Package-A: Supply & Erection Schedule (R1) : New 33 KV Overhead Line by Panther Conductor - Total Qty. 412 CKM
Package-A: Supply & Erection Schedule (R1) : New 33 KV Overhead Line by Panther Conductor - Total Qty. 412 CKM
Supply & Erection Schedule (R1): New 33 KV Overhead Line by Panther conductor -- Total Qty. 412 CKM
Supply Scheule Erection Scheule
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
Erection
per unit)
Qty. 412
Qty./Km
(INR)
(INR)
Total
(INR)
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13) 15=(5X14) 16=(11+15)
MS Nut & Bolt with spring and plain washers of different size
20 KG 10 4037.60 BO 0 0 0 0 0
(Galvinized)
21 Stone base plate (450X450X75 mm) Nos. 24 9690 BO 0 0 0 0 0
22 Anti-climbing Device (Barbed wire) 2x12 SWG KG 50 20188.00 BO 0 0 0 0 0
33 kV DP Channel support clamp (50x6mm) (Galvanized) (1 pair = 1
23 Set of 2 Pair 2 808 BO 0 0 0 0 0
set) for 60kg Rail pole
24 33 kV DP Channel (100x50x6mm) 3150mm long (Galvanized) Set 4 1615 BO 0 0 0 0 0
Earthing (Chemical) with GI earthing pipe 40mm 3.0mtrs long
25 Set 24 9690 BO 0 0 0 0 0
(Bentonite as intermittent layers)
Package-A :
Supply & Erection Schedule (R1): New 33 KV Overhead Line by Panther conductor -- Total Qty. 412 CKM
Supply Scheule Erection Scheule
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
Erection
per unit)
Qty. 412
Qty./Km
(INR)
(INR)
Total
(INR)
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13) 15=(5X14) 16=(11+15)
26 Earthing clamp for earth wire (50x6mm) (Galvanized) Pair 24 9690 BO 0 0 0 0 0
27 Danger Board with clamp Nos. 24 9690 BO 0 0 0 0 0
Overhead covered conductor (Approx 10% of total line length:
29 BO 0
exact quantity shall be as per site requirement)
HDPE/XLPE covered ACSR Panther conductor (200 sq. mm.) as per
29 (a) KMs 3.09 127.31 BO 0 0 0 0 0
EN 50397-1:2006 incuding 3% sag
Accessories for covered conductors required as per EN 50397-2 as
29 (b) BO 0
listed below:
(b) 33 kV Underground XLPE Cable (3Cx400 sq.mm) armoured Km. 2.2 18.13 BO 0 0 0 0 0
Jointing Kit For 33kV XLPE Cable (3Cx400 sq.mm) Heat shrinkable
(c) Set 14 115 BO 0 0 0 0 0
Straight through
Heat Shrikable jointing kit for 33 kV (3Cx400 sq.mm) XLPE Outdoor
(d) Set 6 49 BO 0 0 0 0 0
type
(e) 6'' GI Pipe Medium duty (B Class) Meter 250 2060.00 BO 0 0 0 0 0
(f) 6'' HDPE Pipe PE 63 grade; PN 4 pressure rating Meter 1500 12360.00 BO 0 0 0 0 0
(g) Cable Marker (metal) (including Cable tie and other associated work) No. 40 330 BO 0 0 0 0 0
31 Pole pit excavation for 60 kg 13 mtrs. Long Rail Pole Per Pit 24 9888 BO 0 0 0 0 0
Erection of 13 mtrs Rail Pole with stone base plate BO 0
32 a) Single pole 20 8240 BO 0 0 0 0 0
b) Double pole Per DP 2 824 BO 0 0 0 0 0
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
Erection
per unit)
Qty. 412
Qty./Km
(INR)
(INR)
Total
(INR)
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13) 15=(5X14) 16=(11+15)
Note : 1. All supply materials and their erection work REC/IS guideline for same shall prevail.
2. Materials like clamps, connectors, glands, washers, gaskets, lugs, nuts and bolts, tags, termiantion kits, ties and others which are not provided but required technically during execution shall be supplied without any price imp lication and that will be treated as considered in the price schedule.
3. All the iron materials shall be hot dip galvanised as per IS.
4. Civil works which is not included in the schedule but required during execution, will be treated included in the erection part.
Package-A :
Supply & Erection Schedule (R2): 11kV UG (3Cx300 sq. mm.) HT Al XLPE Armoured Cable (Double circuit)- Total Qty. 131 CKM
Supply Scheule Erection Scheule
Qty./Km
Sl. No.
