1. The document provides estimates for construction of two T-shaped walls based on input dimensions in feet and meters. 2. It includes calculations for excavation, concrete, brick work, damp proof course, plastering, and white washing for the two walls. 3. The estimates are broken down into line items with quantities calculated based on the length, breadth, and height of each component.

Uploaded by

KSHITIJA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
346 views8 pages

T Wall - Estimating and Costing

1. The document provides estimates for construction of two T-shaped walls based on input dimensions in feet and meters. 2. It includes calculations for excavation, concrete, brick work, damp proof course, plastering, and white washing for the two walls. 3. The estimates are broken down into line items with quantities calculated based on the length, breadth, and height of each component.

Uploaded by

KSHITIJA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

ESTIMATING AND COSTING OF CIVIL ENGINEERING PROJECTS (LECTURED BY: #BOSS - A Verified S

Length of Wall 1 = 15 ft
Length of Wall 2 = 10 ft Estimate of T-Wall P.C.C
STEP - 1
STEP - 2
Super
Stru 0.75 12 15

D.P.C 1:2:4

0.5 (6") 10
Step - 3 9" G.L 0.75 Wall 2
0.25 (3")
Step - 2 1.125 0.5 (6")
STEP - 2
Step - 1 1.5 0.5 (6") STEP - 1
P.C.C

PCC
2.25 0.75 (9")
1:3:6
Note: The Input Data are in Red color (In feet), you can change the values as per your requirement
Length (L) Breadth (B) Height (H) Quantity
S# Description No
(ft) (ft) (ft) (Cft)
1
Excavation
(Length = Breadth of PCC - Breadth of Wall + Length of
Wall)
Excavation of Wall - 1 1 16.50 2.25 2.00 74.25
Excavation of Wall - 2 1 10.00 2.25 2.00 45.00
Total Excavation = 119.25
2 Concrete (1:3:6)
(Length = Same As Per Excavation)
Concrete of Wall - 1 1 16.50 2.25 0.75 27.84
Concrete of Wall - 2 1 10.00 2.25 0.75 16.88
Total Concrete = 44.72
3 Brick Work (Foundation upto Plinth)
(Length of Wall 1 = Breadth of B/W - Breadth of Wall +
Length of Wall)

Brick Work in Wall - 1


Step - 1 1 15.750 1.500 0.500 11.813
Step - 2 1 15.375 1.125 0.500 8.648
Step - 3 15.000 0.750 0.750 8.438
Brick Work in Wall - 2
Step - 1 1 10.000 1.500 0.500 7.500
Step - 2 1 10.000 1.125 0.500 5.625
Step - 3 1 10.000 0.750 0.750 5.625
Total Brick Work = 47.648
4
D.P.C (1:2:4) 1.5" thick
(Length = Breadth of DPC - Breadth of Wall +
Length of Wall)
D.P.C of Wall - 1 1 15.000 0.750 --- 11.250
D.P.C of Wall - 2 1 10.000 0.750 --- 7.500
Total D.P.C = 18.750
5 Brick Work (in Cement Mortar (1:4) in S/Str)
(Length = Orgional Length of Wall)
Brick Work S/S of Wall - 1 1 15.00 0.75 12.00 135.00
Brick Work S/S of Wall - 1 1 10.00 0.75 12.00 90.00
Total Brick Work in Super Structure = 225.00
6 Cement Plaster (1" Thick with mortar 1:3)
Plaster in Wall - 1
Front and Back (L x H) 2 15.000 --- 12.00 180.00
Sides (B X H) 2 0.750 --- 12.00 9.00
Plaster in Wall - 2
Front and Back (L x H) 2 10.00 --- 12.00 120.00
Sides (B X H) 1 I already include this side in wall - 1 ---
Total Plaster = 309.00
7 White Wash 3 Coats As Per the Item No. 6 309.00
BY: #BOSS - A Verified Surveyor)

of T-Wall
P.C.C
EP - 1
EP - 2

15 Wall 1

Remarks

0.75 + 0.5 + 0.5 + 0.25 =H


2.25 - 0.75 + 15 = L
L of Side Wall (Wall 2) Should be the
Same

The Length of PCC/Concrete and


Excavation are always same but
height of Excavation and
Concrete is different.

