SL.
NO Category Hierarchy
1 Provisional Sum #[XXX0001]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
2 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
3 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
4 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
5 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
6 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
7 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
8 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
9 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
10 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
11 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
12 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
13 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
14 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
15 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
16 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
17 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
18 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
19 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
20 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
21 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
22 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
23 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
24 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
25 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
26 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
27 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
28 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
29 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
30 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
31 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
32 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
33 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
34 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
35 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
36 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
37 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
38 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
39 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
40 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
41 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
42 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
43 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
44 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
45 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
46 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
47 completion work #[45450000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
48 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
49 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
50 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
51 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
52 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
53 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
54 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
55 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
56 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
57 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
58 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
59 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
60 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
61 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
62 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
63 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
64 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
65 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
66 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
67 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
68 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
69 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
70 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
71 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
72 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
73 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
74 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
75 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
76 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
77 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
78 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
79 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
80 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
81 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
82 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
83 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
84 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
85 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
86 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
87 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
88 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
89 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
90 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
91 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
92 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
93 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
94 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
95 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
96 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
97 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
98 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
99 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
100 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
101 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
102 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
103 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
104 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
105 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
106 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
107 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
108 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
109 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
110 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
111 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
112 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
113 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
114 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
115 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
116 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
117 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
118 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
119 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
120 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
121 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
122 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
123 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
124 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
125 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
126 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
127 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
128 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
129 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
130 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
131 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
132 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
133 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
134 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
135 work #[45310000]>
Total Price (Without VAT and PS)
Discount
Discounted Total
Rank
PE's Estimate
Item Name & Description
Quantity Unit
Insurance Provision : Provisional cost for
the expenses such as performance bond
commission, insurances (project period +
maintenance period+1 months),
consultancy fees, cost of preparation of as
built drawings, cost of quality assurance
tests, registration tax for town
development committee before execution
