation of plants, wages for a watchman and costs for photography. The total estimated cost is Rs. 94,152.09 or Rs. 0.94 lakhs.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

TITLE PAGE

fodkl [k.M c.Mk &tuin 'kkgtgkWiqjA


dk;Z dk uke %& xzke A

xzke iapk;r %&

;kstuk dk uke %& eujsxk

200 PLANTS

o"kZ %& 2020-21

S.No. Name of the Officer Designation Signature


1 Er. Madhusudan Dixit T.A.
2 Sri G.V.A./G.P.A.
3 Sri PRADHAN
dk;Z dk uke %& xzke A
xzke iapk;r %&
;kstuk dk uke %& eujsxk

DETAILS OF MEASUREMENT
S.NO. Discription of Items No. L B H/D QTY. UNIT
1 Excavation of Trench Cum
2 Excavation of Pits(0.45x0.45x0.45) 200 0.45 0.45 0.45 18.23 Cum
3 Plantation and Refiling of Pits 200 No.
4 Earth work and Veeding 200 No.
5 Cortage of Plants up to 20 km 200 No.
6 Local cortage of Plants 200 No.
7 Irrigation for 3 monts each 4th day 200 No.
8 Accidental Planting 50 No.
9 Pashu Prahri(Watchman) 365 Mandays

T.A. G.P.V.A. Pradhan


dk;Z dk uke %& xzke A
xzke iapk;r %&
;kstuk dk uke %& eujsxk

ABSTRACT OF COST OF MATERIALS

S.No. MATERIAL QTY UNIT RATE PER AMOUNT

1 Photography 1.00 Job 200.00 Job 200.00


Add 12 % GST 24.00
TOTAL 224.00

T.A. G.V.A./G.P.A. PRADHAN


dk;Z dk uke %& xzke A
xzke iapk;r %&
;kstuk dk uke %& eujsxk

ABSTRACT OF COST OF LABOUR


S.No. Description of Item QTY. UNIT RATE AMOUNT

1 Excavation of Trench Cum 0.00


2 Excavation of Pits(0.45x0.45x0.45) 18.23 No 136.73 2492.59
3 Plantation and Refiling of Pits 200 No 3.00 600.00
4 Earth work and Veeding 200 No 3.00 600.00
5 Cortage of Plants up to 20 km 200 No 40.20 8040.00
6 Local cortage of Plants 200 No 40.20 8040.00
7 Irrigation for 3 monts each 4th day 200 No 1.44 288.00
8 Accidental Planting 50 No 10.05 502.50
9 Pashu Prahri(Watchman) 365 Md 201.00 73365.00
T0tal 93928.09

T.A. G.V.A./G.P.A. PRADHAN


fodkl [k.M c.Mk &tuin 'kkgtgkWiqjA

dk;Z dk uke %& xzke A


xzke iapk;r %&
;kstuk dk uke %& eujsxk

FORM ( J )
S.No. PARTICULARS AMOUNT

1 Labour Cost 93928.09

2 Non Labour Cost 224.00

TOTAL 94152.09

Say 0.94
LACS

T.A. G.P.V.A. PRADHAN