31costmodelcsnj&!!!.
qxd          30/07/2007       10:29      Page 54
         54      economics.cost model
         07      Cost breakdown
        The cost breakdown is based on a           building services reflect this.        variation in cost between                must be included in the
        four-storey college building with            The rates are based on a             schemes can be wide because of           submission to the LSC:
        space arranged around an atrium.           design-and-build contract,             the college’s discretion with            ■ Demolition and site
          The scheme has a number of               procured via a two-stage tender.       regard to design standards in            preparation
        sustainability features including          Rates are current in 2nd quarter       response to location, affordability      ■ External works and services
        displacement ventilation, a                2007 for a south-east location         and so on. Costs for the scope of        ■ Loose furniture, fittings and
        high-performance external                    The specification and rates in       work described in this model can         operating equipment
        envelope and a green roof.                 this model reflect a high-quality      range from about £1,700/m2 to            ■ Decant costs
          The building is specified to be          scheme that addresses the              more than £2,200/m2.                     ■ Professional fees and VAT.
        highly robust and the rates for            Learning and Skills Council’s            However, the following items           These will typically increase the
        partitions, doors, finishes and            (LSC) design-led agenda. The           excluded from the breakdown              cost to more than £3,000/m2.
          b      Cost breakdown
                                                     Total cost           £/m2       %                                               Total cost            £/m2         %
                                                              £            gifa                                                               £             gifa
                                                                                          Cladding; metal-faced composite cladding panels; cladding
        Substructure                                1,832,500           130.89     6.52   rails: 2490m2 @ £410
        Piled foundations; 600 diameter rotary bored piles; pile caps;                    Curtain-walling; stick system with double-glazed windows
        ground beams: 4,250m2 @ £310                                                      and metal-faced spandrel panels: 1,090m2 @ £470
        Ground slab; 250 thick; excavation and disposal: 4,250m2 @ £100                   Powder-coated aluminium double-glazed ribbon windows;
        Lift pits: 6 nr @ £15,000                                                         window boards: 2,270m2 @ £350
                                                                                          Extra over curtain wall and ribbon windows for opening lights;
        Frame and upper floors                      2,995,500           213.96    10.65   automatic actuators included in controls: 850m2 @ £200
        Structural steelwork; UB and UC sections: 820t @ £1,700                           Solar shading; fixed aluminium louvres: 600 m @ £200
        Structural steelwork; hollow sections: 50t @ £2,500                               Allowance for soffit cladding, insulated metal panels: 400m2 @ £350
        Fire protection to steelwork: 16,150m2 @ £20                                      Allowance for column cladding, curved metal panels: Item @ £40,000
        Allowance for column encasement: 2,100m @ £85                                     Glazed main entrance doors; revolving door with pass doors:
        Upper floors, thermodeck hollowcore planks: 9,750m2 @ £100                        2 nr @ £35,000
                                                                                          Fire escape doors; steel-faced double doors in powder-coated
        Roof                                        2,031,500           145.11     7.22   frames; ironmongery: 16 nr @ £2,000
        Insitu concrete roof slab; metal deck and insitu concrete: 3,450m2 @ £90          Loading bay doors: Item @ £7,000
        Flat roof, single-ply membrane including screed, insulation, trims,               Aluminium louvres to plant rooms etc: 400m2 @ £400
        upstands, flashings, linings to gutters, paving slabs to
        30% of area: 3,450m2 @ £115                                                       Internal walls and partitions             1,245,300           88.95      4.43
        Extra for green roof construction; strengthening to roof slab;                    Single-glazed screens to atrium: 380m2 @ £350
        sedum blanket; filter fleece and drainage layer: 1,500m2 @ £135                   Blockwork; average rate for thickness ranging from
        Atrium roof; hollow section framing, aluminium-framed                             100 to 190mm: 5,530m2 @ £45
        double-glazed units: 1,200m2 @ £800                                               Extra for twin-leaf acoustic wall construction: 3,050m2 @ £14
        Extra for upstands and fascia cladding: 400m @ £80                                Drywall partition; 1 hour FR; heavy duty boarding: 7,630m2 @ £70
        Extra for soffits to roof overhangs: 240m2 @ £55                                  Glazed screen partitions: 610m2 @ £340
        Mansafe system: Item @ £34,000                                                    Allowance for folding partitions: Item @ £40,000
        Roof-level drainage installation; symphonic: 4,250m2 @ £10                        Toilet cubicles: 56 nr @ £700
        Allowance for plant platforms, walkways etc: Item @ £40,000
                                                                                          Internal doors                               651,800          46.56      2.32
        Stairs                                         468,500           33.46     1.66   Solid core fire-rated doors and hardwood frames;stainless steel ironmongery
        Feature stairs to atrium; projecting steel stairflights with                      (average rate per leaf for single and double doors): 270 nr @ £1,200
        semi-circular half landings; glass balustrades with stainless                     Doors and hardwood frames; non fire-rated; stainless steel ironmongery