of work etc as per written instruction of
the engineer.(The payment of this item
will be done according to submitted
original copy of related invoices.) 1 ps
GENERAL WORK: SITE CLEARENCE:
Clearing the site of all the vegetation,
roots and other unuseful materials and
leveling the Site for stacking the useful
items in specified space and disposing
other item before commencing the
construction work and placing project
description sign board as per instruction of
the site engineer all complete including
layout of buildings. 2848.31 Sqm
EARTH WORK: CUTTING & FILLING: E/W in
Excavation in all type of soils in
foundation manually including 15 m
hauling distance & 1.5m lift all complete
work as per instruction. 2076.58 Cum
Earthwork filling in floor with transported
soil, watering, consolidation in layers of 15
cm and ramming as per instruction of site
engineer. 222.75 Cum
STONE WORK: Dry stone / boulder soling
work in foundation bed using (available at
good condition at site) all complete as for
instruction. 159.96 Cum
Stone Masonary Work (1:6)c/s mortar
with proper bonding with block & bond
stone using in proper line & level work all
complete as per instruction of site
engineer. 353.75 Cum
Providing and laying decorative stone
fixing on wall in proper line & level laid in
12.5mm thick base plaster of 1:4 cement
sand mortar & green base mortar
including the cost of joint filler on floors,
fitting & grouting of joints with white
cement as per drawing & specifications all
complete. 282.49 Sqm
BRICK WORK: Providing, laying and curing
first class brick masonry works in cement,
sand mortar (1:4) in ground floor finished
in perfect lines & level as per specification,
drawings & instructions of the site
engineer. 223.69 Cum
Providing, laying and curing first class brick
masonry works in cement, sand mortar
(1:4) in superstructure above ground floor
finished in perfect lines & level as per
specification, drawings & instructions of
the site engineer. 121.91 Cum
Providing & filling brick ballast works all
complete as per instruction of the site
engineer. 14.13 Cum
PCC & RCC: Providing and Laying Plain
Cement Concrete ( P.C.C.) in 1:3:6 in
foundation with cement, sand and crosser
aggregate including mixing, laying,
finishing to approved level, line and
dimensions and curing all complete as per
specification and instruction of site
Engineer. 59.05 Cum
Providing and Laying Plain Cement
Concrete ( P.C.C.) in 1:2:4 in foundation
with cement, sand and crosser aggregate
including mixing, laying, finishing to
approved level, line and dimensions and
curing all complete as per specification
and instruction of site Engineer. 50.63 Cum
Providing and laying PCC (1:1.5:3) M20 for
RCC work in foundation, column, beam,
slab, lintel etc. with cement sand and
crosser aggregate of required size
including mixing with concrete mixture,
compacting the concrete with vibrator
machine, laying, finishing to approved
level, lines and dimension and curing all
complete work as per specification and
instruction of site Engineer. 403.92 Cum
REINFORCEMENT: Providing
Reinforcement bars (Grade Fe 415 or
above) work including straightening,
cleaning, cutting, bending, binding with 20
SWG annealed wire & fixing in position as
per design drawing, bar bending schedule
for raft foundation column, beam, wall,
stair, slab in all RCC works as per
specification, drawing & instruction of site
Engineer. Approved brand : Himal Iron,
Panchakanya or Equivalent. 69765.05 Kg
Form Work : 19mm ply wood & Steel
props for all kinds of RCC work with
necessary wood, nails, proping,
scaffolding, stagging, support inclusive of
wedging and cutting holes for utilization
work till the support is full unyielding nett
for Column/Beam/Slab etc. Complete
works. 2526.64 Sqm
PLASTERING & POINTING WORK:
Providing, laying & curing 12.5 mm thick
cement sand (1:3) plastering in ceiling,
beams surfaces including chipping &
wetting the concrete surfaces finished in
perfect plumb, lines and level as per
drawings, specifications and instructions of
the site engineer 526.78 Sqm
Providing, laying & curing 12.5 mm thick
cement sand (1:4) Plastering on outside
wall to perfect plumb, lines & level
including plaster beat (pani patti) for
preventing the flow of rain water from slab
edges during rain fall all complete as per
design drawings, specifications and
instruction of the site engineer all
complete: 3166.47 Sqm
2 mm thick plain white putty plaster on
wall & Celing as per instruction, all
complete. 3108.18 Sqm
FLOORING & FINISHING: 16mm thick
marble tile flooring & skirting - Supplying
and laying 16mm thick marble tile in
20mm thick cement sand mortar in(1:2)
ratio and grinding and polishing in perfect
line and level with finish according to
drawing and specification and instruction
of site engineer as all complete 401.92 Sqm
Providing and laying 500 gauge plastic
sheet on floor of buildings on perfect line
& level as per design, specification and
instruction of site engineer. 375 Sqm
Providing & laying porcelain non glazed
floor tiles in 1:4 cement sand mortar in
perfect lines & level finishing the joint with
white cement with or without pigments
where necessary all complete as per
design drawings, patterns, specifications
and instruction of the site engineer: 107.1 Sqm
Providing & laying porcelain glazed wall
tiles in 1:4 cement sand mortar in perfect
lines & level finishing the joint with white
cement with or without pigments where
necessary all complete as per design
drawings, patterns, specifications and
instruction of the site engineer: 189.96 Sqm
3mm thick punning works with 1:1 c/s
mortar in perfect line and level with finish
according to drawing and specification and
instruction of site engineer as all complete 106.59 Sqm
Providing laying of shisam wooden
Parketing of 150X30X8mm size in perfect
line and level with finish according to
drawing and specification and instruction
of site engineer as all complete 536.93 Sqm
Providing & laying a slate roofing as per
design drawings, patterns, specifications
and instruction of the site engineer: 604.5 Sqm
PAINTING WORKS: Providing & painting
two coats of Enamel paint with one coat of
primer of approved brand and colour as
per specifications and instruction of the
site engineer. 430.6 Sqm
Providing & painting two coats of emulsion
paint with one coat of primer of approved
brand and colour over plastered surfaces
of building, walls ceiling area as per
specifications and instruction of the site
engineer. 2870.47 Sqm
Supplying and applying Two coat weather
proof painting (Apex or equivalent) with
one coat of cement primer of approved
colour in outer side of building as per
specifications and instruction of the site
engineer. 1706.03 Sqm
Two coats of Alluminium painting work
with primer painting over porperly sanded
metal surface all complete. 364.36 Sqm
DOOR & WINDOWS: Supplying and
installation of Aluminium Profile Sliding
Window frame (88 x38.1x1.1) with fixed
panel, 5 mm thick clear glass, insect net
shutter, patented standard hardware like:
rollers, gaskets,brush including all
necessary accessories all complete
according to design drawing, specification
and instruction of site engineer. 182.18 Sqm
Providing, making and fixing in position
salwood frames for doors with good
seasoned salwood, including the cost of
holdfast (2 Numbers on each side of height
upto 1500mm and 3numbers on each
sides of frame height upto 2100mm) set
into concrete block of size 300 x 150 x 150
mm in 1:2:4 (1 cement :2 Coarse sand : 4
graded stone aggregate), screw, applying 2
coat of hot bitumen to the surfasc
contacting to masonary and concrete etc,
all complete as per design, drawing,
specifications instructions of the Engineer. 2.13 Cum
Providing & fixing 38mm thick solid core
flush door shutters, in single leaf or double
leaf as per detailed drawing. The flush
doors shall be factory made solid core
block board shutters bonded with phenol
formaldehyde resin. The lipping shall be of
teakwood all-round the flush door with a
minimum thickness of 12mm. The
following C.P. fittings shall be used: (a) - 2-
150 mm Handles in each leaf; (b) Tower-
bolt – 300 mm long at top 1 in each leaf
and 200 at bottom in each leaf; ( c ) 1 no.
