Design of Box (Under Canal) : Loads On RCC Box Per MT

The document describes the design of a box structure under a canal. It provides dimensions and specifications of the box and lists loads that will act on it in different scenarios. These include the weight of materials, soil pressures, water pressures and loads. Four cases are analyzed: when the box and canal are empty; when the box is full and canal empty; when the box is empty and canal full; and when both box and canal are full. Forces on the box are calculated and diagrammed for each case.

Uploaded by

sneha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
151 views6 pages

Design of Box (Under Canal) : Loads On RCC Box Per MT

The document describes the design of a box structure under a canal. It provides dimensions and specifications of the box and lists loads that will act on it in different scenarios. These include the weight of materials, soil pressures, water pressures and loads. Four cases are analyzed: when the box and canal are empty; when the box is full and canal empty; when the box is empty and canal full; and when both box and canal are full. Forces on the box are calculated and diagrammed for each case.

Uploaded by

sneha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 6

DESIGN OF BOX ( UNDER CANAL )

Width of Box = 1.800 mts.


Height of Box including wc = 1.275 mts.
Height of Box = 1.200 m
Thickness of sealing coat = 0.100 mts.
Thickness of w.c = 0.075 mts.
Thickness of Hor. Mem(top) = 0.300 mts.
Thickness of Hor. Mem(bottom) = 0.300 mts.
Thickness of Ver.(end) Mem = 0.300 mts.
Thickness of Middle Mem = 0.300 mts.
F S L of canal = 500.926 M
Tail water level of drain = 496.676 M from TEL'S
Live Load Surcharge = 0.000 M 496.679
Avg. Ground Level/TBL = 501.676 M
Canal bed level = 498.676 M
Height of earth over box = 1.900 mts.
Top level of box = 496.676 M
Sill level = 495.176 M
Haunch size = 0.150 x 0.15 m
Density of RCC = 2.500
Density of earth = 2.100
Density of concrete = 2.400
Density of water = 1.000
Coeft. = 0.361

F.S.L 500.926
496.676
498.676
496.676
0.3
496.376

1.275

495.176
0.300
1.800 1.800
0.30 0.30
4.500

Loads on RCC box per mt.

Wt. of top member = 4.500 x 0.300 x 2.500 = 3.375 t


Wt. of bottom member = 4.500 x 0.300 x 2.500 = 3.375 t
Wt. of vertical walls ( end ) =2x 1.275 x 0.300 x 2.500 = 1.913 t
Wt. of vertical walls (middle ) =1x 1.275 x 0.300 x 2.500 = 0.956 t
Wt. of sealing coat = 4.500 x 0.100 x 2.400 = 1.080 t
Wt. of water in box =2x 1.800 x 1.200 x 1.000 = 4.320 t
Wt. of Haunches (4 per vent0 = 0.5 x 0.150 x 0.150 x 2.500 = 0.113 t
Wt. of wc =2x 1.800 x 0.075 x 2.400 = 0.648 t
Wt. of earth over the box = 4.500 x 1.900 x 2.100 = 17.955 t
Wt. of water over the box = 4.500 x 2.250 x 1.000 = 10.125
TOTAL 43.859
CASE 1 BOX EMPTY & CANAL EMPTY

Total wt. of box(without water) = 43.859 - 4.320 - 10.125 = 29.414 t

net upward soil reaction B = 29.414 - 3.375 - 0.648 = 5.643 t/m2


4.500
load on top of slab A = 3.375 + 1.080 + 17.955 = 4.980 t/m2
4.500
water pressure C = = 0

water load D = = 0

earth pr. At top E = 0.361 x 2.100 x 2.05 = 1.554 t/m2

earth pr. At bottom F = 0.361 x 2.100 x 3.625 = 2.748 t/m2

CASE 2 BOX FULL & CANAL EMPTY

Total wt. of box = 43.859 - 10.125 = 33.734 t

net upward soil reaction B = 33.734 - 3.375 - 0.648 = 6.603 t/m2


4.500
load on top of slab A = 3.375 + 1.080 + 17.955 = 4.980 t/m2
4.500
water pressure C = 0 TO 1.200 t/m2