2.25 - 0.75 + 15 = L
1.50 - 0.75 + 15 = L
0.75 - 0.75 + 15 = L

Wall 2 is a side wall, so the


Length of Side wall is always
same

Sft
Sft
Sft

Sft
Sft

Sft

Sft
Sft
ESTIMATING AND COSTING OF CIVIL ENGINEERING PROJECTS (LECTURED BY: #BOSS - A Verified S
Length of Wall 1 in ft = 6 m
Length of Wall 2 in ft = 4 m Estimate of T-Wall P.C.C
STEP - 1
STEP - 2
Super
Stru 30 7 6
m

D.P.C 1:2:4 P.L


4
Wall 2
Step - 2 40 60 cm
G.L
STEP - 2
Step - 1 50 20 cm STEP - 1
P.C.C

PCC
70 30 cm
1:3:6
Note: The Input Data are in Red color (In feet), you can change the values as per your requirement
Length (L) Breadth (B) Height (H) Quantity
S# Description No
(ft) (ft) (ft) (Cft)
1
Excavation
(Length = Breadth of PCC - Breadth of Wall + Length of
Wall)
Excavation of Wall - 1 1 6.40 0.70 0.50 2.24
Excavation of Wall - 2 1 4.00 0.70 0.50 1.40
Total Excavation = 3.64
2 Concrete (1:3:6)
(Length = Same As Per Excavation)
Concrete of Wall - 1 1 6.40 0.70 0.30 1.34
Concrete of Wall - 2 1 4.00 0.70 0.30 0.84
Total Concrete = 2.18
3 Brick Work (Foundation upto Plinth)
(Length of Wall 1 = Breadth of B/W - Breadth of Wall +
Length of Wall)

Brick Work in Wall - 1


Step - 1 1 6.200 0.500 0.200 0.620
Step - 2 1 6.100 0.400 0.600 1.464
Brick Work in Wall - 2
Step - 1 1 4.000 0.500 0.200 0.400
Step - 2 1 4.000 0.400 0.600 0.960
Total Brick Work = 3.444
4
D.P.C (1:2:4) 1.5" thick
(Length = Breadth of DPC - Breadth of Wall +
Length of Wall)
D.P.C of Wall - 1 1 6.000 0.300 --- 1.800
D.P.C of Wall - 2 1 4.000 0.300 --- 1.200
Total D.P.C = 3.000
5 Brick Work (in Cement Mortar (1:4) in S/Str)
(Length = Orgional Length of Wall)
Brick Work S/S of Wall - 1 1 6.00 0.30 7.00 12.60
Brick Work S/S of Wall - 1 1 4.00 0.30 7.00 8.40
Total Brick Work in Super Structure = 21.00
6 Cement Plaster (1" Thick with mortar 1:3)
Plaster in Wall - 1
Front and Back (L x H) 2 6.000 --- 7.00 42.00
Sides (B X H) 2 0.300 --- 7.00 2.10
Plaster in Wall - 2
Front and Back (L x H) 2 4.00 --- 7.00 28.00
Sides (B X H) 1 I already include this side in wall - 1 ---
Total Plaster = 72.10
7 White Wash 3 Coats As Per the Item No. 6 72.10
BY: #BOSS - A Verified Surveyor)

of T-Wall
P.C.C
EP - 1
EP - 2

6 Wall 1

Remarks

0.3 + 0.2 = H
0.7 - 0.3 + 6 = L
L of Side Wall (Wall 2) Should be the
Same

The Length of PCC/Concrete and


Excavation are always same but
height of Excavation and
Concrete is different.

0.50 - 0.3 + 6 = L
0.40 - 0.3 + 6 = L

Wall 2 is a side wall, so the


Length of Side wall is always
same

Sft
Sft
Sft
Sft
Sft

Sft

Sft
Sft