The document contains a list of 81 items categorized under the construction project hierarchy of "Construction work" > "Building completion work" > "Other building completion work" or "Construction work" > "Building installation work" > "Plumbing and sanitary works". Each item appears to be a specific work element or provision within that categorization.

Uploaded by

Laxu Khanal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views119 pages

Comparative Chart

The document contains a list of 81 items categorized under the construction project hierarchy of "Construction work" > "Building completion work" > "Other building completion work" or "Construction work" > "Building installation work" > "Plumbing and sanitary works". Each item appears to be a specific work element or provision within that categorization.

Uploaded by

Laxu Khanal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 119

SL.

NO Category Hierarchy

1 Provisional Sum #[XXX0001]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
2 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
3 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
4 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
5 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
6 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
7 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
8 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
9 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
10 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
11 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
12 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
13 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
14 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
15 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
16 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
17 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
18 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
19 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
20 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
21 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
22 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
23 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
24 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
25 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
26 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
27 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
28 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
29 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
30 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
31 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
32 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
33 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
34 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
35 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
36 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
37 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
38 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
39 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
40 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
41 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
42 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
43 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
44 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
45 completion work #[45450000]>

Construction work #[45000000] > Building completion work #[45400000] > Other building
46 completion work #[45450000]>
Construction work #[45000000] > Building completion work #[45400000] > Other building
47 completion work #[45450000]>

Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
48 sanitary works #[45330000]>

Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
49 sanitary works #[45330000]>

Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
50 sanitary works #[45330000]>

Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
51 sanitary works #[45330000]>

Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
52 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
53 sanitary works #[45330000]>

Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
54 sanitary works #[45330000]>

Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
55 sanitary works #[45330000]>

Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
56 sanitary works #[45330000]>

Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
57 sanitary works #[45330000]>

Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
58 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
59 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
60 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
61 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
62 sanitary works #[45330000]>

Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
63 sanitary works #[45330000]>

Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
64 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
65 sanitary works #[45330000]>

Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
66 sanitary works #[45330000]>

Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
67 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
68 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
69 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
70 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
71 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
72 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
73 sanitary works #[45330000]>

Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
74 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
75 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
76 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
77 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
78 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
79 sanitary works #[45330000]>

Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
80 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
81 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
82 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
83 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
84 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
85 sanitary works #[45330000]>

Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
86 sanitary works #[45330000]>

Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
87 sanitary works #[45330000]>

Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
88 sanitary works #[45330000]>

Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
89 sanitary works #[45330000]>

Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
90 sanitary works #[45330000]>

Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
91 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
92 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
93 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
94 sanitary works #[45330000]>

Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
95 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
96 sanitary works #[45330000]>

Construction work #[45000000] > Building installation work #[45300000] > Plumbing and
97 sanitary works #[45330000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
98 work #[45310000]>

Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
99 work #[45310000]>

Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
100 work #[45310000]>

Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
101 work #[45310000]>

Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
102 work #[45310000]>

Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
103 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
104 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
105 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
106 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
107 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
108 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
109 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
110 work #[45310000]>

Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
111 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
112 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
113 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
114 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
115 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
116 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
117 work #[45310000]>

Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
118 work #[45310000]>

Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
119 work #[45310000]>

Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
120 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
121 work #[45310000]>

Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
122 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
123 work #[45310000]>

Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
124 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
125 work #[45310000]>

Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
126 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
127 work #[45310000]>

Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
128 work #[45310000]>

Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
129 work #[45310000]>

Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
130 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
131 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
132 work #[45310000]>

Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
133 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
134 work #[45310000]>
Construction work #[45000000] > Building installation work #[45300000] > Electrical installation
135 work #[45310000]>
Total Price (Without VAT and PS)
Discount
Discounted Total
Rank
PE's Estimate
Item Name & Description
Quantity Unit

Insurance Provision : Provisional cost for


the expenses such as performance bond
commission, insurances (project period +
maintenance period+1 months),
consultancy fees, cost of preparation of as
built drawings, cost of quality assurance
tests, registration tax for town
development committee before execution
of work etc as per written instruction of
the engineer.(The payment of this item
will be done according to submitted
original copy of related invoices.) 1 ps

GENERAL WORK: SITE CLEARENCE:


Clearing the site of all the vegetation,
roots and other unuseful materials and
leveling the Site for stacking the useful
items in specified space and disposing
other item before commencing the
construction work and placing project
description sign board as per instruction of
the site engineer all complete including
layout of buildings. 2848.31 Sqm

EARTH WORK: CUTTING & FILLING: E/W in


Excavation in all type of soils in
foundation manually including 15 m
hauling distance & 1.5m lift all complete
work as per instruction. 2076.58 Cum

Earthwork filling in floor with transported


soil, watering, consolidation in layers of 15
cm and ramming as per instruction of site
engineer. 222.75 Cum

STONE WORK: Dry stone / boulder soling


work in foundation bed using (available at
good condition at site) all complete as for
instruction. 159.96 Cum
Stone Masonary Work (1:6)c/s mortar
with proper bonding with block & bond
stone using in proper line & level work all
complete as per instruction of site
engineer. 353.75 Cum

Providing and laying decorative stone


fixing on wall in proper line & level laid in
12.5mm thick base plaster of 1:4 cement
sand mortar & green base mortar
including the cost of joint filler on floors,
fitting & grouting of joints with white
cement as per drawing & specifications all
complete. 282.49 Sqm

BRICK WORK: Providing, laying and curing


first class brick masonry works in cement,
sand mortar (1:4) in ground floor finished
in perfect lines & level as per specification,
drawings & instructions of the site
engineer. 223.69 Cum

