Section 7 Test and Inspection
Shanghai Conch Kawasaki Engineering Co.,Ltd.
                                                         CONTENTS
1   Shop tests and inspections(Main equipment) ................................................................................. 1
2   Field tests and inspections............................................................................................................... 9
3   Application for approval ................................................................................................................ 10
Shanghai Conch Kawasaki Engineering Co.,Ltd.
Inspections and tests will be performed on major equipment during the process of manufacturing or
upon completion of fabrication, as well as general tests and inspections will be made on materials and
dimensions.
However, Employer shall perform the application for local authorities during the installation works and
final inspections at the project site, if necessary, Contractor shall provide necessary documentation to
help the Owner get the approval.
1      Shop tests and inspections(Main equipment)
                                                                        Contrac
 No.     Equipment          INSPECTION ITEM                  Employer             MAKER        NOTES
                                                                        tor
 1       Steam Turbine
                            Visual inspection                W          W         M            Photo
                            Assembly dimension         and
                                                             W          W         M,S
                            clearance inspection
                            Cleanliness inspection           W          W         M,S
                            Oil motive     characteristic
                                                             W          W         M,S
                            check
 1.1     Steam Turbine
                            Turning device test              H          H         M,S
                            Painting inspection (all parts
                                                             W          W         M,S          Photo
                            color, thickness, etc.)
                            Packaging inspection (all
                                                             W          W         M            Photo
                            equipment in the contract)
                            Certificate    of      product
                                                             R          R         M,S
                            quality
                            Raw material certificate         R          R         M,S
                            Material        re-inspection
                                                             R          R         M,S
                            report
 1.2     Casing             NDT(UT)                          R          R         M,S
                            Hydrostatic test                 H          H         M,S
                            Visual inspection                W          W         M            Photo
                            Raw material certificate         R          R         M,S
                            Material        re-inspection
                                                             R          R         M,S
                            report
 1.3     Nozzles
                            Cleanliness inspection           W          W         M,S
                            Visual inspection                W          W         M            Photo
 1.4     Diaphragm          Raw material certificate         R          R         M,S
    Shanghai Conch Kawasaki Engineering Co.,Ltd.                                                 7-1
                                                                       Contrac
No.    Equipment            INSPECTION ITEM                 Employer             MAKER   NOTES
                                                                       tor
                            Material        re-inspection
                                                            R          R         M,S
                            report
                            Visual inspection               W          W         M       Photo
                            Raw material certificate        R          R         M,S
1.5    gland sealing
                            Visual inspection               W          W         M       Photo
                            Raw material certificate        R          R         M,S
       Stationary           Material        re-inspection
1.6                                                         R          R         M,S
       blade                report
                            Visual inspection               W          W         M       Photo
                            Raw material certificate        R          R         M,S
                            Material        re-inspection
1.7    Rotary Blade                                         R          R         M,S
                            report
                            NDT(MT)                         W          W         M,S     Photo
                            Raw material certificate        R          R         M,S
                            Material    re-inspection
1.8    Shaft                                                R          R         M,S
                            report,NDT(UT)
                            Heat treatment                  R          R         M,S
                            Raw material certificate        R          R         M,S
                            Heat treatment,Hardness
       Rotor        blade
1.9                         check,Metallographic            R          R         M,S
       wheel
                            Report
                            NDT(UT)                         R          R         M,S
                            Run out check                   W          W         M,S
1.1    Rotor                Dynamic     balancing(High
                            speed balance),overspeed        H          H         M,S
                            test
                            Raw material certificate        R          R         M,S
1.11   Coupling
                            NDT(UT)                         R          R         M,S
       Emergency
1.12                        Over speed test                 R          R         M,S
       governor
                            Raw material certificate        R          R         M,S
1.13   Bearing
                            NDT(UT)                         R          R         M,S
                            Raw material certificate        R          R         M,S
1.14   Bearing house
                            Kerosene leakage inspection     W          W         M,S
                            Raw material certificate        R          R         M,S
       Casing bolts and
1.15
       nuts
                            Hardness check                  R          R         M,S
 Shanghai Conch Kawasaki Engineering Co.,Ltd.                                              7-2
                                                                       Contrac
No.    Equipment          INSPECTION ITEM                   Employer             MAKER   NOTES
                                                                       tor
1.16   Base plate         Raw material certificate          R          R         M,S
                          Raw material certificate          R          R         M,S
                          NDT(MT,UT)                        R          R         M,S
       Main       steam
1.17                      Hydrostatic test                  W          W         M,S
       stop valve
                          Tightness check                   W          W         M,S
                          Range test                        W          W         M,S
                          Raw material certificate          R          R         M,S
                          Full water test                   R          R         M,S
1.18   oil tank
                          Leakage test                      W          W         M,S
                          Visual inspection                 W          W         M       Photo
                          Raw material certificate          R          R         M,S
                          Hydrostatic test                  R          R         M,S
1.29   Oil cooler         Dimension inspection              W          W         M,S
                          Visual               inspection
                          (identification,    nameplate,    W          W         M,S     Photo
                          etc.)
