Jawar to Nari Road Construction Plan

The document appears to be an engineering drawing showing a proposed road alignment between two locations. It includes a plan view and profile of the proposed roadway from chainage 0+000 to 1+065. It lists the client and design consultant for a new construction link road project.

Uploaded by

Dushyant Jadaun
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
113 views4 pages

Jawar to Nari Road Construction Plan

The document appears to be an engineering drawing showing a proposed road alignment between two locations. It includes a plan view and profile of the proposed roadway from chainage 0+000 to 1+065. It lists the client and design consultant for a new construction link road project.

Uploaded by

Dushyant Jadaun
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

>>

TO NH >

HOUSE

SHOP & H
OUSE

HOU
SE
KKRI

TEM
ANSO TI

PLE
<<< TO M

HOU
SE
CENTRE LINE
PROPOSED CARRIAGE WAY
CLIENT: DESIGN CONSULTANT : PROJECT : DRAWING TITLE :
DRG. NO. CIPL/HW/DWG/003
NEW CONSTRUCTION LINK ROAD JAWAR TO NARI PLAN & PROFILE MAIN CARRIAGEWAY
HIMACHAL PRADESH PUBLIC FROM DESIGN CH KM 0+000 TO KM1+065 DATE : JUNE-2019 REV:D
WORK DEPARTMENT CHECKED APPROVED
DESIGNED DRAWN

REV DATE DESCRIPTION A B C D


CIVILMANTRA INFRACON PVT LTD.
SCALE : AS SHOWN PAPER SIZE : A3
REV
DATE
Vertical

Chainage
Horizontal
LZ00 LEVELS
MC00 LEVELS

DESCRIPTION
388
390
392
394
396
398
400
402
404
406
408
410
412
414
418

Level Datum =486.000


0.000 -999.000 497.721 Chainage=0.000m

A
Level=497.721m

L
G
10.000 497.275 497.759

B
R
Chainage=19.483m
20.000 497.397 497.797 Level=497.795m

C
L L R
30.000 497.695 497.883

D
L

R
L
40.000 -999.000 498.056

L
R
Chainage=49.483m

CLIENT:
50.000 498.144 498.315 Level=498.300m

L
G
60.000 498.325 498.614

L
R
70.000 498.742 498.913 Chainage=73.845m

L
Level=499.028m
80.000 499.080 499.190

WORK DEPARTMENT
HIMACHAL PRADESH PUBLIC
90.000 499.236 499.361

L
R
Chainage=99.874m
100.000 499.487 499.417 Level=499.417m
110.000 499.375 499.358

L=70.000m
120.000 498.961 499.184

DESIGN CONSULTANT :
R=-870.899m
130.000 498.719 498.896

L
R
140.000 498.425 498.493 Chainage=143.845m

CIVILMANTRA INFRACON PVT LTD.


Level=498.307m

L
150.000 497.846 497.996

L
R
160.000 497.296 497.491

L
170.000 496.775 496.986

G=-5.049
L=69.205m
180.000 496.195 496.481

L
R L
190.000 495.690 495.977
200.000 495.215 495.472

L
R
210.000 494.749 494.967 Chainage=213.050m
Level=494.813m
220.000 494.319 494.451
230.000 493.851 493.890

L
R
240.000 493.589 493.284

L=38.136m
250.000 493.026 492.631 Chainage=253.050m
Level=492.423m

L
G
260.000 491.702 491.943 Chainage=262.030m

L
R
Level=491.803m
270.000 490.499 491.290
280.000 489.535 490.753

L
290.000 489.147 490.335
300.000 489.441 490.034

L=60.000m
R=845.954m
L
R
310.000 489.846 489.852 Chainage=320.421m
Level=489.788m
320.000 489.827 489.788
Chainage=322.030m
330.000 489.755 489.804 Level=489.789m
L

340.000 489.809 489.823


GROUND LEVEL

G=0.190
L=64.960m

350.000 489.697 489.842


L
R
FINISHED ROAD LEVEL

360.000 489.682 489.861


L

370.000 489.651 489.880


380.000 489.606 489.899
Chainage=386.990m
390.000 489.577 489.918 Level=489.913m
Chainage=399.164m
PROJECT :

400.000 489.694 489.924 Level=489.924m


410.000 490.438 489.915
420.000 490.568 489.890
L=80.259m
R=-70.000m

430.000 490.431 489.850


FROM DESIGN CH KM 0+000 TO KM1+065
L=69.656m

NEW CONSTRUCTION LINK ROAD JAWAR TO NARI


R=-6400.005m

440.000 490.237 489.794


450.000 489.663 489.722
Chainage=456.646m
460.000 489.450 489.636 Level=489.666m
SCALE : AS SHOWN
DRAWING TITLE :