Providing, laying and curing first class brick


masonry works in cement, sand mortar
(1:4) in superstructure above ground floor
finished in perfect lines & level as per
specification, drawings & instructions of
the site engineer. 121.91 Cum

Providing & filling brick ballast works all


complete as per instruction of the site
engineer. 14.13 Cum

PCC & RCC: Providing and Laying Plain


Cement Concrete ( P.C.C.) in 1:3:6 in
foundation with cement, sand and crosser
aggregate including mixing, laying,
finishing to approved level, line and
dimensions and curing all complete as per
specification and instruction of site
Engineer. 59.05 Cum

Providing and Laying Plain Cement


Concrete ( P.C.C.) in 1:2:4 in foundation
with cement, sand and crosser aggregate
including mixing, laying, finishing to
approved level, line and dimensions and
curing all complete as per specification
and instruction of site Engineer. 50.63 Cum
Providing and laying PCC (1:1.5:3) M20 for
RCC work in foundation, column, beam,
slab, lintel etc. with cement sand and
crosser aggregate of required size
including mixing with concrete mixture,
compacting the concrete with vibrator
machine, laying, finishing to approved
level, lines and dimension and curing all
complete work as per specification and
instruction of site Engineer. 403.92 Cum

REINFORCEMENT: Providing
Reinforcement bars (Grade Fe 415 or
above) work including straightening,
cleaning, cutting, bending, binding with 20
SWG annealed wire & fixing in position as
per design drawing, bar bending schedule
for raft foundation column, beam, wall,
stair, slab in all RCC works as per
specification, drawing & instruction of site
Engineer. Approved brand : Himal Iron,
Panchakanya or Equivalent. 69765.05 Kg

Form Work : 19mm ply wood & Steel


props for all kinds of RCC work with
necessary wood, nails, proping,
scaffolding, stagging, support inclusive of
wedging and cutting holes for utilization
work till the support is full unyielding nett
for Column/Beam/Slab etc. Complete
works. 2526.64 Sqm

PLASTERING & POINTING WORK:


Providing, laying & curing 12.5 mm thick
cement sand (1:3) plastering in ceiling,
beams surfaces including chipping &
wetting the concrete surfaces finished in
perfect plumb, lines and level as per
drawings, specifications and instructions of
the site engineer 526.78 Sqm
Providing, laying & curing 12.5 mm thick
cement sand (1:4) Plastering on outside
wall to perfect plumb, lines & level
including plaster beat (pani patti) for
preventing the flow of rain water from slab
edges during rain fall all complete as per
design drawings, specifications and
instruction of the site engineer all
complete: 3166.47 Sqm

2 mm thick plain white putty plaster on


wall & Celing as per instruction, all
complete. 3108.18 Sqm

FLOORING & FINISHING: 16mm thick


marble tile flooring & skirting - Supplying
and laying 16mm thick marble tile in
20mm thick cement sand mortar in(1:2)
ratio and grinding and polishing in perfect
line and level with finish according to
drawing and specification and instruction
of site engineer as all complete 401.92 Sqm

Providing and laying 500 gauge plastic


sheet on floor of buildings on perfect line
& level as per design, specification and
instruction of site engineer. 375 Sqm

Providing & laying porcelain non glazed


floor tiles in 1:4 cement sand mortar in
perfect lines & level finishing the joint with
white cement with or without pigments
where necessary all complete as per
design drawings, patterns, specifications
and instruction of the site engineer: 107.1 Sqm

Providing & laying porcelain glazed wall


tiles in 1:4 cement sand mortar in perfect
lines & level finishing the joint with white
cement with or without pigments where
necessary all complete as per design
drawings, patterns, specifications and
instruction of the site engineer: 189.96 Sqm
3mm thick punning works with 1:1 c/s
mortar in perfect line and level with finish
according to drawing and specification and
instruction of site engineer as all complete 106.59 Sqm

Providing laying of shisam wooden


Parketing of 150X30X8mm size in perfect
line and level with finish according to
drawing and specification and instruction
of site engineer as all complete 536.93 Sqm

Providing & laying a slate roofing as per


design drawings, patterns, specifications
and instruction of the site engineer: 604.5 Sqm

PAINTING WORKS: Providing & painting


two coats of Enamel paint with one coat of
primer of approved brand and colour as
per specifications and instruction of the
site engineer. 430.6 Sqm

Providing & painting two coats of emulsion


paint with one coat of primer of approved
brand and colour over plastered surfaces
of building, walls ceiling area as per
specifications and instruction of the site
engineer. 2870.47 Sqm

Supplying and applying Two coat weather


proof painting (Apex or equivalent) with
one coat of cement primer of approved
colour in outer side of building as per
specifications and instruction of the site
engineer. 1706.03 Sqm

Two coats of Alluminium painting work


with primer painting over porperly sanded
metal surface all complete. 364.36 Sqm
DOOR & WINDOWS: Supplying and
installation of Aluminium Profile Sliding
Window frame (88 x38.1x1.1) with fixed
panel, 5 mm thick clear glass, insect net
shutter, patented standard hardware like:
rollers, gaskets,brush including all
necessary accessories all complete
according to design drawing, specification
and instruction of site engineer. 182.18 Sqm

Providing, making and fixing in position


salwood frames for doors with good
seasoned salwood, including the cost of
holdfast (2 Numbers on each side of height
upto 1500mm and 3numbers on each
sides of frame height upto 2100mm) set
into concrete block of size 300 x 150 x 150
mm in 1:2:4 (1 cement :2 Coarse sand : 4
graded stone aggregate), screw, applying 2
coat of hot bitumen to the surfasc
contacting to masonary and concrete etc,
all complete as per design, drawing,
specifications instructions of the Engineer. 2.13 Cum

