Project           : PROPOSED TWO (2) STOREY RESIDENTIAL
Location          :
Owner:
                                 S P E C I F IC A T I O N S
      I.        GENERAL CONDITIONS
        All the specifications of this project are based upon the regulation of the following code
as follow: The National Building Code of the Philippines, The Fire Code of the Philippines, The
Electrical Code and the following code if necessary.
        This specification will compliment the plans prepared by the Architect/Engineer. In case
of conflicts between plans and the specifications, the attention of the Architect/Engineer shall be
called for his decision.
       All measurements shall be verified at the job site. In case no dimensions are given
references to grids shall be made, while on others, scale measurements shall be taken giving
reasonable for reproductions inaccuracies.
           1.     SCOPE OF WORK
                  The work includes the furnishing of all materials, tool and equipments, and the
                  labor for the completions of the project.
           2.     LOCATION
                  The site shall be physically pinpointed by the Owner and shall be verified by the
                  Contractor based on the location plan. Responsibility for the determinations of the
                  exact location rest on the Owner and Contractor shall not be liable for error in the
                  location. The Contractor however, shall be responsible for the staking out the
                  building and for the establishment of the correct grade.
           3.     CLEARING, GRADING & BACKFILLING
                  The Contractor shall be clear the building site at least 3.00 meters in all directions
                  outside the building line shall grade the area within the clearing lines. Filling shall
                  be in 6th layers, leveled and tamped. No footing shall be place on fill. Filling may
                  be of earth gravel or mixture thereof.
II.        CONCRETE & MASONRY WORKS
           1.     SCOPE
                  All concrete work shall be done in accordance with the pertinent provisions of the
                  National Building Code and ACI Code 318-95. Masonry works shall conform to
                  ASTM C90 G-1 OR G2.
           2.     MATERIALS
                  Portland cement shall conform in standards 40 kilo bags.
                  Fine aggregates: natural stones: maximum size 2.54 cm.
           3.     CONCRETE PROPORTIONS
                  a. Class “A” (1:2:4) . fc’ = 3,000 psi for all columns, beam 2nd floor slab
                                                                                              Page 1 of 4
            b. Class “A” (1:2:4) . fc’ = 3,000 psi for all footings / hallway
            c. Class “B” (1:2:5) . fc’ = 2,500 psi for all slabs on grade
            d. Deep wet concrete surface three times a day for 7 days after placing
            e. Remove frameworks as per best standard sound engineering practice.
       4.   GROUT, MORTAR & PLASTER
            Grout – 1:3 for edge joints For cells of CHB – 1:3:3 (pea size gravel only)
            Mortar – 1:3                    Plaster – 1:2
       5.   MASONRY
            Soak blocks thoroughly, lay plum and true to line on 3/8’ thick cement lime
            mortar bed, Class B mixture.
            All steel reinforcement shall be cold-rolled steel of local manufacturer size as
            indicated in the structural details.
III.   CARPENTRY & MILL WORK
       1.   SCOPE
            All lumber shall be dry and free from defects.
            Apply anti-termite
       2.   KIND OF LUMBER
            A. Yakal – for jambs and heads
            b. Coco lumber – for all forms and scaffoldings
       3.   DOORS
            All doors to be 1-3/4 finished thickness except for toilets which shall be 1-1/2
            finished thickness. Panel Type Door Tangile.
       4.   CABINETS
            A ¾ thick. Plywood for kitchen cabinet
       5.   CEILING
            5A 1.5 x 2 metal furring space @ 0.6 x 0.4 with 3.5 thick flexboard
IV.    HARDWARES
       1.   SCOPE
            Provides all rough hard wares required including nails, bolts, lag screw and all
            finishing hard wares, and such other hard wares necessary to complete the work.
       2.   MATERIALS
            Butts and hinges: loose pain, ball tip butts, 3”x3” 3 piece per door. One piece door
            knob (US Brand)
       3.   WORKMANSHIP
            Finishing hardware shall be installed by skilled carpenters without damaging the
            finish of the door or any surface.
V.     WINDOWS & GRILL
       1.   SCOPE
            Aluminum Powder Coated Sliding and Awning Window
       2.   MATERIALS
            Stair and Terrace Grills shall be mild steel, wrought iron of local manufacturer.
                                                                                      Page 2 of 4
VI.    ROOFING & TINSMITHING WORKS
       1.   SCOPE
            Provide all tinsmithing work and other accessories such as rivets and thick screw
            to complete the tinsmithing work.
       2.   MATERIALS
            All materials shall be Molave matte gray Roofing Sheet.
            For roofing, all scratches & damages surfaces shall be refinished to match the
            adjacent surface.
            Steel trusses for roof framing use angle bar for top and bottom cord and C-Steel
            purlins.
VII.   PLUMBING WORKS
       1.   SCOPE
            Work includes the complete installation of the plumbing system including fixtures
            and the connections of the water system.
       2.   WATER METER
            The Owner shall make all the necessary arrangements in water district for 1 meter
            in all deposits, fees shall be responsibility of the owner.
       3.   MATERIALS
            All piping materials shall be PPR pipe
            Fixture shall be American standard (white). Stainless kitchen sink TEKA.
            Shower heads, valves and other toilet fixtures shall be chrome or nickel polished.
            Hose bib shall brass.
       4.   WORKMANSHIP
            All fixtures are installed by skilled workmen without denting, bruising or
            scratching the surface of the fittings and fixtures using approved equipment for
            the purpose.
       5.   GUARANTEE
            The plumbing work shall be guaranteed by the contractor in writing for six
            months after acceptance against defects.
VIII. ELECTRICAL WORKS
       1.   SCOPE
            All electrical work shall conform to the requirements of the National Electrical
            Code and the rules and regulations of the power company
       2.   WIRING SYSTEM
            All electrical wires shall be in ½” dia. and ¾ dia. and mold flex pipe or
            unplasticized electrical conduit as indicated in the plan.
            All wires be TW and thin stranded wire minimum size shall be
            #14 AWG. Royu brand Circuit Breaker, Switches and outlet Royu brand.
IX.    FEES AND LICENSES
                                                                                     Page 3 of 4
        All permits, deposits, inspection fees or licenses in connection with the electrical works
shall be responsibility of the owner including the arrangement of the service connection of the
electrical system.
       1.      OUTLETS
               All convenience outlets are duplex type, 15A, 18” from the finished floor line.
               Wide series Royu.
       2.      ELECTRICAL METER
               The Owner shall make all the necessary arrangement in electrical provider for the
               installation of one (1) watt hour meter.
       3.      SERVICE EQUIPMENT
               The service equipment consists of integrated circuit breaker, circuits as indicated
               and rated. The breaker shall be mounted 6” with top of enclosure above finished
               floor line.
       4.      TESTING
               The whole electrical system shall be free of grounds and
               short circuits.
       5.      GUARANTEE
               The electrical works shall be guaranteed by the contractor in writing for six
               months after acceptance against defects.
X.     PAINTING FINISHING
       1.      SCOPE
               All exterior of the buildings shall painted (elastomeric paint)
               Paintings shall be done in minimum of two coats, primer and
               final coat.
               All surfaces to be painted shall be clean and dry before painting.
       2.      MATERIALS
               All materials including and latex shall be new of Davies’s or Boysen paint brand
               and in their original container or equal.
XI.    CLEANING
       1.      Upon completion of the work, remove all paint spots, rubbish and repair any
               damage to work no matter or who caused.
       2.      Leave premises broom clean and in perfect order and repair ready for use and lead
               occupancy.
CONFORMED:
      Owner
                                                                                         Page 4 of 4