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
Erection
per unit)
Qty. 131
(INR)
(INR)
(INR)
Total
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13) 15=(5X14) 16=(11+15)
Rail Pole 60 Kgs per mtr 13 mtr long each with stone base plate
1 No. 6 786 BO 0 0 0 0 0
(450X450X75 mm)
2 DP channel (100x50x6mm) 2200 mm long (Galvinized) Set 2 262 BO 0 0 0 0 0
3 11 KV Disc Insulator (Porcelin Type) 70 KN with H/W Set 6 786 BO 0 0 0 0 0
4 Cross Bracing for DP (Galvinized) Set 2 262 BO 0 0 0 0 0
Stay Set Complete (1800x16 mm) with Stay wire 7/10 SWG & guy
5 Set 12 1572 BO 0 0 0 0 0
Insulator
6 Stay Clamp Side (50X10 mm)Galvinized Pair 8 1048 BO 0 0 0 0 0
7 Stay Clamp Angle (50x10 mm)Galvinized Pair 4 524 BO 0 0 0 0 0
8 DP Channel supporting clamp (50x6 mm),Galvinized Set 2 262 BO 0 0 0 0 0
9 11kV clamp for cross bracing Galvinized Pair 8 1048 BO 0 0 0 0 0
10 Earthing complete with GI wire no. 8 for 11 kV with coil earthing Set 6 786 BO 0 0 0 0 0
11 Red oxide paint Ltr 5 655.00 BO 0 0 0 0 0
12 Allluminium paint Ltr 5 655.00 BO 0 0 0 0 0
13 Anti climbing Device (Barbed wire) 2x12 SWG Kg 8 1048.00 BO 0 0 0 0 0
14 Danger Board with clamp Set 2 262 BO 0 0 0 0 0
15 MS Nut & Bolt of different size (Galvinized) Kg 10 1310.00 BO 0 0 0 0 0
16 11 kV Underground XLPE Cable(3Cx300 sq.mm),(Armoured) Km. 2.7 353.70 BO 0 0 0 0 0
Staright through Jointing Kit For 11 kV XLPE Cable heat shrinkable
17 Set 8 1048 BO 0 0 0 0 0
(3cx300 sq.mm.)
Heat Shrikable jointing kit & termination kit for 11 kV (3Cx300 sq.mm)
18 Set 8 1048 BO 0 0 0 0 0
XLPE AL cable Outdoor type
19 6" G.I. Pipe Medium duty (B Class) Meter 40 5240 BO 0 0 0 0 0
20 HDPE Pipe (150 mm Diameter)PE 63 grade; PN 4 pressure rating Meter 100 13100 BO 0 0 0 0 0
21 Cable Marker (metal), cable tie and other associated accessories No. 40 5240 BO 0 0 0 0 0
Exacavation of trench and sand filling, brick filling and back filling of
22 Meter 500 65500 BO 0 0 0 0 0
trench for XLPE Cable laying (trench Size 1200x600 mm)
Note : 1. All supply materials and their erection work REC/IS guideline for same shall prevail.
Package-A :
Supply & Erection Schedule (R2): 11kV UG (3Cx300 sq. mm.) HT Al XLPE Armoured Cable (Double circuit)- Total Qty. 131 CKM
Supply Scheule Erection Scheule
Qty./Km
Sl. No.
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
Erection
per unit)
Qty. 131
(INR)
(INR)
(INR)
Total
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13) 15=(5X14) 16=(11+15)
2. Materials like clamps, connectors, glands, washers, gaskets, lugs, nuts and bolts, tags, termiantion kits, ties and others which are not provided but required technically during execution shall be supplied without any price imp lication and that will be treated as considered in the price schedule.
3. All the iron materials shall be hot dip galvanised as per IS.
4. Civil works which is not included in the schedule but required during execution, will be treated included in the erection part.
Package-A :
Supply & Erection Schedule (R3): 500 KVA distribution transformer with 1 KM of L.T. AB cable of 3CX95 sq. mm. -Total Qty. 290 Nos. DSS and 290 KM Double length
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
Erection
per unit)
Qty. 290
Qty./Km
(INR)
(INR)
(INR)
Total
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13) 15=(5X14) 16=(11+15)
12 MS Channel (75x40x6 mm) for supporting H.G fuse [GALVANIZED] Set 1 290 BO 0 0 0 0 0
LT Distribution box suitable for 500 KVA transformer (800 A, isolator &
18 Nos. 1 290 BO 0 0 0 0 0
12 SP MCCB of 160 A)
19 Aluminium binding wire KG 10 2900 BO 0 0 0 0 0
20 Aluminium Tape KG 10 2900 BO 0 0 0 0 0
21 Stone Base plate for 11 KV Nos. 2 580 BO 0 0 0 0 0
22 Anti-climbing Device (Barbed wire) KG 10 2900 BO 0 0 0 0 0
23 Al paint Ltrs 5 1450 BO 0 0 0 0 0
24 Red oxide paint Ltrs 8 2320 BO 0 0 0 0 0
25 11 KV Danger Board with clamp No. 1 290 BO 0 0 0 0 0
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
Erection
per unit)
Qty. 290
Qty./Km
(INR)
(INR)
(INR)
Total
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13) 15=(5X14) 16=(11+15)
27 LT Al XLPE AB Cable 3CX95+1CX70+1CX70 sq.mm Km 2 580.00 BO 0 0 0 0 0
a) Erection of stay with stone /RCC stay plate and stay binding and
Per Stay 18 5220 BO 0 0 0 0 0
fitting of stay clamps etc.
45
b) Concreting of stay pit with 1:3:6 mixture and filling with earth and
ramming including supply of stone/jhama chips, sand etc. To be Per Stay 18 5220 BO 0 0 0 0 0
supplied by the contractor.
Note : 1. All supply materials and their erection work REC/IS guideline for same shall prevail.
2. Materials like clamps, connectors, glands, washers, gaskets, lugs, nuts and bolts, tags, termiantion kits, ties and others which are not provided but required technically during execution shall be supplied without any price imp lication and that will be treated as considered in the price schedule.