Providing & fixing 38mm thick solid core


flush door shutters, in single leaf or double
leaf as per detailed drawing. The flush
doors shall be factory made solid core
block board shutters bonded with phenol
formaldehyde resin. The lipping shall be of
teakwood all-round the flush door with a
minimum thickness of 12mm. The
following C.P. fittings shall be used: (a) - 2-
150 mm Handles in each leaf; (b) Tower-
bolt – 300 mm long at top 1 in each leaf
and 200 at bottom in each leaf; ( c ) 1 no.
300 mm long C.P. Aldrops with Godrej
made padlock; (d) 125 mm heavy duty GI
But Hinges 3 nos. in each leaf. (rate shall
include all required door hardware). 139.87 Sqm
Providing and fabricating MS grill with
20x4.5mm thick metal strips of approved
pattern and manufacture finished with one
coat of metal primer paint with approved
colour as per design, drawing and
instruction all complete. 3916.77 Kg

MISCELLANEOUS WORKS Providing 2" dia


stainless steel pipe hand rail fixing on
staircase & verandah ( 3 line 1" dia pipe
horizontal laying & 2" dia pipe vertical
laying at 2m c/c, ht 0.9m including painting
as per design drawing and specifications
and instructions of site engineer. 25.9 Sqm

Providing and laying 2 coats of water


proofing materials for terrace roof
(elastocrate cementious elastrometric
water proofing coating two components)
capacity per Kg 6 sq ft as per specification
and direction complete works. 181.27 Sqm

Providing and paving heavy duty concrete


interlocking block 60mm thick in walk way
as per drawing, design and instruction of
site engineer all complete. 489.2 Sqm

Providing & fixing metal spiral stair of 100


mm centre post using 1 1/4" dia. Black
pipe hand rail and 3/4" x 3/4" dia. Square
pipe with 2' -2' 6" wide as per design,
specification & instructions of Site
Engineer all complete 3 Rm

Supplying & Fixing 0.075x0.125 m size,


2.10m height concrete (1:2:4) post with
reinforcement for fencing at 2.00 m
interval as per design, drawing,
specifications and instructions of site
engineer. 30 Nos
Supplying and fixing of
tiitng/straightening 12 guage G.I barbed
wire for fencing through with proper
straightening with necessary U nails,hook
etc all complete as per specification 420 Sqm

Making & fixing MS door for pump house


with locking arrangement of approved
pattern and manufacture finished with one
coat of metal primer paint and two coat of
enamel paint with approved colour as per
design, drawing and instruction all
complete. 6 Nos

Providing, fabricating & fixing MS angle for


water tank stand of approved pattern and
manufacture finished with one coat of
metal primer & enamel paint with
approved colour as per design, drawing
and instruction all complete. 17 Kg

Making & fixing 3mm thick MS sheet


manhole cover (.60cmx.60cm) as per
design drawing, specifications and
instructions of site engineer all complete. 15 Nos

Providing and applying Dustban Permise


chemicals for Anti termite Treatment all
complete. 528 Sqm

Supply,Providing and fitting of Iron works


as per specification and technical body
instruction all complete. For Ramp Slab 2400 Kg

Supplying & fitting 50mm dia. Black iron


pipe post c/c 2.0m, 20*20*4mm &
25*25*4mm size mid angle frame of 7mm
dia reinforcement in diagonal 225 Kg

Supplying and planting outdoor gardening


plants (Dhupi, Kapur etc.) and flowering
plants 50 Nos
Supplying and application of
Polycarboxylate ether based
Superplastisizer in structural concrete
(M20) to increase workability without
affect in strength of concrete to make
concrete pump able all complete as per
specifications 913.63 Kg

SANITARY WORKS: Assessories Fixure:


Supply and Insatallation and fixing in
position White glazed porcelain clay One
Piece commode with 'P ' & 'S ' trap and
slow falling seat cover complete set.
(Hindware, Paryware, Somany, cera or
eqv.) 13 Set

Supply and Insatallation and fixing in


position 10 ltr PVC dual flushing cistern ,
15 mm PVC connector with both ends
couplings, 32 mm long pvc pipe all
complete with testing and ready for
operation 13 Set

Supply, Insatallation and fixing in position


of 550x400 mm White glazed porcylain
clay wall mounted Wash Basin with
pedestrail and one 15 mm pillar cock ,32
mm bottle trap with plug chain and stay ,
one 15 mm PVC connector with both ends
couplings with testing and ready for
operation 15 Set

Supply, Insatallation and fixing in position


White glazed porcylain clay wall hung
Wash Basin with pedestrail , one no.15
mm pillar cock, grab bar ., 32 mm bottle
trap with plug , chain and stay all
complete , one 15 mm PVC connecting
pipe testing and ready for operation for
disable as per instruction 13 Set

Supply, Insatallation and fixing in position


of White glazed porcylain clay urinal size
465x355x265 with bracket testing and
ready for operation 5 Set
Supply, Insatallation and fixing in position
of White glazed porcylain clay division
plate 680x300 with bracket with testing
and ready for operation 5 Set

Supply, Insatallation and fixing in position


of Single bowl large Stainless Steel Kitchen
Sink without drain board of size
600x450x250 mm with 15 mm PVC
connector -1nos. with both ends
couplings, 15mm CP sink cock , 40mm
PVC bottle trap, 40mm CP Waste Coupling
with Plug, stay and chain with testing and
ready for operation 1 Set