                          Raw material certificate          R          R         M,S
                          Casing hydrostatic test           R          R         M,S
1.2    Oil filter         Dimension inspection              W          W         M,S
                          Visual               inspection
                          (identification,    nameplate,    W          W         M,S     Photo
                          etc.)
1.21   Oil pipe, valve    Raw material certificate          R          R         M,S
                          Raw material certificate          R          R         M,S
                          Dynamic balancing                 R          R         M,S
       High pressure      Casing hydrostatic test           R          R         M,S
       oil      pump/
       Emergency oil      Performance test (including
1.22                      cavitation, vibration, noise,     SW         SW        M,S
       pump/Low
       pressure    oil    temperature detection)
       pump               Visual             inspection
                          (identification, nameplate,       W          W         M,S     Photo
                          etc.)
                          Dimension inspection              W          W         M,S
 Shanghai Conch Kawasaki Engineering Co.,Ltd.                                              7-3
                                                                       Contrac
No.    Equipment          INSPECTION ITEM                   Employer             MAKER   NOTES
                                                                       tor
                          Visual              inspection
       Turbine control    (identification,   nameplate,     SW         SW        M,S     Photo
       system(DEH),E      etc.)
       TS       Turbine
       emergency trip     Insulation resistance check       R          R         M,S
       protection
                          Function check                    W          W         M,S
       system,TSI
1.23   Turbine                                                                           Original
       Supervisory                                                                       vender
                          TSI                               R          R         M,S
       Instrumentatio                                                                    test
       n                                                                                 report
       System,Turbine     Dimension inspection              SW         SW        M,S
       instrument
       cabinet            Painting inspection (all parts
                                                            W          W         M,S     Photo
                          color, thickness, etc.)
                          Visual              inspection
                          (identification, nameplate,       SW         SW        M,S     Photo
                          etc.)
       DC        motor    Insulation resistance check       R          R         M,S
       control
                          Withstand voltage test            R          R         M,S
1.24   cabinet,Turning
       device motor
                          Function check                    W          W         M,S
       control cabinet
                          Dimension inspection              SW         SW        M,S
                          Painting inspection (all parts
                                                            W          W         M,S     Photo
                          color, thickness, etc.)
                          Winding            resistance,
                          insulation         resistance,    R          R         M,S
                          withstand voltage test
                          No-load test, no-load loss,
                          full load efficiency/power        R          R         M,S
                          factor
       The      motor
       (turning device    Vibration and noise               R          R         M,S
1.25
       motor, pump
                          Temperature               rise,
       motor etc.)
                          instantaneous        overload,                                 Pendin
                                                            R          R         M,S
                          over speed, protection level,                                  g
                          insulation rating test
                          Mechanical                test
                          (appearance,       nameplate,     R          R         M,S     Photo
                          size, paint)
2      Generator
                          DC resistance of stator and
                                                            W          W         M,S
                          rotor
                          Stator and rotor insulation
                          resistance (before and after      W          W         M,S
                          withstand voltage test)
2.1    Generator set
                          Insulation resistance of
                          bearing      house      and
                          temperature       measuring       W          W         M,S
                          element (before and after
                          withstand voltage test)
 Shanghai Conch Kawasaki Engineering Co.,Ltd.                                              7-4
                                                                       Contrac
No.   Equipment            INSPECTION ITEM                  Employer             MAKER   NOTES
                                                                       tor
                           Polarization index               W          W         M,S
                           Power frequency withstand
                           voltage test of stator and       W          W         M,S
                           rotor
                           DC withstand voltage and
                                                            W          W         M,S
                           leakage current test
                           Rotor       winding       AC
                                                            W          W         M,S
                           impedance test
                           No load characteristic and
                                                            H          H         M,S
                           short time over voltage test
                           Short circuit characteristics
                           and transient over current       H          H         M,S
                           test
                           Phase              sequence
                                                            W          W         M,S
                           measurement
                           Shaft voltage measurement        W          W         M,S
                           Bearing vibration                W          W         M,S
                           Air gap measurement              R          R         M,S
                           Visual              inspection
                           (identification, nameplate,      W          W         M,S     Photo
                           etc.)
                           Painting inspection (all parts
                                                            W          W         M,S     Photo
                           color, thickness, etc.)
