Water Harvesting - Critchley PDF
Water Harvesting - Critchley PDF
(AGL/MISC/17/91)
A Manual for the Design and Construction of Water Harvesting Schemes for Plant
Production
by
Will Critchley - Conservation Agronomist Centre for Development Cooperation Services Free
University, Amsterdam
and
Klaus Siegert - Water Resources Engineer Land and Water Development Division FAO, Rome
This electronic document has been scanned using optical character recognition (OCR) software
and careful manual recorrection. Even if the quality of digitalisation is high, the FAO declines all
responsibility for any discrepancies that may exist between the present document and its
original printed version.
Source: http://www.fao.org/docrep/U3160E/u3160e00.HTM
Table of Contents
The focus of the manual is on simple, field scale systems for improved production of crops,
trees and rangeland species in drought prone areas. Water harvesting systems for water supply
such as haffirs, ponds and rooftop tanks are not covered in this manual, nor are large-scale
water spreading systems (spate irrigation).
Most of the systems outlined and experiences described are drawn from Sub-Saharan Africa.
Nevertheless, the manual is also relevant to arid and semi-arid areas in other parts of the world
where the basic problems - low and erratic rainfall, high rates of runoff, and unreliable food
production are similar.
The manual provides the field worker with selection criteria and detailed technical designs for
the various systems, as well as information on field layout and construction. This is the main
part of the document - but the full range of information given is much wider.
Throughout, there has been an effort to keep the manual a practical working document, using
tables, diagrams, charts and photographs as much as possible in place of text. It is hoped that
the manual will serve as a useful field guide for the implementation of water harvesting
schemes.
Acknowledgement
The authors wish to thank the World Bank for having made available the findings of the Sub-
Saharan Water Harvesting Study on which parts of this publication are based. Photographs are
by Will Critchley. Thanks are also due to Mr. D. Mazzei of FAO for his assistance with the
illustrations for this manual. Finally, Ms. C.D. Smith Redfern of FAO deserves a special note of
gratitude for typing, correcting and advising on layout and, in general, putting the whole paper
together.
1. Introduction
As land pressure rises, more and more marginal areas in the world are being used for
agriculture. Much of this land is located in the arid or semi-arid belts where rain falls irregularly
and much of the precious water is soon lost as surface runoff. Recent droughts have highlighted
the risks to human beings and livestock, which occur when rains falter or fail.
While irrigation may be the most obvious response to drought, it has proved costly and can only
benefit a fortunate few. There is now increasing interest in a low cost alternative - generally
referred to as "water harvesting".
Water harvesting is the collection of runoff for productive purposes. Instead of runoff being left
to cause erosion, it is harvested and utilized. In the semi-arid drought-prone areas where it is
already practised, water harvesting is a directly productive form of soil and water conservation.
Both yields and reliability of production can be significantly improved with this method.
Water harvesting (WH) can be considered as a rudimentary form of irrigation. The difference is
that with WH the farmer (or more usually, the agro-pastoralist) has no control over timing.
Runoff can only be harvested when it rains. In regions where crops are entirely rainfed, a
reduction of 50% in the seasonal rainfall, for example, may result in a total crop failure. If,
however, the available rain can be concentrated on a smaller area, reasonable yields will still be
received. Of course in a year of severe drought there may be no runoff to collect, but an efficient
water harvesting system will improve plant growth in the majority of years.
Various forms of water harvesting (WH) have been used traditionally throughout the centuries.
Some of the very earliest agriculture, in the Middle East, was based on techniques such as
diversion of "wadi" flow (spate flow from normally dry watercourses) onto agricultural fields. In
the Negev Desert of Israel, WH systems dating back 4000 years or more have been discovered
(Evanari et al. 1971). These schemes involved the clearing of hillsides from vegetation to
increase runoff, which was then directed to fields on the plains.
Floodwater farming has been practised in the desert areas of Arizona and northwest New
Mexico for at least the last 1000 years (Zaunderer and Hutchinson 1988). The Hopi Indians on
the Colorado Plateau, cultivate fields situated at the mouth of ephemeral streams. Where the
streams fan out, these fields are called "Akchin". Pacey and Cullis (1986) describe
microcatchment techniques for tree growing, used in southern Tunisia, which were discovered
in the nineteenth century by travelers. In the "Khadin" system of India, floodwater is impounded
behind earth bunds, and crops then planted into the residual moisture when the water infiltrates.
A growing awareness of the potential of water harvesting for improved crop production arose in
the 1970s and 1980s, with the widespread droughts in Africa leaving a trail of crop failures. The
stimulus was the well-documented work on WH in the Negev Desert of Israel (Evanari et al.
1971).
However much of the experience with WH gained in countries such as Israel, USA and Australia
has limited relevance to resource-poor areas in the semi-arid regions of Africa and Asia. In
Israel, research emphasis is on the hydrological aspects of microcatchments for fruit trees such
as almonds and pistachio nuts. In the USA and Australia WH techniques are mainly applied for
domestic and livestock water supply, and research is directed towards improving runoff yields
from treated catchment surfaces.
A number of WH projects have been set up in Sub-Saharan Africa during the past decade. Their
objectives have been to combat the effects of drought by improving plant production (usually
annual food crops), and in certain areas rehabilitating abandoned and degraded land (Critchley
and Reij 1989). However few of the projects have succeeded in combining technical efficiency
with low cost and acceptability to the local farmers or agropastoralists. This is partially due to
the lack of technical "know how" but also often due to the selection of an inappropriate approach
with regard to the prevailing socio-economic conditions.
Appropriate systems should ideally evolve from the experience of traditional techniques - where
these exist. They should also be based on lessons learned from the shortcomings of previous
projects. Above all it is necessary that the systems are appreciated by the communities where
they are introduced. Without popular participation and support, projects are unlikely to succeed.
Water harvesting technology is especially relevant to the semi-arid and arid areas where the
problems of environmental degradation, drought and population pressures are most evident. It
is an important component of the package of remedies for these problem zones, and there is no
doubt that implementation of WH techniques will expand.
Notes:
* Water supply systems (i.e. ponded water) used for a variety of purposes, mainly domestic and
stock water but also some supplementary irrigation.
** The term "farming" (as in "Runoff Farming") is used in its broadest sense - to include trees,
agroforestry, rangeland rehabilitation, etc.
1.2 Definitions and classification
Water harvesting in its broadest sense will be defined as the
Runoff may be harvested from roofs and ground surfaces as well as from intermittent or
ephemeral watercourses.
Water harvesting techniques which harvest runoff from roofs or ground surfaces fall under the
term:
RAINWATER HARVESTING
while all systems which collect discharges from watercourses are grouped under the term:
FLOODWATER HARVESTING
A wide variety of water harvesting techniques for many different applications are known.
Productive uses include provision of domestic and stock water, concentration of runoff for crops,
fodder and tree production and less frequently water supply for fish and duck ponds.
In the context of this manual, the end use is plant production, including fodder and trees.
Classification of water harvesting techniques is as varied as the terminology (Reij et al. 1988).
Different authors use different names and often disagree about definitions.
It is not the intention of this manual to introduce new terms but instead it was considered
appropriate to make use of the terminology which has been established within the context of the
"Sub-Saharan Water Harvesting Study," undertaken by the World Bank in 1986-1989. The
general and practical classification is presented in Figure 2.
1.3 Basic categories of water harvesting systems for plant production
The water harvesting techniques described in this manual fall under three basic categories
whose main characteristics are summarized as follows:
Main characteristics:
Typical Examples:
Main Characteristics:
Typical Examples:
Figure 4 External catchment system: trapezoidal bunds for crops (Source: Critchley and
Reij 1989)
1.3.3 Floodwater farming (floodwater harvesting)
(often referred to as "Water Spreading" and sometimes "Spate Irrigation")
Main Characteristics:
- turbulent channel flow harvested either (a) by diversion or (b) by spreading within channel
bed/valley floor
Typical Examples:
Figure 5 Floodwater farming systems: (a) spreading within channel bed; (b) diversion
system
1.4 Overview of main WH systems
An overview of the main Water Harvesting systems which are described in detail in Section 5 is
given in Table 1. This summary will be useful as a quick reference.
The eight techniques presented and explained in the manual are not the only water harvesting
systems known but they do represent the major range of techniques for different situations and
productive uses. In a number of cases, the system which is described here is the most typical
example of a technique for which a number of variations exist - trapezoidal bunds are a case in
point.
2.1.1 Introduction
For the design of water harvesting systems, it is necessary to assess the water requirement of
the crop intended to be grown.
There have been various methods developed to determine the water requirement for specific
plants. An excellent guide to the details of these calculations and different methods is the FAO
Irrigation and Drainage Paper 24 "Crop Water Requirements". It should however be noted that
formulae which give high accuracy also require a high accuracy of measured input data which in
most places where water harvesting is practised will not be available.
In the absence of any measured climatic data, it is often adequate to use estimates of water
requirements for common crops (Table 2). However, for a better understanding of the various
factors and their interrelationship which influences the water demand of a specific plant, the
following has been drawn from the FAO Irrigation Water Management Training Manual No. 3.
A certain crop grown in a sunny and hot climate needs more water per day than the same crop
grown in a cloudy and cooler climate. There are, however, apart from sunshine and
temperature, other climatic factors which influence the crop water need. These factors are
humidity and wind speed. When it is dry, the crop water needs are higher than when it is humid.
In windy climates, the crops will use more water than in calm climates.
The highest crop water needs are thus found in areas which are hot, dry, windy and sunny. The
lowest values are found when it is cool, humid and cloudy with little or no wind.
From the above, it is clear that the crop grown in different climatic zones will have different
water needs. For example, a certain maize variety grown in a cool climate will need less water
per day than the same maize variety grown in a hotter climate.
It is therefore useful to take a certain standard crop or reference crop and determine how much
water this crop needs per day in the various climatic regions. As a standard crop (or reference
crop) grass has been chosen.
Table 4 indicates the average daily water needs of this reference grass crop. The daily water
needs of the grass depend on the climatic zone (rainfall regime) and daily temperatures.
For the various field crops it is possible to determine how much water they need compared to
the standard grass. A number of crops need less water than grass, a number of crops need
more water than grass and other crops need more or less the same amount of water as grass.
Understanding of this relationship is extremely important for the selection of crops to be grown
in a water harvesting scheme (see Chapter 6, Crop Husbandry).
The influence of the crop type on the crop water need is important in two ways.
a. The crop type has an influence on the daily water needs of a fully grown crop; i.e. the peak
daily water needs of a fully developed maize crop will need more water per day than a fully
developed crop of onions.
b. The crop type has an influence on the duration of the total growing season of the crop. There
are short duration crops, e.g. peas, with a duration of the total growing season of 90-100 days
and longer duration crops, e.g. melons, with a duration of the total growing season of 120-160
days. There are, of course, also perennial crops that are in the field for many years, such as fruit
trees.
While, for example, the daily water need of melons may be less than the daily water need of
beans, the seasonal water need of melons will be higher than that of beans because the
duration of the total growing season of melons is much longer.
Data on the duration of the total growing season of the various crops grown in an area can best
be obtained locally. These data may be obtained from, for example, the seed supplier, the
Extension Service, the Irrigation Department or Ministry of Agriculture.
Table 6 gives some indicative values or approximate values for the duration of the total growing
season for the various field crops. It should, however, be noted that the values are only rough
approximations and it is much better to obtain the values locally.
Crop Total growing period (days) Crop Total growing period (days)
Alfalfa 100-365 Melon 120-160
Barley/Oats/ Wheat 120-150 Millet 105-140
Bean, green 75-90 Onion, green 70-95
dry 95-110 dry 150-210
Citrus 240-365 Pepper 120-210
Cotton 180-195 Rice 90-150
Grain/small 150-165 Sorghum 120-130
Lentil 150-170 Soybean 135-150
Maize, sweet 80-110 Squash 95-120
grain 125-180 Sunflower 125-130
From Table 6, it is obvious that there is a large variation of values not only between crops, but
also within one crop type. In general, it can be assumed that the growing period for a certain
crop is longer when the climate is cool and shorter when the climate is warm.
Crops differ in their response to moisture deficit. This characteristic is commonly termed
"drought resistance" (Table 7 summarizes sensitivity to drought). When crop water requirements
are not met, crops with a high drought sensitivity suffer greater reductions in yields than crops
with a low sensitivity.
The calculation of crop water requirements by means of the two methods described in this
section is relatively simple. The basic formula for the calculation reads as follows:
ETcrop = kc x Eto
where:
ETcrop = the water requirement of a given crop in mm per unit of time e.g. mm/day, mm/month
or mm/season.
ETo = the "reference crop evapotranspiration" in mm per unit of time e.g. mm/day, mm/month or
mm/season.
In many cases it will be possible to obtain estimates of ETo for the area of concern (or an area
nearby with similar climatic conditions) from the Meteorological Service. However, where this is
not possible, the values for ETo have to be calculated. Two easy methods will be explained
below:
With this method, ETo can be obtained by using evaporation rates which are directly measured
with an evaporation pan. This is a shallow pan, containing water which is exposed to the
evaporative influence of the climate. The standard pan is the Class A Pan of the US Weather
Bureau (Figure 6). It has a diameter of 1.21 m, a depth of 25 cm and is placed 15 cm above the
ground.
Figure 6 Class A evaporation pan
An evaporation pan is easy to construct and in most situations the material can be found locally.
- the water is allowed to evaporate during a certain period of time (usually 24 hours). For
example, each morning at 7.00 hours a measurement is taken. Rainfall, if any, is measured
simultaneously;
- the amount of water which has evaporated in a given time unit is equal to the difference
between the two measured water depths. This is the pan evaporation rate: Epan (mm/24 hours).
The readings taken from the pan (Epan) however do not give ETo directly, but have to be
multiplied by a "Pan Coefficient" (Kpan).
For the Class A evaporation pan, Kpan varies between 0.35 and 0.85, with an average of 0.70.
If the precise pan factor is not known, the average value (0.70) can be used as an
approximation. For greater accuracy a detailed table of Kpan figures is given in Irrigation Water
Management Training Manual No. 3.
b. The Blaney-Criddle Method
If no measured data on pan evaporation are available, the Blaney-Criddle method can be used
to calculate ETo. This method is straightforward and requires only data on mean daily
temperatures. However, with this method, only approximations of ETo are obtained which can
be inaccurate in extreme conditions.
The Blaney-Criddle Method always refers to mean monthly values, both for the temperature and
the ETo. If in a local meteorological station the daily minimum and maximum temperatures are
measured, the mean daily temperature is calculated as follows:
To determine the value of p. Table 8 is used. To be able to obtain the p value, it is essential to
know the approximate latitude of the area: the number of degrees north or south of the Equator.
Table 8 - MEAN DAILY PERCENTAGE (p) OF ANNUAL DAYTIME HOURS FOR DIFFERENT
LATITUDES
Latitude:
North Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec
South July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June
60° .15 .20 .26 .32 .38 .41 .40 .34 .28 .22 .17 .13
55 .17 .21 .26 .32 .36 .39 .38 .33 .28 .23 .18 .16
50 .19 .23 .27 .31 .34 .36 .35 .32 .28 .24 .20 .18
45 .20 .23 .27 .30 .34 .35 .34 .32 .28 .24 .21 .20
40 .22 .24 .27 .30 .32 .34 .33 .31 .28 .25 .22 .21
35 .23 .25 .27 .29 .31 .32 .32 .30 .28 .25 .23 .22
30 .24 .25 .27 .29 .31 .32 .31 .30 .28 .26 .24 .23
25 .24 .26 .27 .29 .30 .31 .31 .29 .28 .26 .25 .24
20 .25 .26 .27 .28 .29 .30 .30 .29 .28 .26 .25 .25
15 .26 .26 .27 .28 .29 .29 .29 .28 .28 .27 .26 .25
10 .26 .27 .27 .28 .28 .29 .29 .28 .28 .27 .26 .26
5 .27 .27 .27 .28 .28 .28 .28 .28 .28 .27 .27 .27
0 .27 .27 .27 .27 .27 .27 .27 .27 .27 .27 .27 .27
For example, when p = 0.29 and T mean = 21.5 °C , the ETo is calculated as follows: ETo = 0.29
(0.46 x 21.5 + 8) = 0.29 (9.89 + 8) = 0.29 x 17.89 = 5.2 mm/day.
Table 9 contains approximate values fur ETo which may be used in the absence of measured or
calculated figures.
iii. Crop Factor - Kc
In order to obtain the crop water requirement ETcrop the reference crop evapotranspiration,
ETo, must be multiplied by the crop factor, Kc. The crop factor (or "crop coefficient") varies
according to the growth stage of the crop. There are four growth stages to distinguish:
Table 10 contains crop factors for the most commonly crops grown under water harvesting.
Crop Initial (days) Crop dev. (days) Mid-season (days) Late (days) Season
stage stage stage season average.
Cotton 0.45 (30) 0.75 (50) 1.15 (55) 0.75 (45) 0.82
Maize 0.40 (20) 0.80 (35) 1.15 (40) 0.70 (30) 0.82
Millet 0.35 (15) 0.70 (25) 1.10 (40) 0.65 (25) 0.79
Sorghum 0.35 (20) 0.75 (30) 1.10 (40) 0.65 (30) 0.78
Grain/small 0.35 (20) 0.75 (30) 1.10 (60) 0.65 (40) 0.78
Legumes 0.45 (15) 0.75 (25) 1.10 (35) 0.50 (15) 0.79
Groundnuts 0.45 (25) 0.75 (35) 1.05 (45) 0.70 (25) 0,79
Table 10 also contains the number of days which each crop takes over a given growth stage.
However, the length of the different crop stages will vary according to the variety and the
climatic conditions where the crop is grown. In the semi-arid/arid areas where WH is practised
crops will often mature faster than the figures quoted in Table 10.
While conventional irrigation strives to maximize the crop yields by applying the optimal amount
of water required by the crops at well determined intervals, this is not possible with water
harvesting techniques. As already discussed, the farmer or agropastoralist has no influence on
the occurrence of the rains neither in time nor in the amount of rainfall.
Bearing the above in mind, it is therefore a common practice to only determine the total amount
of water which the crop requires over the whole growing season. As explained in section 2.1.4,
the crop water requirement for a given crop is calculated according to the formula:
ETcrop = Kc x ETo
Since the values for ETo are normally measured or calculated on a daily basis (mm/day), an
average value for the total growing season has to be determined and then multiplied with the
average seasonal crop factor Kc as given in the last column of Table 10.
