DESIGN OF BOX ( UNDER CANAL )
Width of Box                          =       1.800 mts.
Height of Box including wc            =       1.275 mts.
Height of Box                         =       1.200   m
Thickness of sealing coat             =       0.100   mts.
Thickness of w.c                      =       0.075   mts.
Thickness of Hor. Mem(top)            =       0.300   mts.
Thickness of Hor. Mem(bottom)         =       0.300   mts.
Thickness of Ver.(end) Mem            =       0.300   mts.
Thickness of Middle Mem               =       0.300   mts.
F S L of canal                        =     500.926   M
Tail water level of drain             =     496.676   M                   from TEL'S
Live Load Surcharge                   =       0.000   M                                                  496.679
Avg. Ground Level/TBL                 =     501.676   M
Canal bed level                       =     498.676   M
Height of earth over box              =       1.900   mts.
Top level of box                      =     496.676   M
Sill level                            =     495.176   M
Haunch size                           =       0.150 x                            0.15 m
Density of RCC                        =       2.500
Density of earth                      =       2.100
Density of concrete                   =       2.400
Density of water                      =       1.000
Coeft.                                =       0.361
                                              F.S.L                       500.926
                                                              496.676
                                            498.676
                                                                                           496.676
                 0.3
                                                                                           496.376
               1.275
                                                                                           495.176
               0.300
                                  1.800                           1.800
                  0.30                                                    0.30
                                                      4.500
Loads on RCC box per mt.
Wt. of top member                 =         4.500             x            0.300       x    2.500    =     3.375 t
Wt. of bottom member              =         4.500             x            0.300       x    2.500    =     3.375 t
Wt. of vertical walls ( end )     =2x       1.275             x            0.300       x    2.500    =     1.913   t
Wt. of vertical walls (middle )   =1x       1.275             x            0.300       x    2.500    =     0.956   t
Wt. of sealing coat               =         4.500             x            0.100       x    2.400    =     1.080   t
Wt. of water in box               =2x       1.800             x            1.200       x    1.000    =     4.320   t
Wt. of Haunches (4 per vent0      = 0.5 x   0.150             x            0.150       x    2.500    =     0.113   t
Wt. of wc                         =2x       1.800             x            0.075       x    2.400    =     0.648   t
Wt. of earth over the box         =         4.500             x            1.900       x    2.100    =    17.955 t
Wt. of water over the box         =         4.500             x            2.250       x    1.000    =    10.125
TOTAL                                                                                                     43.859
CASE 1        BOX EMPTY & CANAL EMPTY
Total wt. of box(without water) =          43.859       -         4.320     -    10.125   =    29.414 t
net upward soil reaction            B =    29.414       -         3.375     -   0.648     =        5.643 t/m2
                                                                  4.500
load on top of slab                 A =   3.375         +         1.080     +   17.955    =        4.980 t/m2
                                                                  4.500
water pressure                      C =                                                   =    0
water load                          D =                                                   =    0
earth pr. At top                    E =   0.361         x         2.100     x    2.05     =        1.554 t/m2
earth pr. At bottom                 F =   0.361         x         2.100     x   3.625     =        2.748 t/m2
CASE 2        BOX FULL & CANAL EMPTY
Total wt. of box                      =   43.859        -         10.125                  =    33.734 t
net upward soil reaction            B =    33.734       -         3.375     -   0.648     =        6.603 t/m2
                                                                  4.500
load on top of slab                 A =   3.375         +         1.080     +   17.955    =        4.980 t/m2
                                                                  4.500
water pressure                      C =                                           0       TO       1.200 t/m2
water load                          D =                                                   =        1.200 t/m2
earth pr. At top                    E =     0.361       x           2.100   x     2.050   =        1.554 t/m2
earth pr. At bottom                 F =     0.361       x           2.100   x     3.625   =        2.748 t/m2
upward thrust on top slab           G =   0.300         x         1.000                   =        0.300 t/m3
CASE 3        BOX EMPTY & CANAL FULL
Total wt. of box(without water) =          43.859       -         4.320                   =    39.539 t
net upward soil reaction            B =    39.539       -         3.375     -   0.648     =        7.893 t/m2
                                                                  4.500
load on top of slab                 A =    10.125   + 17.955 +     1.080    +   3.375     =        7.230 t/m2
                                                                 4.500
water pressure                      C =                                                   =    0
water load                          D =                                                   =    0
