Construction Cost Breakdown
Construction Cost Breakdown
General
Contractor's Overhead Expenses                                        5%
Contractor's Profit                                               10.0%
VAT                                                                 6.0%
Income Tax                                                            7%
Exchange rate                                      1 US$ =   BDT 83.50
Provisional sum for Physical        % of Installation               5.0%
Contingencies
Provisional Sum for Price           1.5% of FC and 6% of
Contingencies                       LC Costs
Provisional Sum for alleviations    % of Installation             0.29%
program, refer to SCC, Sub-
Clause xxxxxx
International Transport on EXW                                    13.5%
Price for Pipes
Local transportation from port to                                 30.0%
site
CD, VAT and Local Transport for                                   65.5%
Pipes
Fittings for PE/GRP                                                   15%
Fittings for uPVC                                                     30%
Guarantees
   Performance Security             % of Installation             0.25%
   Advance Payment Guarantee        % of Installation             0.25%
Insurances
   Cargo Insurance                 % of Installation             0.375%
   Installation All Risks          % of Installation             0.375%
   Insurance
   Third Party Liability Insurance % of Installation             0.375%
Basic Rates
Civil Works
Item                               Unit                  Rate (BDT) Remarks
Earthwork Med stiff Clay, 3m                 cum                186.00
Earthwork Med stiff Clay, 5m                 cum                226.00
Earthwork Med stiff Clay, 7m                 cum                346.00
Earthwork Med stiff Clay, 9m                 cum                426.00
Earth Filling (E/E)                          cum                149.00
Sand filling (FM: 0.80)                      cum                635.00
Item                                 Unit             Rate (BDT) Remarks
Sand filling (FM: 1.20)                      cum              913.00
BFS                                          sqm              420.00
CC (1:3:6)                                   cum            6,647.00
CC (1:2:4)                                   cum            7,643.00
Brick work (1:4)                             cum            6,769.00
RCC (1:2:4)                                  cum            7,517.00
RCC (1:1.5:3)                                cum            8,521.70
MS Rod (60 grade)                             kg               82.00
Plaster (1:4)                                sqm              192.50
Enamel Paint                                 sqm              141.90
Epoxy Paint                                  sqm              978.00
RCC Meter chamber with cover                  no            1,160.50
Polythene 200 micron                         sqm               42.00
Shal Bollah                                   m               592.00
Sheet pile                                   sqm              609.00
                                                                0.00
Man Power                                                       0.00
Field Supervisor/Manager                    man day       2,200.00
Supervisor/ Field Engineer                  man day       1,739.93
Head Operator                               man day       1,100.00
Asstt. operator                             man day         605.00
Head Detection/Head Mason                   man day       1,100.00
Surveyor                                    man day         495.00
Asstt. Surveyor                             man day         330.00
Technical staff/ Plumber/ Mason/            man day       1,275.95
Social Worker
Skilled labour/ Semi Skilled                man day        695.97
technician/ Mud Operator
Ordinary/ Casual Labour                     man day        463.98
Site security                               man day        220.00
Driver                                      man day        440.00
Sweeper for Odd Job                         man day        550.00
                                                             0.00
                                                             0.00
                                                             0.00
                                                             0.00
Equipments/ Tools                                            0.00
Diesel HDD Unit                              day              0.00
Diesel MMX Unit                              day              0.00
Hydraulic HDD Unit                           day         13,200.00
Hydraulic MMX Unit                           day              0.00
Hydro/ Pipe Burst Machine                    day          7,700.00
Micro Tunneling                              day         20,000.00
Hydro Test Machine                           day          1,540.00
GPR                                          day          1,100.00
Compactor                                    day          1,650.00
Scaffolding                                  sqm             59.17
5-ton capacity truck-fare in Dhaka           Trip         1,739.93
city i/c loading, unloading
(mm) (Tk) (Tk) (cum) (Tk) (Tk.) (cum) (Tk) (m) (Tk) (sqm) (Tk) (cum) (Tk) (cum) (Tk)
      1             2               3           4          5             6             7            8               9        10          11         12          13        14        15        16          17
GRP Pipe (upto 3.00 meter)