        steel handrails (rate per flight): 8 nr @16,000                                   (average rate per leaf for single and double doors): 270 nr @ £900
        Precast concrete internal staircases with half landings;                          Glazed access doors to atrium walkways: 6 nr @ £3,400
        painted steel handrails and balustrades; including allowance                      Extra for magnetic catches to double fire doors: 46 nr @ £1,400
        for wall, floor and ceiling finishes (rate per flight): 20 nr @ £13,000
        Glazed feature balustrade with stainless steel handrail                           Wall finishes                                599,600          42.83      2.13
        to part atrium edge: 100m @ £700                                                  Emulsion paint: 19,500m @ £4
                                                                                                                   2
        Miscellaneous access stairs and cat ladders: Item @ £10,500                       Plasterboard lining and emulsion paint to wall surfaces
                                                                                          generally: 5,040m2 @ £40
        External walls, windows and doors           3,814,600           272.47    13.56   Ceramic tiling: 2,700m2 @ £50
        Rendered blockwork and architectural blockwork; insulation,                       Allowance for acoustic treatments: Item @ £85,000
        lightweight steel framing: 2770m2 @ £270                                          Allowance for column casings: Item @ £100,000
               BUILDING MAGAZINE 03.08.2007
31costmodelcsnj&!!!.qxd         30/07/2007        10:29      Page 55
          A glass wall and concrete columns
          mark the “gateway to learning” in
          Wilkinson Eyre’s refurbishment
          of City and Islington College
          b     Cost breakdown (continued)
                                                    Total cost          £/m2      %                                                 Total cost        £/m2       %
                                                             £           gifa                                                                £         gifa
        Floor finishes                              1,104,500          78.89    3.93   Sanitary installations                        140,000         10.00     0.50
        70 deep screed: 4,100m2 @ £20                                                  WCs and fittings: 50 nr @ £410
        Fully accessible raised floor: 8,700m2 @ £40                                   Extra for disabled fittings: 8 nr @270
        Edge fixed carpet; hardwood skirtings: 7,500m2 @ £35                           Urinals and fittings: 20 nr @ £340
        Limestone tiling: 1,200m2 @ £160                                               Wash handbasins and fittings: 70 nr @ £410
        Ceramic tiling: 500m2 @ £70                                                    Shower in cubicle, tray, fittings complete: 8 nr @ £1,400
        Vinyl flooring, coved skirtings: 3,000m2 @ £50                                 Classroom sinks: 20 nr @ £470
        Epoxy floor paint: 600m2 @ £15                                                 Laboratory sinks: 15 nr @ £270
        Entrance matting and matwells: Item @ £26,000                                  Cleaners sinks: 4 nr @ £680
                                                                                       Drinking fountains: 8 nr @ £680
        Ceiling finishes                              516,300          36.88    1.84   Allowance for IPS panels; pre-plumbed: 140 nr @ £350
        Plasterboard ceilings on MF framing, emulsion
        paint finish: 2,900m2 @ £27                                                    Service equipment                             310,000         22.14     1.10
        Mineral fibre concealed grid ceiling; plasterboard                             Kitchen, servery and bar fit-out; complete: Item @ £310,000
        margins and bulkheads; generally: 8,700m2 @ £40
        Extra for acoustic treatments: Item @ £90,000                                  Disposal installations                        168,000         12.00     0.60
                                                                                       Waste, soil and vent pipework: 14,000m @ £7
                                                                                                                                2
        Furniture and fittings                        971,700          69.41    3.46   Rainwater installation; syphonic drainage: 14,000m2 @ £5
        External and internal identity, directional and statutory                      Hot and cold water installations              300,000         21.43     1.07
        signage: Item @ £150,000                                                       Mains water service, treatment: Item @ £30,000
        Reception furniture: Item @ £80,000                                            Hot water storage and distribution: Item @ £120,000
        IT work benches to general teaching spaces: 750 m @ £540                       Cold water storage and distribution: Item @ £150,000
        Laboratory work benches: 250 m @ £270
        Allowance for fume cupboards and other laboratory fittings: Item @ £26,000
        Allowances for lockers, shelving and storage racks: Item @ £78,000
        Allowance for whiteboards, pinboards and other teaching room
        fittings: Item @ £105,000
        Window blinds: 870m2 @ £45
        Vanitory units (cost per basin): 60 nr @ £350
                                                                                                                                BUILDING MAGAZINE 03.08.2007
31costmodelcsnj&!!!.qxd         30/07/2007        10:30     Page 56
         56        economics.cost model
          b     Cost breakdown (continued)
                                                      Total cost          £/m2      %                                               Total cost           £/m2        %
                                                               £           gifa                                                              £            gifa
        Space heating, air treatment and                                                 Preliminaries                             4,810,200          343.59      17.11
        ventilation                                1,890,000        135.00        6.72   Management costs, site establishment and site supervision.
