PROBLEM No .
1
The ordinates of a 6 hr unit hydrograph for a catchment are given below
Time(hr)                 0      3       6         9       12       15      18
UHO (Cumecs)             0     25      50       85       125      160     185
i) Compute the ordinates of the DRH due to rainfall excess of 3.5 cm occurring in 6 hr
ii)Two storms each of 6 hr duration and having rainfall excess values of 3.0cm and 2.0 cm respe
The 2 cm rainfall excess follows the 3 cm rainfall. Calculate the resulting DRH
iii) Derive the flood hydrograph due to the storm given below
Time from start of storm(h)     0        6      12         18
Accumulated rainfall (cm)       0      3.5      11       16.5
The storm loss rate for the catchment is estimated as 2.5mm/hr The base flow can be assumed a
 and increasing by 2.0Cumecs for every 12 hrs till the end of the DRH.
i)                              Ordinate
                                s of 3.5
                                Cm
                6 hr            DRH                                       700
                UHO             (Cumecs                                   600
Time hr         (Cumecs)        )
                                                                          500
      0                0                 0
                                                                          400
      3               25             87.5
                                                                          300
      6               50              175
      9               85            297.5                                 200
     12              125            437.5                                 100
     15              160              560                                   0
                                                                                0   10        20
     18              185            647.5
                                                                                         Column B
     24              160              560
     30              110              385
     36               60              210
     42               36              126
     48               25             87.5
     54               16               56
     60                8               28
     69                0                 0
ii)
                                                                   Ord. of
                                         Ordinate                  2.0 Cm   Ord. of
                                         s of 3.                   DRH      5.0 Cm
                                         Cm                        (Cumecs) DRH
                     6 hr                DRH                       Col 2    (Cumecs
                     UHO                 (Cumecs                   lagged by) Col
Time hr              (Cumecs)            )                         6hr*2    3+col 4
      0                       0                   0                                 0
      3                     25                   75                                75
      6                     50                 150                        0       150
      9                     85                 255                       50       305
     12                    125                 375                      100       475
     15                    160                 480                      170       650
     18                    185                 555                      250       805
     21                   172.5              517.5                      320     837.5
     24                    160                 480                      370       850
     30                    110                 330                      320       650
     36                     60                 180                      220       400
     42                     36                 108                      120       228
     48                     25                   75                      72       147
     54                     16                   48                      50        98
     60                       8                  24                      32        56
     66                     2.7                 8.1                      16      24.1
     72                       0                   0                     5.4       5.4
     78                       0                   0                       0         0
iii)
Duration                          First 6 hSecond 6hr Third 6 hr
Total rainfall depth cm                3.5        7.5        5.5
Loss                                   1.5        1.5        1.5
Effective rainfall cm                    2          6          4
                                                                             Ord. of
                                                                   Ord. of 4.0 Cm
                                         Ordinate                  6.0 Cm DRH
                                         s of 2                    DRH       (Cumecs
                                         cmCm                      (Cumecs) ) Col 2
                     6 hr                DRH                       Col 2     lagged
                     UHO                 (Cumecs                   lagged by by      Base
Time hr              (Cumecs)            )                         6hr*6     12hr*4 flow
      0                  0                0                                    15
      3                25               50                                     15
      6                50              100                  0                  15
      9                85              170                150                  15
     12               125              250                300         0        17
     15               160              320                510       100        17
     18               185              370                750       200        17
     21              172.5             345                960       340        17
     24               160              320               1110       500        19
     27               135              270               1035       640        19
     30               110              220                960       740        19
     36                60              120                660       640        21
     42                36               72                360       440        21
     48                25               50                216       240        23
     54                16               32                150       144        23
     60                  8              16                 96       100        25
     66                2.7              5.4                48        64        25
     69                  0                0              32.1        48        25
     72                  0                0              16.2        32        27
     75                  0                0                 0      21.4        27
     78                                                     0      10.8        27
     81                                                               0        29
     84
PROBLEM No. 2
The runoff data at a stream gauging station for a flood are given below. The drainage area is 40 k
for the basin and plot the same.
Time(hr)                   2     5        8       11         14       17      20
Discharge (Cume           50   47        75     120         225      290     270
State the peak of the unit hydrograph.