3. All the iron materials shall be hot dip galvanised as per IS.
4. Civil works which is not included in the schedule but required during execution, will be treated included in the erection part.
Package-A :
Supply & Erection Schedule (R4): Additional 1X10 MVA Power Transformer at 33/11 KV PSS --Total Qty. 1 No.
Supply Scheule Erection Scheule
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
per unit)
Qty./Km
Qty. 1
Total
(INR)
(INR)
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13
36 kV, 800A, 25kA for 3 seconds, 3-ph double break centre rotating
4 Set 2 2 BO 0 0
type (DBCR), Gang Operated Isolator
12 kV, 630A, 25kA for 3 seconds, 3-ph double break centre rotating
5 Set 2 2 BO 0 0
type (DBCR), Gang Operated Isolator
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
per unit)
Qty./Km
Qty. 1
Total
(INR)
(INR)
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13
Note : 1. All supply materials and their erection work REC/IS guideline for same shall prevail.
2. Materials like clamps, connectors, glands, washers, gaskets, lugs, nuts and bolts, tags, termiantion kits, ties and others which are not provided but required technically during execution shall be supplied without any price imp lication and that will be treated as considered in the price sched
3. All the iron materials shall be hot dip galvanised as per IS.
4. Civil works which is not included in the schedule but required during execution, will be treated included in the erection part.
Erection Scheule
Unit Erection Charges
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
including GST (INR)
14=(12+13)
Total Value of Erection
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
including Service Tax
(INR)
15=(5X14)
Total Value of Supply and
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Erection
16=(11+15)
Erection Scheule
Unit Erection Charges
0
0
including GST (INR)
14=(12+13)
Total Value of Erection
0
0
including Service Tax
(INR)
15=(5X14)
0
0
0
Erection
16=(11+15)
Package-A :
Supply & Erection Schedule (R6): New 33 KV Overhead Line by Panther conductor --Total Qty. 30 CKM
Supply Scheule Erection Scheule
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
Erection
per unit)
Qty./Km
Qty. 30
(INR)
Total
(INR)
(INR)
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13) 15=(5X14) 16=(11+15)
MS Nut & Bolt with spring and palin washers of different size BO
20 KG 10 294.00 0 0 0 0 0 0 0 0 0
(Galvinized)
21 Stone base plate (450X450X75 mm) Nos. 24 706 BO 0 0 0 0 0 0 0 0 0
22 Anti-climbing Device (Barbed wire) 2x12 SWG KG 50 1470.00 BO 0 0 0 0 0 0 0 0 0
33 kV DP Channel support clamp (50x6mm) (Galvanized) (1 pair = 1 BO
23 Set of 2 Pair 2 59 0 0 0 0 0 0 0 0 0
set) for 60kg Rail pole
24 33 kV DP Channel (100x50x6mm) 3150mm long (Galvanized) Set 4 118 BO 0 0 0 0 0 0 0 0 0
Earthing (Chemical) with GI earthing pipe 40mm 3.0mtrs long BO
25 Set 24 706 0 0 0 0 0 0 0 0 0
(Bentonite as intermittent layers)
Package-A :
Supply & Erection Schedule (R6): New 33 KV Overhead Line by Panther conductor --Total Qty. 30 CKM
Supply Scheule Erection Scheule
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
Erection
per unit)
Qty./Km
Qty. 30
(INR)
Total
(INR)
(INR)
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13) 15=(5X14) 16=(11+15)
26 Earthing clamp for earth wire (50x6mm) (Galvanized) Pair 24 706 BO 0 0 0 0 0 0 0 0 0
27 Danger Board with clamp Nos. 24 706 BO 0 0 0 0 0 0 0 0 0
Overhead covered conductor (Approx 10% of total line length: BO
28 0 0 0 0 0 0 0 0 0
exact quantity shall be as per site requirement)
HDPE/XLPE covered ACSR Panther conductor (200 sq. mm.) as per BO
28 (a) KMs 3.09 9.27 0 0 0 0 0 0 0 0 0
EN 50397-1:2006 incuding 3% sag
Accessories for covered conductors required as per EN 50397-2 as BO
28 (b) 0 0 0 0 0
listed below:
(b) 33 kV Underground XLPE Cable (3Cx400 sq.mm) armoured Km. 2.2 1.32 BO 0 0 0 0 0 0 0 0 0
Jointing Kit For 33kV XLPE Cable (3Cx400 sq.mm) Heat shrinkable BO
(c) Set 8 5 0 0 0 0 0 0 0 0 0
Straight through
Heat Shrikable jointing kit for 33 kV (3Cx400 sq.mm) XLPE Outdoor BO
(d) Set 8 5 0 0 0 0 0 0 0 0 0
type
(e) 6'' GI Pipe Medium duty (B Class) Meter 40 24 BO 0 0 0 0 0 0 0 0 0
(f) 6'' HDPE Pipe PE 63 grade; PN 4 pressure rating Meter 100 60 BO 0 0 0 0 0 0 0 0 0
BO
(g) Cable Marker (metal) (including Cable tie and other associated work) No. 40 24 0 0 0 0 0 0 0
31 Pole pit excavation for 60 kg 13 mtrs. Long Rail Pole Per Pit 24 720 BO 0 0 0 0 0 0 0
Erection of 13 mtrs Rail Pole with stone base plate BO 0 0 0
32 a) Single pole 20 600 BO 0 0 0 0 0 0 0
b) Double pole Per DP 2 60 BO 0 0 0 0 0 0 0
BO
Concreting and top muffing of support with 1:3:6 mixture (including
cost of approved quality of stone chips 20mm to 6mm size grated,
33 clean coarse sand of FM 2.5 to 3 grade and cement concrete along Per 20 cft 24 720 0 0 0 0 0 0 0
with cost of screening, shuttering, mixing, placing the mixture in
position, vibrating, striking, curing, taxes and royalty all complete)
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
Erection
per unit)
Qty./Km
Qty. 30
(INR)
Total
(INR)
(INR)
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13) 15=(5X14) 16=(11+15)
Note : 1. All supply materials and their erection work REC/IS guideline for same shall prevail.