300 mm long C.P. Aldrops with Godrej
made padlock; (d) 125 mm heavy duty GI
But Hinges 3 nos. in each leaf. (rate shall
include all required door hardware). 139.87 Sqm
Providing and fabricating MS grill with
20x4.5mm thick metal strips of approved
pattern and manufacture finished with one
coat of metal primer paint with approved
colour as per design, drawing and
instruction all complete. 3916.77 Kg
MISCELLANEOUS WORKS Providing 2" dia
stainless steel pipe hand rail fixing on
staircase & verandah ( 3 line 1" dia pipe
horizontal laying & 2" dia pipe vertical
laying at 2m c/c, ht 0.9m including painting
as per design drawing and specifications
and instructions of site engineer. 25.9 Sqm
Providing and laying 2 coats of water
proofing materials for terrace roof
(elastocrate cementious elastrometric
water proofing coating two components)
capacity per Kg 6 sq ft as per specification
and direction complete works. 181.27 Sqm
Providing and paving heavy duty concrete
interlocking block 60mm thick in walk way
as per drawing, design and instruction of
site engineer all complete. 489.2 Sqm
Providing & fixing metal spiral stair of 100
mm centre post using 1 1/4" dia. Black
pipe hand rail and 3/4" x 3/4" dia. Square
pipe with 2' -2' 6" wide as per design,
specification & instructions of Site
Engineer all complete 3 Rm
Supplying & Fixing 0.075x0.125 m size,
2.10m height concrete (1:2:4) post with
reinforcement for fencing at 2.00 m
interval as per design, drawing,
specifications and instructions of site
engineer. 30 Nos
Supplying and fixing of
tiitng/straightening 12 guage G.I barbed
wire for fencing through with proper
straightening with necessary U nails,hook
etc all complete as per specification 420 Sqm
Making & fixing MS door for pump house
with locking arrangement of approved
pattern and manufacture finished with one
coat of metal primer paint and two coat of
enamel paint with approved colour as per
design, drawing and instruction all
complete. 6 Nos
Providing, fabricating & fixing MS angle for
water tank stand of approved pattern and
manufacture finished with one coat of
metal primer & enamel paint with
approved colour as per design, drawing
and instruction all complete. 17 Kg
Making & fixing 3mm thick MS sheet
manhole cover (.60cmx.60cm) as per
design drawing, specifications and
instructions of site engineer all complete. 15 Nos
Providing and applying Dustban Permise
chemicals for Anti termite Treatment all
complete. 528 Sqm
Supply,Providing and fitting of Iron works
as per specification and technical body
instruction all complete. For Ramp Slab 2400 Kg
Supplying & fitting 50mm dia. Black iron
pipe post c/c 2.0m, 20*20*4mm &
25*25*4mm size mid angle frame of 7mm
dia reinforcement in diagonal 225 Kg
Supplying and planting outdoor gardening
plants (Dhupi, Kapur etc.) and flowering
plants 50 Nos
Supplying and application of
Polycarboxylate ether based
Superplastisizer in structural concrete
(M20) to increase workability without
affect in strength of concrete to make
concrete pump able all complete as per
specifications 913.63 Kg
SANITARY WORKS: Assessories Fixure:
Supply and Insatallation and fixing in
position White glazed porcelain clay One
Piece commode with 'P ' & 'S ' trap and
slow falling seat cover complete set.
(Hindware, Paryware, Somany, cera or
eqv.) 13 Set
Supply and Insatallation and fixing in
position 10 ltr PVC dual flushing cistern ,
15 mm PVC connector with both ends
couplings, 32 mm long pvc pipe all
complete with testing and ready for
operation 13 Set
Supply, Insatallation and fixing in position
of 550x400 mm White glazed porcylain
clay wall mounted Wash Basin with
pedestrail and one 15 mm pillar cock ,32
mm bottle trap with plug chain and stay ,
one 15 mm PVC connector with both ends
couplings with testing and ready for
operation 15 Set
Supply, Insatallation and fixing in position
White glazed porcylain clay wall hung
Wash Basin with pedestrail , one no.15
mm pillar cock, grab bar ., 32 mm bottle
trap with plug , chain and stay all
complete , one 15 mm PVC connecting
pipe testing and ready for operation for
disable as per instruction 13 Set
Supply, Insatallation and fixing in position
of White glazed porcylain clay urinal size
465x355x265 with bracket testing and
ready for operation 5 Set
Supply, Insatallation and fixing in position
of White glazed porcylain clay division
plate 680x300 with bracket with testing
and ready for operation 5 Set
Supply, Insatallation and fixing in position
of Single bowl large Stainless Steel Kitchen
Sink without drain board of size
600x450x250 mm with 15 mm PVC
connector -1nos. with both ends
couplings, 15mm CP sink cock , 40mm
PVC bottle trap, 40mm CP Waste Coupling
with Plug, stay and chain with testing and
ready for operation 1 Set
Supply, Insatallation and fixing in position