Example:
- length of total growing season: 120 days (sum of all 4 crop stages according to Table 10)
- ETo: average of 6.0 mm/day over the total growing season (from measurement, calculation or Table 9)
ET crop = kc x Eto
ET crop = 4.68 x 120 days = approx. 560 mm per total growing season
2.2 Water requirements of trees, rangeland and fodder
There is little information available about the water requirements of multipurpose trees planted
under rainwater harvesting systems in semi-arid areas. In general, the water requirements for
trees are more difficult to determine than for crops. Trees are relatively sensitive to moisture
stress during the establishment stage compared with their ability to withstand drought once their
root systems are fully developed. There is no accurate information available on the response of
these species, in terms of yields, to different irrigation/water regimes.
Table 11 gives some basic data of multipurpose trees often planted in semi-arid areas. The
critical stage for most trees is in the first two years of seedling/sapling establishment.
Table 11 is based on the ICRAF Publication "Agroforestry in Dryland Africa", Rocheleau et al.
(1988).
There are some known values of water requirements for fruit trees under water harvesting
systems - most of the figures have been derived from Israel. Table 12 contains the water
requirements for some fruit trees.
Water requirements for rangeland and fodder species grown in semi-arid/arid areas under WH
systems are usually not calculated.
The objective is to improve performance, within economic constraints, and to ensure the
survival of the plants from season to season, rather than fully satisfying water requirements.
2.3 Soil requirements for water harvesting
2.3.1 Introduction
The physical, chemical and biological properties of the soil affect the yield response of plants to
extra moisture harvested. Generally the soil characteristics for water harvesting should be the
same as those for irrigation.
Ideally the soil in the catchment area should have a high runoff coefficient while the soil in the
cultivated area should be a deep, fertile loam. Where the conditions for the cultivated and
catchment areas conflict, the requirements of the cultivated area should always take
precedence.
The following are important aspects of soils which affect plant performance under WH systems.
2.3.2 Texture
The texture of a soil has an influence on several important soil characteristics including
infiltration rate and available water capacity. Soil texture refers to its composition in terms of
mineral particles. A broad classification is:
Generally speaking it is the medium textured soils, the loams, which are best suited to WH
system since these are ideally suited for plant growth in terms of nutrient supply, biological
activity and nutrient and water holding capacities.
2.3.3 Structure
Soil structure refers to the grouping of soil particles into aggregates, and the arrangement of
these aggregates. A good soil structure is usually associated with loamy soil and a relatively
high content of organic matter. Inevitably, under hot climatic conditions, organic matter levels
are often low, due to the rapid rates of decomposition. The application of organic materials such
as crop residues and animal manure is helpful in improving the structure.
2.3.4 Depth
The depth of soil is particularly important where WH systems are proposed. Deep soils have the
capacity to store the harvested runoff as well as providing a greater amount of total nutrients for
plant growth. Soils of less than one metre deep are poorly suited to WH. Two metres depth or
more is ideal, though rarely found in practice.
2.3.5 Fertility
In many of the areas where WH systems may be introduced, lack of moisture and low soil
fertility are the major constraints to plant growth. Some areas in Sub-Saharan Africa, for
example, may be limited by low soil fertility as much as by lack of moisture. Nitrogen and
phosphorus are usually the elements most deficient in these soils. While it is often not possible
to avoid poor soils in areas under WH system development, attention should be given to the
maintenance of fertility levels.
2.3.6 Salinity/sodicity
Sodic soils, which have a high exchangeable sodium percentage, and saline soil which have
excess soluble salts, should be avoided for WH systems. These soils can reduce moisture
availability directly, or indirectly, as well as exerting direct harmful influence on plant growth.
The infiltration rate of a soil depends primarily on its texture. Typical comparative figures of
infiltration are as follows:
mm/hour
sandy soil 50
sandy loam 25
loam 12.5
clay loam 7.5
A very low infiltration rate can be detrimental to WH systems because of the possibility of
waterlogging in the cultivated area. On the other hand, a low infiltration rate leads to high runoff,
which is desirable for the catchment area. The soils of the cropped area however should be
sufficiently permeable to allow adequate moisture to the crop root zone without causing
waterlogging problems. Therefore, the requirements of the cultivated area should always take
precedence.
Crust formation is a special problem of arid and semi-arid areas, leading to high runoff and low
infiltration rates. Soil compaction as a result of heavy traffic either from machinery or grazing
animals could also result in lower infiltration rates.
The capacity of soils to hold, and to release adequate levels of moisture to plants is vital to WH.
AWC is a measure of this parameter, and is expressed as the depth of water in mm readily
available to plants after a soil has been thoroughly wetted to "field capacity". AWC values for
loams vary from 100-200 mm/metre. Not only is the AWC important, but the depth of the soil is
critical also. In WH systems which pond runoff, it is vital that this water can be held by the soil
and made available to the plants.
The AWC has implications for technical design - for example simple calculation demonstrates
that even in deep soils (2 metres) with high AWC values (200 mm/metre) there is no point
ponding water to depths greater than 40 cm. This quantity when infiltrated is adequate to
replenish the soil profile from permanent wilting point to field capacity and any surplus will be
lost by deep drainage as well as being a potential waterlogging hazard.
The ability of a soil to form resilient earth bunds (where these are a component of the WH
system) is very important, and often overlooked. Generally the soils which should particularly be
avoided are those which crack on drying, namely those which contain a high proportion of
montmorillonite clay (especially vertisols or "black cotton soils"), and those which form erodible
bunds, namely very sandy soils, or soils with very poor structure.
3.1 Introduction
As defined in Chapter 1, water harvesting is the collection of runoff for productive use.
Runoff is generated by rainstorms and its occurrence and quantity are dependent on the
characteristics of the rainfall event, i.e. intensity, duration and distribution. There are, in addition,
other important factors which influence the runoff generating process. They will be discussed in
section 3.5.
Rainfall intensity is defined as the ratio of the total amount of rain (rainfall depth) falling during a
given period to the duration of the period It is expressed in depth units per unit time, usually as
mm per hour (mm/h).
In temperate climates, the standard deviation of annual rainfall is about 10-20 percent and in 13
years out of 20, annual amounts are between 75 and 125 percent of the mean. In arid and semi-
arid climates the ratio of maximum to minimum annual amounts is much greater and the annual
rainfall distribution becomes increasingly skewed with increasing aridity. With mean annual
rainfalls of 200-300 mm the rainfall in 19 years out of 20 typically ranges from 40 to 200 percent
of the mean and for 100 mm/year, 30 to 350 percent of the mean. At more arid locations it is not
uncommon to experience several consecutive years with no rainfall.
For a water harvesting planner, the most difficult task is therefore to select the appropriate
"design" rainfall according to which the ratio of catchment to cultivated area will be determined
(see Chapter 4).
Design rainfall is defined as the total amount of rain during the cropping season at which or
above which the catchment area will provide sufficient runoff to satisfy the crop water
requirements. If the actual rainfall in the cropping season is below the design rainfall, there will
be moisture stress in the plants; if the actual rainfall exceeds the design rainfall, there will be
surplus runoff which may result in a damage to the structures.
The design rainfall is usually assigned to a certain probability of occurrence or exceedance. If,
for example, the design rainfall with a 67 percent probability of exceedance is selected, this
means that on average this value will be reached or exceeded in two years out of three and
therefore the crop water requirements would also be met in two years out of three.
The first step is to obtain annual rainfall totals for the cropping season from the area of concern.
In locations where rainfall records do not exist, figures from stations nearby may be used with
caution. It is important to obtain long-term records. As explained in section 3.2, the variability of
rainfall in arid and semi-arid areas is considerable. An analysis of only 5 or 6 years of
observations is inadequate as these 5 or 6 values may belong to a particularly dry or wet period
and hence may not be representative for the long term rainfall pattern.
In the following example, 32 annual rainfall totals from Mogadishu (Somalia) were used for an
analysis (Table 13).
The next step is to rank the annual totals from Table 13 with m == 1 for the largest and m = 32
for the lowest value and to rearrange the data accordingly (Table 14).
The probability of occurrence P (%) for each of the ranked observations can be calculated
(columns 4, 8, 12, 16, Table 14) from the equation:
where:
The above equation is recommended for N = 10 to 100 (Reining et al. 1989). There are several
other, but similar, equations known to compute experimental probabilities.
The next step is to plot the ranked observations (columns 2, 6,10, 14, Table 14) against the
corresponding probabilities (columns 4, 8,12,16, Table 14). For this purpose normal probability
paper must be used (Figure 7).
Finally a curve is fitted to the plotted observations in such a way that the distance of
observations above or below the curve should be as close as possible to the curve (Figure 7).
The curve may be a straight line.
From this curve it is now possible to obtain the probability of occurrence or exceedance of a
rainfall value of a specific magnitude. Inversely, it is also possible to obtain the magnitude of the
rain corresponding to a given probability.
In the above example, the annual rainfall with a probability level of 67 percent of exceedance is
371 mm (Figure 7), i.e. on average in 67 percent of time (2 years out of 3) annual rain of 371
mm would be equalled or exceeded.
For a probability of exceedance of 33 percent, the corresponding value of the yearly rainfall is
531 mm (Figure 7).
Figure 7 Probability diagram with regression line for an observed series of annual rainfall
totals -Mogadishu, Somalia
The return period T (in years) can easily be derived once the exceedance probability P (%) is
known from the equations.
From the above examples the return period for the 67 percent and the 33 percent exceedance
probability events would thus be:
i.e. on average an annual rainfall of 371 mm or higher can be expected in 2 years out of 3;
respectively i.e. on average an annual rainfall of 531 mm or more can only be expected in 1
year out of 3.
3.5 Rainfall-runoff relationship
When rain falls, the first drops of water are intercepted by the leaves and stems of the
vegetation. This is usually referred to as interception storage.
As the rain continues, water reaching the ground surface infiltrates into the soil until it reaches a
stage where the rate of rainfall (intensity) exceeds the infiltration capacity of the soil. Thereafter,
surface puddles, ditches, and other depressions are filled (depression storage), after which
runoff is generated.
The infiltration capacity of the soil depends on its texture and structure, as well as on the
antecedent soil moisture content (previous rainfall or dry season). The initial capacity (of a dry
soil) is high but, as the storm continues, it decreases until it reaches a steady value termed as
final infiltration rate (see Figure 8).
The process of runoff generation continues as long as the rainfall intensity exceeds the actual
infiltration capacity of the soil but it stops as soon as the rate of rainfall drops below the actual
rate of infiltration.
The rainfall runoff process is well described in the literature. Numerous papers on the subject
have been published and many computer simulation models have been developed. All these
models, however, require detailed knowledge of a number of factors and initial boundary
conditions in a catchment area which in most cases are not readily available.
For a better understanding of the difficulties of accurately predicting the amount of runoff
resulting from a rainfall event, the major factors which influence the rainfall-runoff process are
described below.
Apart from rainfall characteristics such as intensity, duration and distribution, there are a number
of site (or catchment) specific factors which have a direct bearing on the occurrence and volume
of runoff.
i. Soil type
The infiltration capacity is among others dependent on the porosity of a soil which determines
the water storage capacity and affects the resistance of water to flow into deeper layers.
Porosity differs from one soil type to the other. The highest infiltration capacities are observed in
loose, sandy soils while heavy clay or loamy soils have considerable smaller infiltration
capacities.
Figure 9 illustrates the difference in infiltration capacities measured in different soil types.
The infiltration capacity depends furthermore on the moisture content prevailing in a soil at the
onset of a rainstorm.
The initial high capacity decreases with time (provided the rain does not stop) until it reaches a
constant value as the soil profile becomes saturated (Figures 8 and 9).
Figure 9 Infiltration capacity curves for different soil types
This however, is only valid when the soil surface remains undisturbed.
It is well known that the average size of raindrops increases with the intensity of a rainstorm. In
a high intensity storm the kinetic energy of raindrops is considerable when hitting the soil
surface. This causes a breakdown of the soil aggregate as well as soil dispersion with the
consequence of driving fine soil particles into the upper soil pores. This results in clogging of the
pores, formation of a thin but dense and compacted layer at the surface which highly reduces
the infiltration capacity.
This effect, often referred to as capping, crusting or sealing, explains why in arid and semi-arid
areas where rainstorms with high intensities are frequent, considerable quantities of surface
runoff are observed even when the rainfall duration is short and the rainfall depth is
comparatively small.
Soils with a high clay or loam content (e.g. Loess soils with about 20% clay) are the most
sensitive for forming a cap with subsequently lower infiltration capacities. On coarse, sandy soils
the capping effect is comparatively small.
ii. Vegetation
The amount of rain lost to interception storage on the foliage depends on the kind of vegetation
and its growth stage. Values of interception are between 1 and 4 mm. A cereal crop, for
example, has a smaller storage capacity than a dense grass cover.
More significant is the effect the vegetation has on the infiltration capacity of the soil. A dense
vegetation cover shields the soil from the raindrop impact and reduces the crusting effect as
described earlier.
In addition, the root system as well as organic matter in the soil increase the soil porosity thus
allowing more water to infiltrate. Vegetation also retards the surface flow particularly on gentle
slopes, giving the water more time to infiltrate and to evaporate.
In conclusion, an area densely covered with vegetation, yields less runoff than bare ground.
Investigations on experimental runoff plots (Sharma et al. 1986) have shown that steep slope
plots yield more runoff than those with gentle slopes.
In addition, it was observed that the quantity of runoff decreased with increasing slope length.
This is mainly due to lower flow velocities and subsequently a longer time of concentration
(defined as the time needed for a drop of water to reach the outlet of a catchment from the most
remote location in the catchment). This means that the water is exposed for a longer duration to
infiltration and evaporation before it reaches the measuring point. The same applies when
catchment areas of different sizes are compared.
The runoff efficiency (volume of runoff per unit of area) increases with the decreasing size of the
catchment i.e. the larger the size of the catchment the larger the time of concentration and the
smaller the runoff efficiency.
It should however be noted that the diagram in Figure 10 has been derived from investigations
in the Negev desert and not be considered as generally applicable to others regions. The
purpose of this diagram is to demonstrate the general trend between runoff and catchment size.
Apart from the above-mentioned site-specific factors which strongly influence the rainfall-runoff
process, it should also be considered that the physical conditions of a catchment area are not
homogenous. Even at the micro level there are a variety of different slopes, soil types,
vegetation covers etc. Each catchment has therefore its own runoff response and will respond
differently to different rainstorm events.
The design of water harvesting schemes requires the knowledge of the quantity of runoff to be
produced by rainstorms in a given catchment area. It is commonly assumed that the quantity
(volume) of runoff is a proportion (percentage) of the rainfall depth.
In rural catchments where no or only small parts of the area are impervious, the coefficient K,
which describes the percentage of runoff resulting from a rainstorm, is however not a constant
factor. Instead its value is highly variable and depends on the above described catchment-
specific factors and on the rainstorm characteristics.
For example, in a specific catchment area with the same initial boundary condition (e.g.
antecedent soil moisture), a rainstorm of 40 minutes duration with an average intensity of 30
mm/h would produce a smaller percentage of runoff than a rainstorm of only 20 minutes
duration but with an average intensity of 60 mm/h although the total rainfall depth of both events
were equal.
As explained above, the runoff coefficient from an individual rainstorm is defined as runoff
divided by the corresponding rainfall both expressed as depth over catchment area (mm):
Actual measurements should be carried out until a representative range is obtained. Shanan
and Tadmor recommend that at least 2 years should be spent to measure rainfall and runoff
data before any larger construction programme starts. Such a time span would in any case be
justified bearing in mind the negative demonstration effect a water harvesting project would
have if the structures were seriously damaged or destroyed already during the first rainstorm
because the design was based on erroneous runoff coefficients.
When plotting the runoff coefficients against the relevant rainfall depths a satisfactory correlation
is usually observed (see Figure 11).
Figure 11. Rainfall-runoff relationships, Baringo, Kenya (Source: Finkel 1987)
A much better relationship would be obtained if in addition to rainfall depth the corresponding
rainstorm intensity, the rainstorm duration and the antecedent soil moisture were also
measured. This would allow rainstorm events to be grouped according to their average intensity
and their antecedent soil moisture and to plot the runoff coefficients against the relevant rainfall
durations separately for different intensities (see Figure 12).
It is also possible to time the length of individual rainstorms and to calculate the average
intensities by dividing the measured rainfall depths by the corresponding duration of the storms.
Figure 12. Runoff coefficients in relation to rainfall intensity, rainfall duration and
antecedent soil moisture. Measured on loess soil with sparse vegetation. Ground slope
1.5%. (Source: Siegert 1978)
When analysing the measured data it will be noted that a certain amount of rainfall is always
required before any runoff occurs. This amount, usually referred to as threshold rainfall,
represents the initial losses due to interception and depression storage as well as to meet the
initially high infiltration losses.
The threshold rainfall depends on the physical characteristics of the area and varies from
catchment to catchment. In areas with only sparse vegetation and where the land is very
regularly shaped, the threshold rainfall may be only in the range of 3 mm while in other
catchments this value can easily exceed 12 mm, particularly where the prevailing soils have a
high infiltration capacity. The fact that the threshold rainfall has first to be surpassed explains
why not every rainstorm produces runoff. This is important to know when assessing the annual
runoff-coefficient of a catchment area.
The annual (seasonal) runoff coefficient differs from the runoff coefficients derived from
individual storms as it takes into account also those rainfall events which did not produce any
runoff. The annual (seasonal) runoff-coefficient is therefore always smaller than the arithmetic
mean of runoff coefficients derived from individual runoff-producing storms.
The size of a plot should ideally be as large as the estimated size of the catchment planned for
the water harvesting project. This is not always possible mainly due to the problem of storing the
accumulated runoff. A minimum size of 3-4 m in width and 10-12 m in length is recommended.
Smaller dimensions should be avoided, since the results obtained from very small plots are
rather misleading.
Care must be taken to avoid sites with special problems such as rills, cracks or gullies crossing
the plot. These would drastically affect the results which would not be representative for the
whole area. The gradient along the plot should be regular and free of local depressions. During
construction of the plot, care must be taken not to disturb or change the natural conditions of the
plot such as destroying the vegetation or compacting the soil. It is advisable to construct several
plots in series in the project area which would permit comparison of the measured runoff
volumes and to judge on the representative character of the selected plot sites.
Around the plots metal sheets or wooden planks must be driven into the soil with at least 15 cm
of height above ground to stop water flowing from outside into the plot and vice versa (see
Figure 13). A rain gauge must be installed near to the plot. At the lower end of the plot a gutter
is required to collect the runoff. The gutter should have a gradient of 1% towards the collection
tank. The soil around the gutter should be backfilled and compacted. The joint between the
gutter and the lower side of the plot may be cemented to form an apron in order to allow a
smooth flow of water from the plot into the gutter. The collection tank may be constructed from
stone masonry, brick or concrete blocks, but a buried barrel will also meet the requirements.