2. Materials like clamps, connectors, glands, washers, gaskets, lugs, nuts and bolts, tags, termiantion kits, ties and others which are not provided but required technically during execution shall be supplied without any price imp lication and that will be treated as considered in the price schedule.
3. All the iron materials shall be hot dip galvanised as per IS.
4. Civil works which is not included in the schedule but required during execution, will be treated included in the erection part.
Package-A :
Supply & Erection Schedule (R7): 11kV UG (3Cx300 sq. mm.) HT Al XLPE Armoured Cable (Double circuit)- Total Qty. 8 CKM
Supply Scheule Erection Scheule
Qty./Km
Sl. No.
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
Erection
per unit)
Qty. 8
(INR)
Total
(INR)
(INR)
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13) 15=(5X14) 16=(11+15)
Rail Pole 60 Kgs per mtr 13 mtr long each with stone base plate BO
1 No. 6 48 0 0 0 0 0 0 0 0 0
(450X450X75 mm)
2 DP channel (100x50x6mm) 2200 mm long (Galvinized) Set 2 16 BO 0 0 0 0 0 0 0 0 0
3 11 KV Disc Insulator (Porcelin Type) 70 KN with H/W Set 6 48 BO 0 0 0 0 0 0 0 0 0
4 Cross Bracing for DP (Galvinized) Set 2 16 BO 0 0 0 0 0 0 0 0 0
Stay Set Complete (1800x16 mm) with Stay wire 7/10 SWG & guy BO
5 Set 12 96 0 0 0 0 0 0 0 0 0
Insulator
6 Stay Clamp Side (50X10 mm)Galvinized Pair 8 64 BO 0 0 0 0 0 0 0 0 0
7 Stay Clamp Angle (50x10 mm)Galvinized Pair 4 32 BO 0 0 0 0 0 0 0 0 0
8 DP Channel supporting clamp (50x6 mm),Galvinized Set 2 16 BO 0 0 0 0 0 0 0 0 0
9 11kV clamp for cross bracing Galvinized Pair 8 64 BO 0 0 0 0 0 0 0 0 0
10 Earthing complete with GI wire no. 8 for 11 kV with coil earthing Set 6 48 BO 0 0 0 0 0 0 0 0 0
11 Red oxide paint Ltr 5 40 BO 0 0 0 0 0 0 0 0 0
12 Allluminium paint Ltr 5 40.00 BO 0 0 0 0 0 0 0 0 0
13 Anti climbing Device (Barbed wire) 2x12 SWG Kg 8 64.00 BO 0 0 0 0 0 0 0 0 0
14 Danger Board with clamp Set 2 16 BO 0 0 0 0 0 0 0 0 0
15 MS Nut & Bolt of different size (Galvinized) Kg 10 80.00 BO 0 0 0 0 0 0 0 0 0
16 11 kV Underground XLPE Cable(3Cx300 sq.mm),(Armoured) Km. 2.2 17.60 BO 0 0 0 0 0 0 0 0 0
Staright through Jointing Kit For 11 kV XLPE Cable heat shrinkable BO
17 Set 8 64 0 0 0 0 0 0 0 0 0
(3cx300 sq.mm.)
Heat Shrikable jointing kit & termination kit for 11 kV (3Cx300 sq.mm) BO
18 Set 8 64 0 0 0 0 0 0 0 0 0
XLPE AL cable Outdoor type
19 6" G.I. Pipe Medium duty (B Class) Meter 40 320 BO 0 0 0 0 0 0 0 0 0
20 6 " HDPE Pipe PE 63 grade; PN 4 pressure rating Meter 100 800 BO 0 0 0 0 0 0 0 0 0
BO
21 Cable Marker (metal) (including Cable tie and other associated work) No. 40 320 0 0 0 0 0 0 0
Exacavation of trench and sand filling, brick filling and back filling of BO
22 Meter 500 4000 0 0 0 0 0 0 0
trench for XLPE Cable laying (trench Size 1200x600 mm)
Qty./Km
Sl. No.
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
Erection
per unit)
Qty. 8
(INR)
Total
(INR)
(INR)
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13) 15=(5X14) 16=(11+15)
Note : 1. All supply materials and their erection work REC/IS guideline for same shall prevail.
2. Materials like clamps, connectors, glands, washers, gaskets, lugs, nuts and bolts, tags, termiantion kits, ties and others which are not provided but required technically during execution shall be supplied without any price imp lication and that will be treated as considered in the price schedule.
3. All the iron materials shall be hot dip galvanised as per IS.
4. Civil works which is not included in the schedule but required during execution, will be treated included in the erection part.