stainless steel Wall Mixture all complete
and ready for operation 1 Set
Supply, Insatallation and fixing in position
15 mm CP shower head with arm and
flange all complete and ready for
operation 13 Set
Supply, Insatallation and fixing in position
15 mm CP Commode Spray with testing
and ready for operation 13 Set
Supply, Insatallation and fixing in position
15 mm CP Urinal auto closing valve with
built in control valve 5 Set
Supply, Insatallation and fixing in position
of CP Toilet paper holder 13 Nos
Supply, Insatallation and fixing in position
of 15 mm CP Bib Cock 25 Nos
Supply, Insatallation and fixing in position
15 mm CP Angle Valve 25 Nos
Supply, Insatallation and fixing in position
of CP soap dish 5 Nos
European pattern stainless steel 60-90 cm
long with bend type Grab Bar .(Disabled
toilet) 2 Nos
Supply, Insatallation and fixing in position
of 22 inch mm long CP glass shelf with
guard rail. 13 Nos
Supply, Insatallation and fixing in position
of 24inch Single Towel rail heavy 13 Nos
Supply, Insatallation and fixing in position
of Looking mirror Modi Guard 600x450
mm 13 Nos
Supply, Insatallation and fixing in position
of PVC Multi-floor trap with cover
110mmx75 mm 13 Nos
WATER SUPPLY PIPES: 50 Dia CPVC Pipes 200 Rm
- 40 mm dia. 185 Rm
- 32 mm dia. 200 Rm
- 25 mm dia. 285 Rm
- 20 mm dia. 300 Rm
- 15 mm dia. 225 Rm
Supply and Installation of CPVC Ball
Valves CTS sockets as per drawing and
instruction- 50 Dia 100 Nos
- 40 mm dia. 155 Nos
- 32 mm dia. 135 Nos
- 25 mm dia. 215 Nos
- 20 mm dia. 150 Nos
- 15 mm dia. 175 Nos
Supply and Installation of pipe Insulation
for hot water ( Aeroflex , Superloan or
equivalent) 6 mm thick- 32 mm Dia 200 Rm
- 25 mm dia. 285 Rm
- 15 mm dia. 300 Rm
Supply and Installation of 2000 litres
stainless Steel Roof Tanks NS brand extra
heavy all complete testing and ready for
operation 3 Nos
25mm dia. Check valve G.M 15 Rm
20mm dia. Gate valve G.M 15 Rm
Supply and installation of 2 H.P. Electrical
motor water pump multi stage, coupled
pump (Crompton) with check valve all
complete with ready for operation 3 Set
Supply and installation of Pressure sensor
switch for pump auto switch off all
complete set. 6 Set
Supply and installation solar water heater
with 3.0 KW elecric booster with
thermostat all complete set technical
specification (inside boiler MS sheet 4 mm
thick with expantion joint overlap joint ) in
cover and bottom with 25x25x3mm angle
welded 4 kg per meter , 300 lit 24 tubes
solar heater fixing with electric booster all
complete 4 Nos
Supply and Installation of Euro Guard
water purification set with all necessary
accessories Water Filter 1 lit/min 4 Set
Supply and installation 5 kg ABC type fire
extinguisher with pressure guage type all
complete set. 10 Set
Supply and Installation of 20 kg weight
600x600 mm square type CI Cover 10 Set
Supply and Installation of 14 kg weight
450x450 mm square type 10 Set
SEWER, RAIN WATER AND WASTE WATER
PIPE INSTILATION Supply and Installation
of ISI flowguard or equivalent brand uPVC
pipes including cutting, jointing, sealing
with rubber washer and solvent cement
and all necessary fittings such as Tees, Y-
Tees, Bends (with or without doors),
Reducers, Couplers, connector pieces,
offsets ,cowl etc. for complete installation,
PVC clamps, nails and hooks. Installation of
pipes and specials including making holes
on walls or floor and repairing the same to
its original finish, excavation and backfill
(compaction as per civil works
specifications) in any type of soil. Pipes to
be installed on trenches or walls or floor or
hung to ceilings as per drawings,
specifications and instructions, cleaning of
the system, testing and ready for
operation. The rate shall include for all
labour and materials required. The
measurement shall be done for running
metre, fittings etc not payable seperately.
- 110 mm ED 6 kg/cm2 250 Rm
- 75 mm ED 6 kg/cm2 250 Rm
Supply and Installation of 160 mm HDEP 4
Kg/cm2 including excavation and
backfilling all complete 250 Rm
Supply and Installation of 110 mm HDEP 4
Kg/cm2 250 Rm
200 mm dia NP2 RCC Hume pipe including
collar and cement sand mortar all
complete. 50 Rm
ELECTRICAL WORKS: Wiring for Light /
Fan / Power Point, wiring following
specified parameters: General light point
wiring with 2 x 1.5 sq. mm + 1 x 1sq.mm
multistrain (3/22x2+1/18x1) PVC insulated
earth loop Cu. Conductor upto metallic
part including accessories.( Average
Length 12 mtr. ) 185 point
6 / 15 A Power point wiring with 2 x 4
sq.mm + 1 x 2.5 sq. mm multistrain
(7/22x2+3/22x1) PVC insulated earth loop
Cu. conductor including accessories.
( Average Length 18 mtr. ) 74 point
A. Single phase AC Power point wiring
with 2 x 6 sq.mm + 1 x 2.5 sq. mm
(7/20x2+3/22x1)PVC insulated earth loop
Cu. conductor including accessories.