Supply, Insatallation and fixing in position


stainless steel Wall Mixture all complete
and ready for operation 1 Set

Supply, Insatallation and fixing in position


15 mm CP shower head with arm and
flange all complete and ready for
operation 13 Set

Supply, Insatallation and fixing in position


15 mm CP Commode Spray with testing
and ready for operation 13 Set

Supply, Insatallation and fixing in position


15 mm CP Urinal auto closing valve with
built in control valve 5 Set
Supply, Insatallation and fixing in position
of CP Toilet paper holder 13 Nos
Supply, Insatallation and fixing in position
of 15 mm CP Bib Cock 25 Nos
Supply, Insatallation and fixing in position
15 mm CP Angle Valve 25 Nos
Supply, Insatallation and fixing in position
of CP soap dish 5 Nos

European pattern stainless steel 60-90 cm


long with bend type Grab Bar .(Disabled
toilet) 2 Nos

Supply, Insatallation and fixing in position


of 22 inch mm long CP glass shelf with
guard rail. 13 Nos
Supply, Insatallation and fixing in position
of 24inch Single Towel rail heavy 13 Nos

Supply, Insatallation and fixing in position


of Looking mirror Modi Guard 600x450
mm 13 Nos

Supply, Insatallation and fixing in position


of PVC Multi-floor trap with cover
110mmx75 mm 13 Nos

WATER SUPPLY PIPES: 50 Dia CPVC Pipes 200 Rm

- 40 mm dia. 185 Rm

- 32 mm dia. 200 Rm

- 25 mm dia. 285 Rm

- 20 mm dia. 300 Rm

- 15 mm dia. 225 Rm

Supply and Installation of CPVC Ball


Valves CTS sockets as per drawing and
instruction- 50 Dia 100 Nos

- 40 mm dia. 155 Nos

- 32 mm dia. 135 Nos

- 25 mm dia. 215 Nos

- 20 mm dia. 150 Nos

- 15 mm dia. 175 Nos

Supply and Installation of pipe Insulation


for hot water ( Aeroflex , Superloan or
equivalent) 6 mm thick- 32 mm Dia 200 Rm

- 25 mm dia. 285 Rm

- 15 mm dia. 300 Rm
Supply and Installation of 2000 litres
stainless Steel Roof Tanks NS brand extra
heavy all complete testing and ready for
operation 3 Nos

25mm dia. Check valve G.M 15 Rm

20mm dia. Gate valve G.M 15 Rm

Supply and installation of 2 H.P. Electrical


motor water pump multi stage, coupled
pump (Crompton) with check valve all
complete with ready for operation 3 Set

Supply and installation of Pressure sensor


switch for pump auto switch off all
complete set. 6 Set

Supply and installation solar water heater


with 3.0 KW elecric booster with
thermostat all complete set technical
specification (inside boiler MS sheet 4 mm
thick with expantion joint overlap joint ) in
cover and bottom with 25x25x3mm angle
welded 4 kg per meter , 300 lit 24 tubes
solar heater fixing with electric booster all
complete 4 Nos

Supply and Installation of Euro Guard


water purification set with all necessary
accessories Water Filter 1 lit/min 4 Set

Supply and installation 5 kg ABC type fire


extinguisher with pressure guage type all
complete set. 10 Set

Supply and Installation of 20 kg weight


600x600 mm square type CI Cover 10 Set
Supply and Installation of 14 kg weight
450x450 mm square type 10 Set
SEWER, RAIN WATER AND WASTE WATER
PIPE INSTILATION Supply and Installation
of ISI flowguard or equivalent brand uPVC
pipes including cutting, jointing, sealing
with rubber washer and solvent cement
and all necessary fittings such as Tees, Y-
Tees, Bends (with or without doors),
Reducers, Couplers, connector pieces,
offsets ,cowl etc. for complete installation,
PVC clamps, nails and hooks. Installation of
pipes and specials including making holes
on walls or floor and repairing the same to
its original finish, excavation and backfill
(compaction as per civil works
specifications) in any type of soil. Pipes to
be installed on trenches or walls or floor or
hung to ceilings as per drawings,
specifications and instructions, cleaning of
the system, testing and ready for
operation. The rate shall include for all
labour and materials required. The
measurement shall be done for running
metre, fittings etc not payable seperately.
- 110 mm ED 6 kg/cm2 250 Rm

- 75 mm ED 6 kg/cm2 250 Rm

Supply and Installation of 160 mm HDEP 4


Kg/cm2 including excavation and
backfilling all complete 250 Rm
Supply and Installation of 110 mm HDEP 4
Kg/cm2 250 Rm

200 mm dia NP2 RCC Hume pipe including


collar and cement sand mortar all
complete. 50 Rm
ELECTRICAL WORKS: Wiring for Light /
Fan / Power Point, wiring following
specified parameters: General light point
wiring with 2 x 1.5 sq. mm + 1 x 1sq.mm
multistrain (3/22x2+1/18x1) PVC insulated
earth loop Cu. Conductor upto metallic
part including accessories.( Average
Length 12 mtr. ) 185 point

6 / 15 A Power point wiring with 2 x 4


sq.mm + 1 x 2.5 sq. mm multistrain
(7/22x2+3/22x1) PVC insulated earth loop
Cu. conductor including accessories.
( Average Length 18 mtr. ) 74 point

A. Single phase AC Power point wiring


with 2 x 6 sq.mm + 1 x 2.5 sq. mm
(7/20x2+3/22x1)PVC insulated earth loop
Cu. conductor including accessories.
( Average Length 18 mtr. ) 36 point