water load D = = 1.200 t/m2

earth pr. At top E = 0.361 x 2.100 x 2.050 = 1.554 t/m2

earth pr. At bottom F = 0.361 x 2.100 x 3.625 = 2.748 t/m2

upward thrust on top slab G = 0.300 x 1.000 = 0.300 t/m3

CASE 3 BOX EMPTY & CANAL FULL

Total wt. of box(without water) = 43.859 - 4.320 = 39.539 t

net upward soil reaction B = 39.539 - 3.375 - 0.648 = 7.893 t/m2


4.500
load on top of slab A = 10.125 + 17.955 + 1.080 + 3.375 = 7.230 t/m2
4.500
water pressure C = = 0

water load D = = 0

earth pr. At top E = 0.361 x 1.100 x 0.15 = 0.060 t/m2

earth pr. At bottom F = 0.361 x 1.100 x 1.725 = 0.685 t/m2

water pr. At top H = 4.400 x 1.000 = 4.400 t/m2

water pr. At bottom J = 5.975 x 1.000 = 5.975 t/m2


CASE 4 BOX FULL & CANAL FULL

Total wt. of box = = 43.859 t

net upward soil reaction B = 43.859 - 3.375 - 0.648 = 8.853 t/m2


4.500
load on top of slab A = 10.125 + 17.955 + 1.080 + 3.375 = 7.230 t/m2
4.500
water pressure C = 0 TO 1.200 t/m2

water load D = 1.200 t/m2

earth pr. At top E = 0.361 x 1.100 x 0.150 = 0.060 t/m2

earth pr. At bottom F = 0.361 x 1.100 x 1.725 = 0.685 t/m2

water pr. At top H = 4.400 x 1.000 = 4.400 t/m2

water pr. At bottom J = 5.975 x 1.000 = 5.975 t/m2

upward thrust on top slab G = 0.300 x 1.000 = 0.300 t/m3

A
H
E EH E H
E 3 4 B E
B B
B B B
B G B
G
C C C
B B B
B D B B
J B
F B J
1 2 E
B B
B FH B
F
E B
B B B
B B B

NODES
1 ( 0.000 0.000 )
2 ( 2.100 0.000 )
3 ( 4.200 0.000
4 ( 0.000 1.575 )
5 ( 2.100 1.575 )
6 ( 4.200 1.575 )
STAAD SPACE UT AT KM 14.751 UNDER CANAL
START JOB INFORMATION
ENGINEER DATE 10/10/2014
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER MTON
JOINT COORDINATES
1 0.000 0.000
2 2.100 0.000
3 4.200 1.000
4 0.000 1.575
5 2.100 1.575
6 4.200 1.575
MEMBER INCIDENCES
1 1 2; 2 2 3;3 4 5;4 5 6;5 1 4;6 2 5;7 3 6;
MEMBER PROPERTY INDIAN
1 TO 4 PRIS YD 0.3 ZD 1
5 TO 7 PRIS YD 0.3 ZD 1
6 PRIS YD 0.3 ZD 1
CONSTANTS
E CONCRETE ALL
POISSON CONCRETE ALL
DENSITY CONCRETE ALL
SUPPORTS
1 2 3 PINNED
LOAD 1 BOX EMPTY & CANAL EMPTY
MEMBER LOAD
1 UNI GY 5.643
2 UNI GY -4.980
3 LIN Y -2.748 -1.554
4 LIN Y 2.748 1.554
LOAD 2 BOX FULL & CANAL EMPTY
MEMBER LOAD
1 UNI GY 6.603
1 UNI GY -1.200
2 UNI GY -4.980
2 UNI GY 0.300
3 LIN Y -2.748 -1.554
3 LIN Y 1.200 0.000
4 LIN Y 2.748 1.554
4 LIN Y -1.200 0.000
LOAD 3 BOX EMPTY & CANAL FULL
MEMBER LOAD
1 UNI GY 7.893
2 UNI GY -7.230
3 LIN Y -0.685 -0.060
3 LIN Y -5.975 -4.400
4 LIN Y 0.685 0.060
4 LIN Y 5.975 4.400
LOAD 4 BOX FULL & CANAL FULL
MEMBER LOAD
1 UNI GY 8.853
1 UNI GY -1.200
2 UNI GY -7.230
2 UNI GY 0.300
3 LIN Y -0.685 -0.060
3 LIN Y -5.975 -4.400
3 LIN Y 1.200 0.000
4 LIN Y 0.685 0.060
4 LIN Y 5.975 4.400
4 LIN Y -1.200 0.000
PERFORM ANALYSIS
PRINT ANALYSIS RESULT
FINISH