0% found this document useful (0 votes)
54 views1 page

Supplierdeviationform

This deviation request form is used by suppliers to request changes from Watts Water Technologies' design standards for specific parts before shipment. The form collects information about the supplier, part number, description of the current specification or process, proposed deviation, and reason for the deviation. Watts will then approve or disapprove the request and provide any necessary disposition details.

Uploaded by

Sachin Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views1 page

Supplierdeviationform

This deviation request form is used by suppliers to request changes from Watts Water Technologies' design standards for specific parts before shipment. The form collects information about the supplier, part number, description of the current specification or process, proposed deviation, and reason for the deviation. Watts will then approve or disapprove the request and provide any necessary disposition details.

Uploaded by

Sachin Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Deviation Request Form

This form is to be used by Suppliers to request a deviation from the Design Standards (on a specific part
number and lot) and must be completed before shipment.

Please print, fill out, and mail the following form to:
Site Quality Manger at Watts Water Technologies, Inc. or its Divisions.

A. Supplier and Part Information


Watts Part Number:____________________________
Supplier Name: __________________________________
Watts Part Description: __________________________
Supplier Contact: __________________________________
Watts Revision Level: ___________________________
Supplier Email: __________________________________
Watts PO Number: _____________________________
Supplier Phone: __________________________________
Quantity: _____________________________________
Supplier Address: _________________________________
Required Date: ________________________________
Supplier City: __________________________________
Watts Name of Project: __________________________
Supplier State: Zip: ___________________
Today’s Date: _________________________________

B. Deviation Information
Deviation Request is: Process Related: ______ Product Related: ______
1st Time: ______ Material Change: ______
Permanent: ______ Temporary: ______

Current Specification or Process:

Proposed Deviation:

Reason for Deviation/Justification/Corrective Action:

C. Watts Approval/Disapproval
Watts Approval/Disapproval Signed by:
_______ Recommended Name:___________________
_______ Recommended as Noted
_______ Not Recommended Signature:________________
_______ Received Too Late
Date:____________________

D. Disposition
Document Change Required? _____Yes/No_____ If Yes, ECN#___________
Comments:______________________________________________________ Rev. 04/15/2011

You might also like