Out Door/Terrace Light point wiring with


2 x 1.5 sq. mm + 1 x 1sq.mm multistrain
(3/22x2+1/18x1) PVC insulated earth loop
Cu. Conductor upto metallic part including
accessories.( Average Length 15 mtr. ) 8 point

8 swg cu.wire in HDPE polythene pipe for


earth continuty from panel board to DB
etc all complete 100 Rm

Switch/ Socket 'Supply, delivery,


installation, testing and commissioning of
following Switch / power socket coupled
with sp finger touch switch including heavy
gauge anti-corrosive company made metal
box & all accessories as per the drawings,
specifications, electricity rules and
instructions all complete. 1 gang 1 way 10
A Switch 17 Nos

' 2 gang 1 way 10 A switch 32 Nos

' 3 gang 1 way 10A switch 27 Nos


' 4 gang 1 way 10 A switch 4 Nos

'6 gang 1 way 10 A switch 8 Nos

' 1 gang 2 way 10 A switch 2 Nos


Junction box made of metal withcover size
6"*4" ect all complete 20 Nos

6/15 A power socket / switch 74 Nos

'Light & Fan Fixtures:Fixing and


Commissing of the folling light/Fan
FixtureCeiling/Dome light 117 Set

Mirror Light 13 Set

Tube Light 25 Set

Wall light 8 Set

chandiler light/dinning light 13 Set

12w led down light 101 Set

Terrace light 9 Set

Earthing / Protection System- Supplying


materials, installation, testing,
commissioning of equipments body /
system earthing, consisting following
specified parameters: (Make: Ashlok /
LPI ) Maintanance Free Earthing; Earthing
with cu.plate size 60cm*60cm with G.N. 8
copper wire for earth continuty from panel
board to earthing site etc all complete 3 Nos

20 x 3 mm pure copper strip from the base


of arrester base to grounding Or
Equivalent capacity conductor. 100 M

Supplying , laying, installation, testing and


commissioning of one number 8 SWG
bare copper wire from various panels
/feeder posts/blocks to make bonded
grounding system. 20 M
Supply & Installation of the Direct lightning
Protection System. 1 Set

Main Cables & Wires: Supply, laying ,


Interconnection, Testing of following size
cable / Wires including Jointing Kits,
Pipes/Couduit, required tools and
accessories. 35 sq. mm 1 core
Unarmoured Al. Conductor or equivalent 20 M
Supply & Fixing 2x7/20 & 1x1/18 P.V.C.
copper wire for DB to DB . 20 M

Main Distribution / Sub-Distribution


Board Installation Works- Suply,
installation, testing and commissioning of
the following:cable insulating materials as
per site conditions,specification. Circuit
Breakers /accessories should be as per
specification, or equivalent, but subjected
to prior approval of engineer
(MCCB/MCB :-ABB/LS/Schneider 1 Set

Floor Distribution Board: 3 Set

Fire
Alraming/Telephone/CCTV/Networking
System- Manual call point 3 Nos

Fire Alaram Hooter 6 Nos

2x1.5 sq. mm COCOND single core PVC


cable drawn inside 16 mm Ø PVC conduit 50 Rm

8-Zone Fire alarm Control Panel with 3


circuits sounder circuits equipped with self
contained maintenance free battery and
battery charger of sufficient capacity to
drive 40 electronic hooters 1 Set

RJ 11 Telephone outlet socket (modular


type) with necessary connection box, 3-
paired telephone cable drawn inside 20
mm dia PVC conduit ( Average Length 35
mtr. ) 30 Nos
10-paired Telephone cable drawn inside
25 mm dia. PVC conduit 20 Rm
RJ 45 Data outlet socket (modular type)
with necessary connection box, CAT 6
cable drawn inside 20 mm dia PVC conduit
from the connection box meant for
corresponding floor HUB( Average Length
35 mtr. ) 5 Nos