470.000 489.267 489.546


L
R

480.000 489.149 489.456


490.000 489.142 489.366
L

G=-0.898

PAPER SIZE : A3

500.000 489.013 489.277


L=105.095m

PLAN & PROFILE MAIN CARRIAGEWAY

DESIGNED
DRAWN
DATE : JUNE-2019
DRG. NO. CIPL/HW/DWG/003

CHECKED
REV:D
APPROVED
TE M
PLE

HOU
SE

H OU SE

ET
IL
TO
E
US
HO

CENTRE LINE
PROPOSED CARRIAGE WAY
CLIENT: DESIGN CONSULTANT : PROJECT : DRAWING TITLE :
DRG. NO. CIPL/HW/DWG/003
NEW CONSTRUCTION LINK ROAD JAWAR TO NARI PLAN & PROFILE MAIN CARRIAGEWAY
HIMACHAL PRADESH PUBLIC FROM DESIGN CH KM 0+000 TO KM1+065 DATE : JUNE-2019 REV:D
WORK DEPARTMENT CHECKED APPROVED
DESIGNED DRAWN

REV DATE DESCRIPTION A B C D


CIVILMANTRA INFRACON PVT LTD.
SCALE : AS SHOWN PAPER SIZE : A3
REV
DATE
Vertical

Chainage
Horizontal
LZ00 LEVELS
MC00 LEVELS

DESCRIPTION
388
390
392
394
396
398
400
402
404
406
408
410
412
414
418

Level Datum =486.000

8
0.000
500.000 -999.000
489.013 497.721
489.277

5m

A
510.000 488.893 489.187

B
C
520.000 488.793 489.097

D
530.000 488.769 489.007
540.000 488.692 488.917

CLIENT:
550.000 488.537 488.828

L=87.627m
R=150.000m
560.000 488.499 488.738 Chainage=561.741m
Level=488.722m
570.000 488.446 488.651

WORK DEPARTMENT
580.000 488.322 488.572

HIMACHAL PRADESH PUBLIC


590.000 488.290 488.502

R
L L
R
600.000 488.244 488.440

L=60.000m
610.000 488.240 488.387

DESIGN CONSULTANT :
620.000 488.225 488.343 Chainage=621.741m
Level=488.336m

L
R
630.000 488.175 488.303

CIVILMANTRA INFRACON PVT LTD.


640.000 488.109 488.264
650.000 488.042 488.225
660.000 487.967 488.186

G=-0.390
670.000 487.915 488.147

L=143.355m
L=57.142m
R=-200.000m
680.000 487.920 488.108
690.000 487.884 488.069
700.000 487.791 488.030
710.000 487.717 487.991
720.000 487.645 487.952
GROUND LEVEL

L=42.883m
730.000 487.670 487.913

R=200.000m
FINISHED ROAD LEVEL

740.000 487.565 487.874


750.000 487.435 487.835
760.000 487.454 487.796 Chainage=765.096m
Level=487.776m
770.000 487.083 487.761
Chainage=777.249m
780.000 486.738 487.754 Level=487.752m

R
790.000 486.428 487.778

L=89.490m
800.000 486.733 487.835

L=50.000m
810.000 486.529 487.925 Chainage=815.096m
Level=487.982m
820.000 487.772 488.042
830.000 488.175 488.164
L
R

G=1.216

840.000 488.043 488.285


L=54.857m
L

850.000 -999.000 488.407


L
R

860.000 488.089 488.528


Chainage=869.953m
870.000 -999.000 488.650 Level=488.649m
880.000 -999.000 488.797
L
R

890.000 488.645 488.995


L=45.299m

PROJECT :

Chainage=899.953m
900.000 488.879 489.245 Level=489.243m
910.000 489.114 489.519
L
R

920.000 489.620 489.794


G=2.746

FROM DESIGN CH KM 0+000 TO KM1+065


L=61.384m

930.000 489.970 490.069


NEW CONSTRUCTION LINK ROAD JAWAR TO NARI
L

940.000 490.242 490.343


950.000 490.480 490.618
960.000 490.892 490.892 Chainage=961.337m
SCALE : AS SHOWN
DRAWING TITLE :

Level=490.929m
970.000 491.064 491.183
L=49.664m
R=110.000m

980.000 491.255 491.517


990.000 491.440 491.895
PAPER SIZE : A3

1000.000 491.917 492.316


L

PLAN & PROFILE MAIN CARRIAGEWAY

1010.000 492.162 492.780


1020.000 492.530 493.288
L
R

L=100.000m
R=2300.246m

1030.000 492.965 493.840


DESIGNED

1040.000 493.098 494.434


R

DRAWN
DATE : JUNE-2019

1050.000 494.414 495.073 Chainage=1061.337m


R

Level=495.849m
1060.000 495.329 495.755
L LL L L

Chainage=1065.627m
G

DRG. NO. CIPL/HW/DWG/003

496.144 496.153
CHECKED

1065.627 Level=496.153m
REV:D
APPROVED

You might also like