( Average Length 18 mtr. ) 36 point
Out Door/Terrace Light point wiring with
2 x 1.5 sq. mm + 1 x 1sq.mm multistrain
(3/22x2+1/18x1) PVC insulated earth loop
Cu. Conductor upto metallic part including
accessories.( Average Length 15 mtr. ) 8 point
8 swg cu.wire in HDPE polythene pipe for
earth continuty from panel board to DB
etc all complete 100 Rm
Switch/ Socket 'Supply, delivery,
installation, testing and commissioning of
following Switch / power socket coupled
with sp finger touch switch including heavy
gauge anti-corrosive company made metal
box & all accessories as per the drawings,
specifications, electricity rules and
instructions all complete. 1 gang 1 way 10
A Switch 17 Nos
' 2 gang 1 way 10 A switch 32 Nos
' 3 gang 1 way 10A switch 27 Nos
' 4 gang 1 way 10 A switch 4 Nos
'6 gang 1 way 10 A switch 8 Nos
' 1 gang 2 way 10 A switch 2 Nos
Junction box made of metal withcover size
6"*4" ect all complete 20 Nos
6/15 A power socket / switch 74 Nos
'Light & Fan Fixtures:Fixing and
Commissing of the folling light/Fan
FixtureCeiling/Dome light 117 Set
Mirror Light 13 Set
Tube Light 25 Set
Wall light 8 Set
chandiler light/dinning light 13 Set
12w led down light 101 Set
Terrace light 9 Set
Earthing / Protection System- Supplying
materials, installation, testing,
commissioning of equipments body /
system earthing, consisting following
specified parameters: (Make: Ashlok /
LPI ) Maintanance Free Earthing; Earthing
with cu.plate size 60cm*60cm with G.N. 8
copper wire for earth continuty from panel
board to earthing site etc all complete 3 Nos
20 x 3 mm pure copper strip from the base
of arrester base to grounding Or
Equivalent capacity conductor. 100 M
Supplying , laying, installation, testing and
commissioning of one number 8 SWG
bare copper wire from various panels
/feeder posts/blocks to make bonded
grounding system. 20 M
Supply & Installation of the Direct lightning
Protection System. 1 Set
Main Cables & Wires: Supply, laying ,
Interconnection, Testing of following size
cable / Wires including Jointing Kits,
Pipes/Couduit, required tools and
accessories. 35 sq. mm 1 core
Unarmoured Al. Conductor or equivalent 20 M
Supply & Fixing 2x7/20 & 1x1/18 P.V.C.
copper wire for DB to DB . 20 M
Main Distribution / Sub-Distribution
Board Installation Works- Suply,
installation, testing and commissioning of
the following:cable insulating materials as
per site conditions,specification. Circuit
Breakers /accessories should be as per
specification, or equivalent, but subjected
to prior approval of engineer
(MCCB/MCB :-ABB/LS/Schneider 1 Set
Floor Distribution Board: 3 Set
Fire
Alraming/Telephone/CCTV/Networking
System- Manual call point 3 Nos
Fire Alaram Hooter 6 Nos
2x1.5 sq. mm COCOND single core PVC
cable drawn inside 16 mm Ø PVC conduit 50 Rm
8-Zone Fire alarm Control Panel with 3
circuits sounder circuits equipped with self
contained maintenance free battery and
battery charger of sufficient capacity to
drive 40 electronic hooters 1 Set
RJ 11 Telephone outlet socket (modular
type) with necessary connection box, 3-
paired telephone cable drawn inside 20
mm dia PVC conduit ( Average Length 35
mtr. ) 30 Nos
10-paired Telephone cable drawn inside
25 mm dia. PVC conduit 20 Rm
RJ 45 Data outlet socket (modular type)
with necessary connection box, CAT 6
cable drawn inside 20 mm dia PVC conduit
from the connection box meant for
corresponding floor HUB( Average Length
35 mtr. ) 5 Nos
75 ohms Co-axial cable With 2*1.5 sq. mm
copper cable for Camara signal drawn
inside 20 mm dia. PVC conduit 200 M
Dome Type Camara Set 10 Set
32 port DVR Set 1 Set
PE's Estimate Kanchanjunga Nirman Sewa
Official Rate (NRs) Amount Rate
352448.67 352448.67 352448.67
44.85 127746.7 20
615.94 1279048.69 200
612.95 136534.61 150
3343.05 534754.28 2000
10350 3661312.5 5200
2257.84 637817.22 150
15830.78 3541187.18 13000
16215.74 1976860.86 13000
3497.95 49426.03 15000
11468.37 677207.25 9000
15260.21 772624.43 11000
13976.81 5645513.1 15000
120.29 8392037.86 100
799.44 2019897.08 800
415.96 219119.41 500
377.52 1195405.75 500
521.95 1622314.55 300
2975.19 1195788.36 3500
214.47 80426.25 400
2715.61 290841.83 3500
2987.83 567568.19 3500
282.25 30085.03 400
2722.28 1461673.8 800
801.55 484536.97 600
297.74 128206.84 400
315.51 905661.99 375
289.22 493418 350
292.92 106728.33 425