Package-A :
Supply & Erection Schedule (R8): 500 KVA distribution transformer with 1 KM of L.T. AB cable of 3CX95 sq. mm. -Total Qty. 10 Nos.
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
Erection
per unit)
Qty./Km
Qty. 10
(INR)
Total
(INR)
(INR)
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13) 15=(5X14) 16=(11+15)
LT Distribution box suitable for 500 KVA transformer (800 A, isolator & BO
18 Nos. 1 10 0 0 0 0 0 0 0 0 0
12 SP MCCB of 160 A)
19 Aluminium binding wire KG 10 100 BO 0 0 0 0 0 0 0 0 0
20 Aluminium Tape KG 10 100 BO 0 0 0 0 0 0 0 0 0
21 Stone Base plate for 11 KV Nos. 2 20 BO 0 0 0 0 0 0 0 0 0
22 Anti-climbing Device (Barbed wire) KG 10 100 BO 0 0 0 0 0 0 0 0 0
23 Al paint Ltrs 5 50 BO 0 0 0 0 0 0 0 0 0
24 Red oxide paint Ltrs 8 80 BO 0 0 0 0 0 0 0 0 0
25 11 KV Danger Board with clamp No. 1 10 BO 0 0 0 0 0 0 0 0 0
Package-A :
Supply & Erection Schedule (R8): 500 KVA distribution transformer with 1 KM of L.T. AB cable of 3CX95 sq. mm. -Total Qty. 10 Nos.
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
Erection
per unit)
Qty./Km
Qty. 10
(INR)
Total
(INR)
(INR)
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13) 15=(5X14) 16=(11+15)
BO
11 KV Earthing (Chemical) with GI earthing pipe 40mm 3.0mtrs long
26 No. 3 30 0 0 0 0 0 0 0 0 0
(Bentonate as intermittent layers) with G.I wire No.8 SWG
a) Erection of stay with stone /RCC stay plate and stay binding and BO
Per Stay 18 180 0 0 0 0 0 0 0
fitting of stay clamps etc.
45
b) Concreting of stay pit with 1:3:6 mixture and filling with earth and BO
ramming including supply of stone/jhama chips, sand etc. To be Per Stay 18 180 0 0 0 0 0 0 0
supplied by the contractor.
Note : 1. All supply materials and their erection work REC/IS guideline for same shall prevail.
Package-A :
Supply & Erection Schedule (R8): 500 KVA distribution transformer with 1 KM of L.T. AB cable of 3CX95 sq. mm. -Total Qty. 10 Nos.
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
Erection
per unit)
Qty./Km
Qty. 10
(INR)
Total
(INR)
(INR)
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13) 15=(5X14) 16=(11+15)
2. Materials like clamps, connectors, glands, washers, gaskets, lugs, nuts and bolts, tags, termiantion kits, ties and others which are not provided but required technically during execution shall be supplied without any price imp lication and that will be treated as considered in the price schedule.
3. All the iron materials shall be hot dip galvanised as per IS.
4. Civil works which is not included in the schedule but required during execution, will be treated included in the erection part.
Package-A :
Supply & Erection Schedule (R9): New 33/11 KV GIS Substation (2x10 MVA) -- Total Qty. 1 Nos.
Supply Scheule Erection Scheule
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
per unit)
Qty./Km
Qty. 1
Total
(INR)
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13)
1.01 10.0 MVA with on load tap changer No 2 2.00 BO #REF! #REF! #REF! #REF! 0
30 kV, 10kA, 1-ph Station Class Lightening Arrester complete (1
set= 3 Nos.), jumpering from bus bar, hardware etc as required as
2.00 Set 2 2.00 #REF! #REF! #REF! #REF! 0
per technical specifications, approved drawings and scope of the
works. BO
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
per unit)
Qty./Km
Qty. 1
Total
(INR)
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13)
BO
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
per unit)
Qty./Km
Qty. 1
Total
(INR)
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13)
BO
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
per unit)
Qty./Km
Qty. 1
Total
(INR)
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13)
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
per unit)
Qty./Km
Qty. 1
Total
(INR)
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13)
26.01 40 mm dia., 3000 mm long GI pipe earth electrode with test link Set 50 50.00 #REF! #REF! #REF! #REF! 0
BO
Package-A :
Supply & Erection Schedule (R9): New 33/11 KV GIS Substation (2x10 MVA) -- Total Qty. 1 Nos.