The tank should be covered and thus be protected against evaporation and rainfall. The storage
capacity of the tank depends on the size of the plot but should be large enough to collect water
also from extreme rain storms. Following every storm (or every day at a specific time), the
volume of water collected in the rain gauge and in the runoff tank must be measured. Thereafter
the gauge and tank must be completely emptied. Any silt which may have deposited in the tank
and in the gutter must be cleared.
Figure 13. Standard layout of a runoff plot (Source: Siegert 1978)
4. Design model for catchment: Cultivated area ratio
4.1 Introduction
Each WH system consists of a catchment (collection) and a cultivated (concentration) area. The
relationship between the two, in terms of size, determines by what factor the rainfall will be
"multiplied". For an appropriate design of a system, it is recommended to determine the ratio
between catchment (C) and cultivated (CA) area.
Many successful water harvesting systems have been established by merely estimating the
ratio between catchment and cultivated area. This may indeed be the only possible approach
where basic data such as rainfall, runoff and crop water requirements are not known. However,
calculation of the ratio will certainly result in a more efficient and effective system provided the
basic data are available and accurate.
Nevertheless, it should be noted that calculations are always based on parameters with high
variability. Rainfall and runoff are characteristically erratic in regions where WH is practised. It
is, therefore, sometimes necessary to modify an original design in the light of experience, and
often it will be useful to incorporate safety measures, such as cut-off drains, to avoid damage in
years when rainfall exceeds the design rainfall.
The calculation of C:CA ratio is primarily useful for WH systems where crops are intended to be
grown. This will be discussed first.
Figure 14. Catchment-cultivated area ratio - The principle
4.2 Crop production systems
The calculation of the catchment: cultivated area ratio is based on the concept that the design
must comply with the rule:
The amount of water harvested from the catchment area is a function of the amount of runoff
created by the rainfall on the area. This runoff, for a defined time scale, is calculated by
multiplying a "design" rainfall with a runoff coefficient. As not all runoff can be efficiently utilized
(because of deep percolation losses, etc.) it must be additionally multiplied with an efficiency
factor.
The amount of water required is obtained by multiplying the size of the cultivated area with the
net crop water requirements which is the total water requirement less the assumed "design"
rainfall.
we obtain:
Crop water requirement depends on the kind of crop and the climate of the place where it is
grown. Estimates as given in Chapter 2 should be used when precise data are not available.
Design Rainfall
The design rainfall is set by calculations or estimates (see Chapter 3). It is the amount of
seasonal rain at which, or above which, the system is designed to provide enough runoff to
meet the crop water requirement. If the rainfall is below the "design rainfall," there is a risk of
crop failure due to moisture stress. When rainfall is above the "design", then runoff will be in
surplus and may overtop the bunds.
Design rainfall is calculated at a certain probability of occurrence. If, for example, it is set at a
67% probability, it will be met or exceeded (on average) in two years out of three and the
harvested rain will satisfy the crop water requirements also in two out of three years.
A conservative design would be based on a higher probability (which means a lower design
rainfall), in order to make the system more "reliable" and thus to meet the crop water
requirements more frequently. However the associated risk would be a more frequent flooding
of the system in years where rainfall exceeds the design rainfall.
Runoff Coefficient
This is the proportion of rainfall which flows along the ground as surface runoff. It depends
amongst other factors on the degree of slope, soil type, vegetation cover, antecedent soil
moisture, rainfall intensity and duration. The coefficient ranges usually between 0.1 and 0.5.
When measured data are not available, the coefficient may be estimated from experience.
However, this method should be avoided whenever possible (see Chapter 3).
Efficiency Factor
This factor takes into account the inefficiency of uneven distribution of the water within the field
as well as losses due to evaporation and deep percolation. Where the cultivated area is levelled
and smooth the efficiency is higher. Microcatchment systems have higher efficiencies as water
is usually less deeply ponded. Selection of the factor is left to the discretion of the designer
based on his experience and of the actual technique selected. Normally the factor ranges
between 0.5 and 0.75.
4.3 Examples on how to calculate the ratio C: Ca
a. Example One
Climate: Arid
RWH System: External Catchment (e.g. trapezoidal bunds)
Crop Millet:
- Crop Water Requirement for Millet (total growing season) = 475 mm (low because rapid
maturity)
- Runoff Coefficient (seasonal) = 0.25 (low due to relatively long catchment and low slope)
i.e.: The catchment area must be 7.2 times larger than the cultivated area (in other words, the
catchment: cultivated area ratio is 7.2:1)
Comment: The ratio is high, but the system is designed for a dry area with a low runoff
coefficient assumed.
b. Example Two:
Climate: Semi-Arid
RWH System: External Catchment (e.g. trapezoidal bunds)
i.e: The catchment area must be 3.2 times larger than the cultivated area. In other words, the
catchment: cultivated area ratio is 3.2:1.
c. Example Three:
Climate: Semi-Arid
RWH System: Microcatchment (e.g. contour ridges)
Crop: 110 day Sorghum
- Design Rainfall = 310 mm (set at a probability level of P = 75% to give more reliability)
- Runoff Coefficient == 0.5 (reflecting the high proportion of runoff from very short catchments)
- Efficiency Factor == 0.75 (reflecting the greater efficiency of short slope catchments)
i.e. The catchment area must be approximately twice as large as the cultivated area.
Comment: Ratios are always lower for microcatchment systems due to a higher efficiency of
water use and a higher runoff coefficient. Using a design rainfall of 67% probability (i.e. a less
reliable system) would have even reduced the ratio to 1:1.
4.4 Systems for trees
The ratio between catchment and cultivated area is difficult to determine for systems where
trees are intended to be grown. As already discussed, only rough estimates are available for the
water requirements of the indigenous, multi-purpose species commonly planted in WH systems.
Furthermore, trees are almost exclusively grown in microcatchment systems where it is difficult
to determine which proportion of the total area is actually exploited by the root zone bearing in
mind the different stages of root development over the years before a seedling has grown into a
mature tree.
where:
As a rule of thumb, it can be assumed that the area to be exploited by the root system is equal
to the area of the canopy of the tree.
Example:
Table 15 shows some examples of catchment and cultivated area sizes for several species. The
range in dimensions is remarkable.
As a rule of thumb, for multipurpose trees in the arid/semi-arid regions, the size of the
microcatchment per tree (catchment and cultivated area together) should range between 10 and
100 square metres, depending on the aridity of the area and the species grown. Flexibility can
be introduced by planting more than one tree seedling within the system and removing surplus
seedlings at a later stage if necessary.
4.4 Systems for rangeland and fodder
In most cases it is not necessary to calculate the ratio C:CA for systems implementing fodder
production and/or rangeland rehabilitation. As a general guideline, a ratio of 2:1 to 3:1 for
microcatchments (which are normally used) is appropriate.
Before selecting a specific technique, due consideration must be given to the social and cultural
aspects prevailing in the area of concern as they are paramount and will affect the success or
failure of the technique implemented. This is particularly important in the arid and semi-arid
regions of Africa and may help to explain the failure of so many projects that did not take into
account the people's priorities. In arid and semi-arid Africa, most of the population has
experienced basic subsistence regimes which resulted over the centuries in setting priorities for
survival. Until all higher priorities have been satisfied, no lower priority activities can be
effectively undertaken.
In Chapter 7 of this Manual, socio-economic aspects are discussed. Along with checking the
sequence of priorities, the planner must also consider alternate sources of water. These must
be compared with water harvesting in cost and in the risk involved. The comparison must take
into account the water quality required, operational and maintenance considerations as well as
the initial cost. Where alternate water is of better quality, is cheaper to develop, easier to obtain
or involves less risk, it should be given priority. An example of this is the development of springs
or shallow wells for micro-scale irrigation, prior to water harvesting.
A water harvesting scheme will only be sustainable if it fits into the socio-economic context of
the area as described in the previous chapter and also fulfills a number of basic technical
criteria.
Figure 16 contains a flowchart with the basic technical selection criteria for the different water
harvesting techniques.
SLOPE: The ground slope is a key limiting factor to water harvesting. Water harvesting is not
recommended for areas where slopes are greater than 5% due to uneven distribution of run-off
and large quantities of earthwork required which is not economical.
SOILS: Should have the main attributes of soils which are suitable for irrigation: they should be
deep, not be saline or sodic and ideally possess inherent fertility. A serious limitation for the
application of water harvesting are soils with a sandy texture. If the infiltration rate is higher than
the rainfall intensity, no runoff will occur.
COSTS: The quantities of earth/stonework involved in construction directly affects the cost of a
scheme or, if it is implemented on a self help basis, indicates how labour intensive its
construction will be.
Table 16 can be used as a quick reference to check the quantity of necessary earthworks
required for different systems. A more quantified breakdown is given in the following sections
where each system is described in detail.
5.2 Negarim microcatchments
5.2.1 Background
Negarim microcatchments are diamond-shaped basins surrounded by small earth bunds with an
infiltration pit in the lowest corner of each. Runoff is collected from within the basin and stored in
the infiltration pit. Microcatchments are mainly used for growing trees or bushes. This technique
is appropriate for small-scale tree planting in any area which has a moisture deficit. Besides
harvesting water for the trees, it simultaneously conserves soil. Negarim microcatchments are
neat and precise, and relatively easy to construct.
Notes
1. Typical dimensions are assumed for each system: for greater detail see relevant chapters.
2. For microcatchment systems (1, 2, 3 and 4), the whole area covered (cultivated and within-
field catchment) is taken as "treated".
3. Labour rates for earthworks: Larger structures (e.g. trapezoidal bunds) may take 50% more
labour per unit volume of earthworks than smaller structures (e.g. Negarim microcatchments)
because of increased earthmoving required. Typical rates per person/day range from 1.0 to 3.0
m3.
4. Labour rates for stoneworks: Typical labour rates achieved are 0.5 m3 per person/day for
construction. Transport of stone increases this figure considerably.
Plate 5 Negarim microcatchment
Although the first reports of such microcatchments are from southern Tunisia (Pacey and Cullis,
1986) the technique has been developed in the Negev desert of Israel. The word "Negarim" is
derived from the Hebrew word for runoff - "Neger". Negarim microcatchments are the most well
known form of all water harvesting systems.
Israel has the most widespread and best developed Negarim microcatchments, mostly located
on research farms in the Negev Desert, where rainfall is as low as 100-150 mm per annum.
However the technique, and variations of it, is widely used in other semi-arid and arid areas,
especially in North and Sub-Saharan Africa Because it is a well-proven technique, it is often one
of the first to be tested by new projects.
Negarim microcatchments are mainly used for tree growing in arid and semi-arid areas.
Soils: should be at least 1.5 m but preferably 2 m deep in order to ensure adequate root
development and storage of the water harvested.
Each microcatchment consists of a catchment area and an infiltration pit (cultivated area). The
shape of each unit is normally square, but the appearance from above is of a network of
diamond shapes with infiltration pits in the lowest corners (Figure 17).
iii. Limitations
While Negarim microcatchments are well suited for hand construction, they cannot easily be
mechanized. Once the trees are planted, it is not possible to operate and cultivate with
machines between the tree lines.
The area of each unit is either determined on the basis of a calculation of the plant (tree) water
requirement (see Chapter 4) or, more usually, an estimate of this.
Size of microcatchments (per unit) normally range between 10 m2 and 100 m2 depending on
the specie of tree to be planted but larger sizes are also feasible, particularly when more than
one tree will be grown within one unit.
Table 17. BUND HEIGHTS (cm) ON HIGHER GROUND SLOPES
v. Design of bunds
The bund height is primarily dependent on the prevailing ground slope and the selected size of
the micro-catchment. It is recommended to construct bunds with a height of at least 25 cm in
order to avoid the risk of over-topping and subsequent damage.
Where the ground slope exceeds 2.0%, the bund height near the infiltration pit must be
increased. Table 17 gives recommended figures for different sizes and ground slopes.
Figure 18. Negarim microcatchment: details for 0.25 m bund size (for dimensions x and y
see Table 18)
The top of the bund should be at least 25 cm wide and side slopes should be at least in the
range of 1:1 in order to reduce soil erosion during rainstorms. Whenever possible, the bunds
should be provided with a grass cover since this is the best protection against erosion.
Table 18 presents recommended values for pit dimensions. A maximum depth of 40 cm should
not be exceeded in order to avoid water losses through deep percolation and to reduce the
workload for excavation. Excavated soil from the pit should be used for construction of the
bunds.
Table 18 further gives required quantities of earthworks for different layouts. Quantities per unit
include only the infiltration pit and two sides of the catchment, while the other two bunds are
included in the microcatchment above. When a diversion ditch is required additional earthworks
of 62.5 m3 per 100 m length of ditch will be needed.
** Calculation of earthworks per unit includes only two of the sides around the catchment: the
other two sides are included in the microcatchment above. Does not include earthworks
required for diversion ditch (which is 62.5 m3 for each 100 metre length).
Step one
The first step is to find a contour line. This can be done by using a line level or a water tube
level (see appendix). Since natural contours are often not smooth, it will be necessary to even
out the contours so that finally a straight line is obtained. The first line, at the top of the block is
marked (see Figure 20). If the topography is very uneven, separate smaller blocks of
microcatchments should be considered.
Step Two
By means of a tape measure, the tips of the bunds are now marked along the "straightened
contour". The first line will be open-ended. The distance between the tips (a-b) depends on the
selected catchment size. Table 19 gives the corresponding distance between a-b for different
catchment sizes.
Table 19. DISTANCE BETWEEN BLINDS IN RELATION TO CATCHMENT SIZE
Step Three
Step Four
The next row of microcatchments can now be staked out. The apexes of the bunds of the upper
row will be the tips for the second row and the corresponding apexed will be found according to
Step 3. When the second row of microcatchments has been marked, repeat the same
procedure for the third row, etc. The final result will be a block of diamond-shaped
microcatchments, with a first row which is open at the upslope end.
The size of the infiltration put (dimension to be taken from Table 18) is staked out and the pit is
excavated - leaving a small step towards the back on which the seedling will be planted (see
Figure 21).
Step Six
Before constructing the bunds, the area within the microcatchments should be cleared of all
vegetation. The bunds should then be constructed in two layers. The excavated material from
the pit is used to form the bund.
The bunds should be compacted during construction. Before compaction, the soil should be
wetted wherever possible. Compaction may be done by foot or with a barrel filled with sand or
water. To ensure a uniform height of the bund, a string should be fixed at the beginning and the
end of each bund alignment and be adjusted above ground according to the selected bund
height.
Step Seven
A diversion ditch should be provided above the block of microcatchments if there is a risk of
damage by runoff from upslope of the block. The diversion ditch should be aligned in a 0.25%
slope and in most cases a depth of 50 cm and a width of 1.0-1.5 m will be sufficient. The soil is
deposited downslope. The diversion ditch should be constructed first to prevent damage in case
a rainstorm occurs during construction of the microcatchments.
Maintenance will be required for repair of damages to bunds, which may occur if storms are
heavy soon after construction when the bunds are not yet fully consolidated. The site should be
inspected after each significant rainfall as breakages can have a "domino" effect if left
unrepaired.
5.2.5 Husbandry
Tree seedlings of at least 30 cm height should be planted immediately after the first rain of the
season. It is recommended that two seedlings are planted in each microcatchment - one in the
bottom of the pit (which would survive even in a dry year) and one on a step at the back of the
pit. If both plants survive, the weaker can be removed after the beginning of the second season.
For some species, seeds can be planted directly. This eliminates the cost of a nursery.
Manure or compost should be applied to the planting pit to improve fertility and water-holding
capacity. If grasses and herbs are allowed to develop in the catchment area, the runoff will be
reduced to some extent, however, the fodder obtained gives a rapid return to the investment in
construction. Regular weeding is necessary in the vicinity of the planting pit.
Negarim microcatchments have been developed in Israel for the production of fruit trees, but
even there the returns on investment are not always positive. It is not a cheap technique,
bearing in mind that one person-day is required to build (on average) two units, and costs per
unit rise considerably as the microcatchment size increases.
It is essential that the costs are balanced against the potential benefits. In the case of
multipurpose trees in arid/semi-arid areas, for several years the main benefit will be the soil
conservation effect and grass for fodder until the trees become productive.
Negarim microcatchments are appropriate both in village afforestation blocks, or around
homesteads where a few open-ended "V" shaped microcatchments provide shade or support
amenity trees.
Jujuba (Ziziphus mauritiana) is the best suited fruit tree for the arid areas of India. The plum-sized fruits
are delicious and a rich source of vitamins.
The Central Arid Zone Research Institute (CAZRI) at Jodhpur, Rajasthan, has carried-out experiments to
investigate the effect of microcatchments on fruit production.
The findings were encouraging. Growth and fruit production were significantly improved by
microcatchment techniques. On 0.5% slopes a 72 m catchment area per tree was sufficient to obtain
excellent fruit yields. On a 5% slope the size could be reduced to 54 m2 because of the increased runoff.
Runoff coefficients increased over years due to a soil crust formed over the microcatchment surface.
5.3.1 Background
Contour bunds for trees are a simplified form of microcatchments. Construction can be
mechanized and the technique is therefore suitable for implementation on a larger scale. As its
name indicates, the bunds follow the contour, at close spacing, and by provision of small earth
ties the system is divided into individual microcatchments. Whether mechanized or not, this
system is more economical than Negarim microcatchment, particularly for large scale
implementation on even land - since less earth has to be moved. A second advantage of
contour bunds is their suitability to the cultivation of crops or fodder between the bunds. As with
other forms of microcatchment water harvesting techniques, the yield of runoff is high, and when
designed correctly, there is no loss of runoff out of the system.
Contour bunding for tree planting is not yet as common as Negarim microcatchments. Examples
of its application come from Baringo District, Kenya.
Contour bunds for tree planting can be used under the following conditions:
Soils: Must be at least 1.5 m and preferably 2 m deep to ensure adequate root development and
water storage.
ii. Limitations
Contour bunds are not suitable for uneven or eroded land as overtopping of excess water with
subsequent breakage may occur at low spots.
The overall layout consists of a series of parallel, or almost parallel, earth bunds approximately
on the contour at a spacing of between 5 and 10 metres.
The bunds are formed with soil excavated from an adjacent parallel furrow on their upslope
side. Small earth ties perpendicular to the bund on the upslope side subdivide the system into
microcatchments. Infiltration pits are excavated in the junction between ties and bunds. A
diversion ditch protects the system where necessary.
The size of microcatchment per tree is estimated in the same way as for Negarim
microcatchments. However, the system is more flexible, because the microcatchment size can
be easily altered by adding or removing cross-ties within the fixed spacing of the bunds.
Common sizes of microcatchments are around 10 -50 m2 for each tree.