                           Packaging inspection (all
                                                            W          W         M,S     Photo
                           equipment in the contract)
                           Certificate     of     product
                                                            R          R         M,S
                           quality
                           Raw material certificate         R          R         M,S
2.2   Shaft
                           Machining dimension and
                                                            R          R         M,S
                           precision of key parts
                           Raw material certificate         R          R         M,S
2.3    Retaining ring
                           Machining dimension and
                                                            R          R         M,S
                           precision of key parts
                           Raw material certificate         R          R         M,S
2.4   Central ring
                           Machining dimension and
                                                            R          R         M,S
                           precision of key parts
2.5   Slot wedge           Raw material certificate         R          R         M,S
                           Raw material certificate         R          R         M,S
2.6   Slip ring
                           Machining dimension and
                                                            R          R         M,S
                           precision of key parts
2.7   Rotor copper         Raw material certificate         R          R         M,S
                           Raw material certificate         R          R         M,S
      Silicon      steel
2.8
      sheets
                           Burr check                       R          R         M,S
 Shanghai Conch Kawasaki Engineering Co.,Ltd.                                              7-5
                                                                       Contrac
No.    Equipment         INSPECTION ITEM                    Employer             MAKER   NOTES
                                                                       tor
                         Appearance and thickness
                                                            R          R         M,S
                         of painting film
                         Surface insulation resistance
                                                            R          R         M,S
                         measurement
2.9    Stator wire       Raw material certificate           R          R         M,S
                         wire rod insulating medium
                                                            R          R         M,S
                         loss factor check
2.1    Stator bar
                         Power frequency withstand
                                                            R          R         M,S
                         voltage test
                         Assembly quality inspection        R          R         M,S
                         Rotor winding inter turn
2.11   Rotor                                                R          R         M,S
                         short circuit test
                         High speed balancing and
                                                            H          H         M,S
                         over speed test
                         Core heat loss test                R          R         M,S
2.12   stator
                         Stator assembly inspection         R          R         M,S
                         Raw material certificate
                         ( including winding wire,          R          R         M,S
                         shaft)
                         DC resistance of stator and
                                                            W          W         M,S
                         rotor
                         Stator and rotor insulation
                                                            W          W         M,S
                         resistance
                         AC withstand voltage test
                                                            W          W         M,S
2.13   Exciter           for stator and rotor
                         No-load test                       W          W         M,S
                         Short circuit test                 W          W         M,S
                         Excitation response ratio          W          W         M,S
                         Visual                inspection
                         (identification,     nameplate,    W          W         M,S     Photo
                         etc.)
                         Raw material certificate           R          R         M,S
                         Leakage inspection                 R          R         M,S
       Bearing     and   Cleanliness inspection             R          R         M,S
2.14
       bearing house
                         NDT                                R          R         M,S
                         Visual                inspection
                         (identification,     nameplate,    W          W         M,S     Photo
                         etc.)
                         Raw material certificate           R          R         M,S
2.15   Air cooler
                         Hydrostatic test                   R          R         M,S
2.16   Generator         Insulation resistance              SW         SW        M,S
 Shanghai Conch Kawasaki Engineering Co.,Ltd.                                              7-6
                                                                     Contrac
No.   Equipment          INSPECTION ITEM                  Employer             MAKER   NOTES
                                                                     tor
      exciter control
                         Withstand voltage test           R          R         M,S
      cabinet
                         Function check                   W          W         M,S
                         Visual              inspection
                         (identification,   nameplate,    W          W         M,S     Photo
                         etc.)
                         Dimensional inspection           W          W         M,S
                         Painting inspection (all parts
                                                          W          W         M,S     Photo
                         color, thickness, etc.)
                         Certificate    of      product
                                                          R          R         M,S
                         quality
3     VEGA Boiler
                         Raw material certificate         R          R         M,S
                         NDT(100% RT)                     R          R         M,S
                         NDT(PT,before post weld
                                                          R          R         M,S
                         heat treatment)
                         Post weld heat treatment         R          R         M,S
                         NDT(MT, after post weld
      Drum         and                                    R          R         M,S
3.1                      heat treatment)
      internal parts
                         Hydrostatic test                 W          W         M,S
                         Visual              inspection
                         (identification,   nameplate,    W          W         M       Photo
                         etc.)
                         Dimensional inspection           SW         SW        M,S
                         Painting inspection (all parts
                                                          R          R         M,S     Photo
                         color, thickness, etc.)
                         Raw material certificate         R          R         M,S
                         NDT(100% RT)                     R          R         M,S
                         NDT(100% PT or MT )              R          R         M,S
      Generator&         Hydrostatic test                 SW         SW        M,S
3.2
      Superheater        Visual              inspection
                         (identification,   nameplate,    SW         SW        M       Photo
                         etc.)