    200            m             2,213.00     663.90      2.84         527.31        12.56         0.25       1,380.54      2.79       412.92      0.00        0.00      0.00      0.00      0.55       505.42
    250            m             2,923.00     876.90      2.99         556.61        13.82         0.25       1,380.54      2.95       435.86      0.00        0.00      0.00      0.00      0.62       562.33
    300            m             3,315.00     994.50      3.15         585.90        15.20         0.25       1,380.54      3.10       458.80      0.00        0.00      0.00      0.00      0.68       620.21
    350            m             3,315.00     994.50      3.31         615.20        16.72         0.25       1,380.54      3.26       481.74      0.00        0.00      0.00      0.00      0.74       679.08
    400            m             5,043.00    1,512.90     3.47         644.49        16.72         0.25       1,380.54      3.41       504.68      0.00        0.00      0.00      0.00      0.81       738.92
    450            m             5,177.40    1,553.22     3.62         673.79        18.39         0.25       1,380.54      3.57       527.62      0.00        0.00      0.00      0.00      0.88       799.75
    500            m             7,807.00    2,342.10     3.78         703.08        20.23         0.25       1,380.54      3.72       550.56      0.00        0.00      0.00      0.00      0.94       861.55
    600            m            10,104.00    3,031.20     4.10         761.67        22.25         0.25       1,380.54      4.03       596.44      0.00        0.00      0.00      0.00      1.08       988.10
    700            m            15,281.00    4,584.30     4.45         826.77        24.48         0.26       1,380.54      4.36       645.77      0.00        0.00      0.00      0.00      1.26      1,150.52
    800            m            18,120.00    5,436.00     5.28         982.08        26.92         0.26       1,380.54      5.17       765.16      0.00        0.00      0.00      0.00      1.64      1,499.46
    900            m            16,570.65    4,971.20     5.64        1,049.74       29.62         0.26       1,380.54      5.51       815.85      0.00        0.00      0.00      0.00      1.86      1,695.97
   1,000           m            18,250.80    5,475.24     6.01        1,118.33       32.58         0.26       1,380.54      5.86       867.03      0.00        0.00      0.00      0.00      2.08      1,900.96
   1,050           m            19,930.95    5,979.28     6.18        1,148.55       35.84         0.26       1,380.54      6.02       890.47      0.00        0.00      0.00      0.00      2.17      1,984.95
   1,200           m            21,611.10    6,483.33     6.77        1,258.29       39.42         0.27       1,380.54      6.56       970.88      0.00        0.00      0.00      0.00      2.56      2,336.39
   1,370           m            23,291.24    6,987.37     7.33        1,362.64       43.36         0.27       1,380.54      7.10      1,051.39     0.00        0.00      0.00      0.00      2.90      2,647.05
   1,524           m            24,971.39    7,491.42     7.83        1,457.16       47.70         0.27       1,380.54      7.60      1,124.33     0.00        0.00      0.00      0.00      3.22      2,938.24
   1,680           m            26,651.54    7,995.46     8.35        1,552.91       52.47         0.27       1,380.54      8.10      1,198.21     0.00        0.00      0.00      0.00      3.55      3,242.70
   1,830           m            28,331.69    8,499.51     8.84        1,644.98       57.71         0.27       1,380.54      8.58      1,269.25     0.00        0.00      0.00      0.00      3.88      3,544.43
GRP_Pipe-A                                                                                                                                                                                                         Page: 8
        Back filling         Site  Temp Road Restoration                                                                    D                       B
                                                                          Cost*2      Cost*3     Total cost
                          cleaning                         Road cutting
 Quantity        Cost*1             Quantity      Cost*1      Fee to
                                                           DCC(2018)
                                                            =2020year                                         Std    Sand       CC     Total
    (cum)         (Tk)     (Tk.)      (cum)        (Tk)                    (Tk.)       (Tk.)       (Tk.)                                       Sl
     1.71        254.79     5.00       0.54        80.46     5,811.99     3,080.98    2,974.92   11,868.00    3.00   0.15       0.00   3.15     1       0.90
     1.76        261.87     5.50       0.57        84.93     6,134.88     3,197.20    3,904.15   13,237.00    3.00   0.15       0.00   3.15     2       0.95
     1.80        268.20     6.05       0.60        89.40     6,457.77     3,313.65    4,420.15   14,192.00    3.00   0.15       0.00   3.15     3       1.00
     1.84        273.79     6.66       0.63        93.87     6,780.66     3,430.34    4,426.74   14,638.00    3.00   0.15       0.00   3.15     3       1.05
     1.87        278.63     6.66       0.66        98.34     7,103.54     3,547.26    6,677.61   17,329.00    3.00   0.15       0.00   3.15     4       1.10
     1.90        282.73     7.32       0.69       102.81     7,426.43     3,664.42    6,859.14   17,950.00    3.00   0.15       0.00   3.15     5       1.15