Supply Scheule Erection Scheule
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
per unit)
Qty./Km
Qty. 1
Total
(INR)
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13)
LT Power Cables including their termination materials like glands,
27.00 lugs, tagging etc. as per technical specifications, approved #REF! #REF! #REF! #REF! 0
drawings and scope of the work. BO
3.5 Core 150 Sq. mm armoured, stranded aluminium conductor,
27.01 km 0.1 0.10 #REF! #REF! #REF! #REF! 0
PVC insulated and PVC sheathed cable BO
3.5 Core 95 Sq. mm armoured, stranded aluminium conductor,
27.02 km 0.1 0.10 #REF! #REF! #REF! #REF! 0
PVC insulated and PVC sheathed cable BO
2 Core 16 Sq. mm armoured, stranded aluminium conductor, PVC
27.03 km 0.1 0.10 #REF! #REF! #REF! #REF! 0
insulated and PVC sheathed cable BO
LT Control cables including their termination materials like
28.00 glands, lugs etc. as per technical specifications, approved #REF! #REF! #REF! #REF! 0
drawings and scope of the work. BO
4 Core 2.5 sqmm armoured, stranded copper conductor, PVC
28.01 km 0.1 0.10 #REF! #REF! #REF! #REF! 0
insulated and PVC sheathed cable BO
6 Core 2.5 sqmm armoured, stranded copper conductor, PVC
28.02 km 0.1 0.10 #REF! #REF! #REF! #REF! 0
insulated and PVC sheathed cable BO
12 Core 2.5 sqmm armoured, stranded copper conductor, PVC
28.03 km 0.1 0.10 #REF! #REF! #REF! #REF! 0
insulated and PVC sheathed cable BO
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
per unit)
Qty./Km
Qty. 1
Total
(INR)
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13)
Tool & Plant: Gum Boot- 2 pair, Hand Gloves- 2 pair, Insulated
Plier- 2 nos., D E spanner set- 2 sets, Slide range 8" & 12" 2 nos
each, Torch (Flash Light) 4 cell- 2 nos, Earth megger- 1 no,
Insulation Megger (hand operated) 1000 V-1 no & 5000V-1no.,
38.01 Tong Tester (Digital)- 1 no, Discharge Rod (1 Set=3 Nos)- 6 Sets,AL Lot 1 1.00 #REF! #REF! #REF! #REF! 0
Ladder(6mtr.)-1no.,Crimping tool-01no.,Multimeter (3.5 digit)-01
no. Chain pulley(Block)-01no.,Safety Belt with thigh straps
confirming IS:2925 with ISI mark-02no., Rubber mat (1.25"
Thick)for laying in front of all panels in control room completely.
BO
39.00 Office Furniture as per requirement BO #REF! #REF! #REF! #REF! 0
39.01 Office table Godrej make No. 2 2.00 BO #REF! #REF! #REF! #REF! 0
39.02 Office chair Godrej make No. 6 6.00 BO #REF! #REF! #REF! #REF! 0
39.03 Godrej Storwel (Almirah) standard size. No. 2 2.00 BO #REF! #REF! #REF! #REF! 0
11 kv capacitor bank including mounting steel galvanised
structure and accessories as required as per detailed technical
40.00 #REF! #REF! #REF! #REF! 0
specifications, drawing and scope of works in following
arrangements: BO
Package-A :
Supply & Erection Schedule (R9): New 33/11 KV GIS Substation (2x10 MVA) -- Total Qty. 1 Nos.
Supply Scheule Erection Scheule
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
per unit)
Qty./Km
Qty. 1
Total
(INR)
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13)
BO
41 RTU-Type B 33/11 kV Sub Stations BO #REF! #REF! #REF! #REF! 0
RTU base equipment comprising panels, racks, sub-racks, Power
Supply modules, CPU, Analog and Digital input Control output
Modules, interfacing equipments for interfacing MFTs using RS-
41.01 485 MODBUS Protocol and 2 Eathernet Ports, required A-D Set 1 1.00 #REF! #REF! #REF! #REF! 0
Converters & all other required items/accessories including
complete wiring for all modules for locations mentioned for Type B
RTUs BO
41.02 Multifunction Transducers (MFTs) No. 13 13.00 BO #REF! #REF! #REF! #REF! 0
41.03 Weather transducer - Wind speed No. 1 1.00 BO #REF! #REF! #REF! #REF! 0
41.04 Weather transducer - Rainfall No. 1 1.00 BO #REF! #REF! #REF! #REF! 0
41.05 Weather transducer - Humidity No. 1 1.00 BO #REF! #REF! #REF! #REF! 0
41.06 Weather transducer -Temperature No. 1 1.00 BO #REF! #REF! #REF! #REF! 0
41.07 Weather transducer -Wind Direction No. 1 1.00 BO #REF! #REF! #REF! #REF! 0
41.08 Router for RTUs No. 1 1.00 BO #REF! #REF! #REF! #REF! 0
41.09 Single TFT PC for LDMS(22``) Nos 1 1.00 BO #REF! #REF! #REF! #REF! 0
41.10 B/W Laser printer for LDMS Nos 1 1.00 BO #REF! #REF! #REF! #REF! 0
Any other hardware to meet functional/performance
42 #REF! #REF! #REF! #REF! 0
requirement of MTS BO
42.a OLTC Transducers No. 2.00 2.00 BO #REF! #REF! #REF! #REF! 0
43 RTU Database Configuration & Maintenance Software tool No. 1.00 1.00 BO #REF! #REF! #REF! #REF! 0
Master Station cum RTU Simulator & Protocol analyzer software
44 No. 1.00 1.00 #REF! #REF! #REF! #REF! 0
tool BO
Laptop PC for above software tools along with interfacing
45 No. 1.00 1.00 #REF! #REF! #REF! #REF! 0
hardware including Hub BO
Bandwidth Charges for 5 Years BO #REF! #REF! #REF! #REF! 0
Network Connectivity Charges for Single 2Mbps MPLS Links per
46 Rs/Site 1.00 1.00 #REF! #REF! #REF! #REF! 0
year including NTU one time Charges*** BO
RVDUs Network Connectivity Charges for 2MBps MPLS Links per
47 Rs/Site 1.00 1.00 #REF! #REF! #REF! #REF! 0
year including NTU one time Charges *** BO
48 2 kVA UPS for RTU Locations/LDMS Sets 1.00 1.00 BO #REF! #REF! #REF! #REF! 0
49 48 V DCPS at RTU Locations along with VRLA Batteries Sets 1.00 1.00 BO #REF! #REF! #REF! #REF! 0
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
per unit)
Qty./Km
Qty. 1
Total
(INR)
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13)
BO
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
per unit)
Qty./Km
Qty. 1
Total
(INR)
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13)
Vitrified ceramic tile (mirror polished) 600 x 600 x 10mm thick shall
be provided for floors of office rooms, conference room & control 0 0 #REF! #REF! #REF!
equipment room and for dado upto false ceiling.