75 ohms Co-axial cable With 2*1.5 sq. mm


copper cable for Camara signal drawn
inside 20 mm dia. PVC conduit 200 M

Dome Type Camara Set 10 Set

32 port DVR Set 1 Set


PE's Estimate Kanchanjunga Nirman Sewa
Official Rate (NRs) Amount Rate

352448.67 352448.67 352448.67

44.85 127746.7 20

615.94 1279048.69 200

612.95 136534.61 150

3343.05 534754.28 2000


10350 3661312.5 5200

2257.84 637817.22 150

15830.78 3541187.18 13000

16215.74 1976860.86 13000

3497.95 49426.03 15000

11468.37 677207.25 9000

15260.21 772624.43 11000


13976.81 5645513.1 15000

120.29 8392037.86 100

799.44 2019897.08 800

415.96 219119.41 500


377.52 1195405.75 500

521.95 1622314.55 300

2975.19 1195788.36 3500

214.47 80426.25 400

2715.61 290841.83 3500

2987.83 567568.19 3500


282.25 30085.03 400

2722.28 1461673.8 800

801.55 484536.97 600

297.74 128206.84 400

315.51 905661.99 375

289.22 493418 350

292.92 106728.33 425


6756.2 1230844.52 5500

282890.82 602557.45 150000

20619.17 2884003.31 1400


138 540514.26 130

920 23828 4000

643.44 116636.37 400

1776.47 869049.12 3800

11504.6 34513.8 800

978.81 29364.3 2500


71.55 30051 400

5000 30000 5000

213.04 3621.68 125

12231.56 183473.4 2000

494.5 261096 400

213.04 511296 125

3117.08 701343 125

762.91 38145.5 600


517.5 472803.53 750

30406.77 395288.01 17000

1929.11 25078.43 2000

12762.96 191444.4 12000

6342.97 82458.61 10000

20063.96 100319.8 9000


3143.21 15716.05 5000

10926.98 10926.98 8000

17447.82 17447.82 20000

1737.39 22586.07 1500

1792.13 23297.69 1300

3304.89 16524.45 2000

1260.25 16383.25 400

1725.95 43148.75 500

1587.36 39684 400

763.94 3819.7 500

33473.94 66947.88 6000

1079.16 14029.08 2000


2243.52 29165.76 1500

2115.73 27504.49 1000

549.01 7137.13 1000

1091.7 218340 175

756.17 139891.45 150

588.9 117780 125

497.3 141730.5 100

381.04 114312 90

327.73 73739.25 75

2621.43 262143 50

2059.98 319296.9 40

1737.79 234601.65 35

1737.79 373624.85 30

810.33 121549.5 25

689.51 120664.25 20

301 60200 90

263.09 74980.65 85

214.53 64359 80
46029.08 138087.24 30000

1979.57 29693.55 2500

1412.2 21183 2500

34045.3 102135.9 20000

4787.73 28726.38 6000

64781.47 259125.88 25000

24438.52 97754.08 20000

9480.48 94804.8 12000

4304.88 43048.8 3000

3313.46 33134.6 2500


943.21 235802.5 100

538.03 134507.5 125

1556.19 389047.5 500

814.1 203525 400

1697.42 84871 6000


497.21 91983.85 300

1210.49 89576.26 325

1620.58 58340.88 390

497.21 3977.68 1000

90 9000 200

431.25 7331.25 1000

478.4 15308.8 500

644 17388 400


713 2852 600

822.25 6578 700

431.25 862.5 1000

159.56 3191.2 500

595.7 44081.8 300

739.45 86515.65 400

880.33 11444.29 1000

740.03 18500.75 1500

702.08 5616.64 2000

5882.83 76476.79 1500

1926.83 194609.83 500

3007.83 27070.47 2000

8505 25515 15000

2000 200000 350

64 1280 450
120000 120000 25000

500 10000 400

140.92 2818.4 500

40000 40000 45000

7457.75 22373.25 25000

4500 13500 25000

5500 33000 15000

150 7500 610

65000 65000 10000

343 10290 500

100 2000 500


343 1715 5000

55 11000 150

15000 150000 5000

120000 120000 15000


53885151.7
0
53885151.7
NA
Ganeshkunda/I.S Nirman Sewa Joint
unga Nirman Sewa Dhulikhel Nirman Sewa P. Ltd
Venture
Amount Rate Amount Rate