earth pr. At top                    E =   0.361         x         1.100     x    0.15     =        0.060 t/m2
earth pr. At bottom                 F =   0.361         x         1.100     x   1.725     =        0.685 t/m2
water pr. At top                    H =   4.400         x         1.000                   =        4.400 t/m2
water pr. At bottom                 J =   5.975         x         1.000                   =        5.975 t/m2
CASE 4            BOX FULL & CANAL FULL
Total wt. of box                          =                                                   =    43.859 t
net upward soil reaction              B =       43.859         -       3.375      -   0.648   =     8.853 t/m2
                                                                       4.500
load on top of slab                   A =       10.125    + 17.955 +   1.080      +   3.375   =     7.230 t/m2
                                                                       4.500
water pressure                        C =                                              0      TO    1.200 t/m2
water load                            D =                                                           1.200 t/m2
earth pr. At top                      E =      0.361           x       1.100      x   0.150   =     0.060 t/m2
earth pr. At bottom                   F =      0.361           x       1.100      x   1.725   =     0.685 t/m2
water pr. At top                      H =      4.400           x       1.000                  =     4.400 t/m2
water pr. At bottom                   J =      5.975           x       1.000                  =     5.975 t/m2
upward thrust on top slab             G =      0.300           x       1.000                  =     0.300 t/m3
                                                                            A
  H
   E          EH                                                                                     E           H
               E           3                                            4                             B           E
    B                                                                                                              B
     B          B                                                                                      B
                 B                            G                                                                     B
                                               G
                                     C          C        C
                                      B          B        B
                                       B        D B        B
  J                                              B
      F                                           B                                                              J
                           1                                             2                                           E
          B                                                                                                           B
           B FH                                                                                                        B
                                                                                                      F
              E                                                             B
               B                                                             B                             B
                B                                                             B                             B
NODES
     1        (    0.000        0.000 )
     2        (    2.100        0.000 )
     3        (    4.200        0.000
     4        (    0.000        1.575 )
          5   ( 2.100           1.575 )
          6   ( 4.200          1.575 )
STAAD SPACE                     UT AT KM 14.751 UNDER CANAL
START JOB INFORMATION
ENGINEER DATE        10/10/2014
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER MTON
JOINT COORDINATES
    1        0.000                0.000
    2        2.100                0.000
    3        4.200                1.000
    4        0.000                1.575
    5        2.100                1.575
      6           4.200          1.575
MEMBER INCIDENCES
1 1 2; 2 2 3;3 4 5;4 5 6;5 1 4;6 2 5;7 3 6;
MEMBER PROPERTY INDIAN
1 TO 4 PRIS YD                                 0.3     ZD 1
5 TO 7 PRIS YD                                 0.3     ZD 1
6 PRIS YD                                      0.3     ZD 1
CONSTANTS
E CONCRETE ALL
POISSON CONCRETE ALL
DENSITY CONCRETE ALL
SUPPORTS
1 2 3 PINNED
LOAD 1 BOX EMPTY & CANAL EMPTY
MEMBER LOAD
    1     UNI        GY                       5.643
    2     UNI        GY                       -4.980
    3     LIN        Y                        -2.748     -1.554
    4     LIN        Y                        2.748      1.554
LOAD 2 BOX FULL & CANAL EMPTY
MEMBER LOAD
      1       UNI            GY               6.603
      1       UNI            GY               -1.200
      2       UNI            GY               -4.980
      2       UNI            GY               0.300
    3     LIN       Y                         -2.748     -1.554
    3     LIN       Y                         1.200      0.000
    4     LIN       Y                         2.748      1.554
    4     LIN       Y                         -1.200     0.000
LOAD 3 BOX EMPTY & CANAL FULL
MEMBER LOAD
      1       UNI            GY               7.893
      2       UNI            GY               -7.230
    3     LIN        Y         -0.685   -0.060
    3     LIN        Y         -5.975   -4.400
    4     LIN        Y         0.685    0.060
    4     LIN        Y         5.975    4.400
LOAD 4 BOX FULL & CANAL FULL
MEMBER LOAD
    1     UNI       GY         8.853
    1     UNI       GY         -1.200
    2     UNI       GY         -7.230
    2     UNI       GY         0.300
    3     LIN       Y          -0.685   -0.060
    3     LIN       Y          -5.975   -4.400
    3     LIN       Y          1.200    0.000
    4     LIN       Y          0.685    0.060
    4     LIN       Y          5.975    4.400
    4     LIN        Y         -1.200   0.000
PERFORM ANALYSIS
PRINT ANALYSIS RESULT
FINISH