Bund heights vary, but are in the order of 20 - 40 cm depending on the prevailing slope. As
bunds are often made by machine the actual shape of the bund depends on the type of
machine; whether for example a disc plough or a motor grader is used. It is recommended that
the bund should not be less than 25 cm in height. Base width must be at least 75 cm. The
configuration of the furrow upslope of the bund depends on the method of construction.
Figure 26. Microcatchment unit
Bunds should be spaced at either 5 m or 10 m apart. Cross-ties should be at least 2 metres long
at a spacing of 2 to 10 metres. The exact size of each microcatchment is thus defined. It is
recommended to provide 10 m spacing between the bunds on slopes of up to 0.5% and 5 m on
steeper slopes. A common size of microcatchment for multipurpose trees is 25 m2. This
corresponds to 10 metre bund spacing with ties at 2.5 m spacing or 5 metre bund-spacing with
ties at 5 m spacing.
Excavated soil from the infiltration pit is used to form the ties. The pit is excavated in the junction
of the bund and the cross-tie. A pit size of 80 cm x 80 cm and 40 cm deep is usually sufficient.
Table 20 gives quantities of earthworks required for various layouts of contour bunds. The bund
height assumed is 25 cm with 75 cm base width.
Size Unit Microcatchment Volume Earthworks per No. Units per Earthworks
Unit ha m3/ha
Bund Tie Area (m3)
spacing spacing (m2)
5m 2m 10 0.5 1000 500
5m 5m 25 0.9 400 360
5m 10m 50 1.5 200 300
10m 2.5m 25 0.6 400 240
10m 5m 50 0.9 200 180
Step One
The contour is determined by means of a simple surveying instrument, such as a line level or a
water tube level (see appendix). As contour bunds are implemented on even land, contours
need only be staked out approximately every 50 metres. The real contour should be smoothed
to a gentle curve. Bunds may become slightly wider apart at one end to accommodate any
change in the contour.
Step Two
The alignment of each bund should be marked on the ground before construction starts. As
recommended under "bund design" the bunds should be set at a spacing of 10 m for slopes up
to 0.5% and 5 m for steeper slopes. When disc ploughs are used, a single disc (with the
remaining one or two removed) forms an adequate bund. Where available, a reversible plough
is preferred because furrows can be ploughed consecutively in both directions. Compaction of
the bunds is recommended. When no machines are available, this should be done by foot or
with a barrel filled with sand.
Step Three
The catchment size required for each seedling determines the spacing between cross-ties. For
example where a 25 m2 catchment area is required and bunds are 10 metres apart the cross-
ties will be 2.5 metres apart. Cross-ties are made by hand.
An infiltration pit of 80 cm x 80 cm and 40 cm deep is dug in the furrow above the bund. Water
collected in the furrow will then drain into the pit and supply the adjacent seedling. The
excavated material is sufficient to form a cross-tie of 2 m length, 75 cm base width and 25 cm
height. The cross-tie extends upslope from the main bund at an angle of 90° to the main bund;
at least 30 cm should be left between the cross-tie and the pit to allow sufficient space for
planting the seedling.
Step Four
At each side of the block, a lateral bund of 25 - 30 cm height is built to prevent loss of runoff out
of the system. The earth should be excavated from inside the system and the contour bunds
must be joined up with the lateral bund.
Step Five
A diversion ditch should be provided above the scheme if there is a risk of damage by runoff
from outside the block. The diversion ditch is aligned on a 0.25% slope and a common
dimension is 50 cm deep and 1 - 1.5 m wide, with the soil piled downslope. The diversion ditch
should be constructed before the contour bunds are built to prevent damage if rainstorms occur
during construction.
5.3.4 Maintenance
5.3.5 Husbandry
The majority of the husbandry factors noted under Negarim microcatchments also apply to this
system: there are, however, certain differences.
Tree seedlings, of at least 30 cm height, should be planted immediately after the first runoff has
been harvested. The seedlings are planted in the space between the infiltration pit and the
cross-tie. It is advisable to plant an extra seedling in the bottom of the pit for the eventuality of a
very dry year. Manure or compost can be added to the planting pit to improve fertility and water
holding capacity.
One important advantage of contour bunds for tree establishment is that oxen or mechanized
cultivation can take place between the bunds, allowing crops or fodder to be produced before
the trees become productive. However, this has the disadvantage of reducing the amount of
runoff reaching the trees.
Contour bunds for trees are mainly made by machine; costs of bund construction can be
relatively low and implementation fast, especially where plots are large and even and the kind of
mechanization well adapted.
However, as with all mechanization in areas with limited resources, there is a question mark
about future sustainability. Experience has shown that very often the machines come abruptly to
a halt when the project itself ends.
Another aspect that must be addressed is the management after the scheme has been
established (which is usually done under the auspices of a development project). This is an
issue which has to be seriously considered during the planning phase. Management of a large
afforestation block by the local community is in most cases a new challenge and failure or
success will depend on acceptance of the technique by the rural population.
The plains surrounding Lake Baringo in Kenya's semi-arid north are extensive but denuded of trees. Two
major problems are observed here: the continuing erosion of the potentially fertile land by runoff and
wind, and the increasing lack of fuelwood and fodder.
The Baringo "Fuel and Fodder Project" became operational in 1982 and developed the technique of
contour bunding for tree planting using hired motor-graders for construction. 130 hectares, in blocks of
about 10 ha in size and surrounded by solar-powered electric fences, were implemented up to 1987.
Common species planted were Acacia spp., Prosposis spp., and Combretum aculeatum. While
performance has not always been consistent, establishment and growth of the trees are generally good.
An interesting development is the growing importance attached by the people and the project authorities
to the production of grass within the plots as a by-product. To avoid damage to the bunds, grazing is
controlled. The grass is also used for thatching.
The management of the plot will be handed over to local village communities when procedures and
guidelines have been worked out.
5.4 Semi-circular bunds
5.4.1 Background
Semi-circular bunds are earth embankments in the shape of a semi-circle with the tips of the
bunds on the contour. Semi-circular bunds, of varying dimensions, are used mainly for
rangeland rehabilitation or fodder production. This technique is also useful for growing trees and
shrubs and, in some cases, has been used for growing crops. Depending on the location, and
the chosen catchment: cultivated area ratio, it may be a short slope or long slope catchment
technique. The examples described here are short slope catchment systems.
Semi-circular bunds, (the term "demi-lune" is used in Francophone Africa), are recommended
as a quick and easy method of improving rangelands in semi-arid areas. Semi-circular bunds
are more efficient in terms of impounded area to bund volume than other equivalent structures -
such as trapezoidal bunds for example. Surprisingly, this technique has never been used
traditionally.
Semi-circular bunds for rangeland improvement and fodder production can be used under the
following conditions:
Topography: even topography required, especially for design "a" (see below).
The main limitation of semi-circular bunds is that construction cannot easily be mechanized.
Since semi-circular bunds can be designed to a variety of dimensions, two specific designs are
explained in this section. Design "a" comprises small structures, closely spaced. It is suitable for
the relatively "wetter" semi-arid areas but requires low slopes and even terrain. Design "b", with
larger and wider spaced bunds, is more suitable for drier areas, and does not need such even
topography.
The two designs of semi-circular bunds considered here differ in the size of structure and in field
layout. Design "a" has bunds with radii of 6 metres, and design "b" has bunds with radii of 20
metres. In both designs the semi-circular bunds are constructed in staggered lines with runoff
producing catchments between structures.
Design "a" is a short slope catchment technique, and is not designed to use runoff from outside
the treated area, nor to accommodate overflow. Design "b" is also a short slope catchment
system, but can accommodate limited runoff from an external source. Overflow occurs around
the tips of the bund which are set on the contour.
Figure 29. Semi-circular bunds: field layout
As discussed in Chapter 4, C:CA ratios of up to 3:1 are generally recommended for water
harvesting systems used for rangeland improvement and fodder -production. A detailed
calculation is not required. The reasons for applying low ratios are that already adapted
rangeland and fodder plants in semi-arid and arid areas need only a small amount of extra
moisture to respond significantly with higher yields. Larger ratios would require bigger and more
expensive structures, with a higher risk of breaching.
Design "a" as described here has a C:CA ratio of only 1.4:1, and does not require provision for
overflow. Design "b" has a C:CA ratio of 3:1, and therefore provision for overflow around the
tips of the bunds is recommended, though occurrence of overflow is usually rare. A larger C:CA
ratio for design "b" is possible but it should not exceed 5:1.
iv. Bund design
Design "a":
This design, suitable for slopes of 1% or less, consists of a series of small semi-circular bunds
with radii of 6 metres. Each bund has a constant cross section over the whole length of 19 m.
The recommended bund height is 25 cm with side slopes of 1:1 which result in a base width of
75 cm at a selected top width of 25 cm.
The tips of each bund are set on the contour, and the distance between the tips of adjacent
bunds in the same row is 3 metres. Bunds in the row below are staggered, thus allowing the
collection of runoff from the area between the bunds above. The distance between the two
rows, from the base of bunds in the first line to tips of bunds in the second, is 3 metres. At this
spacing 70-75 bunds per hectare are required.
Design "b"
The radius of the semi-circle is 20 metres. The cross-section of the bund changes over its
length. At the wing tip, the bund is only 10 cm high, but the height increases towards the middle
of the base to 50 cm with side slopes of 3:1 (horizontal: vertical), and a top width of 10 cm.
Corresponding base widths are 70 cm and 3.10 metres, respectively.
As with design "a", the bunds must be arranged in a staggered configuration. Due to the larger
dimensions of the bunds there are only 4 structures required per hectare. The distance between
the tips of two adjacent structures in one row is 10 m while 30 metres are recommended
between the base of the upper structure and the tips of the lower one. As already mentioned
above, radii and distances between the structures can be increased or decreased according to
the selected C:CA ratio. Design "b" is recommended on slopes up to 2%. For higher slopes,
smaller radii are required. For example, on a slope of 4%, the radius should be reduced to 10
metres and the distance between two adjacent rows from 30 metres to 15 metres while the tips
of two adjacent structures should be 5 m apart instead of 10 m. The number of structures
required for one hectare would thus increase to 16 which maintains the C:CA ratio of 3:1.
Figure 30 Semi-circular bund dimensions
v. Quantities of earthworks
It should be noted that where a diversion ditch is required (Design "a" only), 62.5 m3 for each
100 metres of length has to be added to the figures in column 6.
Table 21. QUANTITIES OF EARTHWORKS FOR SEMI-CIRCULAR BUNDS
Land slope Radius Length of Impounded area Earthworks per Bunds Earthworks per
(m) bund (m) per bund (m2) bund (m3) per ha ha (m3)
(1) (2) (3) (4) (5) (6)
Design "a" 6 19 57 2.4 73 175
up to 1.0%
Design "b" 20 63 630 26.4 4 105
up to 2.0%
4.0% 10 31 160 13.2 16 210
vi. Design variations
Semi-circular bunds can be constructed in a variety of sizes, with a range of both radii and bund
dimensions. Small radii are common when semi-circular bunds are used for tree growing and
production of crops. A recommended radius for these smaller structures is 2 to 3 metres, with
bunds of about 25 cm in height.
Step One
The first contour, at the top of the scheme, is staked out using a simple surveying instrument as
described in the appendix. This line need not be smooth.
Step Two
A tape measure is now used to mark the tips of the semi-circular bunds on the contour. For
design "a", the tips of one structure are 12 metres apart (2 times the radius) and the distance to
the next unit is 3 m. For design "b", the tips are 40 metres apart and the distance to the next
structure is 10 m.
Step Three
The centre point between the tips of each semi-circular unit is marked. A piece of string as long
as the selected radius is now fixed at the centre point by means of a peg. Holding the string tight
at the other end, the alignment of the semi-circle is defined by swinging the end of the string
from one tip to the other. The alignment can be marked by pegs or small stones (see Figure 31).
Step Four
Staking out and construction of the semi-circular bunds in the second and all following rows will
be carried out in the same way. It is important that the structures in each row are staggered in
relation to structures in the row above. The centre points of the bunds, for example, in the
second row should coincide with the middle of the gaps between bunds in the first row and so
forth. It must be ensured that the space between bunds from one row to another is according to
the chosen distance, that is, 3 m for design "a" and 30 m for design "b".
Figure 31. Layout technique
Step Five
After setting out, bund construction is started with excavation of a small trench inside the bund.
Further excavation should always be from inside the bund, as evenly as possible. This will
increase the storage capacity of the semi-circular bund. The bund should be constructed in
layers of 10-15 cm with each layer being compacted and wetted first if possible.
Step Six
For design "b", it is recommended that the bund tips are protected with a layer of stones, as
shown in Figure 32. This will ensure that the bund tips are more resistant to erosion when
excess water discharges around them. A diversion ditch above the first row of structures may be
necessary for design "a" to protect the first row of bunds against runoff coming from the
catchment area above. Where semi-circular bunds of design "a" are built in one block of several
hectares it is advisable to provide one or more diversion ditches within the block as a safety
factor. Diversion ditches should be 1 - 1.5 metre wide and 50 cm deep, with a gradient of
0.25%.
5.4.4 Maintenance
As with all earthen structures, the most critical period for semi-circular bunds is when rainstorms
occur just after construction, since at this time the bunds are not yet fully consolidated. Any
breakages must be repaired immediately. If damage occurs, it is recommended that a diversion
ditch is provided if not already constructed. Semi-circular bunds which are used for fodder
production normally need repairs of initial breaches only. This is because in the course of time,
a dense network of the perennial grasses will protect the bunds against erosion and damage.
The situation is different if animals have access into the bunded area and are allowed to graze.
In this case, regular inspections and maintenance (repair) of bund damages will be necessary.
Figure 32. Protection of wingtips
5.4.5 Husbandry
It may be possible to allow the already existing vegetation to develop - provided it consists of
desirable species or perennial rootstocks. In most cases, however, it will be more appropriate to
re-seed with seed from outside. Local collection of perennial grass seed from useful species can
also be appropriate provided the seed is taken from "virgin land". Together with grass, trees and
shrub seedlings may be planted within the bunds.
5.4.6 Socio-economic Factors
Water harvesting for range improvement and for fodder production will mainly be applied in
areas where the majority of the inhabitants are agro-pastoralists - at least in the Sub-Saharan
Africa context. In these areas, the concept of improving communally used rangeland is usually
alien. Therefore, it may be difficult to motivate the population to invest voluntarily, in the time
and effort required for implementing and maintaining such a water harvesting system. Even
when this is possible it is equally important to introduce an appropriate and acceptable range
management programme to avoid over-grazing and subsequent degradation of the range.
Controlled grazing is also essential to maintain good quality rangeland, and the bunded area
must be rested periodically for it to regenerate, so that natural reseeding can take place.
Although semi-circular bunds are mostly used for growing grass, bushes or trees, the technique is also
suitable for crop production. "Demi-lunes", literally "half moons", were introduced as a crop production
technique by a Non-Government Organization in Tahoua Department of Niger during the mid-1980s. The
concept was not only to concentrate runoff for crop production, but to rehabilitate degraded land in an
area with an average annual rainfall of only 250- 300 mm.
The semi-circular bunds in this project are small, each with a radius of only about 2 metres. The total
number within each block is about 300 per hectare, resulting in an average catchment: cultivated area
ratio of 4:1. The "demi-lunes" were constructed by hand, using food-for-work rations during the
construction time. The main crop grown is bulrush millet. In recent years the Government has tested a
similar system for rehabilitation of rangeland where, within the bunds, grass and trees were planted.
5.5 Contour ridges for crops
5.5.1 Background
Contour ridges, sometimes called contour furrows or microwatersheds, are used for crop
production. This is again a microcatchment technique. Ridges follow the contour at a spacing of
usually 1 to 2 metres. Runoff is collected from the uncultivated strip between ridges and stored
in a furrow just above the ridges. Crops are planted on both sides of the furrow. The system is
simple to construct - by hand or by machine - and can be even less labour intensive than the
conventional tilling of a plot.
The yield of runoff from the very short catchment lengths is extremely efficient and when
designed and constructed correctly there should be no loss of runoff out of the system. Another
advantage is an even crop growth due to the fact that each plant has approximately the same
contributing catchment area.
Contour ridges for crops are not yet a widespread technique. They are being tested for crop
production on various projects in Africa.
Contour ridges for crop production can be used under the following conditions:
ii. Limitations
Contour ridges are limited to areas with relatively high rainfall, as the amount of harvested runoff
is comparatively small due to the small catchment area.
The overall layout consists of parallel, or almost parallel, earth ridges approximately on the
contour at a spacing of between one and two metres. Soil is excavated and placed downslope
to form a ridge, and the excavated furrow above the ridge collects runoff from the catchment
strip between ridges. Small earth ties in the furrow are provided every few metres to ensure an
even storage of runoff. A diversion ditch may be necessary to protect the system against runoff
from outside.
The cultivated area is not easy to define. It is a common practice to assume a 50 cm strip with
the furrow at its centre. Crops are planted within this zone, and use the runoff concentrated in
the furrow. Thus for a typical distance of 1.5 m between ridges, the C:CA ratio is 2:1; that is a
catchment strip of one metre and a cultivated strip of half a metre. A distance of 2 metres
between ridges would give a 3:1 ratio. The C:CA ratio can be adjusted by increasing or
decreasing the distance between the ridges.
The calculation of the catchment: cultivated area ratio follows the design model of Chapter 4. In
practice a spacing of 1.5 - 2.0 metres between ridges (C:CA ratios of 2:1 and 3:1 respectively) is
generally recommended for annual crops in semi-arid areas.
v. Ridge design
Ridges need only be as high as necessary to prevent overtopping by runoff. As the runoff is
harvested only from a small strip between the ridges, a height of 15 -20 cm is sufficient. If bunds
are spaced at more than 2 metres, the ridge height must be increased.
Quantities of earthwork for different contour ridge spacing and ridge heights are given below. It
should be noted that the construction of the ridges already includes land preparation - no further
cultivation is required. Where a diversion ditch is necessary, an additional 62.5 m3 for each 100
metre of length of ditch has to be added.
Design variations developed in Israel are the "runoff strips" ("Shananim") and "strip collectors"
as described by Shanan and Tadmore (1979). A series of wide, but shallow ridges and furrows
are formed by means of a blade grader. The space in between the ridges can be several metres
(for strip collectors, the space is usually between 2-5 metres).
Figure 35. Design variations
Step One
Contours are surveyed by a simple surveying instrument such as a water tube level or line level
(see appendix). The real contour should be smoothed to obtain a better alignment for
agricultural operations.