BO
6.02 Interior Wall / Ceiling Finish BO 0 0 #REF! #REF! #REF!
For all air conditioned control room, 600 x 600 x 10mm th. Vitrified
ceramic tile dado shall be provided upto false ceiling and for other
0 0 #REF! #REF! #REF!
air - conditioned areas acrylic emulsion paint of approved make and
shade over 2 mm thick plaster of paris punning shall be provided.
BO
For all other areas oil bound distemper ( IS : 428 ) of approved shade
0 0 #REF! #REF! #REF!
over 2 mm thick plaster of paris punning shall be provided.
BO
For battery room and other areas coming in contact with acid /
alkali fumes, chemical resistant chlorinated rubber paint shall be
provided above 2.1 m height. Up to 2.1 m height from finished floor 0 0 #REF! #REF! #REF!
level acid alkali resistant epoxy resin finish shall be provided as
specified elsewhere. BO
All R. C. C. ceilings shall be finished with acrylic distemper. 0 0 #REF! #REF! #REF!
BO
Package-A :
Supply & Erection Schedule (R9): New 33/11 KV GIS Substation (2x10 MVA) -- Total Qty. 1 Nos.
Supply Scheule Erection Scheule
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
per unit)
Qty./Km
Qty. 1
Total
(INR)
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13)
Extertior Finish: Permanently colour coated M. S. / High tensile
steel metal cladding (non - insulated) of approved colour
combination shall be provided for parapet walls of buildings where 0 0 #REF! #REF! #REF!
metal cladding is specified. The cladding sheets shall be coated with
silicon modified paint BO
6.03 PAINTING BO 0 0 #REF! #REF! #REF!
Material
Zinc silicate primer (minimum 75 micron Dry Film Thickness - DFT)
shall be inorganic (Ethyl) self curing high built (Solid by volume
minimum 60%) formulation as per BS : 5493 (Inorganic Zinc rich
systems).
Intermediate (Under) coat (minimum 75 micron DFT) shall be of
epoxy based titanium di-oxide / micaceous iron oxide pigmented
high performance (solid by volume minimum 60%) epoxy coating as
per BS : 5493 ( two pack chemical resistant under coats).
Finish coat (minimum 75 micron DFT) shall be of epoxy based
colored pigmented high performance (solid by volume minimum
60%) epoxy coating as per BS: 5493 (two pack chemical resistant
finishes).
Final finish coat (minimum 25 Micron DFT) shall be of polyurethane 0 0 #REF! #REF! #REF!
colour pigmented (solid by volume minimum 40%) as per BS: 5493
(two pack chemical resistant finishes).
All paints including primer shall be of reputed brand / manufacturer
and as approved by the Employer.
Preparation of Surface
The surfaces shall be blast cleaned to near white metal surface (Sa 2
½) i.e. 2nd quality (requiring at least 95% of the surface completely
cleaned) as given in BS : 4232 . For blast cleaning shot blasting shall
be used, as indicated in technical specification.
Application of paint
The contractor shall submit the total painting scheme and works
shall be started after the approval of the scheme, as indicated in
technical specification.
BO
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
per unit)
Qty./Km
Qty. 1
Total
(INR)
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13)
Design, engineering and construction of Drainage System made of
brick work in the Substation premises including Excavation etc,
8.00 R/Mtr 50.00 50.00 0 0 #REF! #REF! #REF!
all complete as per design, Technical Specification, approved
Drawing & Scope of works BO
BO
12.01 10 MVA with on load tap changer Set 2.00 2.00 BO 0 0 #REF! #REF! #REF!
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
per unit)
Qty./Km
Qty. 1
Total
(INR)
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13)
BO
16.01 For Transformer Protection No 2.00 2.00 BO 0 0 #REF! #REF! #REF!
16.02 For Feeder Protection No 2.00 2.00 BO 0 0 #REF! #REF! #REF!
16.03 For Bus Coupler No 1.00 1.00 BO 0 0 #REF! #REF! #REF!
16.04 For Station service transformer No. 1.00 1.00 BO 0 0 #REF! #REF! #REF!
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
per unit)
Qty./Km
Qty. 1
Total
(INR)
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13)
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
per unit)
Qty./Km
Qty. 1
Total
(INR)
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13)
BO
Package-A :
Supply & Erection Schedule (R9): New 33/11 KV GIS Substation (2x10 MVA) -- Total Qty. 1 Nos.
Supply Scheule Erection Scheule
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
per unit)
Qty./Km
Qty. 1
Total
(INR)
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13)
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
per unit)
Qty./Km
Qty. 1
Total
(INR)
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13)
11 kv capacitor bank including mounting steel galvanised
structure and accessories as required as per detailed technical
37.00 0 0 #REF! #REF! #REF!
specifications, drawing and scope of works in following
arrangements: BO
Charges (INR)
Unit Erection
charges incl.