0 352448.67 0 352448.67

56966.2 10 28483.1 20

415316.02 150 311487.01 300

33412.5 150 33412.5 200

319920.01 2000 319920.01 5000


1839500 10000 3537500 12000

42373.5 400 112996 2500

2907970.03 17000 3802730.04 20000

1584830.05 17000 2072470.06 20000

211950 16000 226080 22000

531449.99 12000 708599.99 11000

556930.01 12000 607560.01 12000


6058800.2 22000 8886240.3 20000

6976504.69 105 7325329.92 125

2021311.91 1000 2526639.89 1400

263390.01 400 210712.01 500


1583234.99 400 1266587.99 500

932453.98 150 466226.99 300

1406720.05 4000 1607680.05 3500

150000 200 75000 300

374849.99 2500 267750 2000

664860.02 2500 474900.02 2000


42636 100 10659 200

429543.99 500 268465 10000

362700 500 302250 4000

172240 250 107650 300

1076426.24 250 717617.49 300

597110.51 250 426507.51 300

154852.99 250 91090 300


1001989.96 8000 1457439.94 10000

319500.02 300000 639000.03 300000

195817.99 3000 419609.99 10000


509180.1 200 783354 200

103600 1500 38850 3500

72508 250 45317.5 1000

1858960.05 2000 978400.02 1500

2400 5000 15000 2500

75000 5000 150000 10000


168000 2000 840000 1500

30000 2500 15000 2000

2125 200 3400 200

30000 5000 75000 3000

211200 500 264000 200

300000 200 480000 150

28125 200 45000 150

30000 1200 60000 5000


685222.5 200 182726 200

221000 2000 26000 50000

26000 2000 26000 10000

180000 2000 30000 10000

130000 2000 26000 10000

45000 1200 6000 10000


25000 1200 6000 10000

8000 15000 15000 15000

20000 10000 10000 15000

19500 1200 15600 2500

16900 1200 15600 15000

10000 1200 6000 10000

5200 1200 15600 2000

12500 1200 30000 1500

10000 1200 30000 1500

2500 1200 6000 1500

12000 1200 2400 20000

26000 1200 15600 1500


19500 1200 15600 1500

13000 1200 15600 3000

13000 1200 15600 1500

35000 500 100000 300

27750 500 92500 200

25000 500 100000 200

28500 500 142500 200

27000 500 150000 200

16875 500 112500 200

5000 500 50000 1500

6200 500 77500 1500

4725 500 67500 1500

6450 500 107500 1500

3750 500 75000 1500

3500 500 87500 1500

18000 500 100000 200

24225 500 142500 200

24000 500 150000 200


90000 40000 120000 75000

37500 500 7500 200

37500 500 7500 200

60000 15000 45000 25000

36000 500 3000 1500

100000 5000 20000 50000

80000 5000 20000 15000

120000 5000 50000 6000

30000 5000 50000 3000

25000 5000 50000 3000


25000 500 125000 300

31250 500 125000 300

125000 500 125000 300

100000 500 125000 300

300000 500 25000 5000


55500 400 74000 500

24050 400 29600 500

14040 400 14400 500

8000 400 3200 500

20000 200 20000 300

17000 1500 25500 1000

16000 500 16000 250

10800 500 13500 350


2400 500 2000 450

5600 500 4000 650

2000 500 1000 250

10000 500 10000 1500

22200 500 37000 700

46800 3500 409500 1500

13000 1500 19500 2000

37500 1500 37500 1500

16000 1500 12000 1500

19500 1500 19500 1500

50500 500 50500 1500

18000 500 4500 1500

45000 5000 15000 25000

35000 200 20000 500

9000 200 4000 500


25000 10000 10000 1500

8000 200 4000 500

10000 200 4000 500

45000 50000 50000 60000

75000 5000 15000 25000

75000 5000 15000 1500

90000 5000 30000 1500

30500 350 17500 500

10000 5000 5000 5000

15000 1500 45000 1500

10000 350 7000 500


25000 1200 6000 1500

30000 200 40000 500

50000 3000 30000 15000

15000 5000 5000 1500


40671597.5 47191942.37
0 0
40671597.5 47191942.37
1 3
Nirman Sewa P. Ltd shanti-adhikari j v Valley - Babu Ratna J/V
Amount Rate Amount Rate

0 352448.67 0 352448.67

56966.2 10 28483.1 20

622974.02 375 778717.5 300

44550 250 55687.5 200

799800.03 2000 319920.01 2500


4245000 7200 2547000 8500

706224.98 1800 508481.98 300

4473800.05 13500 3019815.03 12300

2438200.07 13500 1645785.05 12300

310860 13000 183690 3000

649549.99 9500 560974.99 9000

607560.01 11000 556930.01 10000


8078400.27 13000 5250960.17 13500

8720630.86 98 6836974.59 102

3537295.85 700 1768647.92 500

263390.01 350 184373.01 490


1583234.99 350 1108264.49 490

932453.98 350 1087862.98 140

1406720.05 2800 1125376.04 4000

112500 50 18750 160

214200 2700 289170 2500

379920.01 2800 531888.02 2500


21318 150 15988.5 200

5369299.93 2000 1073859.99 1600

2418000 2000 1209000 3300

129180 300 129180 200

861140.99 300 861140.99 150

511809.01 400 682412.01 160

109308 300 109308 210


1821799.93 4400 801591.97 5800

639000.03 200000 426000.02 280000

1398699.95 5000 699349.98 6500


783354 145 567931.65 2200

90650 500 12950 12000

181270 550 99698.5 450

733800.02 1300 635960.02 1200

7500 140 420 10000

300000 6000 180000 2000


630000 250 105000 400

12000 5500 33000 15000

3400 140 2380 900

45000 2000 30000 7000

105600 1200 633600 200

360000 140 336000 110

33750 150 33750 160

250000 25 1250 900


182726 1200 1096356.01 200

650000 3000 39000 17600

130000 5500 71500 2400

150000 3500 52500 6400

130000 5500 71500 6400

50000 4000 20000 3600


50000 1000 5000 2400

15000 3500 3500 6000

15000 8500 8500 2000

32500 2500 32500 1200

195000 500 6500 960

50000 1000 5000 600

26000 350 4550 480

37500 700 17500 1280

37500 500 12500 1220

7500 500 2500 480

40000 1500 3000 1600

19500 2000 26000 960


19500 700 9100 480

39000 3500 45500 1440

19500 1000 13000 400

60000 250 50000 320

37000 300 55500 280

40000 250 50000 240

57000 200 57000 200

60000 50 15000 160

45000 35 7875 120

150000 1000 100000 880

232500 300 46500 720

202500 275 37125 560

322500 250 53750 400

225000 200 30000 240

262500 100 17500 160

40000 100 20000 120

57000 125 35625 120

60000 50 15000 120


225000 22000 66000 22400

3000 700 10500 1120

3000 700 10500 960

75000 8000 24000 22400

9000 800 4800 4800

200000 60000 240000 16000

60000 15000 60000 5200

60000 15000 150000 5360

30000 10000 100000 5600

30000 5000 50000 4000


75000 300 75000 960

75000 300 75000 720

75000 200 50000 960

75000 200 50000 880

250000 5000 250000 4000


92500 1000 185000 720

37000 900 66600 960

18000 900 32400 1200

4000 900 7200 960

30000 300 30000 2800

17000 700 11900 400

8000 350 11200 400

9450 450 12150 560


1800 600 2400 72

5200 700 5600 960

500 400 800 880

30000 400 8000 1200

51800 400 29600 880

175500 1500 175500 1920

26000 700 9100 1520

37500 3000 75000 1280

12000 600 4800 960

19500 800 10400 1120

151500 500 50500 960

13500 700 6300 720

75000 40000 120000 16000

50000 200 20000 2000

10000 200 4000 2000


1500 400 400 16000

10000 400 8000 960

10000 100 2000 800

60000 7000 7000 120000

75000 3500 10500 12000

4500 500 1500 8000

9000 10000 60000 3600

25000 350 17500 1200

5000 5000 5000 40000

45000 1500 45000 200

10000 500 10000 960


7500 500 2500 1200

100000 120 24000 400

150000 12000 120000 12000

1500 30000 30000 12000


63382087.23 41661555.03
0 0
63382087.23 41661555.03
7 2
- Babu Ratna J/V Ghishing/Kunwar-J/V Gaura Construction Pvt. Ltd.
Amount Rate Amount Rate