     1.92        286.08     8.05       0.72       107.28     7,749.32     3,781.81   10,284.66   21,816.00    3.00   0.15       0.00   3.15     6       1.20
     1.95        290.55     8.86       0.78       116.22     8,395.10     4,017.30   13,282.53   25,695.00    3.00   0.15       0.00   3.15     7       1.30
     1.96        292.04     9.74       0.84       125.16     9,040.87     4,295.64   20,024.68   33,362.00    3.00   0.18       0.00   3.18     8       1.40
     2.15        319.61    10.72       0.99       147.51    10,655.32     4,946.84   23,741.15   39,344.00    3.00   0.20       0.00   3.20     9       1.65
     2.10        312.90    11.79       1.05       156.45    11,301.09     5,254.99   21,739.70   38,296.00    3.00   0.23       0.00   3.23    10       1.75
     2.04        303.22    12.97       1.11       165.39    11,946.87     5,570.07   23,936.98   41,454.00    3.00   0.25       0.00   3.25    11       1.85
     2.00        297.26    14.27       1.14       169.86    12,269.76     5,701.76   26,130.19   44,102.00    3.00   0.25       0.00   3.25    12       1.90
     1.85        274.91    15.69       1.23       183.27    13,238.42     6,221.00   28,332.81   47,793.00    3.00   0.30       0.00   3.30    13       2.05
     1.62        241.47    17.26       1.33       198.47    14,336.24     6,683.08   30,537.71   51,558.00    3.00   0.30       0.00   3.30    14       2.22
     1.37        203.75    18.99       1.42       212.24    15,330.74     7,104.01   32,741.73   55,177.00    3.00   0.30       0.00   3.30    15       2.37
     1.06        158.33    20.89       1.52       226.18    16,338.15     7,532.68   34,946.54   58,818.00    3.00   0.30       0.00   3.30    16       2.53
     0.72        107.82    22.97       1.61       239.59    17,306.82     7,947.01   37,151.47   62,406.00    3.00   0.30       0.00   3.30    17       2.68
     2.61        388.89     5.00       0.54        80.46     5,811.99     3,533.97    2,977.43   12,324.00    4.00   0.15       0.00   4.15     1       0.90
     2.71        403.42     5.50       0.57        84.93     6,134.88     3,654.17    3,906.91   13,696.00    4.00   0.15       0.00   4.15     2       0.95
     2.80        417.20     6.05       0.60        89.40     6,457.77     3,816.40    4,423.19   14,698.00    4.00   0.15       0.00   4.15     3       1.00
     2.89        430.24     6.66       0.63        93.87     6,780.66     3,916.18    4,430.09   15,127.00    4.00   0.15       0.00   4.15     3       1.05
     2.97        442.53     6.66       0.66        98.34     7,103.54     4,099.77    6,680.96   17,885.00    4.00   0.15       0.00   4.15     4       1.10
     3.05        454.08     7.32       0.69       102.81     7,426.43     4,241.80    6,862.82   18,532.00    4.00   0.15       0.00   4.15     5       1.15
     3.12        464.88     8.05       0.72       107.28     7,749.32     4,384.07   10,288.71   22,423.00    4.00   0.15       0.00   4.15     6       1.20
     3.25        484.25     8.86       0.78       116.22     8,395.10     4,669.32   13,286.98   26,352.00    4.00   0.15       0.00   4.15     7       1.30
     3.36        500.64     9.74       0.84       125.16     9,040.87     5,032.70   20,029.57   34,104.00    4.00   0.18       0.00   4.18     8       1.40
     3.80        565.46    10.72       0.99       147.51    10,655.32     5,632.30   23,746.54   40,035.00    4.00   0.20       0.00   4.20     9       1.65
     3.85        573.65    11.79       1.05       156.45    11,301.09     5,981.14   21,745.63   39,028.00    4.00   0.23       0.00   4.23    10       1.75
     3.89        578.87    12.97       1.11       165.39    11,946.87     6,335.97   23,943.49   42,227.00    4.00   0.25       0.00   4.25    11       1.85
     3.90        580.36    14.27       1.14       169.86    12,269.76     6,491.61   26,137.36   44,899.00    4.00   0.25       0.00   4.25    12       1.90
     3.90        580.36    15.69       1.23       183.27    13,238.42     7,063.63   28,340.69   48,643.00    4.00   0.30       0.00   4.30    13       2.05
     3.84        572.25    17.26       1.33       198.47    14,336.24     7,605.56   30,546.38   52,489.00    4.00   0.30       0.00   4.30    14       2.22
     3.74        557.47    18.99       1.42       212.24    15,330.74     8,098.82   32,751.27   56,181.00    4.00   0.30       0.00   4.30    15       2.37
     3.59        535.30    20.89       1.52       226.18    16,338.15     8,600.75   34,957.03   59,896.00    4.00   0.30       0.00   4.30    16       2.53
     3.40        507.14    22.97       1.61       239.59    17,306.82     9,085.54   37,163.02   63,556.00    4.00   0.30       0.00   4.30    17       2.68
GRP_Pipe-A                                                                                                                                                     Page: 9
                        Iteam                 Material
                      Pipe price                 1
                        Boxing                 0.57
                     Shall Ballah              0.60
                  Steel sheet pile             0.85
                   Sand bedding                0.69
                   Local carrying
           Earth cutting including of road
                  Pipe installation
                     Back filling
                    Site cleaning
            Temporary road restoration
3596.4
Cost*1
            (Tk)
               11
       Per m of Shall
           bollah
             and
        considering 4
         times reuse.
