Jacket Installation
Installation Spread Transportation Spread A Transportation Spread B Transportation Spread C
BOKALIFT Jacket Piles & Transition Pieces Conductors
A
Transit to site & Dynamic Transportation Spread Transportation Spread Transportation Spread
Positioning Trails Mobilization Mobilization Mobilization
Pre-installation Survey B Load-Out & Sea fastening of Load-Out & Sea fastening of Load-Out & Sea fastening of
C Jacket on Cargo Barge Piles on Cargo Barge Conductors on Cargo Barge
Transit to Site Transit to Site Transit to Site
Cargo Barge Berthing B B
CB Berthing & Personnel
alongside Installation
Transfer on CB C
Vessel C
Jacket Sea fastening Cutting
& Rigging Connection
Jacket Horizontal Lift,
Jacket Offloading from
Upending & Setting down
Cargo Barge
on seabed
Cargo Barge Release &
Cargo Barge Unberthing
Personnel Recovery
Cargo Barge Berthing
Piles Sea fastening Cutting
alongside Installation
& Transfer to Bokalift Deck
Vessel
Transit to Port
Piles Installation Piles Offloading from Cargo
Barge to Installation Vessel
Demobilization of
Deck
Transportation Spread
Cargo Barge Release &
Cargo Barge Unberthing
Personnel Recovery
D
Conductors Piles Sea
Jacket Levelling, Cargo Barge
fastening Cutting &
Crown Shims Welding Unberthing alongside
Transfer on Bokalift
& Pile final cut-off Installation Vessel
Deck
Transit to Port
Conductors Piles
Transition Piece Conductors Piles Offloading from Cargo
Installation Installation Barge
Demobilization of
Transportation Spread
Cargo Barge Release & Cargo Barge
Personnel Recovery Unberthing
Jacket Legs/Piles Grouting E Transit to Port
Post-installation Survey Demobilization of
Transportation Spread
Move to next location
Completed