6756.2 1230844.52 5500
282890.82 602557.45 150000
20619.17 2884003.31 1400
138 540514.26 130
920 23828 4000
643.44 116636.37 400
1776.47 869049.12 3800
11504.6 34513.8 800
978.81 29364.3 2500
71.55 30051 400
5000 30000 5000
213.04 3621.68 125
12231.56 183473.4 2000
494.5 261096 400
213.04 511296 125
3117.08 701343 125
762.91 38145.5 600
517.5 472803.53 750
30406.77 395288.01 17000
1929.11 25078.43 2000
12762.96 191444.4 12000
6342.97 82458.61 10000
20063.96 100319.8 9000
3143.21 15716.05 5000
10926.98 10926.98 8000
17447.82 17447.82 20000
1737.39 22586.07 1500
1792.13 23297.69 1300
3304.89 16524.45 2000
1260.25 16383.25 400
1725.95 43148.75 500
1587.36 39684 400
763.94 3819.7 500
33473.94 66947.88 6000
1079.16 14029.08 2000
2243.52 29165.76 1500
2115.73 27504.49 1000
549.01 7137.13 1000
1091.7 218340 175
756.17 139891.45 150
588.9 117780 125
497.3 141730.5 100
381.04 114312 90
327.73 73739.25 75
2621.43 262143 50
2059.98 319296.9 40
1737.79 234601.65 35
1737.79 373624.85 30
810.33 121549.5 25
689.51 120664.25 20
301 60200 90
263.09 74980.65 85
214.53 64359 80
46029.08 138087.24 30000
1979.57 29693.55 2500
1412.2 21183 2500
34045.3 102135.9 20000
4787.73 28726.38 6000
64781.47 259125.88 25000
24438.52 97754.08 20000
9480.48 94804.8 12000
4304.88 43048.8 3000
3313.46 33134.6 2500
943.21 235802.5 100
538.03 134507.5 125
1556.19 389047.5 500
814.1 203525 400
1697.42 84871 6000
497.21 91983.85 300
1210.49 89576.26 325
1620.58 58340.88 390
497.21 3977.68 1000
90 9000 200
431.25 7331.25 1000
478.4 15308.8 500
644 17388 400
713 2852 600
822.25 6578 700
431.25 862.5 1000
159.56 3191.2 500
595.7 44081.8 300
739.45 86515.65 400
880.33 11444.29 1000
740.03 18500.75 1500
702.08 5616.64 2000
5882.83 76476.79 1500
1926.83 194609.83 500
3007.83 27070.47 2000
8505 25515 15000
2000 200000 350
64 1280 450
120000 120000 25000
500 10000 400
140.92 2818.4 500
40000 40000 45000
7457.75 22373.25 25000
4500 13500 25000
5500 33000 15000
150 7500 610
65000 65000 10000
343 10290 500
100 2000 500
343 1715 5000
55 11000 150
15000 150000 5000
120000 120000 15000
53885151.7
0
53885151.7
NA
Ganeshkunda/I.S Nirman Sewa Joint
unga Nirman Sewa Dhulikhel Nirman Sewa P. Ltd
Venture
Amount Rate Amount Rate
0 352448.67 0 352448.67
56966.2 10 28483.1 20
415316.02 150 311487.01 300
33412.5 150 33412.5 200
319920.01 2000 319920.01 5000
1839500 10000 3537500 12000
42373.5 400 112996 2500
2907970.03 17000 3802730.04 20000
1584830.05 17000 2072470.06 20000
211950 16000 226080 22000
531449.99 12000 708599.99 11000
556930.01 12000 607560.01 12000
6058800.2 22000 8886240.3 20000
6976504.69 105 7325329.92 125
2021311.91 1000 2526639.89 1400
263390.01 400 210712.01 500
1583234.99 400 1266587.99 500
932453.98 150 466226.99 300
1406720.05 4000 1607680.05 3500
150000 200 75000 300
374849.99 2500 267750 2000
664860.02 2500 474900.02 2000
42636 100 10659 200
429543.99 500 268465 10000
362700 500 302250 4000
172240 250 107650 300
1076426.24 250 717617.49 300
597110.51 250 426507.51 300
154852.99 250 91090 300
1001989.96 8000 1457439.94 10000
319500.02 300000 639000.03 300000
195817.99 3000 419609.99 10000
509180.1 200 783354 200
103600 1500 38850 3500
72508 250 45317.5 1000
1858960.05 2000 978400.02 1500
2400 5000 15000 2500
75000 5000 150000 10000
168000 2000 840000 1500
30000 2500 15000 2000
2125 200 3400 200
30000 5000 75000 3000
211200 500 264000 200
300000 200 480000 150
28125 200 45000 150
30000 1200 60000 5000
685222.5 200 182726 200
221000 2000 26000 50000
26000 2000 26000 10000
180000 2000 30000 10000
130000 2000 26000 10000
45000 1200 6000 10000
25000 1200 6000 10000
8000 15000 15000 15000
20000 10000 10000 15000
19500 1200 15600 2500
16900 1200 15600 15000
10000 1200 6000 10000
5200 1200 15600 2000
12500 1200 30000 1500
10000 1200 30000 1500
2500 1200 6000 1500
12000 1200 2400 20000
26000 1200 15600 1500
19500 1200 15600 1500
13000 1200 15600 3000
13000 1200 15600 1500
35000 500 100000 300
27750 500 92500 200
25000 500 100000 200
28500 500 142500 200
27000 500 150000 200
16875 500 112500 200
5000 500 50000 1500
6200 500 77500 1500
4725 500 67500 1500
6450 500 107500 1500
3750 500 75000 1500
3500 500 87500 1500
18000 500 100000 200
24225 500 142500 200
24000 500 150000 200
90000 40000 120000 75000
37500 500 7500 200
37500 500 7500 200
60000 15000 45000 25000
36000 500 3000 1500
100000 5000 20000 50000