GST (INR/
(INR/ Unit)
Unit F & I
per unit)
Qty./Km
Qty. 1
Total
(INR)
GST
GST
Unit
1 2 3 4 5 6 7 8 9 10=(7+8+9) 11=(5X10) 12 13 14=(12+13)
Design, engineering and construction of overhead beam mounted,
remote operated 5T Electric hoist (including monorail) with all
47 accessories for lifting of electrical equipment at Control Room Sets 1.00 1.00 0 0 #REF! #REF! #REF!
Building as per technical specifications, approved drawings and
scope of the work. BO
Design, engineering and construction of ventilation system
48 (excluding duct system) as per technical specifications, approved Lot /PSS 1.00 1.00 0 0 #REF! #REF! #REF!
drawings and scope of the work. BO
Design, engineering and construction of CCTV (6 nos.) and
49 Surveillance system as per technical specifications, approved Lot /PSS 1.00 1.00 0 0 #REF! #REF! #REF!
drawings and scope of the work BO
Total
Note : 1. All supply materials and their erection work REC/IS guideline for same shall prevail.
2. Materials like clamps, connectors, glands, washers, gaskets, lugs, nuts and bolts, tags, termiantion kits, ties and others which are not provided but required technically during execution shall be supplied without any price imp lication and that will be treated as considered in the price sch
3. All the iron materials shall be hot dip galvanised as per IS.
4. Civil works which is not included in the schedule but required during execution, will be treated included in the erection part.
Package-A :
1 KV GIS Substation (2x10 MVA) -- Total Qty. 1 Nos.
Erection Scheule
Erection
(INR)
15=(5X14) 16=(11+15)
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
Package-A :
1 KV GIS Substation (2x10 MVA) -- Total Qty. 1 Nos.
Erection Scheule
Erection
(INR)
15=(5X14) 16=(11+15)
0 #REF!
0 #REF!
0 #REF!
0 #REF!
Package-A :
1 KV GIS Substation (2x10 MVA) -- Total Qty. 1 Nos.
Erection Scheule
Erection
(INR)
15=(5X14) 16=(11+15)
0 #REF!
0 #REF!
0 #REF!
0 #REF!
Package-A :
1 KV GIS Substation (2x10 MVA) -- Total Qty. 1 Nos.
Erection Scheule
Erection
(INR)
15=(5X14) 16=(11+15)
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
Package-A :
1 KV GIS Substation (2x10 MVA) -- Total Qty. 1 Nos.
Erection Scheule
Erection
(INR)
15=(5X14) 16=(11+15)
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
Package-A :
1 KV GIS Substation (2x10 MVA) -- Total Qty. 1 Nos.
Erection Scheule
Erection
(INR)
15=(5X14) 16=(11+15)
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
Package-A :
1 KV GIS Substation (2x10 MVA) -- Total Qty. 1 Nos.
Erection Scheule
Erection
(INR)
15=(5X14) 16=(11+15)
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
Package-A :
1 KV GIS Substation (2x10 MVA) -- Total Qty. 1 Nos.
Erection Scheule
Erection
(INR)
15=(5X14) 16=(11+15)
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
0 #REF!
Package-A :
1 KV GIS Substation (2x10 MVA) -- Total Qty. 1 Nos.
Erection Scheule
Erection
(INR)
15=(5X14) 16=(11+15)
0 #REF!
0 #REF!
0 0
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
Package-A :
1 KV GIS Substation (2x10 MVA) -- Total Qty. 1 Nos.
Erection Scheule
Erection
(INR)
15=(5X14) 16=(11+15)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
Package-A :
1 KV GIS Substation (2x10 MVA) -- Total Qty. 1 Nos.
Erection Scheule
Erection
(INR)
15=(5X14) 16=(11+15)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
Package-A :
1 KV GIS Substation (2x10 MVA) -- Total Qty. 1 Nos.
Erection Scheule
Erection
(INR)
15=(5X14) 16=(11+15)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
Package-A :
1 KV GIS Substation (2x10 MVA) -- Total Qty. 1 Nos.
Erection Scheule
Erection
(INR)
15=(5X14) 16=(11+15)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
Package-A :
1 KV GIS Substation (2x10 MVA) -- Total Qty. 1 Nos.
Erection Scheule
Erection
(INR)
15=(5X14) 16=(11+15)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
Package-A :
1 KV GIS Substation (2x10 MVA) -- Total Qty. 1 Nos.
Erection Scheule
Erection
(INR)
15=(5X14) 16=(11+15)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
Package-A :
1 KV GIS Substation (2x10 MVA) -- Total Qty. 1 Nos.
Erection Scheule
Erection
(INR)
15=(5X14) 16=(11+15)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
Package-A :
1 KV GIS Substation (2x10 MVA) -- Total Qty. 1 Nos.
Erection Scheule
Erection
(INR)
15=(5X14) 16=(11+15)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
Package-A :
1 KV GIS Substation (2x10 MVA) -- Total Qty. 1 Nos.
Erection Scheule
Erection
(INR)
15=(5X14) 16=(11+15)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!
ded but required technically during execution shall be supplied without any price imp lication and that will be treated as considered in the price schedule.