0% found this document useful (0 votes)
3K views1 page

Final Dimensional Report: Prepared by Approved by

This dimensional report details the inspection of a part against its drawing specifications. It lists 6 dimensions - labeled A through G - along with their drawing specifications, actual measured values, deviations from specifications, and whether each dimension was within tolerance and thus acceptable. The report was prepared by the QC inspector and approved by the QC manager, and includes their signatures and dates.

Uploaded by

QC Taner 453
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3K views1 page

Final Dimensional Report: Prepared by Approved by

This dimensional report details the inspection of a part against its drawing specifications. It lists 6 dimensions - labeled A through G - along with their drawing specifications, actual measured values, deviations from specifications, and whether each dimension was within tolerance and thus acceptable. The report was prepared by the QC inspector and approved by the QC manager, and includes their signatures and dates.

Uploaded by

QC Taner 453
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

EXHIBIT: S PAGE 2 OF 2

FINAL DIMENSIONAL REPORT


JOB NO. : INSPECTED BY :
DRAWING NO. : SERIAL NO. :

DATE OF INSPECTION : ITEM DESCRIPTION :

SKETCH REFER TO PAGE 1 OF 2

DRAWING
POST ACTUAL DEVIATION TOLERANCE ACCEPT REJECT REMARKS
DIMENSION
A 1900 -1900 ±4
B 2400 -2400 ±4
C 2400 -2400 ±4
D 2800 -2800 ±4
E 1720 -1720 ±4
F 470 -470 ±6.35
G 955 -955 ±6.35

PREPARED BY APPROVED BY

Signature : Signature :
Name : Name :
Position : QC INSPECTOR Position : QC MANAGER