80000 5000 20000 15000
120000 5000 50000 6000
30000 5000 50000 3000
25000 5000 50000 3000
25000 500 125000 300
31250 500 125000 300
125000 500 125000 300
100000 500 125000 300
300000 500 25000 5000
55500 400 74000 500
24050 400 29600 500
14040 400 14400 500
8000 400 3200 500
20000 200 20000 300
17000 1500 25500 1000
16000 500 16000 250
10800 500 13500 350
2400 500 2000 450
5600 500 4000 650
2000 500 1000 250
10000 500 10000 1500
22200 500 37000 700
46800 3500 409500 1500
13000 1500 19500 2000
37500 1500 37500 1500
16000 1500 12000 1500
19500 1500 19500 1500
50500 500 50500 1500
18000 500 4500 1500
45000 5000 15000 25000
35000 200 20000 500
9000 200 4000 500
25000 10000 10000 1500
8000 200 4000 500
10000 200 4000 500
45000 50000 50000 60000
75000 5000 15000 25000
75000 5000 15000 1500
90000 5000 30000 1500
30500 350 17500 500
10000 5000 5000 5000
15000 1500 45000 1500
10000 350 7000 500
25000 1200 6000 1500
30000 200 40000 500
50000 3000 30000 15000
15000 5000 5000 1500
40671597.5 47191942.37
0 0
40671597.5 47191942.37
1 3
Nirman Sewa P. Ltd shanti-adhikari j v Valley - Babu Ratna J/V
Amount Rate Amount Rate
0 352448.67 0 352448.67
56966.2 10 28483.1 20
622974.02 375 778717.5 300
44550 250 55687.5 200
799800.03 2000 319920.01 2500
4245000 7200 2547000 8500
706224.98 1800 508481.98 300
4473800.05 13500 3019815.03 12300
2438200.07 13500 1645785.05 12300
310860 13000 183690 3000
649549.99 9500 560974.99 9000
607560.01 11000 556930.01 10000
8078400.27 13000 5250960.17 13500
8720630.86 98 6836974.59 102
3537295.85 700 1768647.92 500
263390.01 350 184373.01 490
1583234.99 350 1108264.49 490
932453.98 350 1087862.98 140
1406720.05 2800 1125376.04 4000
112500 50 18750 160
214200 2700 289170 2500
379920.01 2800 531888.02 2500
21318 150 15988.5 200
5369299.93 2000 1073859.99 1600
2418000 2000 1209000 3300
129180 300 129180 200
861140.99 300 861140.99 150
511809.01 400 682412.01 160
109308 300 109308 210
1821799.93 4400 801591.97 5800
639000.03 200000 426000.02 280000
1398699.95 5000 699349.98 6500
783354 145 567931.65 2200
90650 500 12950 12000
181270 550 99698.5 450
733800.02 1300 635960.02 1200
7500 140 420 10000
300000 6000 180000 2000
630000 250 105000 400
12000 5500 33000 15000
3400 140 2380 900
45000 2000 30000 7000
105600 1200 633600 200
360000 140 336000 110
33750 150 33750 160
250000 25 1250 900
182726 1200 1096356.01 200
650000 3000 39000 17600
130000 5500 71500 2400
150000 3500 52500 6400
130000 5500 71500 6400
50000 4000 20000 3600
50000 1000 5000 2400
15000 3500 3500 6000
15000 8500 8500 2000
32500 2500 32500 1200
195000 500 6500 960
50000 1000 5000 600
26000 350 4550 480
37500 700 17500 1280
37500 500 12500 1220
7500 500 2500 480
40000 1500 3000 1600
19500 2000 26000 960
19500 700 9100 480
39000 3500 45500 1440
19500 1000 13000 400
60000 250 50000 320
37000 300 55500 280
40000 250 50000 240
57000 200 57000 200
60000 50 15000 160
45000 35 7875 120
150000 1000 100000 880
232500 300 46500 720
202500 275 37125 560
322500 250 53750 400
225000 200 30000 240
262500 100 17500 160
40000 100 20000 120
57000 125 35625 120
60000 50 15000 120
225000 22000 66000 22400
3000 700 10500 1120
3000 700 10500 960
75000 8000 24000 22400
9000 800 4800 4800
200000 60000 240000 16000
60000 15000 60000 5200
60000 15000 150000 5360
30000 10000 100000 5600
30000 5000 50000 4000
75000 300 75000 960
75000 300 75000 720
75000 200 50000 960
75000 200 50000 880
250000 5000 250000 4000
92500 1000 185000 720
37000 900 66600 960
18000 900 32400 1200
4000 900 7200 960
30000 300 30000 2800
17000 700 11900 400
8000 350 11200 400
9450 450 12150 560
1800 600 2400 72
5200 700 5600 960
500 400 800 880
30000 400 8000 1200
51800 400 29600 880
175500 1500 175500 1920
26000 700 9100 1520
37500 3000 75000 1280
12000 600 4800 960
19500 800 10400 1120
151500 500 50500 960
13500 700 6300 720
75000 40000 120000 16000
50000 200 20000 2000
10000 200 4000 2000
1500 400 400 16000
10000 400 8000 960
10000 100 2000 800
60000 7000 7000 120000
75000 3500 10500 12000
4500 500 1500 8000
9000 10000 60000 3600
25000 350 17500 1200
5000 5000 5000 40000
45000 1500 45000 200
10000 500 10000 960
7500 500 2500 1200
100000 120 24000 400
150000 12000 120000 12000
1500 30000 30000 12000
63382087.23 41661555.03
0 0
63382087.23 41661555.03
7 2
- Babu Ratna J/V Ghishing/Kunwar-J/V Gaura Construction Pvt. Ltd.
