FIELD DRY DENSITY (SAND REPLACEMENT METHOD )
IS:2720 P-16:(2015)
RFI No : Date of Testing :
Chainage : RMM No
Layer : Source of material :
Width : Lab MDD (g/cc) :
Cylinder No : Lab OMC (%) :
Wt. of sand in cone 9,W3(gm : 2557 Bulk Density of Sand (Ys) :
Description Test 1 Test 2 Test3 Test 4 Test 5 Test 6 Test 7
Representing Test Chainage
Offsets from centre line (mtr)
Depth of Layer (mm) 250 250 250 250 250 250 250
Wt of material from hole, Ww
15577.4 14487.67 15249.77 14542.37 14893 14559.84 14601.81
(Gm)
Wt of Sandr+ cylinder before
31500 31500 31500 31500 31500 31500 31500
pouring, W1 (Gm)
Wt of Sandr+ cylinder after
18100 18950 18450 18941 18789 19000 18945
pouring,W2 (Gm)
Wt of sand in hole, Wb (gm) 10843 9993 10493 10002 10154 9943 9998
Bulk Density of Material
1.925 1.943 1.947 1.948 1.965 1.962 1.957034
Yb=(Wb/Ww)*Ys
RMM Reading 12 12 12 12.5 13 12.5 12.5
Corrected Moisture Content,(w)
12.56 12.56 12.56 13.01 13.56 13.01 13.01
%
DD, Yd=Yb/(1+w) 1.710 1.726 1.730 1.723996 1.731 1.736 1.732
Degree of compaction (%) 97.23 98.12 98.36 98.01 98.39 98.71 98.45
Avg. Compaction Obtainbed(%)
Stanadard Deviation
Required Compaction :OGL 95%, Embankment 95%, Subgrade 97%, CTSB 98%, WMM 98%, AIL 98%, GSB 98%
Remarks : Pass/ Fail
TESTED BY REVIEWED BY
For EPC Rep. For EPC Rep.
Name/ Sign Name/sign
Desigantion Designation
OD )
esting :
material :
(g/cc) : 1.759
(%) : 14.4
ity of Sand (Ys) : 1.34
Test 8 Test 9 Test 10
250 250 250
14581.28 15005.07 15573.61
31500 31500 31500
18974 18759 18474
9969 10184 10469
1.959967 1.974 1.9934
13 13.5 14.5
13.56 14.01 14.98
1.726 1.732 1.734
98.12 98.45 98.56
SB 98%
C-