0 352448.67 0 352448.67

56966.2 50 142415.5 50

622974.02 150 311487.01 500

44550 150 33412.5 400

399900.02 3500 559860.02 5000


3006875 8000 2830000 8000

84747 12000 3389879.88 5000

2751387.03 16000 3579040.04 17000

1499493.05 16000 1950560.06 17000

42390 3000 42390 16000

531449.99 12000 708599.99 13000

506300.01 16000 810080.02 15000


5452920.18 17000 6866640.23 18000

7116034.78 120 8371805.62 120

1263319.95 700 1768647.92 800

258122.21 400 210712.01 1000


1551570.29 400 1266587.99 1000

435145.19 200 621635.99 150

1607680.05 4500 1808640.06 4000

60000 40 15000 20

267750 2200 235620 4000

474900.02 2200 417912.01 4000


21318 180 19186.2 900

859087.99 3000 1610789.98 2000

1994850 4000 2418000 3500

86120 150 64590 300

430570.5 150 430570.5 300

272964.8 150 255904.5 300

76515.6 150 54654 250


1056643.96 6000 1093079.96 8000

596400.03 250000 532500.03 175000

909154.97 8000 1118959.96 6000


8616894.04 140 548347.8 200

310800 4000 103600 5000

81571.5 600 108762 200

587040.01 1200 587040.01 2000

30000 10000 30000 10000

60000 1000 30000 1500


168000 1200 504000 8000

90000 10000 60000 20000

15300 200 3400 300

105000 5000 75000 3000

105600 1000 528000 100

264000 200 480000 200

36000 130 29250 250

45000 500 25000 1000


182726 200 182726 150

228800 12000 156000 12000

31200 10000 130000 5000

96000 8000 120000 9000

83200 8000 104000 9000

18000 8000 40000 9000


12000 7000 35000 7000

6000 6000 6000 5000

2000 3000 3000 7000

15600 2000 26000 5000

12480 2000 26000 2000

3000 1500 7500 6000

6240 500 6500 700

32000 1000 25000 2500

30500 1000 25000 2000

2400 800 4000 1000

3200 1500 3000 7000

12480 2000 26000 2000


6240 2000 26000 2000

18720 1500 19500 1700

5200 1000 13000 1500

64000 700 140000 700

51800 600 111000 500

48000 550 110000 400

57000 500 142500 300

48000 500 150000 250

27000 400 90000 200

88000 1000 100000 500

111600 3500 542500 400

75600 3000 405000 350

86000 2500 537500 300

36000 2000 300000 275

28000 1500 262500 250

24000 600 120000 600

34200 550 156750 500

36000 400 120000 450


67200 40000 120000 35000

16800 2500 37500 1000

14400 1500 22500 800

67200 30000 90000 20000

28800 10000 60000 8000

64000 50000 200000 100000

20800 30000 120000 15000

53600 10000 100000 5000

56000 5000 50000 4000

40000 2500 25000 3000


240000 600 150000 1000

180000 550 137500 600

240000 1000 250000 500

220000 600 150000 800

200000 3500 175000 2500


133200 1200 222000 1500

71040 1200 88800 1500

43200 1200 43200 2000

7680 1200 9600 2000

280000 200 20000 2000

6800 200 3400 300

12800 200 6400 600

15120 300 8100 900


288 400 1600 1200

7680 600 4800 1800

1760 500 1000 800

24000 100 2000 250

65120 800 59200 600

224640 3500 409500 4000

19760 1500 19500 4000

32000 1000 25000 2000

7680 1500 12000 3000

14560 1000 13000 3000

96960 800 80800 2000

6480 800 7200 3000

48000 25000 75000 10000

200000 100 10000 300

40000 200 4000 300


16000 20000 20000 10000

19200 500 10000 2000

16000 200 4000 2000

120000 40000 40000 30000

36000 10000 30000 15000

24000 5000 15000 4000

21600 3000 18000 3000

60000 300 15000 2000

40000 100000 100000 30000

6000 200 6000 500

19200 500 10000 500


6000 1000 5000 15000

80000 100 20000 1000

120000 10000 100000 10000

12000 200000 200000 25000


49940060.39 54330137.79
0 0
49940060.39 54330137.79
4 5
nstruction Pvt. Ltd.
Amount

142415.5

1038290.04

89100

799800.03
2830000

1412449.95

3802730.04

2072470.06

226080

767649.99

759450.02
7270560.24

8371805.62

2021311.91

526780.03
3166469.97

466226.99

1607680.05

7500

428399.99

759840.03
95931

1073859.99

2115750

129180

861140.99

511809.01

91090
1457439.94

372750.02

839219.97
783354

129500

36254

978400.02

30000

45000
3360000

120000

5100

45000

52800

480000

56250

50000
137044.5

156000

65000

135000

117000

45000
35000

5000

7000

65000

26000

30000

9100

62500

50000

5000

14000

26000
26000

22100

19500

140000

92500

80000

85500

75000

45000

50000

62000

47250

64500

41250

43750

120000

142500

135000
105000

15000

12000

60000

48000

400000

60000

50000

40000

30000
250000

150000

125000

200000

125000
277500

111000

72000

16000

200000

5100

19200

24300
4800

14400

1600

5000

44400

468000

52000

50000

24000

39000

202000

27000

30000

30000

6000
10000

40000

40000

30000

45000

12000

18000

100000

30000

15000

10000
75000

200000

100000

25000
58711633.9
0
58711633.9
6

You might also like