Amount Rate Amount Rate
0 352448.67 0 352448.67
56966.2 50 142415.5 50
622974.02 150 311487.01 500
44550 150 33412.5 400
399900.02 3500 559860.02 5000
3006875 8000 2830000 8000
84747 12000 3389879.88 5000
2751387.03 16000 3579040.04 17000
1499493.05 16000 1950560.06 17000
42390 3000 42390 16000
531449.99 12000 708599.99 13000
506300.01 16000 810080.02 15000
5452920.18 17000 6866640.23 18000
7116034.78 120 8371805.62 120
1263319.95 700 1768647.92 800
258122.21 400 210712.01 1000
1551570.29 400 1266587.99 1000
435145.19 200 621635.99 150
1607680.05 4500 1808640.06 4000
60000 40 15000 20
267750 2200 235620 4000
474900.02 2200 417912.01 4000
21318 180 19186.2 900
859087.99 3000 1610789.98 2000
1994850 4000 2418000 3500
86120 150 64590 300
430570.5 150 430570.5 300
272964.8 150 255904.5 300
76515.6 150 54654 250
1056643.96 6000 1093079.96 8000
596400.03 250000 532500.03 175000
909154.97 8000 1118959.96 6000
8616894.04 140 548347.8 200
310800 4000 103600 5000
81571.5 600 108762 200
587040.01 1200 587040.01 2000
30000 10000 30000 10000
60000 1000 30000 1500
168000 1200 504000 8000
90000 10000 60000 20000
15300 200 3400 300
105000 5000 75000 3000
105600 1000 528000 100
264000 200 480000 200
36000 130 29250 250
45000 500 25000 1000
182726 200 182726 150
228800 12000 156000 12000
31200 10000 130000 5000
96000 8000 120000 9000
83200 8000 104000 9000
18000 8000 40000 9000
12000 7000 35000 7000
6000 6000 6000 5000
2000 3000 3000 7000
15600 2000 26000 5000
12480 2000 26000 2000
3000 1500 7500 6000
6240 500 6500 700
32000 1000 25000 2500
30500 1000 25000 2000
2400 800 4000 1000
3200 1500 3000 7000
12480 2000 26000 2000
6240 2000 26000 2000
18720 1500 19500 1700
5200 1000 13000 1500
64000 700 140000 700
51800 600 111000 500
48000 550 110000 400
57000 500 142500 300
48000 500 150000 250
27000 400 90000 200
88000 1000 100000 500
111600 3500 542500 400
75600 3000 405000 350
86000 2500 537500 300
36000 2000 300000 275
28000 1500 262500 250
24000 600 120000 600
34200 550 156750 500
36000 400 120000 450
67200 40000 120000 35000
16800 2500 37500 1000
14400 1500 22500 800
67200 30000 90000 20000
28800 10000 60000 8000
64000 50000 200000 100000
20800 30000 120000 15000
53600 10000 100000 5000
56000 5000 50000 4000
40000 2500 25000 3000
240000 600 150000 1000
180000 550 137500 600
240000 1000 250000 500
220000 600 150000 800
200000 3500 175000 2500
133200 1200 222000 1500
71040 1200 88800 1500
43200 1200 43200 2000
7680 1200 9600 2000
280000 200 20000 2000
6800 200 3400 300
12800 200 6400 600
15120 300 8100 900
288 400 1600 1200
7680 600 4800 1800
1760 500 1000 800
24000 100 2000 250
65120 800 59200 600
224640 3500 409500 4000
19760 1500 19500 4000
32000 1000 25000 2000
7680 1500 12000 3000
14560 1000 13000 3000
96960 800 80800 2000
6480 800 7200 3000
48000 25000 75000 10000
200000 100 10000 300
40000 200 4000 300
16000 20000 20000 10000
19200 500 10000 2000
16000 200 4000 2000
120000 40000 40000 30000
36000 10000 30000 15000
24000 5000 15000 4000
21600 3000 18000 3000
60000 300 15000 2000
40000 100000 100000 30000
6000 200 6000 500
19200 500 10000 500
6000 1000 5000 15000
80000 100 20000 1000
120000 10000 100000 10000
12000 200000 200000 25000
49940060.39 54330137.79
0 0
49940060.39 54330137.79
4 5
nstruction Pvt. Ltd.
Amount
142415.5
1038290.04
89100
799800.03
2830000
1412449.95
3802730.04
2072470.06
226080
767649.99
759450.02
7270560.24
8371805.62
2021311.91
526780.03
3166469.97
466226.99
1607680.05
7500
428399.99
759840.03
95931
1073859.99
2115750
129180
861140.99
511809.01
91090
1457439.94
372750.02
839219.97
783354
129500
36254
978400.02
30000
45000
3360000
120000
5100
45000
52800
480000
56250
50000
137044.5
156000
65000
135000
117000
45000
35000
5000
7000
65000
26000
30000
9100
62500
50000
5000
14000
26000
26000
22100
19500
140000
92500
80000
85500
75000
45000
50000
62000
47250
64500
41250
43750
120000
142500
135000
105000
15000
12000
60000
48000
400000
60000
50000
40000
30000
250000
150000
125000
200000
125000
277500
111000
72000
16000
200000
5100
19200
24300
4800
14400
1600
5000
44400
468000
52000
50000
24000
39000
202000
27000
30000
30000
6000
10000
40000
40000
30000
45000
12000
18000
100000
30000
15000
10000
75000
200000
100000
25000
58711633.9
0
58711633.9
6