       412.92
 Steel sheet piles    CC bedding (Cement Concrete)                Sand bedding and topping (S3+S4)                                  Back filling (S2)
                                                                                                                  1*(Depth-Sand Bedding-Pipe
                                                                1*(sand bedding+pipe          0.55*sand filling                                 1.71*Earth filling (Basic
                                                                                                                      dia/1000-300/1000-
                                                           dia+300/1000)*0.9-pi*Pipe dia2/4) FM 1.2 (Basic D71)        600/1000)*width
                                                                                                                                                         D69)
                     This bedding is used for type B GRP
                                      pipe
                                                           1*((.15+200/1000+300/1000)*.9-                           1*(3.15-.15-200/1000-
                                                                                             0.55*913=505.42              300/1000-                1.71*149=254.79
                                                                pi*(200/1000)2/4)=0.55
                                                                                                                    600/1000)*0.90=1.71
  (Tk.)
    26
11867.83
                                                                                                                                                       Total including
             Material                                  Labour                                   Equipment                             Total             Road cutting
                                                                                                                                                           charge
27 28 29 30.00 31.00
        9                                    Sheet pile
                                                                  21.2 sqm        21.20        609.00
       10 Manhole Cover (600mm dia)
                                                  1 No.        1.00              5000
11 Aluminium Manhole Steps
                                                11 Nos.       11.00               300
12 Pipes (GRP)
                              1000 mm           1.9 m
                               500 mm           0.7 m
                               300 mm           0.6 m
                                                3.2 m          3.20           7,807.00
                                                                      Total
                                                                      Av Depth 4m
                                                                      Av Depth 6m
  This plastic film is used to separate areas, to hold items, or to protect surfaces from paint or per
ngular
                                                                               Dimensions (m)
               24,982.40       24,982.40
              281,313.59      225,926.93    37,769.74    18,561.06
tect surfaces from paint or permanent damage. Polyethylene film (poly film) is used in a variety of applications suc
                                                                      Existing
Bottom Top Slab CC, Thick, Pipe dia, Pipe dia, Pipe dia, Bench        Grade       Manhole Re bar
Thick, t2 Thick, t3 t4     d1        d2        d3        invert,      Thick,      dia     Spacing
    0.300    0.300     0.100     1.000    0.500     0.300     1.100       0.300      0.600    0.200
ety of applications such as packaging, plastic bags, labels, building construction, landscaping, and electrical fabricat
N16
weight      E/W
kg/m        Clearance
    1.579        0.150
ng, and electrical fabrication
0
            Analysis of Rates: R.C.C                        Drop Manhole Rectangular
        9                                    Sheet pile
                                         21.2 sqm   21.20            609.00
10 Manhole Cover (600mm dia)
                                           1 No.     1.00              5000
11 Aluminium Manhole Steps
                                          11 Nos.   11.00               300
12 Pipes (GRP)
                               1000 mm    1.9 m
                                500 mm    0.7 m
                                300 mm    0.6 m
                                          3.2 m      3.20           7,807.00
                                                            Av Depth 4m
                                                            Av Depth 6m
Rectangular
                                                                         Dimensions (m)
24,982.40
63,000.00
21,000.00
  7,807.00
381,066.60   116,789.40
             323,938.52   39,272.79   18,799.44
381,066.60          85%         10%          5%
489,738.83          83%         12%          5%
                                                                      Existing
Bottom Top Slab CC, Thick, Pipe dia, Pipe dia, Pipe dia, Bench        Grade       Manhole Re bar
Thick, t2 Thick, t3 t4     d1        d2        d3        invert,      Thick,      dia     Spacing
    0.300    0.300     0.100     1.000    0.500     0.300     1.100       0.300      0.600    0.200
N16
weight      E/W
kg/m        Clearance
    1.579        0.150
Case of D200mm GRP Pipes
                                                      Unit : mm
1,900
                 3,150
                             Sand Backfill (S3)                    300
350 350
900
                                     Width=0.9m
 Quantity Calculation
 S1 =           0.540   m2
 S2 =           1.710   m2
 S3 =           0.419   m2
 S4 =           0.135   m2
Excavation 2.835 m2