Three-Storey Residential Building: Technical Description

This document is a table of contents for architectural plans of a residential building project located on Lot 8, Block 2. It lists 8 sheets containing details of the site plan, floor plans, elevations, and sections of the building as well as technical descriptions. Sheet A-1 includes a vicinity map, site development plan, and technical descriptions. Sheets A-2 through A-4 contain floor plans, elevations, and sections of the building.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6K views1 page

Three-Storey Residential Building: Technical Description

This document is a table of contents for architectural plans of a residential building project located on Lot 8, Block 2. It lists 8 sheets containing details of the site plan, floor plans, elevations, and sections of the building as well as technical descriptions. Sheet A-1 includes a vicinity map, site development plan, and technical descriptions. Sheets A-2 through A-4 contain floor plans, elevations, and sections of the building.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

TABLE OF CONTENTS

TECHNICAL DESCRIPTION SHEET NO. PARTICULARS


- EXTERIOR PERSPECTIVE - SITE DEVELOPMENT PLAN
LOT 8, BLK-2 A-1 - VICINITY MAP - TECHNICAL DESCRIPTIONS
REPUBLIC OF THE PHILIPPINES
- GROUND FLOOR PLAN
A-2
LINES BEARINGS DISTANCES - SECOND FLOOR PLAN
- THIRD FLOOR PLAN - REAR ELEVATION
A-3 - FRONT ELEVATION - RIGHT ELEVATION
OFFICE OF THE BUILDING OFFICIAL
1-2 DUE SOUTH 12.00 M - LEFT ELEVATION
A-4 - SECTION THRU "A"
2-3 10.82 M - SECTION THRU "B"
- GROUND FLOOR FINISH LAYOUT
3-4 7.60 M - SECOND FLOOR FINISH LAYOUT

4-5 DUE NORTH 13.56 M - THIRD FLOOR FINISH LAYOUT


A-5 - GROUND FLOOR REFLECTED CEILING PLAN
5-6 DUE EAST 5.00 M - SECOND FLOOR REFLECTED CEILING PLAN MUNICIPALITY
6-7 DUE NORTH 5.50 M A-6 - THIRD FLOOR REFLECTED CEILING PLAN
- WINDOW SCHEDULE
7-8 DUE EAST 12.90 M - DOOR SCHEDULE
A-7 - GUEST BEDROOM DETAIL
8-1 6.64 M - BEDROOM 2 DETAIL
- MASTER BEDROOM DETAIL
TIE LINES FROM MON #18, BINAN A-8 - MAIN KITCHEN DETAIL
ESTATE TO COR. "1" - DIRTY KITCHEN DETAIL
- GUEST BATHROOM DETAIL
1515.41 M A-9 - MAID'S TOILET AND BATH DETAIL
- MASTER TOILET AND BATH DETAIL
- THIRD FLOOR TOILET AND BATH DETAIL
- POWDER ROOM DETAIL
- WALK-IN CLOSET DETAIL
3 A-10 - BALCONY DETAILS
- SURFACE MOUNTED SLIDING DOOR
A 1 - STAIR DETAIL
- GENERAL NOTES
S-1 - LEGENDS & SYMBOLS
- REBAR DEVELOPMENT LENGTH,
LAND USE & ZONING
STANDARD HOOKS AND DETAILS
- SLAB SCHEDULE
LOT 10, S-2
BLK-2
B - SLAB DETAIL
- BEAM SCHEDULE
- FOOTING SCHEDULE - FOOT RIDGE DETAIL
- COLUMN SCHEDULE - WALL RAFTER
S-3 - FOOTING DETAIL CONNECTION DETAIL
5 4' 4 3' 3 2 1 - RAFTER DETAIL - TRUSS DIAGRAM
1 S-4
- MASONRY REINFORCEMENT DETAIL
- SHEAR WALL DETAIL
12613 - CANTILEVERED STAIR CONNECTION DETAIL
A 1
3950 553 950 1700 2235 1825 1400
- STAIRWAY SHEAR WALL DETAIL
- FOUNDATION PLAN
LINE & GRADE
S-5 - SECOND FLOOR FRAMING PLAN
- THIRD FLOOR FRAMING PLAN
17900
- ROOF BEAM FRAMING PLAN
2700 800 1500 2204 800 1000 5710 1000 1986 S-6