Step Two
Contour keylines should be staked out every 10 or 15 metres. The alignment for the ridges is
then marked in between the keylines according to selected spacing. On uneven terrain, the
contours may come closer together at one point or widen at other points. It is necessary to stop
lines where the contours converge or to add short extra lines in between where the contours
diverge.
Step Three
The furrows are excavated usually by means of a hoe or are ploughed parallel to the marked
alignments for the ridges. The excavated soil is placed downslope, next to the furrow, and the
ridge is formed.
Step Four
Small cross-ties are built at intervals of about 5 metres dividing each furrow into a number of
segments. The ties are 15-20 cm high and 50 - 75 cm long.
Step Five
A diversion ditch should be provided above the block of contour ridges if there is a risk of
damage caused by runoff from outside the system. The diversion ditch should be 50 cm deep
and 1-1.5 m wide, with a gradient of 0.25%. The excavated soil is placed downslope. The ditch
should be constructed before the contour ridges are built to prevent damage from early rains.
5.5.4 Maintenance
If contour ridges are correctly laid out and built, it is unlikely that there will be any overtopping
and breaching. Nevertheless if breaches do occur, the ridges or ties must be repaired
immediately. The uncultivated catchment area between the ridges should be kept free of
vegetation to ensure that the optimum amount of runoff flows into the furrows.
At the end of each season the ridges need to be rebuilt to their original height. After two or three
seasons, depending on the fertility status of the soils, it may be necessary to move the ridges
downslope by approximately a metre or more, which will result in a fresh supply of nutrients to
the plants.
5.5.5 Husbandry
The main crop (usually a cereal) is seeded into the upslope side of the ridge between the top of
the ridge and the furrow. At this point, the plants have a greater depth of top soil. An intercrop,
usually a legume, can be planted in front of the furrow. It is recommended that the plant
population of the cereal crop be reduced to approximately 65% of the standard for conventional
rainfed cultivation. The reduced number of plants thus have more moisture available in years of
low rainfall.
Weeding must be carried out regularly around the plants and within the catchment strip.
Since the contour ridge technique implies a new tillage and planting method compared with
conventional cultivation, farmers may be initially reluctant to accept this technique.
Demonstration and motivation are therefore very important. On the other hand, it is one of the
simplest and cheapest methods of water harvesting. It can be implemented by the farmer using
a hoe, at no or little extra cost. External support is limited to a minimum. Alternatively it can be
mechanized and a variety of implements can be used. When used by a farmer on his own land,
the system does not create any conflicts of interest between the implementor and the
beneficiary.
PROFILE: Contour Ridges for Crops in Zinder Department, Niger
While contour ridges can be made by hand or by animal draft, implementation can also be mechanized.
This is particularly appropriate for larger scale implementation. The Integrated Programme for the
Rehabilitation of Damergou, Niger is testing ways of bringing degraded land back into productive use,
where annual rainfall is only in the range of 300 mm. The contour ridge technique for crop production was
introduced 1988.
For this purpose, a special plough was designed to form the ridges, usually in straight lines (though
approximately on the contour), at a distance of 2 metres apart. The machine is reversible, and the sub-
soil beneath the furrows is ripped to increase infiltration rates. Cross ties are formed by the machine at an
automatically controlled spacing. It is reported that one hectare can be treated in an hour, and up to 1,000
ha in a four month season by a single machine. The involvement of the villagers and implications for land
tenure however need to be carefully taken into account as the programme develops.
5.6 Trapezoidal bunds
5.6.1 Background
Trapezoidal bunds are used to enclose larger areas (up to 1 ha) and to impound larger
quantities of runoff which is harvested from an external or "long slope" catchment. The name is
derived from the layout of the structure which has the form of a trapezoid -a base bund
connected to two side bunds or wingwalls which extend upslope at an angle of usually 135».
Crops are planted within the enclosed area. Overflow discharges around the tips of the
wingwalls.
The general layout, consisting of a base bund connected to wingwalls is a common traditional
technique in parts of Africa. The concept is similar to the semi-circular bund technique: in this
case, three sides of a plot are enclosed by bunds while the fourth (upslope) side is left open to
allow runoff to enter the field. The simplicity of design and construction and the minimum
maintenance required are the main advantages of this technique. This section is based on the
design and layout of trapezoidal bunds implemented in Turkana District in northern Kenya.
Trapezoidal bunds can be used for growing crops, trees and grass. Their most common
application is for crop production under the following site conditions:
Soils: agricultural soils with good constructional properties i.e. significant (non-cracking) clay
content.
Slopes: from 0.25% - 1.5%, but most suitable below 0.5%. Topography: area within bunds
should be even.
ii. Limitations
This technique is limited to low ground slopes. Construction of trapezoidal bunds on slopes
steeper than 1.5% is technically feasible, but involves prohibitively large quantities of earthwork.
Each unit of trapezoidal bunds consists of a base bund connected to two wingwalls which
extend upslope at an angle of 135 degrees. The size of the enclosed area depends on the slope
and can vary from 0.1 to 1 ha. Trapezoidal bunds may be constructed as single units, or in sets.
When several trapezoidal bunds are built in a set, they are arranged in a staggered
configuration; units in lower lines intersect overflow from the bunds above. A common distance
between the tips of adjacent bunds within one row is 20 m with 30 m spacing between the tips
of the lower row and the base bunds of the upper row (see Figure 38). The planner is of course
free to select other layouts to best fit into the site conditions. The staggered configuration as
shown in Figure 38 should always be followed. It is not recommended to build more than two
rows of trapezoidal bunds since those in a third or fourth row receive significantly less runoff.
Recommended dimensions for one unit of trapezoidal bunds are given in Table 23.
The basic methodology of determining C:CA ratio is given in Chapter 4, for the case where it is
necessary to determine the necessary catchment size for a required cultivated area. It is
sometimes more appropriate to approach the problem the other way round, and determine the
area and number of bunds which can be cultivated from an existing catchment.
Example:
Calculate the number of trapezoidal bunds needed to utilize the runoff from a catchment area of
20 ha under the following conditions:
Slope: 1%
Crop water requirement: 475 mm per season
Design rainfall: 250 mm per season
Runoff coefficient: 0.25
Efficiency factor: 0.50
From Chapter 4:
But C = 20 ha
Thus
From Table 23 the area available for cultivation within one trapezoidal bund on a 1% slope is
3200 m2 = 0.32 ha.
In common with all water harvesting techniques which rely on external catchments, the C:CA
ratio is based on seasonal rainfall reliability in a year of relatively low rainfall. In years of high
rainfall, and particularly under storm conditions resulting in excessive inflow, damage can be
caused to crops and to the bunds themselves. This is particularly the case for bunds on steeper
slopes and for those with high C:CA ratios. This results in recommendation of a maximum C:CA
ratio of 10:1, although ratios of up to 30:1 are sometimes used. Where the use of a large
catchment is unavoidable a temporary diversion ditch is advisable to prevent excessive inflow of
runoff. Conversely, in situations where the catchment is not of adequate size, interception
ditches can be excavated to lead runoff from adjacent catchments to the bunds.
Figure 39. Trapezoidal bund dimensions
v. Bund design
The configuration of the bunds is dependent upon the land slope, and is determined by the
designed maximum flooded depth of 40 cm at the base bund. Consequently as the gradient
becomes steeper the wingwalls extend less far upslope as is illustrated in Figure 39. The
greater the slope above 0.5%, the less efficient the model becomes because of increasing
earthwork requirements per cultivated hectare (see Table 23).
Bund cross-sections are shown in Figure 40 and are based on a 1 metre crest width and 4:1
(horizontal: vertical) side slopes.
Table 23 gives details of dimensions and earthworks quantities in the Turkana model for
different slopes. Earthworks are also quoted per hectare of cultivated area.
The configurations and design criteria outlined above apply to bunds installed in the Turkana
District of Kenya. Considerable variations are possible dependent on climatic, physical and
socio-economic conditions. The optimum design for an individual set of circumstances can only
be achieved by a process of trial and error.
Plate 11 Traditional system in Somalia
Figure 41. "Teras" system, Eastern Sudan (Source: Critchley and Reij 1989)
Table 23. QUANTITIES OF EARTHWORKS FOR TRAPEZOIDAL BUND
Traditional forms of water harvesting, similar to trapezoidal bunds, are found in the clay plains of
Eastern Sudan and also in Somalia. In Sudan, the layout of the bunds is rectangular with the
wingwalls extending upslope at right angles to the base bund. In Northwest Somalia a
development project has constructed banana-shaped bunds by bulldozer.
Step One
When the site for the bund has been decided, the first thing to do is to establish the land slope
using an Abney level or line level as described in the Appendix. Dimensions for bunds on
different slopes are given in Table 23. Having established the ground slope, the tips of the
wingwalls will be determined.
Starting at the top of the field a peg is placed which will be the tip of one of the wingwalls (point
1). The second wingwall tip (point 2) is at the same ground level at the distance obtained from
Table 23. This is set out using a line level and a tape as described in the Appendix and is
marked by a peg.
Step Two
The dimensions for staking out the four main points of the bund are shown on Figure 42. Point
"a" can be established by measuring the distance "x" from Point 1 along the line joining points 1
and 2. Values for "x" (for different slopes) can be obtained from Figure 39. Similarly, Point "b" is
established by measuring the distance "x" from Point 2 along the line joining points 1 and 2.
Points 3 and 4, which are the points of intersection of the base bund and the wingwalls, lie a
distance x downslope from points "a" and "b" respectively, measured at right angles to the line
joining Point 1 and Point 2. The right angle can most easily be found by using a wooden right
angle triangular template (sides: 100 cm, 60 cm and 80 cm). Points 3 and 4 are then pegged.
Step Three
The accuracy of the setting out can be checked by measuring the distances between Point 3
and Point 4, Point 3 and Point 1, and Point 2 and Point 4 which should be:
Point 3 - Point 4 = 40 m
Point 1 - Point 3 = Point 2 - Point 4
Step Four
Having set the main points of the bunds it is necessary then to set out pegs or stones to mark
the earthworks limits. Along the base bund this is done by marking parallel lines at a distance of
2.9 m from Line 3-4. For the wingbunds, the demarcation of the earthworks limits is slightly
more complicated. At point 1 (2) perpendicular distances of 1.30 m either side of the wingbund
centreline are measured and marked. At point 3 (4) distances of 2.90 m either side and
perpendicular to the wingbunds centreline (line 1-3, 2-4) are measured and marked. It is then
possible to peg out earthwork limits on both sides of the wingbunds centreline. Where more
than one bund is required, the other bunds should be pegged out accordingly.
Step Five
Construction of a set of trapezoidal bunds must start with the row furthest upslope. Before
commencing construction the soil within the foundation area of the bunds should be loosened to
ensure good "mating" with the fill, The bund is constructed in two layers, each having a
maximum thickness of 0.30 m. The thickness of the first layer will gradually taper off to zero as
filling proceeds upslope along the wingbunds. Similarly, the thickness of the second layer will
taper to 0.20 m at the tips- Each layer should be thoroughly compacted by rolling, ramming or
stamping, and should be watered prior to compaction, where this is possible.
Excavation to provide the necessary fill should be taken from within the bunded area, where
possible, to assist in levelling the area within the bund to promote even depth of flooding.
Material for fill should not be excavated adjacent to the bunds on their downslope side, as this
promotes gullying and bund failure.
Step Six
The tips of the bunds are only 20 cm high, and excess runoff drains around them. To prevent
erosion of the tips they should be shaped with a small extension or "lip" to lead water away. This
lip should be pitched with stones for extra resistance to erosion. Suggested dimensions are
shown in Figure 43.
Step Seven
Where the catchment is large in relation to the bunded area, it is advisable to construct a
diversion ditch to prevent excessive inflow to the bunds. This ditch is usually 50 cm deep and of
1.0 to 1.5 metres width, and is usually graded at 0.25%. Soil excavated from the ditch is used to
construct an embankment on the downslope side, which also assists in diverting runoff from the
bunds. During the early part of the season breaches can be made in this embankment at
approximately 10 metre intervals and the material used to temporarily plug the ditch, thus
permitting runoff to enter the trapezoidal bunds. As shown on Figure 44, it is necessary to
continue excavation of the ditch some distance downslope, to allow its bed level to reach
ground level. Over this length the bed width of the ditch should be gradually increased to 3
metres.
Figure 44. Trapezoidal bund: diversion ditch
Figure 45. Interception ditch
Step Eight
In situations where the catchment is not of adequate size, interception ditches can be made to
lead runoff from adjacent catchments to the bunds. These are opposite in effect to diversion
ditches but have similar sizes and design criteria. An example is shown in Figure 45.
5.6.4 Maintenance
If there are breaches in the bund, these must be repaired immediately, and the earth compacted
thoroughly. Breaches are often caused by poor construction, or because the catchment area is
producing damaging amounts of runoff - or both. It is advisable to construct a diversion ditch to
protect the repaired bund.
Holes burrowed by rodents can be another cause of breaching. These should be filled in
whenever spotted. Allowing natural vegetation to grow on the bunds leads to improved
consolidation by the plant roots. Repairs to the wing tips will frequently be needed when
overflow has occurred. These should be built up, and extra stone pitching provided if required.
5.6.5 Husbandry
Trapezoidal bunds are normally used for production of annual crops in dry areas. The most
common crops are cereals, and of these sorghum and bulrush (pearl) millet are by far the most
usual. Sorghum is particularly appropriate for such systems because it is both drought tolerant
and withstands temporary waterlogging. In the trapezoidal bund, water tends to be unevenly
distributed because of the slope, and ponding often occurs near the base bund. Likewise the
upper part may be relatively dry. Sorghum can tolerate both these situations.
Planting is carried out in the normal way, after ordinary cultivation of the soil within the bund. It
is usual to plough parallel to the base bund, so that the small furrows formed by ploughing will
locally accumulate some water. In the driest areas planting is sometimes delayed until a runoff
event has saturated the soil within the bund, and germination/establishment is guaranteed. It is
also possible to make use of out-of-season showers by planting a quick maturing legume, such
as cowpea or tepary beans (Phaseolus acutifolius). Another useful technique is to plant
curcurbits like gourds or watermelons on the bottom bund if water ponds deeply.
Trapezoidal bunds were designed for Turkana District when a widespread food relief operation was
underway in 1984. A policy of food-for-work had followed the free distribution of food at the beginning of
the crisis. The first attempts at water harvesting, based on contour bunds, were not well designed or
supervised. The result was extensive bunding which was not useful - and not used. The design for
trapezoidal bunds was based on scientific principles and the best available data on rainfall and runoff.
There was a deliberate policy to "over-design", as food-rewarded labour was not limiting and it was
desired to make the structures as maintenance free as possible. By 1987 about 150 trapezoidal bunds
had been constructed for the production of quick maturing food crops including sorghum and cowpeas.
The Turkana Water Harvesting Project, a small NGO in the northeast of the District, has modified the
basic design for local conditions. Although the line level is used for setting out the bunds, catchment sizes
are estimated by eye and the experience of locally trained technicians.
5.7 Contour stone bunds
5.7.1 Background
Contour stone bunds are used to slow down and filter runoff, thereby increasing infiltration and
capturing sediment. The water and sediment harvested lead directly to improved crop
performance. This technique is well suited to small scale application on farmer's fields and,
given an adequate supply of stones, can be implemented quickly and cheaply.
Making bunds - or merely lines - of stones is a traditional practice in parts of Sahelian West
Africa, notably in Burkina Faso. Improved construction and alignment along the contour makes
the technique considerably more effective. The great advantage of systems based on stone is
that there is no need for spillways, where potentially damaging flows are concentrated. The
filtering effect of the semi-permeable barrier along its full length gives a better spread of runoff
than earth bunds are able to do. Furthermore, stone bunds require much less maintenance.
Stone bunding techniques for water harvesting (as opposed to stone bunding for hillside
terracing, a much more widespread technique) is best developed in Yatenga Province of
Burkina Faso. It has proved an effective technique, which is popular and quickly mastered by
villagers.
Stone bunds for crop production can be used under the following conditions:
Rainfall: 200 mm - 750 mm; from arid to semi-arid areas.
Stone bunds follow the contour, or the approximate contour, across fields or grazing land. The
spacing between bunds ranges normally between 15 and 30 m depending largely on the
amount of stone and labour available. There is no need for diversion ditches or provision of
spillways.
Figure 46. Contour stone bunds: field layout (Source: Critchley and Reij 1989)
Table 24. QUANTITIES AND LABOUR REQUIREMENTS FOR CONTOUR STONE BUNDS
Contour stone bunds are a long slope technique relying on an external catchment. Theoretical
catchment: cultivated area (C:CA) ratios can be calculated using the formula given in Chapter 4.
Initially it is advisable to be conservative in estimation of areas which can be cultivated from any
catchment. The area can be extended either downslope or upslope in subsequent cropping
seasons, if appropriate.
Although simple stone lines can be partially effective, an initial minimum bund height of 25 cm is
recommended, with a base width of 35 - 40 cm. The bund should be set into a shallow trench, of
5 - 10 cm depth, which helps to prevent undermining by runoff. As explained in the construction
details, it is important to incorporate a mixture of large and small stones. A common error is to
use only large stones, which allow runoff to flow freely through the gaps in-between. The bund
should be constructed according to the "reverse filter" principle - with smaller stones placed
upstream of the larger ones to facilitate rapid siltation.
Bund spacings of 20 metres for slopes of less than 1%, and 15 metres for slopes of 1-2%, are
recommended.
Figure 47 Contour stone bund: dimensions
Table 24 gives details of the quantities of stone involved in bunding and the associated labour.
Where there is not enough stone readily available, stone lines can be used to form the
framework of a system. Grass, or other vegetative material, is then planted immediately behind
the lines and forms, over a period of time, a "living barrier" which has a similar effect to a stone
bund. Alternatively, earth contour bunds can be constructed, with stone spillways set into them
(Figure 48).
Figure 48. Design variation: contour earth bunding with stone spillway
Plate 13. Stone bund under construction
Step One
The average slope of the field is determined by a simple surveying instrument such as a water
level or a line level (see Appendix) to decide on the spacing of the bunds. Each contour line is
then set out and pegged individually. A horizontal spacing of approximately 20 metres apart is
recommended for slopes of up to 1%, and 15 metres apart for 1 - 2% slopes. Because of
variations in the slope, the lines may come closer together, or diverge at some points. The
horizontal spacings recommended are the average distances apart. If labour is a limiting factor,
farmers can start with a single bund at the bottom of their fields and work progressively upslope
in seasons to come.
Step Two
After the exact contour is laid out, the line should be smoothed by moving individual pegs up or
downslope. As a guideline, for ground slopes of up to 1.0 % pegs can be moved 2 metres
upslope or downslope to create a smoother curve. Not only will a gentle curve be easier to
follow while ploughing, but also the amount of stone used for construction will be reduced.