Assuming a base flow of 47.0 Cumecs from the start of runoff and 60 cumecs at 38 th hr
                                        UHO
                         Base           (Cumec Time
               Discharg flow DRH        s)      from
               e         (Cum (Cumecs Col4/26 beginning
Time(hr)       (Cumecs) ecs) )          .62      hr
      2               50      0       0       0
                                                                          10
                                                                           9
                                                                           8
 5                  47      47         0      0        0        0
 8                  75      46        29   1.09        3     1.09   10
11                 120      45        75   2.82        6     2.82   9
                                                                    8
14                 225      45       180   6.76        9     6.76
                                                                    7
17                 290      45       245    9.2       12      9.2   6
20                 270      46       224   8.41       15     8.41   5
23                 145      48        97   3.64       18     3.64   4
26                 110      50        60   2.25       21     2.25   3
                                                                    2
29                  90      53        37   1.39       24     1.39
                                                                    1
32                  80      54        26   0.98       27     0.98
                                                                    0
35                  70      57        13   0.49       30     0.49        0   5   10
38                  60      60         0      0       33        0
41                  55
44                  51
47                  50
                                 986
     Volume of runoff = 986 *60*60*3
                         1E+07
     Effective rainfall depth 986*60*60*3/(40*10^6)
     Effective rainfall depth = Volume / Area of catchment
                         0.2662 m
                         26.622 cm
                  24             30           36         42        48              54        60   69
                 160            110           60         36        25              16         8    0
occurring in 6 hr
 of 3.0cm and 2.0 cm respectively occur successively.
ing DRH
ase flow can be assumed as 15 Cumecs at the beginning
                                           Chart Title
      700
      600
      500
      400
      300
      200
      100
       0
            0   10        20          30           40      50      60         70        80
                     Column B         Column C          Column D        Column E
        0       0
        3      75
        6     150
        9     305                                               Chart Title
       12     475       900
                        800
       15     650
                        700
       18     805
                        600
       21    837.5
                        500
       24     850
                        400
       30     650
                        300
       36     400
                        200
       42     228       100
       48     147        0
                              0         10     20          30        40       50   60       70
       54      98
       60      56
       66     24.1
       75       0
Ord. of
total DRH                         Ord. of                                          Chart Title
(Cumecs)                          total DRH
Col                               (Cumecs)          2500
                                  Col
3+col4+co                         3+col4+co
l 5 + col6           Time hr      l 5 + col6        2000
                                                    1500
                                                    1000
                                                                  2500
                                                                  2000
                  15                          0      15
                                                                  1500
                  65                          3      65
                 115                          6     115           1000
                 335                          9     335
                 567                         12     567            500
                 947                         15     947
                                                                     0
                1337                         18    1337                  0    10         20        30   40      50
                1662                         21    1662
                1949                         24    1949
                1964                         27    1964
                1939                         30    1939
                1441                         36    1441
                 893                         42     893
                 529                         48     529
                 349                         54     349
                 237                         60     237
               142.4                         66   142.4
               105.1                         69   105.1
                75.2                         72    75.2
                48.4                         75    48.4
                37.8                         78    37.8
                  29                         81      29
. The drainage area is 40 km2. The duration of rainfall is 3 hours. Derive the 3-hour unit hydrograph
                  23      26        29       32     35       38          41         44        47
                 145     110        90       80     70       60          55         51        50
cumecs at 38 th hr
                                                                                                             Chart T
                               Chart Title                                    350
   10
                                                                              300
    9
                                                                              250
    8
                                                                              Chart T
                        Chart Title                  350
10
                                                     300
9
                                                     250
8
7                                                    200
6                                                    150
5
                                                     100
4
                                                     50
3
2                                                     0
                                                           0   5   10   15    20        2
1
0                                                                            Column B
     0   5   10         15      20    25   30   35
             UNIT HYDROGRAPH
             2.091279
             1.735762
             41.65828
tle
      50   60       70   80
           Chart Title
  20     30    40        50         60   70   80   90
our unit hydrograph
                      Chart Title
                Chart Title
5   10   15    20        25    30        35   40   45   50
              Column B        Column C
     DIRECT RUNOFF HYDROGRAPH