0% found this document useful (0 votes)
110 views2 pages

Mobile Gas Turbine Solutions: Fast. Flexible. Scalable

- APR Energy offers rapidly deployable mobile gas turbine solutions that can provide power in as little as 30-60 days through fast installation and delivery. - Their solutions are scalable up to 500MW+ and require approximately 12% less space than comparable permanent plants. - Key benefits include rapid transport and commercial operation within weeks, fuel and voltage flexibility, full power within 10 minutes, and enhanced grid stability.

Uploaded by

Ivan Rincon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
110 views2 pages

Mobile Gas Turbine Solutions: Fast. Flexible. Scalable

- APR Energy offers rapidly deployable mobile gas turbine solutions that can provide power in as little as 30-60 days through fast installation and delivery. - Their solutions are scalable up to 500MW+ and require approximately 12% less space than comparable permanent plants. - Key benefits include rapid transport and commercial operation within weeks, fuel and voltage flexibility, full power within 10 minutes, and enhanced grid stability.

Uploaded by

Ivan Rincon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

30-60 days

installation & delivery


Mobile
Our solution Gas Turbine
vs. permanent plant Solutions months

Fast. Flexible. Scalable.

%12%
Scalable toto to
Scalable
500 >12
>12
Scalable
Approx. % space
space
Delivery
Delivery
& Installation
& Installation
500
500
MW ++
MW+
MW of space
30-6030-60
than than
comparable daysdays
in as fast

of a comparable
comparable
in as
as fast as

Key Benefits diesel diesel diesel engine


engineengine
plant plant
Diesel
plant Our solution
Our solution
vs. permanent
vs. permanent
plant plant
DieselDiesel months months
• RAPID TRANSPORT Power PowerPower
Modules Modules
Modules
• COMMERCIAL OPERATION IN WEEKS
25 Gas Turbines
Gas Turbines
25 50
25100
50 50 250
100 100
250500
250
500 500 Gas Turbines
• FUEL AND VOLTAGE FLEXIBILITY

• FULL POWER IN UNDER 10 MINUTES


APR ENERGY, the world’s leading provider of fast-track mobile turbine power, offers
• SCALABLE TO 500MW+ the most rapidly deployable and reliable mobile turbine solutions in the market
• ENHANCED GRID STABILITY today. Our aero-derivative, mobile turbines have a proven record of success in
both developed and developing markets, and serve a wide range of applications
• SMALL FOOTPRINT
that includes seasonal peaking power, base-load operation, industrial generation,
• LOW EMISSIONS back-up power, distributed generation, and bridging solutions while permanent
• FULL-SERVICE, TURNKEY PACKAGE power comes online.

Get Power Fast


Fill your urgent electricity needs – anywhere in the world – in just weeks. Our compact
mobile turbines are designed for rapid shipment by road, sea and air and take only
“APR Energy’s turbine days to install. Once in operation, they can reach full power in less than 10 minutes.
solutions are ideally Flexible Operation
suited for our needs
Unlike reciprocating engine technology, our dual-fuel turbines can switch quickly and
as a utility, offering a seamlessly between liquid distillate and gas fuels. They also offer dual frequency,
combination of reliability with the ability to easily convert from 50 to 60Hz, and can be grid connected or
and low emissions in a operated island mode.
dense power package.”
Scale to Fit Your Needs
Frank Tudor With an ISO power rating of 20-35MW per unit, our modular turbine solutions can
Managing Director be scaled to meet capacity requirements ranging from 15MW to 500MW or more
Horizon Power – enough to power entire cities.
Our Turnkey Solution

1Fuel management
2
Power generation
3
Transformation
4
Export
Fuel handling, storage, Multi-fuel Global voltage integration
Fuel testing and treatment & dual frequency capabilities into customer Power
flexibility infrastructure

4
3

2
6
8

1 Fuel storage 5 Mobile gas turbines 7


2 Fuel filtration 6 Transformers - medium stage
3 Water system 7 Transformers - high stage
4 Control room 8 Substation

Comprehensive Services
Design | Engineering | Logistics | Procurement | Construction | Commissioning | Operation | Maintenance | Fuel management | Security

APR Energy Stabilize Your Grid


Mobile gas turbines offer significant grid stability advantages over reciprocating
Turbine Projects engines, while providing ancillary services such as spinning reserves, positive
frequency control and power system stabilization.
ANGOLA
Use Less Space
AUSTRALIA
A modular plant using our compact, power-dense turbines requires approximately
BANGLADESH one-third of the space needed for an equivalent-output diesel reciprocating engine
BENIN plant, making our turbine solution a perfect fit for customers with space constraints.

CANADA Cut Emissions


EGYPT Mobile gas turbines using water injection produce 90 percent less nitrogen oxide
than a typical high-speed diesel engine, and generate about 20 percent less
IRAQ
noise – a great fit for environmentally conscious customers with stringent regula-
JAPAN tory controls.
LIBYA
A Total Solution
MARTINIQUE With APR Energy, you get more than just reliable turbine technology. Our turnkey
NEW CALEDONIA solution offers a complete balance of plant, as well as a full-service package that
includes plant design, installation and commissioning, operation and maintenance,
URUGUAY fuel management and more.
U.S. VIRGIN ISLANDS

) +1 904 223 2278 e-mail: info@aprenergy.com www.aprenergy.com


PP-EN-05

Twitter: @aprenergyplc | LinkedIn: linkedin.com/company/apr-energy | Facebook: facebook.com/aprenergy | YouTube: youtube.com/aprenergy

You might also like