Step Three
A shallow trench is now formed along the smoothed contour. The trench is made by hand tools,
or ploughed by oxen and then excavated by hand. The trench need only be 5 -10 cm deep and
equal to the base width of the bund (35 - 40 cm). The excavated soil is placed upslope.
Step Four
Construction begins with large stones laid down at the base and the downslope side of the
trench, and then smaller stones laid in front and on top of this "anchor" line. Small stones should
be used to plug gaps between the larger ones. Where possible, a line of small or gravelly stones
should run along the upslope face of the bund to create a fine filter. The key to a successful
stone bund is to eliminate any large gaps between stones. In some areas it will be necessary to
break large stones to produce the correct sizes of material.
5.7.4 Maintenance
During heavy runoff events stone bunds may be overtopped and |some stones dislodged.
These should be replaced. A more common requirement is to plug any small gaps with small
stones or gravel where runoff forms a tunnel through.
Eventually stone bunds silt-up, and their water harvesting efficiency is lost. It normally takes 3
seasons or more to happen, and occurs more rapidly where bunds are wider apart, and on
steeper slopes. Bunds should be built up in these circumstances with less tightly packed stones,
to reduce siltation, while maintaining the effect of slowing runoff.
Alternatively grasses can be planted alongside the bund. Andropogon guyanus is the best
grass for this purpose in West Africa. It can be seeded, and the mature grass is used for
weaving into mats. The grass supplements the stone bund and effectively increases its height.
5.7:5 Husbandry
Stone bunds in West Africa are often used for rehabilitation of | infertile and degraded land. In
this context it is recommended that the bunds be supported by a further technique - that of
planting pits or "zai". These pits, which are usually about 0.9 m apart, are up to 0.15 m deep
and 0.30 m in diameter. Manure is placed in the pits to improve plant growth. The pits also
concentrate local runoff which is especially useful at the germination and establishment phase.
Plate 14 'Zai'
As in the case of all cropping systems under water harvesting, an improved standard of general
husbandry is important to make use of the extra water harvested. Manuring (as described
above) is very important in fertility management. Also essential is early weeding: in areas where
stone bunds are commonly used, late weeding is often a constraint to production.
On-farm stone bunding for crop production is quickly appreciated and adopted by farmers. The
techniques involved, including simple surveying, can be easily learned. The amount of labour
required is reasonable, and where groups are organized to work in turn on individual member's
farms, fields can be transformed in a single day. The benefits of stone bunding are often clearly
seen already in the first season - and this helps to make the system popular.
Nevertheless there are some problems which must be faced. Relatively rich farmers can make
use of wage labour to treat their fields, and poorer farmers may lag behind. Differing
availabilities of stones can lead to inequalities between neighbouring areas: not everyone can
benefit in the same way. This leads to another problem - to what extent is the cost of stone
transport justified?
The Agroforestry Project situated in Yatenga Province in the north of Burkina Faso, has been promoting
contour stone bunding since 1980. The reduced rainfall in the Sahelian zones over the last two decades has
left much of the land in this area barren and encrusted with a hard surface cap. Combined with increasing
population pressure, the people were faced with a stark choice - to improve the land or to migrate.
Under the Agroforestry Project the traditional technique of stone bunding was improved, and farmers trained to
lay out contours using a water level, and to build bunds more "scientifically". The results have been visible and
impressive: farmers who have treated their land have obtained cereal yields up to twice that of their
neighbours. The area of land treated has been increased from 150 ha in 1982 to approximately 5000 ha in
1987.
5.8 Permeable rock dams
5.8.1 Background
Permeable rock dams are a floodwater farming technique where runoff waters are spread in
valley bottoms for improved crop production. Developing gullies are healed at the same time.
The structures are typically long, low dam walls across valleys. Permeable rock dams can be
considered a form of "terraced wadi", though the latter term is normally used for structures
within watercourses in more arid areas.
Interest in permeable rock dams has centred on West Africa - Burkina Faso in particular - and
has grown substantially in the latter part of the 1980s. This technique -"digue filtrante" in French
- is particularly popular where villagers have experienced the gullying of previously productive
valley bottoms, resulting in floodwater no longer spreading naturally. The large amount of work
involved means that the technique is labour intensive and needs a group approach, as well as
some assistance with transport of stone.
Permeable rock dams for crop production can be used under the following conditions:
The main limitation of permeable rock dams is that they are particularly site-specific, and require
considerable quantities of loose stone as well as the provision of transport.
ii. Overall configuration
A permeable rock dam is a long, low structure, made from loose stone (occasionally some
gabion baskets may be used) across a valley floor. The central part of the dam is perpendicular
to the watercourse, while the extensions of the wall to either side curve back down the valleys
approximately following the contour. The idea is that the runoff which concentrates in the centre
of the valley, creating a gully, will be spread across the whole valley floor, thus making
conditions more favourable for plant growth. Excess water filters through the dam, or overtops
during peak flows. Gradually the dam silts up with fertile deposits. Usually a series of dams is
built along the same valley floor, giving stability to the valley system as a whole.
The calculation of the C:CA ratio is not necessary as the catchment area and the extent of the
cultivated land are predetermined. However, the catchment characteristics will influence the size
of structure and whether a spillway is required or not.
Figure 50. Permeable rock dams: general layout (Source: Critchley and Reij 1989)
Figure 51. Dam dimensions
Land slope (%) Spacing between dams* (m) Volume of stone per ha cultivated (m3)
0.5 140 70
1.0 70 140
1.5 47 208
2.0 35 280
* vertical intervals between adjacent dams = 0.7 m
The design specifications given below are derived from a number of permeable rock dam
projects in West Africa. Each project varies in detail, but the majority conform to the basic
pattern described here.
The main part of the dam wall is usually about 70 cm high although some are as low as 50 cm.
However, the central portion of the dam including the spillway (if required) may reach a
maximum height of 2 m above the gully floor. The dam wall or "spreader" can extend up to 1000
metres across the widest valley beds, but the lengths normally range from 50 to 300 metres.
The amount of stone used in the largest structures can be up to 2000 tons.
The dam wall is made from loose stone, carefully positioned, with larger boulders forming the
"framework" and smaller stones packed in the middle like a "sandwich". The sideslopes are
usually 3:1 or 2:1 (horizontal: vertical) on the downstream side, and 1:1 or 1:2 on the upstream
side. With shallower side slopes, the structure is more stable, but more expensive.
For all soil types it is recommended to set the dam wall in an excavated trench of about 10 cm
depth to prevent undermining by runoff waters. In erodible soils, it is advisable to place a layer
of gravel, or at least smaller stones, in the trench.
v. Quantities and labour
The quantity of stone, and the labour requirement for collection, transportation and construction
depends on a number of factors and vary widely. Table 25 gives the quantity of stone required
per cultivated hectare for a series of typical permeable rock dams under different land gradients.
The figures were calculated for a rock dam with an average cross section of 0.98 m2 (70 cm
high, base width of 280 cm) and a length of 100 metres. The vertical interval between dams is
assumed to be 0.7 metre, which defines the necessary spacing between adjacent dams (see
Figure 54).
Transport of stones by lorries from the collection site to the fields in the valley is the normal
method. Considerable labour may be required to collect, and sometimes break, stone. Labour
requirements, based on field estimates, are in the range of 0.5 cubic metres of stone per
person/day - excluding transport.
Where permeable rock dams are constructed in wide, relatively flat valley floors, they are
sometimes made straight across - in contrast to the usual design where the spreader bunds
arch back from the centre to follow the contour. With straight dams, the height of the wall
decreases from the centre towards the sides of the valley to maintain a level crest.
Permeable rock dams are similar in many respects to the "terraced wadis" traditionally used in
North Africa and the Middle East. However, the terraced wadi system is used in more arid
regions, across clearly defined watercourses (Gilbertson 1986; Reij 1988). Cross-wadi walls of
stone retain runoff to depths of up to 50 cm, with the excess flowing over spillways into
successive terraces below. Crops and fruit trees utilize the residual moisture.
The "Liman" system, principally reported from Israel, is used on flood plains or in broad "wadi"
beds. Bunds, often of earth, pond water to depths of 40 cm, and excess drains around an
excavated spillway. "Limanim" (plural of Liman) may be constructed in series along a wadi bed.
This technique is found where rainfall is as low as 100 mm per annum, and is used for crops,
fruit trees or forestry.
Figure 52 Permeable rock dams: alternative layout (Source: Critchley and Reij 1989)
Step One
Site selection depends both on the beneficiaries and the technicians. Theoretically it is best to
start at the top of the valley, though this may not always be the people's priority. After site
identification it is necessary to determine whether the structure needs a defined spillway: as a
rule of thumb no spillway is required if the gully is less than one metre deep. For greater depths,
a spillway is recommended. Gullies of over two metres depth pose special problems and should
be only tackled with caution. It is important not to build a permeable rock dam immediately
above a gully head, as there is the risk that the dam will fall into the gully if continued erosion
causes the gully head to cut back.
Step Two
Where a spillway is required, this should be built first. Gabions are best for spillways, as loose
stone is easily destabilized by heavy floods. The following should be noted:
b. An apron of large rocks is needed to break the erosive force of the overflow.
c. The downstream banks of the watercourse should be protected by stone pitching to prevent
enlargement of the gully.
Figure 53. Gabion spillway
Step Three
The alignment of the main dam walls can be marked out, starting at the centre of the valley
(where there may/may not be a spillway). This alignment is ideally along the contour, or as close
to the contour as possible. Thus the extension arms sweep backwards in an arc like the
contours of a valley on a map. The arms end when they turn parallel to the watercourse. The
contour can be laid out simply using a water tube or line level (see appendix).
Step Four
A typical cross section (taken from the design of the PATECORE project in Burkina Faso - see
profile at end of chapter) is recommended for general use. This is of 280 cm base width, 70 cm
height and side slopes of 1:1 upstream and 3:1 downstream. Larger cross sections may be
required dependent on catchment characteristics.
The first action after aligning the extension arms of the dam is to dig a trench at least 10 cm
deep and 280 cm wide (according to the base width of the bund). The earth should be deposited
upslope and the trench filled with gravel or small stones.
Step Five
The skill of construction is in the use of large stones (preferably of 30 cm diameter or more) for
the casing of the wall. This should be built up gradually following the required sideslope, and the
centre packed with smaller stones. The whole length of the bund should be built simultaneously,
in layers. This layered approach reduces the risk of damage by floods during construction.
Earth should not be mixed with the stone because it may be washed out and thus destabilize
the structure. It is particularly important to pack the small stones well at the lower levels to
increase the rate of siltation. The structure is finished off with a cap of large stones. It should be
possible to walk on the structure without any stones falling off. The dam wall should be level
throughout its length, which can be checked by the use of a water tube or line level.
Step Six
If a series of permeable rock dams is to be built, an appropriate vertical interval (VI) should be
selected. Technically speaking it is correct to:
b. use a VI equal to the height of the structure - so that the top of one structure is at the same
level as the base of the one above it (see Figure 54).
Therefore for dams of 70 cm height, the VI should theoretically be 70 cm. However in practice
this may not be practicable due to the amount of stone and labour involved. As a compromise, a
V.I. of 100 cm might be more realistic. Even wider spacing could be adopted, and the "missing"
structures "filled in" afterwards. The vertical interval can be determined most easily by the use of
a line-level.
The horizontal spacing between adjacent dams can be determined from the selected VI and the
prevailing land slope according to the formula:
HI = (VI x 100)/%slope
where:
5.8.4 Maintenance
The design given above, with its low side slopes and wide base should not require any
significant maintenance work provided the described construction method is carefully observed.
It will tolerate some overtopping in heavy floods. Nevertheless there may be some stones
washed off, which will require replacing, or tunneling of water beneath the bund which will need
packing with small stones. No structure in any water harvesting system is entirely maintenance
free and all damage, even small, should be repaired as soon as possible to prevent rapid
deterioration.
5.8.5 Husbandry
Permeable rock dams improve conditions for plant growth by spreading water, where moisture
availability is a limiting factor. In addition, sediment, which will build up behind the bund over the
seasons, is rich in nutrients, and this will further improve the crop growth.
This technique is used exclusively for annual crops. In the sandier soils, which do not retain
moisture for long, the most common crops are millet and groundnuts. As the soils become
heavier, the crops change to sorghum and maize. Where soils are heavy and impermeable,
waterlogging would affect most crops, and therefore rice is grown in these zones. Within one
series of permeable rock dams, several species of crop may be grown, reflecting the variations
in soil and drainage conditions.
The implementation of permeable rock dams raises several important socio-economic issues.
Many of these are rather specific to this technique. This is because permeable rock dams are
characterized by:
Traditionally the gently sloping valleys of the Central Plateau in Burkina Faso have been the most
productive farmland, due to the natural flooding during the rains. However much of the surrounding land
has become degraded and the increased runoff has caused gullies in the valley bottoms. The water no
longer spreads and the land is parched and eroding.
In the mid 1980s a number of projects began to test permeable rock dams across these valleys, with
impressive results. The villagers have been very enthusiastic and there is great demand for assistance. A
recently established project, PATECORE, at Kongoussi specializes in permeable rock dams, or "filtering
floodwater spreaders" as the project calls them.
The dams are built according to the specifications given in the layout and construction section of this
chapter, and much emphasis is put on careful construction. All the labour is provided by the local
community, who are fully involved in site selection and village land-use planning. Villagers are trained in
setting out and construction supervision. The project supplies transport of stone, by lorries with removable
skips, free of charge.
5.9 Water spreading bunds
5.9.1 Background
Water spreading bunds are often applied in situations where trapezoidal bunds are not suitable,
usually where runoff discharges are high and would damage trapezoidal bunds or where the
crops to be grown are susceptible to the temporary waterlogging, which is a characteristic of
trapezoidal bunds. The major characteristic of water spreading bunds is that, as their name
implies, they are intended to spread water, and not to impound it.
They are usually used to spread floodwater which has either been diverted from a watercourse
or has naturally spilled onto the floodplain. The bunds, which are usually made of earth, slow
down the flow of floodwater and spread it over the land to be cultivated, thus allowing it to
infiltrate.
Figure 55 Flow diversion system with water spreading bunds in Pakistan (Source: Nas
1980)
5.9.2 Technical Details
i. Suitability
Topography: even.
The technique of floodwater farming using water spreading bunds is very site-specific. The land
must be sited close to a wadi or another watercourse, usually on a floodplain with alluvial soils
and low slopes. This technique is most appropriate for arid areas where floodwater is the only
realistic choice for crop or fodder production.
Two design examples are given. The first is for slopes of less than 0.5%, where the structures
are merely straight open ended bunds sited across the slope, which "baffle" (slow and spread)
the flow. The second, for slopes greater than 0.5%, is a series of graded bunds, each with a
single short upslope wing, which spread the flow gradually downslope. In each case, crops or
fodder are planted between the bunds.
The precise calculation of a catchment: cultivated area ratio is not practicable or necessary in
the design of most water spreading bunds. The reasons are that the floodwater to be spread is
not impounded - much continues to flow through the system, and furthermore often only part of
the wadi flow is diverted to the productive area. Thus the quantity of water actually utilized
cannot be easily predicted from the catchment size.
Where slopes are less than 0.5%, straight bunds are used to spread water. Both ends are left
open to allow floodwater to pass around the bunds, which are sited at 50 metres apart. Bunds
should overlap - so that the overflow around one should be intercepted by that below it. The
uniform cross section of the bunds is recommended to be 60 cm high, 4.1 metres base width,
and a top width of 50 cm. This gives stable side slopes of 3:1. A maximum bund length of 100
metres is recommended.
In this slope range, graded bunds can be used (Figure 59). Bunds, of constant cross-section,
are graded along a ground slope of 0.25%. Each successive bund in the series downslope is
graded from different ends. A short wingwall is constructed at 135° to the upper end of each
bund to allow interception of the flow around the bund above. This has the effect of further
checking the flow. The spacing between bunds depends on the slope of the land. Examples for
different slopes are given in Figures 58 and 59. The bund cross section is the same as that
recommended for contour bunds on lower slopes. The maximum length of a base bund is
recommended to be 100 metres.
Table 26 gives details of the quantities and labour involved in construction of water spreading
bunds for different slope classes. A bund cross section of 1.38 square metres is assumed.
Labour requirements are relatively high because of the large sized structures requiring soil to be
carried.
Slope class/technique No. bunds per ha Total bund length (m) Earthworks (m3/ha)
Level bunds
- below 0.5% 2 200 275
Graded bunds
- 0.5% 2 220 305
- 1.0% 3 330 455
vi. Design variations
There are many different designs for water spreading bunds possible, and that given in this
manual is merely one example. Much depends on the quantity of water to be spread, the slope
of the land, the type of soil and the labour available. Existing systems are always worth studying
before designing new systems.
Figure 57. Impala Pilot Water Spreading Scheme, Turkana, Kenya (Source: Fallon 1963)
Figure 58. Setting out of level bunds: groundslope < ft 5%
Step One
The first step is to measure the slope of the land, in order to select the appropriate bunding
system. This can be done most simply with an Abney level, or with a line level, as described in
the appendix.
Step Two
Straight bunds are used for ground slopes of less than 0.5% and are spaced at 50 m intervals.
The bunds should, however, be staggered as shown on Figure 58, which also illustrates the
setting out procedure.
Having selected the starting point at the upslope end of the bund system point A is marked with
a peg. Using a line or water level and, if necessary, a tape, point B is pegged on the contour
100 m away from A. Line AB is then the centreline of the first bund and should be marked with
pegs or stones.
Point C is 50 m downslope from point B and can be established by marking of a right angle
perpendicular to AB, using a wooden triangular right angle frame (sides: 100 cm, 60 cm, 80 cm)
and a tape. Point D is then established with level and tape at the same ground level as C, at a
distance of 25 m from C to allow overlap with AB. Point D is then pegged. Point E is also on the
same ground level as point C, but 75 m distant in the opposite direction to point D. The line DE
is the centreline of the second bund and should be marked with pegs or stones. Point F is 50 m
downslope of point E and is established in a similar manner as point C. Point G is then
established on the same ground level as point F but 25 m distant to allow overlap with DE.
Similarly point H is at the same ground level as point F but 75 m distant, in the opposite
direction to point G.
This process can be repeated down the slope to lay out the field of bunds.
Step Three
For ground slopes above 0.5% bunds aligned with a 0.25% gradient are used and are termed
"graded bunds".
Having selected the starting point (A) at the upslope end of the bund system, it is marked with a
peg. Using a line, or water level, and a tape, the line AB is set out on a 0.25% gradient. As the
distance AB is 100 m, the ground level at B is 25 cm below that at A. Point B is then marked
with a peg and the line AB, forming the centreline of the first bund, is marked with pegs or
stones.