                         Dimensional inspection           SW         SW        M,S
                         Painting inspection (all parts
                                                          R          R         M,S     Photo
                         color, thickness, etc.)
                         Raw material certificate         R          R         M,S
      Generator&
3.3   Superheater        NDT(100% RT)                     R          R         M,S
      header
                         NDT(100% PT or MT )              R          R         M,S
 Shanghai Conch Kawasaki Engineering Co.,Ltd.                                            7-7
                                                                     Contrac
No.   Equipment          INSPECTION ITEM                  Employer             MAKER   NOTES
                                                                     tor
                         Post weld heat treatment         R          R         M,S
                         Hydrostatic test                 SW         SW        M,S
                         Visual              inspection
                         (identification,   nameplate,    SW         SW        M       Photo
                         etc.)
                         Dimensional inspection           SW         SW        M,S
                         Painting inspection (all parts
                                                          R          R         M,S     Photo
                         color, thickness, etc.)
4     AQC Boiler
                         Raw material certificate         R          R         M,S
                         NDT(100% RT)                     R          R         M,S
                         NDT(PT,before post weld
                                                          R          R         M,S
                         heat treatment)
                         Post weld heat treatment         R          R         M,S
                         NDT(MT, after post weld
      Drum         and                                    R          R         M,S
4.1                      heat treatment)
      internal parts
                         Hydrostatic test                 W          W         M,S
                         Visual inspection
                         (identification, nameplate,      W          W         M       Photo
                         etc.)
                         Dimensional inspection           SW         SW        M,S
                         Painting inspection (all parts
                                                          R          R         M,S     Photo
                         color, thickness, etc.)
                         Raw material certificate         R          R         M,S
                         NDT(100% RT)                     R          R         M,S
                         NDT(100% PT or MT )              R          R         M,S
      Economizer&        Hydrostatic test                 SW         SW        M,S
4.2   Generator&
      Superheater        Visual              inspection
                         (identification,   nameplate,    SW         SW        M       Photo
                         etc.)
                         Dimensional inspection           SW         SW        M,S
                         Painting inspection (all parts
                                                          R          R         M,S     Photo
                         color, thickness, etc.)
                         Raw material certificate         R          R         M,S
      Economizer&
                         NDT(100% RT)                     R          R         M,S
      Generator&
4.3
      Superheater
                         NDT(100% PT or MT )              R          R         M,S
      header
                         Post weld heat treatment         R          R         M,S
 Shanghai Conch Kawasaki Engineering Co.,Ltd.                                            7-8
                                                                           Contrac
 No.      Equipment            INSPECTION ITEM                  Employer             MAKER   NOTES
                                                                           tor
                               Hydrostatic test                 SW         SW        M,S
                               Visual              inspection
                               (identification,   nameplate,    SW         SW        M       Photo
                               etc.)
                               Dimensional inspection           SW         SW        M,S
                               Painting inspection (all parts
                                                                R          R         M,S     Photo
                               color, thickness, etc.)
                               Raw material certificate         R          R         M,S
                               Assembling                       R          R         M,S
                               Visual              inspection
          Boiler casing of
 4.4                           (identification,   nameplate,    SW         SW        M       Photo
          heating surface
                               etc.)
                               Dimensional inspection           SW         SW        M,S
                               Painting inspection (all parts
                                                                R          R         M,S     Photo
                               color, thickness, etc.)
 Remark:W:Witness,SW:Spot witness,R:Review report,M:Inspection by Maker,S:Submit
 report
2      Field tests and inspections
 Field Tests and Inspections performed by Construction Company.
1) Pre-operation inspection of boiler main parts upon completion of assembly
2) Hydraulic test of boiler
3) Electrical loop test and Interlock test
4) Single machine test
5) Safety valve popping test
6) No load test
7) Synchronizing test
8) Load test
9) Load rejection test (If required)
Note (1): Some site measuring and/or test related to the equipment supplied by the customer during
site inspection and test stage is NOT considered in this proposal.
Note (2): Other tests requested by Local Authority are NOT considered in this proposal.
    Shanghai Conch Kawasaki Engineering Co.,Ltd.                                               7-9
3    Application for approval
Application for approval performed by Owner, CONTRACTOR only provides the necessary
documentation.
1) Application for approval of the project from government and public electricity supplying authority.
2) Application for approval of the operation of the project from government and public electricity
supplying authority.
3) Any others, if necessary.
 Shanghai Conch Kawasaki Engineering Co.,Ltd.                                                  7-10