Y
- ROOF FRAMING PLAN

W
2004 10038

PK
LD
2500 7 - GENERAL NOTES

1033
1033
FIE
- LEGENDS & SYMBOLS

N
- PPR PIPE SIZE EQUIVALENT

EE

1000
1000
LANGKIWA
- WATER CLOSET MOUNTING

GR
- FLOOR DRAIN MOUNTING
Building Line A LOT 9,
P-1 - UNDERSLAB CLEANOUT

1000
BLK-2
SITE A'
- FLOOR CLEANOUT
- CATCH BASIN DETAIL
ARCHITECTURAL

Building Line

3050
3050
- SHOWER MOUNTING DETAIL

Building Line
- LAVATORY MOUNTING DETAIL
- AIR CHAMBER DETAIL

3550
- AREA DRAIN DETAIL

1000 500
5 6 1000 - GREASE TRAP DETAIL

1500
- GROUND FLOOR WATER LINE LAYOUT
P-2 - SECOND FLOOR WATER LINE LAYOUT
1 B - THIRD FLOOR WATER LINE LAYOUT
R

- GROUND FLOOR SEWER LINE LAYOUT

1750
PI
D
W

O
D
P-3 - SECOND FLOOR SEWER LINE LAYOUT
VE
TA

CA
TA

2763
LA
M

O
NG

AV - THIRD FLOOR SEWER LINE LAYOUT


AR

STRUCTURAL
M

UI
IN

LE
D

- GROUND FLOOR STORM DRAINAGE LAYOUT

1000
ST

A
PI

P-4
KWY

18585
D - ROOF STORM DRAINAGE LAYOUT

14395
19060
IR
DR PI L LOMA Building Line
C - EMBEDDED DOWNSPOUT DETAIL
ST

FIELD P
ST

VA
E O
S

E IT
AV
TI

NU
IPIL

IM - ISOMETRIC WATER LINE LAYOUT


A

L
O VERDANA KA
M
MAMPLASAN P-5 - ISOMETRIC SEWER LINE LAYOUT
GREEN

CENTRAL PARK - ISOMETRIC STORM DRAINAGE LAYOUT


BI

3510
NT

DR

Building Line

10045
AN

AN - GENERAL NOTES
HY
5220
ATIS ST
IPIL ST

BA
DA

E- 1 - LEGENDS & SYMBOLS


YA
MOLAVE E DR

LOT 7,
P

PI
ST

AT
- SERVICE DROP DIAGRAM
H BLK-2
DU D - POWER SINGLE LINE DIAGRAM
- DESIGN ANALYSIS

1397
DR
VE
W - PANEL BOARD DETAILS ELECTRICAL
PO

LA
NARR
A ST PI E- 2 - SINGLE LINE DIAGRAM
N

O
E
D
ER

M Y
AN RD
O

- LOAD COMPUTATION
SA

LI
G Building Line
1000

O
NA

AN

AH VA - LOAD COMPUTATION
AH
RR

2175
M
NU
AW

Building Line
DR
A

E- 3
ST

W - GROUND FLOOR CEILING LIGHT LAYOUT


AVE
ST

MOL PI
I L
AL P O
1575

T
YAK AN
DR - SECOND FLOOR CEILING LIGHT LAYOUT
IA PI VE
E
S
Building Line F
ACAC O PI E- 4 - THIRD FLOOR CEILING LIGHT LAYOUT

983
AGOH LA
O
M - GROUND FLOOR WALL LIGHTING LAYOUT
- SECOND FLOOR WALL LIGHTING LAYOUT
KWY

1932

1002
1389

VE E
DR E- 5 - THIRD FLOOR WALL LIGHTING LAYOUT
LD P

MOLA 2 - GROUND FLOOR POWER LAYOUT


919 1081
NFIE

3
4
2500 4063 5350 2000 E- 6 - SECOND FLOOR POWER LAYOUT
PLUMBING
RD

- THIRD FLOOR POWER LAYOUT


GREE
LI

18414
VA

- GENERAL NOTES
NU

CELINA
HOMES AU - 1 - LEGENDS & SYMBOLS
- SINGLE LINE DIAGRAMS
LOT 3, LOT 5, - GROUND FLOOR AUXILIARY LAYOUT
BLK-2 BLK-2 AU - 2 - SECOND FLOOR AUXILIARY LAYOUT
- THIRD FLOOR AUXILIARY LAYOUT
- GENERAL NOTES -KITCHEN HOOD DETAIL
M-1 - EQUIPMENT SCHEDULE -EXHAUST GRILLE
2 4 - LEGENDS & SYMBOLS
- GROUND FLOOR ACU LAYOUT
- SPLIT TYPE ACU DETAIL

A 1 A 1 M-2 - SECOND FLOOR ACU LAYOUT


- THIRD FLOOR ACU LAYOUT
FIRE DEPARTMENT
REPUBLIC ACT 9266 NO REVISION DATE SHEET CONTENTS
THIS DRAWING ACTING AS AN PERSPECTIVE
1 -
INSTRUMENT OF SERVICE IS A

VLADIMIR M. LONGID
PROJECT
THREE-STOREY RESIDENTIAL BUILDING PROPERTY OF GAUDAN DESIGN
& CONSTRUCTION SERVICES,
AND AS SUCH WOULD BE
2
3
-
-
VICINITY MAP
TECHNICAL DESCRIPTION
SITE DEVELOPMENT PLAN
UNLAWFUL TO DUPLICATE OR
ARCHITECT ENGINEER MAKE COPIES OF SAID 4 -
PRC NO. 0015959 PTR NO. 0623786 PRC NO. PTR NO.
OWNER MR. DINDO BORLASA & MRS. MARIA ELEANOR BORLASA DOCUMENTS FOR USE IN THE
REPETITION OF AND FOR OTHER 5 -
IAPOA PROJECTS, WETHER EXECUTED 6 - DRAWN BY DATE SHEET NO
15791059845101210 ISSUED 03/03/2016 TIN ISSUED JNSP
LOCATION PARTLY OR IN WHOLE WITHOUT
TIN 182-447-315 PLACE BAGUIO CITY PTR PLACE THEIR CONSENT. 7 - CHECKED BY VML APRIL 2016 A 1

You might also like