Point C, on the centre line of the second bund, is at a distance of 25 m immediately downslope
of point B. It is most easily found by using the line or water level to establish the maximum field
gradient between B and C, and by measuring from B through that point a distance of 25 m.
Having established C the 0.25% slope line is again established and point D located along that
line 25 m from C. Note that point D will be at a slightly higher ground level than point C and
should provide overlap with the line AB, as shown in Figure 59. The other end of the bund
centreline, point E, is 75 m on the opposite side of C along the 0.25% slope line. The points D
and E should be pegged and mark the centreline of the second bund.
The wing bund always starts from the overlapping end of the base bund, in this case point D.
The wing bund is 25 m long and at an angle of 135° to the base bund. It is most easily found by
extending the line ED a distance of 17.7 m from D to give point X. Point Y is then a distance of
17.7 m upslope from point X, and at a right angle to the line XDE. It can be located using a tape
and right angle template as described above.
The first point on the next bund line, point F, is located in a similar manner to point E and the
bend centreline HFG can be set out as above. The end of the wing bund, W, can be located in a
similar manner as Y.
Step Four
Having marked out the centrelines of the bunds, the limits of fill can be marked by stakes or
stones placed at a distance of 2.05 m on either side of the centrelines.
Step Five
Construction begins at the top of the field as in all water harvesting systems. Earth should be
excavated from both sides to form the bunds, and in the shallow trenches formed, earth ties
should be foreseen at frequent intervals to prevent scouring. The earth beneath the bunds
should be loosened to ensure a good mating with the bund.
The bunds are constructed in two layers of 30 cm each, and compaction by trampling is
recommended on the first course and again when the bund is complete.
Step Six
At the ends of the contour bunds, and at the tip of the wingwalls of the graded bunds, stone
pitching should be placed - if loose stone is available - to reduce potential damage from flow
around the bunds.
5.9.4 Maintenance
As is the case in all water harvesting systems based on earth bunds, breaches are possible in
the early stages of the first season, before consolidation has taken place. Thus there must be
planning for repair work where necessary and careful inspection after all runoff events. In
subsequent seasons the risk of breaching is diminished, when the bunds have consolidated and
been allowed to develop vegetation - which helps bind the soil together, and reduces direct
rainfall damage to the structures. Nevertheless with systems which depend on floodwater,
damaging floods will inevitably occur from time to time, and repairs may be needed at any
stage.
5.9.5 Husbandry
Water spreading bunds are traditionally used for annual crops, and particularly cereals.
Sorghum and millet are the most common. One particular feature of this system, when used in
arid areas with erratic rainfall, is that sowing of the crop should be undertaken in response to
flooding. The direct contribution by rainfall to growth is often very little. Seeds should be sown
into residual moisture after a flood, which gives assurance of germination and early
establishment. Further floods will bring the crop to maturity. However if the crop fails from lack
of subsequent flooding - or if it is buried by silt or sand (as sometimes happens) - the cultivator
should be prepared to replant. An opportunistic attitude is required.
Because water spreading usually takes place on alluvial soils, soil fertility is rarely a constraint
to crop production. Weed growth however tends to be more vigorous due to the favourable
growing conditions, and thus early weeding is particularly important.
In areas where crop production is a novelty it may be risky to provide incentives such as food for
work rations to potential beneficiaries participating in the construction of such a crop production
system. It has often been experienced that people consider it mainly as a job opportunity and
lose any interest in the scheme once the project (and the incentives!) have come to an end.
Once again this highlights the potential danger of incentives, rather than genuine motivation,
which should be the driving force.
Plate 17. Sorghum in wadi (Red Sea Hills)
In the Red Sea Province of Eastern Sudan, traditional water spreading schemes are being rehabilitated
and improved under the technical guidance of the Soil Conservation Administration. In this semi-desert
region natural flooding in wadi beds is the traditional site for cropping of sorghum by the semi-nomadic
population.
The improvements being introduced are large earth diversion embankments in the main or subsidiary
channels, and then a series of spreading bunds or "terraces". These bunds, are usually sited on, or
approximately on, the contour, and spread the diverted flow. The spacing between bunds, in the typically
almost flat landscape, is not fixed but can be quite wide - up to 200 metres apart. Bunds are usually up to
150 metres long, and minimum of 75 cm in height. Some machinery is employed, but manual labour
supported by incentives is also used.
6. Husbandry
6.1 Introduction
The production aspects of rainwater harvesting systems for crops and trees are outlined in the
sections which follow. A brief note is also included about grassland and range. Water harvesting
improves growth by increasing the availability of water to plants in dry areas. However there is
little point investing in rainwater harvesting structures unless attention is also given to other
aspects of husbandry. Plants which are well nourished, cleanly weeded and protected from
pests and diseases will respond best to the extra water.
6.2 Crops
6.2.1 General
Water harvesting helps crops by providing extra moisture at different stages of growth -
although timing cannot be controlled. Periods when the extra moisture can make a significant
difference are:
The most common cereal crops grown under water harvesting are:
- Sorghum (Sorghum bicolor) is the most common grain crop under water harvesting systems.
It is a crop of the dry areas, and in addition to its drought adaption, it also tolerates temporary
waterlogging - which is a common occurrence in some water harvesting systems.
- Pearl Millet (Pennisetum typhoides) is grown in the drier areas of West Africa and India, and
apart from being drought tolerant, it matures rapidly.
- Maize (Zea mays) is occasionally grown under water harvesting but is neither drought adapted
nor waterlogging tolerant - but in parts of East and Southern Africa it is the preferred food grain,
and farmers are often reluctant to plant millet or sorghum instead.
Legumes are less frequently grown under water harvesting but should be encouraged because
of their ability to fix nitrogen and improve the performance of other crops. Suitable legumes are
Cowpeas (Vigna unguiculata), green grams (Vigna radiana), lablab (Lablab purpureus), and
groundnut (Arachis hypogea). All are relatively tolerant of drought and are fast maturing.
Plate. 18 Sorghum
6.2.3 Fertility
In dry areas soil fertility is usually the second most limiting production factor after moisture
stress. The improvement in the supply of water available to plants under water harvesting can
lead to depletion of soil nutrients. Therefore it is very important to maintain levels of organic
matter by adding animal manure or compost to the soil. Inorganic fertilizers are seldom
economic for subsistence crops grown under water harvesting.
Crop rotation helps maintain the fertility status. Legumes should be alternated with cereals as
often as possible. Intercropping of cereals with legumes - sorghum with cowpeas for example -
can also lead to higher overall yields as well as soil fertility maintenance.
Some water harvesting systems actually harvest organic matter from the catchment and
therefore build up fertility. This can most clearly be seen with stone bunding techniques which
filter out soil and other organic particles, thereby building up fertile deposits.
- Early planting makes the best use of limited rainfall. In some areas it may be best to plant
seeds before the rains arrive. This technique is known as "dry planting".
- "Opportunistic" or take-a-chance planting of a quick legume crop like cowpeas can make use
of late season or out of season rainstorms.
- Low plant populations in themselves can improve yields in low rainfall zones, and therefore
spacing of crops is another important consideration.
6.3 Trees
6.3.1 General
Rainwater harvesting is used to help tree seedlings become established in dry areas. The
microcatchment technique concentrates water around the seedlings, and make a considerable
difference to growing conditions at this vital early stage. In semi-arid areas, tree seedlings in the
natural state usually germinate and grow only in years of above average rainfall - water
harvesting imitates these conditions.
Table 27 summarizes the most important characteristics of the most commonly planted trees in
semi-arid areas of Africa and India.
Species Characteristics
Acacia albida "The" agroforestry tree of West Africa. Genuinely multi- purpose. Pods for fodder.
Needs water table. Slow at first.
Acacia nilotica Widespread in India and Africa. Likes deep soils and water table. Good
fuel/fodder. Quite quick growing.
Acacia saligna Introduced species from Australia. For dune fixation/fodder/windbreaks. Hardy.
Fast growing.
Acacia Senegal "Gum arabic" tree producing commercial gum. Good also for fuelwood/fodder.
Direct seeding possible. Slow.
Acacia seyal Likes low-lying areas with heavy soils which flood. Good forage/fuelwood. Quite
fast early growth.
Acacia tortilis "Umbrella thorn". Good fuelwood and charcoal. Branches for fencing. Pods good
fodder. Fast once established.
Albizia lebek From India. Small shade/amenity tree in Sahel. Needs high water table. Foliage
for mulch. Rapid growth.
Azadirachta indica Neem tree: from India/Burma. Grown for shade mainly but also good fodder/fuel.
Fast growing.
Balanites aegyptiaca "Desert date" widespread and ecologically "flexible". Fodder/edible fruit. Direct
seeding possible. Slow.
Cassia siamea Grown for shade, amenity, fuelwood and poles. Better with higher rainfall. Direct
seeding possible. Quick.
Casuarina Good on deep sands (also at coasts) so used for dune stabilization. Also
equisetifolia fuelwood. Fast growing.
Colophosperum Indigenous to Southern Africa. Poles for construction and leaves for fodder.
mopane Firewood. Wood very hard.
Eucalyptus From Australia. Best eucalypt for dry areas. Coppices well. Windbreak/fuelwood.
camaldulensis Very quick growing.
Prosopis chilensis Similar to, and often confused with, P. juliflora, see below.
Species Characteristics
Prosopis cineraria Indigenous to NW India where grown as agroforestry tree. Fodder/fuel/building
materials. Slow.
Prosopis juliflora Very drought resistant and establishes naturally. May invade better areas.
Coppices well. Good fuel supply. Pods for fodder. Quick growth.
Ziziphus mauritiana "Jujube". Produces edible fruit. Can be grafted. Small tree. Branches for fencing.
Slow growth.
6.3.3 Husbandry
Planting of more than one seedling at a planting station is usually a good idea. The reason is
that the additional cost is small compared with the cost of the water harvesting structures and
there is extra assurance of at least one seedling establishing. It is advisable to plant one
seedling at the bottom of the pit/furrow and one by the side. The former may establish better in
a dry year, and the second if conditions are wetter.
Direct seeding is a technique which saves all the nursery costs of producing seedlings. However
it does mean that the trees will be slower growing in the early stages. Tree species which can
successfully be direct seeded include Balanites aegyptiaca and Prosopis juliflora.
Weeding is only necessary close to the seedling. The area between the rows of trees should be
allowed to grow grass (or even planted with an annual crop) so that some economic benefit can
be gained in the first few years, before the trees mature.
Natural revegetation often gives satisfactory results without reseeding. However, where
reseeding is used, it is usually best to collect seeds from local species known to do well in the
area.
One advantage of range/grassland systems is that the roots of these perennial species tend to
protect structures, and therefore maintenance requirements are reduced.
7. Socio-economic factors and project management
7.1 Introduction
This manual concentrates mainly on the technical aspects of rainwater harvesting systems, but
it has been stressed throughout that it takes more than engineering and agronomy to make a
project successful. Socio-economic factors are particularly important. Obviously, if the small
scale farmer is the "customer" or beneficiary, then she/he must understand and be happy with a
system which is appropriate, and which she/he is able to manage and maintain. This section
looks at some socio-economic factors, and the implications they may have on project
management.
7.2.2 Participation
It is becoming more widely accepted that unless people are actively involved in the development
projects which are aimed to help them, the projects are doomed to failure. It is important that the
beneficiaries participate in every stage of the project. When the project is being planned, the
people should be consulted, and their priorities and needs assessed. During the construction
phase the people again should be involved -supplying labour but also helping with field layouts
after being trained with simple surveying instruments.
Throughout the course of the season it is helpful to involve people in monitoring, such as rainfall
and runoff and recording tree mortality. A further participatory role is in maintenance, which
should not be supported by incentives.
After the first season it is the farmers themselves who will often have the best ideas of
modifications that could be made to the systems. In this way they are involved in evaluation,
and in the evolution of the water harvesting systems.
Widespread adoption of water harvesting techniques by the local population is the only way that
significant areas of land can be treated at a reasonable cost on a sustainable basis. It is
therefore important that the systems proposed are simple enough for the people to implement
and to maintain. To encourage adoption, apart from incentives in the form of tools for example,
there is a need for motivational campaigns, demonstrations, training and extension work.
It is tempting to assume that a system which works in one area will also work in another,
superficially similar, zone. However there may be technical dissimilarities such as availability of
stone or intensity of rainfall, and distinct socio-economic differences also. For example a system
which is best adapted to hand construction may not be attractive to people who normally till with
animals. If a system depends on a crop well accepted in one area - sorghum for example - this
may be a barrier to acceptance where maize is the preferred food grain.
If water harvesting is intended to improve the lot of farmers in the poorer, drier areas, it is
important to consider the possible effects on gender and equity. In other words, will the
introduction of water harvesting be particularly advantageous to one group of people, and
exclude others? Perhaps water harvesting will give undue help to one sex, or to the relatively
richer landowners in some situations. These are points a projects should bear in mind during the
design stage. There is little point in providing assistance which only benefits the relatively
wealthier groups.
Land tenure issues can have a variety of influences on water harvesting projects. On one hand
it may be that lack of tenure means that people are reluctant to invest in water harvesting
structures on land which they do not formally own. Where land ownership and rights of use are
complex it may be difficult to persuade the cultivator to improve land that someone else may
use later. On the other hand there are examples of situations where the opposite is the case - in
some areas farmers like to construct bunds because it implies a more definite right of
ownership.
The most difficult situation is that of common land, particularly where no well defined
management tradition exists. Villagers are understandably reluctant to treat areas which are
communally grazed - a point taken up in the next section.
The whole question of land management by village communities has recently been
acknowledged to be extremely important. Degraded land in and around villages can only be
improved if land use management issues are faced by the communities themselves. One of the
techniques which can assist in rehabilitation of degraded land is water harvesting - but it is only
one tool among several others and cannot be effective in isolation. Unless, for example, grazing
controls are implemented, there is little point spending money on water harvesting structures for
re-seeding.
7.3 Project management
The experience of projects related to water harvesting and soil conservation has shown that
there is no substitute for dialogue with the farmers/villagers, and a continued close relationship
throughout. Projects should always aim to learn from the people of the target area, in particular
about local traditional technology.
It is essential that project authorities keep in mind the importance of people's priorities and
participation. It is important that the benefits of the new systems should be apparent to the
farmer as early as possible. For new techniques there is often a need for demonstration before
people will understand and envisage their effectiveness. Motivation and promotion of awareness
among the people with regard to the project objectives and how to achieve them are very
important issues. It is sad but true that very often the people simply do not understand what a
project is trying to achieve, or even what the meaning of the various structures is!
There are two basically different approaches with regard to water harvesting projects.
The technology introduced by the project is relatively simple, and costs per hectare low. The
intention is to promote systems which can be taken up and implemented by the people
themselves, with a minimum of support. The philosophy behind this approach is that the people
themselves must be the prime movers in the development of their own fields and local
environment.
In this approach the technology may be simple or complex, but it is implemented by the project
itself. Machinery is often used, but some projects employ paid (or otherwise rewarded) labour.
Costs are often relatively high. The intention is that the project will quickly and efficiently
rehabilitate land for the people. The philosophy is that the people are simply unable to
undertake the extent of work required using their own resources and therefore they require
considerable or complete support to implement the project.
Experience shows that it is the first approach which offers the most hope for sustainability once
the project has come to an end. Nevertheless there are situations where the introduction of
appropriate machinery or support of some labour can be justified.
This question has been touched on already - but it is an extremely important issue. The
introduction of inappropriate heavy machinery for conservation structures has been a mistake
repeated widely over Africa. Conversely some mechanization - especially where animal traction
is a component - can immeasurably speed up work rates and reduce drudgery.
The advantage of working by hand is that the people regard the techniques as within their
capability. As long as part of the work is voluntary, they will be more willing to carry out
maintenance. Nevertheless hand labour is slow, and labour shortages can be a serious
constraint in some areas.
Water harvesting and conservation projects should never have fixed work plans or rigid targets,
at least not in the early stages of implementation. The reason quite simply is that it is unrealistic
to plan for all contingencies, and arrogant to assume that the techniques and approaches
planned from the outset cannot be improved Learning from experience, and from interaction
with the people, is a much better approach. Flexibility should be written into every project
document.
Many water harvesting projects provide subsidies or incentives for construction. Several points
need to be made about these:
- help and assistance should only be considered as stimuli to the programme; too big a subsidy
to begin with can cripple future expansion and deter participation.
- it is important that in all cases the beneficiaries should make at least some voluntary
contribution towards construction. The level of contribution should rise when incentives are
provided.
- incentives/subsidies should not be used for maintenance: this should be the responsibility of
the beneficiaries.
Monitoring, evaluation and reporting are often weak spots in water harvesting projects. Too
many projects fail to collect data at even the most basic level. For example crop yields and tree
heights are often just estimated. It is also very rare to find any information on the frequency or
depth of water harvested. Without a basic monitoring system, projects are starving themselves
of data for evaluation. Without clearly written reports, widely circulated, projects are denying to
provide others with important information. A suggested monitoring format is presented in Table
28.
Table 28. SUGGESTED MONITORING FORMAT FOR WATER HARVESTING PROJECTS
1. HYDROLOGICAL DATA
- rainfall (standard gauges at important sites)
- runoff (at least visual recordings of occurrence)
2. INPUTS
- labour/machinery hours for (a) construction
(b) maintenance
(c) standard agricultural operations
3. COSTS
- labour/machinery use in (a) construction
(b) maintenance
(c) standard agricultural operations
4. OUTPUTS
- crops: yields of treated plots compared with controls
- trees: survival and growth rates
- grass/fodder: dry matter of treated plots compared with controls
5. ACHIEVEMENTS
- area (hectares) covered each season
- number farmers/villagers involved/benefitting
6. INCENTIVES/SUPPORT
- quantity and costs
7. TRAINING
- number of training sessions
- attendance/number of trained personnel
8. EXTENSION
- number of farmers visited
- number of field days and attendance
Note: SUMMARY SHEETS of data are very useful. These could include:
- labour/ha
- cost/ha
- average yield increases over controls
- total land treated and people benefitting
Appendix - Simple surveying techniques
Introduction
1. The line level is a simple surveying instrument which can be used to lay out contours and
gradients, and also to measure the slope of land. It is simple to operate and is easier to
transport than other similar surveying tools such as the A-frame. It is especially quick and very
accurate when used properly. However a line level does require three people to operate it.
2. A line level consists of two poles, between which a length of string is suspended. A spirit level
is hung on the string. The level is the type used by builders, but has small hooks at either end.