        Space heating, boilers, flues, pumps, distribution in                            Contractor’s preliminaries, overheads and profit @ 17%:
        plantrooms and risers: Item @ £200,000                                           Item @ £3,961,200
        Distribution pipework and radiators: 14,000m2 @ £25                              Testing and commissioning of building services installations;
        Extra for underfloor heating to atrium: Item @ £31,000                           O&M manuals: Item @ £30,000
        Air handling units; ductwork in plantrooms and risers: 11,200m2 @ £25            Allowance for design reserve @ 3%: Item @ £819,000
        Chillers, pumps and pressurisation units, distribution in
        plantrooms and risers: 11,200m2 @ £30                                            Construction cost: building only         28,120,000       2008.56       100.00
        Local supply and extract distribution; displacement ventilation                  (square metre rate based on GIFA)
        with high level extract: 11,200m2 @ £40
        Ventilation installation to laboratories; vacuum system
        and fume cupboard extract: Item @ £70,000
                                                                                           c     Location factors
        Toilet extract ventilation: Item @ £75,000
        Kitchen supply and extract ventilation: Item @ £50,000
        Allowance for localised cooling to equipment rooms: Item @ £50,000               Use these factors to adjust the costs for alternative regions
                                                                                         Inner London                                                              1.08
        Electrical installation                    1,857,000        132.64        6.60   Outer London                                                              1.02
        Mains and sub-mains distribution: 14,000m2 @ £25                                 South West                                                                0.94
        Small power generally: 14,000m2 @ £25                                            East Midlands                                                             0.93
        Electrical supplies to mechanical plant and                                      West Midlands                                                             0.95
        equipment generally: Item @ £55,000                                              East Anglia                                                               0.95
        Lighting generally: 14,000m2 @ £70                                               Yorkshire and Humber                                                      0.98
        Emergency lighting: 14,000m2 @ £7                                                North West of England                                                     0.95
        External lighting generally: Item @ £24,000                                      North of England                                                          1.00
                                                                                         Scotland                                                                  0.99
        Gas installations                               30,000            2.14    0.11   Wales                                                                     0.93
        Incoming gas supply and distribution: Item @ £30,000
        Lift installations                             710,000        50.71       2.52
                                                                                           d     Acknowledgments
        10-person feature lifts with glass doors and back panels;
        complete: 2 nr @ £115,000
        21-person traction lift serving 4 floors: 4 nr @ £120,000
                                                                                          We would like to thank Chris Tremellen and Carl Dainter of Davis
        Protective installations                        28,000            2.00    0.10    Langdon’s specialist Further Education Group for their assistance
        Lightning protection: 14,000m2 @ £1                                               in the preparation of this article.
        Earthing and bonding: 14,000m2 @ £1
        Communication installations                    806,000        57.57       2.87
        Fire alarm and smoke detection; interface with doorhold system;
        disabled refuge comms system; induction loop alarm interface:
        14,000m2 @ £20
        Security system, intuder alarm, CCTV, public address:
        14,000m2 @ £25                                                                    Previously …                              Data toolkit
        Induction loop: Item @ £28,000
        Disabled WC alarm system: Item @ £8,000                                           13 July        Specialist                 Building’s database of
        Data network, including containment: 14,000m2 @ £10                                              cost update                cost data is an essential
                                                                                          20 July        The tracker;               resource for anyone in the
        Specialist installations                       350,000        25.00       1.24                   Building                   business of procuring
        BMS controls: 14,000m2 @ £25                                                                     intelligence               buildings. There is an extensive
                                                                                          27 July        Market forecast            archive of cost models,
        Builder’s work in connection                   489,000        34.93       1.74                                              market forecasts, whole-life
        Framing and access platforms in risers: Item @ £160,000                           Coming up …                               costings, specialist costs,
        Forming holes and chases etc – allowance @ 5%: Item @ £329,000                                                              procurement and sustainability
                                                                                          10 August Mini cost model                 articles and many more