3. The poles should be of even height (about 1.5 m) and the string (about 2 mm in diameter)
and precisely 8 metres in length. A notch is made in each pole at exactly the same height (say
1.4 m above ground level) and the ends of the string tied around these notches.
4. The centre of the string (4 m from each end) is marked and the level itself is suspended
there.
5. The poles are held apart by operators with the string extended and the spirit level positioned
exactly in the middle of the string. When the bubble in the level is between the two marks this
means that the poles are positioned on level points on the land - in other words on the contour.
The poles must be held vertically.
6. To lay out a contour across a slope, the team begin at the edge of the field. The operator
holding the pole at the field's edge (operator A) remains stationary while the operator holding
the other pole (operator B) moves up and down the slope until the third operator is satisfied that
the bubble is centred. Points A and B are then marked (with stones or pegs). Operator A then
moves to B and operator B moves onwards and the process is repeated. This continues until
the contour line reaches the far end of the field.
7. Care should be taken that small obstacles, such as minor high spots, or rills, are avoided by
skipping forward a pace or two. This avoids sharp irregularities in the contour.
8. When the contour has been laid out, the curves can be smoothed by eye according to the
guidelines given for stone or earth bunds.
Figure A.1 Use of the line level
9. A graded contour deviates slightly from the true contour and is normally used to align a
channel, such as a diversion ditch, or to stake out a graded earth bund.
10. In order to lay out a graded contour, further notches must be made on one of the poles.
These notches are made below the original notch at intervals of 2 cm.
11. The usual gradient for a structure such as a diversion ditch is 0.25%. The string of the near
side operator (A) should be affixed to the second notch down his pole (2 cm below the original)
and the far operator (B) retains his string at the original notch. When the bubble in the level is
between the two marks, this now implies that A is 2 cm above B, which is equivalent to a 0.25%
slope over the distance of 8 metres. For a slope of 0.5%, Operator A fixes his string to the third
notch down his pole (4 cm below the top notch) and, when Operator B finds a position where
the level reads dead centre, he is at a ground level 4 cm below that of Operator A. Over a
distance of 8 metres the slope is then 0.5%.
12. The operation now proceeds as before, operator A moving forward to the spot occupied by
B, and B moving onwards - slightly downslope. Once again minor irregularities should be
avoided and the curve smoothed.
13. If a diversion ditch must follow a precise field boundary it can be excavated so that the
bottom of the ditch is given a suitable gradient. Surveying will therefore take place during
excavation.
Figure A.2. Measuring the slope with a line level
14. It is simple to use the line level to measure the slope of the land. Operator A stands exactly
upslope of Operator B and adjusts the string to the notch which gives a level reading. For
example if this notch is the 3rd (i.e. 4 cm below the top notch) the gradient is 0.5%, if the notch
is the eleventh (i.e. 20 cm below the top notch) the gradient is 2.5%, etc.
15. Up to 21 notches should be marked on pole A and the following table shows the percentage
slope indicated by each.
16. Always check the spirit level - by placing it on a horizontal surface and noting the position of
the bubble which should be between the two marks.
17. Check the centre point of the string each day and its length also,
18. Remember that when laying out a gradient that operator (A) is upslope.
20. Avoid placing the poles in depressions or on top of minor high spots in the field.
A.2 Use of the water tube level for surveying
Introduction
1. The water tube level is straightforward to use, and farmers can be quickly taught to layout
contours. The concept itself - of matching up levels of water - is especially easy to understand.
Advantages of the water tube level are that it can be operated by only two people and is more
sensitive than the line level on very low slopes. It is, however, slightly less portable than the line
level, and is not so simple to use for determining slopes or laying out graded contours.
- A length of transparent plastic tubing, 6-10 mm inside diameter and about 14 metres long.
- Four rubber straps (easily made from a bicycle inner tube) to attach the plastic tubing to the
poles.
- One to two litres of water. Muddy water is preferable as it is more easily visible in the tube.
3. The plastic tubing is firmly attached to the poles or staves using the rubber straps, or other
securing devices. The ends of the tube should be about 10 cm from the top of each staff and the
bottom fixing point about 20 cm from the bottom of each staff.
4. The tube is then filled with muddy water until the water level is about halfway up each staff. It
is essential that no air bubbles are trapped in the tube and, if necessary, they can be removed
by tapping with the finger. Wherever the two staves are set, the free water surfaces in each tube
will be at the same level.
Figure A.3. Setting out a contour line
Laying out a contour
5. The two staves are placed back to back at the starting point, marked with a peg (A). After any
air bubbles have been removed and the water has come to rest, a mark is made on both staves,
indicating the water level.
6. The lead man takes one staff and drags the tube in what seems to be the direction of the
contour line. When the tube is almost stretched, the lead man moves slowly up and down the
slope until his staff is at a position where the water level in the tube coincides with the mark. The
staff is then at a position where the ground level's the same as at peg A. A second peg (B) is
placed at this point. The back man now moves from peg A to the other side of peg B where the
lead man remains stationary. It is now the back man's turn to find the correct spot which is
marked by peg C. This procedure continues until the end of the field.
7. The operators then measure, or pace, the horizontal distance required between the contours
and begin to lay out the second contour.
8. The contour may then be "smoothed" by eye, according to the design specifications.
9. Work should be carried out during the coolest time of the day because heat causes the
plastic tube to stretch and this affects the water levels, which may have to be re-marked.
10. It is important to avoid spillage of water, or the water levels will need re-marking. Water is
usually spilled during movement of the staves and this can be avoided by closing the ends of
the tube with plugs during movement. It is, however, essential to remove the plugs while making
measurements.
11. The poles or staves should always be held vertically.
12. Minor depressions or isolated high spots in the field should be avoided.
Annotated bibliography
BARROW, E.G.C. (1983). Use of micro-catchments for tree planting in soil conservation for
semi-arid areas. In: Thomas, D.B. and Senga, W.M. (eds) Soil and Water Conservation in
Kenya. Proc. of the Second National Workshop, Nairobi, March 10-13, 1982: 324-331
BARROW, E.G.C. (ed) (1988). Forestry Handbook for Primary School Teachers in Turkana
District, Forestry Dept., Min. Environment and Natural Resources, Kenya.
A simple introduction to tree planting in arid northern Kenya. Includes a practical guide to siting
and construction of microcatchments.
BEN-ASHER, J. (1988). A review of water harvesting in Israel. (Draft) Working Paper for World
Bank's Sub-Saharan Water Harvesting Study.
This review gives "state of the art" information on WH research in Israel, with considerable
technical detail on hydrological aspects. It also discusses the extent of various systems, and
their prospects for the future.
BEN-ASHER, J., ORON, G. and BUTTON, B.J. (1985). Estimation of runoff volume for
agriculture in arid lands. Jacob Blaustein Institute for Desert Research, Ben Gurion University of
the Negev.
BERTON, S. (1989). Le point sur la maitrise des crus dans les basfonds. Petits et
microbarrages en Afrique de l'Ouest. pp 220-277. GRET, Paris.
A detailed guide to specifications and use of permeable rock dams in West Africa. It is written in
French.
BILLY, B. (1981). Water harvesting for dryland and floodwater farming in the Navajo Indian
reservation. In: Dutt, G.R. et al (eds), Rainfall collection for agriculture in arid and semi-arid
regions: 3-8, Commonwealth Agricultural Bureaux, UK,
BOERS, T.M. and BEN-ASHER, J. (1982). Review of rainwater harvesting. In: Agricultural
Water Management 5: 145-158.
A brief, but detailed review of 170 articles on RWH published between 1970 and 1980.
Definitions are proposed and Microcatchment Water Harvesting (MCWH) and Runoff Farming
Water Harvesting (RFWH) are differentiated. Designs and modelling are discussed.
BOERS, T.M. and BEN-ASHER, J. (1985). Harvesting water in the desert. Report of a research
project; appendix 5, ILRI, Wageningen.
BRUINS, H.J. (1986). Desert environment and agriculture in the central Negev and Kadesh-
Barnea during historical times. Ph.D. Thesis Agricultural University Wageningen. Midbur
Foundation, Nijkerk, The Netherlands.
BRUINS, H.J. EVANARI, M. and NESSLER, U. (1986). Rainwater harvesting agriculture for
food production in arid zones: the challenge of the African famine. In: Applied Geography 6 (I):
13-33.
A review of the role of rainwater harvesting agriculture (runoff farming) for arid Africa.
Distinguishes five categories of runoff farming: micro-catchments, terraced wadis, hillside
conduit systems, liman systems and diversion systems.
BRUNNER, U. and HAEFNER, H. (1986). The successful floodwater farming system of the
Sabeans, Yemen Arab Republic. In: Applied Geography 6 (I): 77-89.
CLUFF, C.B. (1978). Engineering aspects of water harvesting at the University of Arizona. In:
Frasier, G.W. (ed), Proceedings of the Water Harvesting Symposium, March 26-28,1974: 27-39,
Phoenix, Arizona.
CRITCHLEY, W.R.S., (1986). Runoff harvesting for crop production: experience in Kitui District;
1984-1986. Paper presented to the Third National Soil and Water Conservation Workshop,
Nairobi, Kenya.
CRITCHLEY, W.R.S., (1987). Some lessons from water harvesting in Sub-Saharan Africa.
Report from a workshop held in Baringo, Kenya, 13-17 October 1986. World Bank, Eastern and
Southern Africa Projects Dept., Washington DC.
CRITCHLEY, W.R.S. and REIJ, C. (1989). Water harvesting for plant production: Part 2[ Case
studies and conclusions from Sub-Saharan Africa. (Draft)
To be published in 1991 as the final report of the World Bank's Sub-Saharan Water Harvesting
Study. Contains case studies of both traditional techniques and project involvement in WH. The
conclusions cover engineering design, production aspects and socio-economic issues.
DUTT, G.R., HUTCHINSON, C.F. and GARDUNO, M.A. (eds) (1981). Rainfall collection for
agriculture in arid and semi-arid regions. Proceedings of a workshop, University of Arizona and
Chapino Postgraduate College. Commonwealth Agric. Bureaux, UK.
EVANARI, M., SHANAN, L. and TADMOR, N.H. (1964). Runoff farming in the Negev desert of
Israel: 2nd Progress Report Avdat and Shivta farm project. 1962/65. Rehovot, Israel
EVANARI, M., SHANAN, L. and TADMOR, N.H. (1971). The Negev, the challenge of a desert.
Harvard University press. Cambridge, Mass.
FALLON, L.E. (1963). Water spreading in Turkana, a hope for an impoverished people. USAID
Nairobi, Kenya.
FAO, (1977). Crop Water Requirements. Irrigation and Drainage Paper 24. Rome.
FAO, (1979). Yield response to water. Irrigation and Drainage Paper 33. Rome.
FAO, (1986). Irrigation water needs. Training Manual No 3. (Provisional Edition). Rome.
FINKEL, M. (1986). Water harvesting in Turkana, Kenya. Paper presented at the World Bank
Workshop on water harvesting in Baringo, Kenya.
A draft manual which covers several of the techniques described in Part 5, as well as giving
detailed treatment of water requirements and system design.
FRASIER, G.W. and MYERS, L.E. (1983). Handbook of water harvesting. Agricultural handbook
No. 600. USDA, Washington DC.
GILBERTSON, D.D. (1986). Runoff (floodwater) farming and rural water supply in arid lands. In:
Applied Geography 6 (1): 5-11.
GTZ (1988). Development of a sustainable smallholder farming systems in Burkina Faso. Final
report.
The report of a research project comparing various WH techniques for the Sudano-Sahelian
zone of Burkina Faso. Compares, inter alia, earth bunds, stone bunds, and permeable rock
dams.
HILLMAN, F. (1980). Water harvesting in Turkana District, Kenya. Pastoral Network Paper,
Agricultural Admin. Unit/ODI No. 10d, Overseas Development Institute, London.
HOGG, R. (1988). Water harvesting and agricultural production in semi-arid Kenya. In:
Development and Change 19: 69-87
HUDSON, N.W. (1987). Soil and water conservation in semi-arid areas. FAO Soils Bulletin
No.57.
Wide ranging and very well illustrated review of soil and water conservation techniques in semi-
arid areas worldwide. Includes section on RWH and related techniques.
KARGOUGOU, I. (1986). Report on water harvesting works in Burkina Faso. Paper presented
to the World Bank Workshop on water harvesting in Sub-Saharan Africa. Baringo, Kenya.
LINSLEY, KOHLER and PAULHUS (1958). Hydrology for Engineers. McGraw Hill.
MATLOCK, W.G. and DUTT, G.R. (1986). A primer on water harvesting and runoff farming.
Agricultural Engineering Dept./University of Arizona, USA
MoALD, Gov. KENYA (1984). Runoff harvesting for crop, range and tree production in the
BPSAAP area. Baringo Pilot Semi-Arid Area Project Interim Report, ch 12: 78-113. Baringo,
Kenya
MoALD, Gov. KENYA (1986). Water harvesting and water spreading in Turkana, a field worker's
manual. Nairobi, Kenya.
A useful practical manual, covering trapezoidal bunds, tree microcatchments and semi-circular
bunds for fodder. A general introduction to water spreading also.
MYERS, L.E. (1974). Water harvesting, 2000 BC to 1974 AD. In Frasier, G.W. (ed),
Proceedings of the water harvesting symposium, March 26-29, 1974, Phoenix, Arizona
NABHAN, G.P. (1986). Papago Indian desert agriculture and water control in the Sonoran
desert, 1917-1934. In: Applied Geography 6 (1): 43-59.
NATIONAL ACADEMY OF SCIENCES (1974). More water for arid lands. Promising
technologies and research opportunities. Washington DC.
Less than 20 pages devoted to RWH and Runoff Agriculture, but this booklet has been one of
the pioneers in awareness raising about RWH. Much of the content is a review of work in Israel.
NATIONAL ACADEMY OF SCIENCES (1980). Firewood crops - shrubs and tree species for
energy production.
A detailed guide to many of the multipurpose trees planted under RWH conditions.
NESSLER, U. (1980). Ancient techniques aid modern arid zone agriculture. In: Kidma, Israel
Journal of Development 5 (4): 3-7
PACEY, A. and CULLIS, A. (1986). Rainwater harvesting; the collection of rainfall and runoff in
rural areas. IT Publications, London, UK-
RWH is explored in its technical and socio-economic aspects. Covering a wide spectrum of
systems it is clearly illustrated and constitutes a valuable background text.
Useful brief description of permeable rock dam construction. Technical specifications and
methodology. Used in Ch. 7, Part Five.
RAY, D. (1986). Water harvesting in India. In: Waterlines Vol 4 (4).
REIJ, C., TURNER, S. and KUHLMAN, T. (1986). Soil and water conservation in Sub-Saharan
Africa: issues and options. IFAD/CDCS, Free University, Amsterdam.
REIJ, C. (1987). The Agro-Forestry Project in Burkina Faso; an analysis of popular participation
in soil and water conservation. In: Reij et al. Soil and water conservation in Sub-Saharan Africa,
Annex 2.
REIJ, C., MULDER, P. and BEGEMANN, L. (1988). Water harvesting for plant production.
World Bank Technical Paper No. 91 1988.
The most comprehensive literature review available of water harvesting for plant production
across the semi-arid and arid areas of the world, many diagrams, tables and the most extensive
bibliography available. A product of the World Bank's Sub-Saharan Water Harvesting Study.
Useful reference book for agroforestry systems, especially the tree component. Gives details of
microcatchment techniques for arid and semi-arid areas. Clearly illustrated.
ROOSE, E. (1985). Diversion channel terraces or permeable microdams? Analysis of two soil
and water conservation approaches in the little farms of the Sudano-Sahel. International
Conference on Soil Conservation, Maracay, Venezuela, November 3-9 1985, ISCO.
SHANAN, L. and TADMOR, N.H. (1979). Micro-catchment systems for arid zone development;
a handbook for design and construction. Hebrew University, Jerusalem.
The original guide to microcatchment systems for trees, but also includes systems for crops.
Technical information on hydrology is especially detailed, but also practical guidance for design
and construction.
SHARMA, K.D. (1986). Runoff behaviour of water harvesting microcatchments. In: Agricultural
Water Management 11 (2): 137-144.
SHARMA, K.D., PAREEK, O.P. and SINGH, H.P. (1986). Microcatchment water harvesting for
raising Jujube orchards in an arid climate. In: Transactions of the ASEA 29 (1). 112-118.
SIEGERT K- (1978). Surface runoff from arable lands (in German). Mitteilungen aus dem
Leichtweiss Institut No. 58.
SMITH P.D. (1988). Water harvesting for improved food production in arid lands: some design
considerations and research needs. Centre for Arid Zone Studies, University of North Wales,
Bangor.
SMITH, P.D. and CRITCHLEY, W.R.S. (1983). The potential of runoff harvesting for crop
production and range rehabilitation in semi-arid Baringo. In: Thomas, D.B. and Senga, W.M.
(eds) Soil and Water Conservation in Kenya. Proc. of the Second National Workshop, Nairobi,
March 10-13, 1982: 324-331
TADMOR, N.H., EVANARI, M. and SHANAN, L. (1970). Runoff farming in the desert: Survival
and yields of perennial range plants. In: Agronomy Journal 62: 695-699.
UNESCO (1977). Map of the world distribution of arid zones. Man and Biosphere Technical
Notes No.7.
VON MAYDELL, H-J. (1986). Trees and shrubs of the Sahel. GTZ, Eschborn.
The most comprehensive guide available to trees suited to the Sahel and semi-arid Sub-
Saharan Africa in general. Detailed and well illustrated.
WIDANAPATHIRANA, A.S. (1987). Exploring wadi resources for irrigation in arid areas of the
Western Sudan: strategy and problems. Presented at the International Symposium on the
Conjunctive Use of Surface and Groundwater. Lahore, Pakistan.
An introduction to WH in the USA and Mexico. Covers both traditional techniques and modern
research.
3. Exploiting Agronomic Test Results. Symbiotic Nitrogen Fixation User's Manual: Analysis of
variance on Apple II computer. G. Caraux. 1985*.
5. Landscape-guided Climatic Inventory Using Remote-sensing Imagery. F. van der Laan. 1985.
6. Biogas in Africa: Current Status and Strategies to Enhance its Diffusion. D.C. Stuckey. 1985.
7. Status Report on Plant Nutrition in Fertilizer Programme Countries in Asia and the Pacific
Region. 1986.
10. Status Report on Plant Nutrition in Fertilizer Programme Countries in Africa. 1986.
14. Manpower Planning for Irrigation. R. Carter, D. Mason and M. Kay. AGL/ESH. 1988.
16. Water, Soil and Crop Management Relating to the Use of Saline Water. 1990.
* Out of print
M/U3160E/2/1.95/200