WORK SHOP-Model PDF

1. The document contains dimensions in millimeters for a structural design with columns labeled A through C and foundations labeled 1 through 5. 2. Notes specify that all dimensions must be verified on site and reconciled before construction and that minimum concrete cover is 50 mm for foundations and 40 mm for columns. 3. A table provides the dimensions for the columns, foundations, and placement of reinforcing bars.

Uploaded by

priyanka prusty
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
100 views1 page

WORK SHOP-Model PDF

1. The document contains dimensions in millimeters for a structural design with columns labeled A through C and foundations labeled 1 through 5. 2. Notes specify that all dimensions must be verified on site and reconciled before construction and that minimum concrete cover is 50 mm for foundations and 40 mm for columns. 3. A table provides the dimensions for the columns, foundations, and placement of reinforcing bars.

Uploaded by

priyanka prusty
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3 4 5 1 2 3 4 5

NOTES :-
1. ALL DIMENSIONS ARE IN MM UNLESS STATED
3125 3125 5001 2249 3125 3125 5001 2249
OTHERWISE.
F1 F1 F1 F1 F1

A
2. ALL DIMENSIONS SHALL BE VERIFIED AT SITE AND
A A A
C1 C1 C1 C1 C1 PB PB PB PB
RECONCILED BEFORE EXECUTION AT SITE.
PB
3075

F1 F1 F1 F1
3075 PB PB PB PB
3. MINIMUM CLEAR COVER TO MAIN
B
C1 C1 C1 C1
B B
PB PB PB PB
B REINFORCEMENT IS IN
2301
F1 F1 F1 F1
2301 PB PB PB PB
FOUNDATION - 50 MM
C
C1 C1 C1 C1
C C
PB PB PB
C COLUMN - 40 MM
PB

2725 2725
PB PB
PB
PB
BEAM - 30 MM
D
F1 F1 F1 F1

D D PB PB PB D
SLAB - 20 MM
C1 C1 C1 C1
4. THE BUILDING IS DESIGNED AS PER EARTHQUAKE
FOOTING SCHEDULE
ZONE III, ZONE FACTOR - 0.16, DAMPING RATIO 5%
1 2 3 4 5 1 2 3 4 5
REINFORCEMENT AND IMPORTANCE FACTOR 1.5.
SL. NO. MARK SIZE PEDESTAL AT TOP AT BOTTOM 5. REINFORCED CONCRETE IS OF GRADE - M20 AND
1. F1 1500 X 1500 X 350 550X 800 X 350
10MM@150MM C/C
BOTH WAY
12MM@150MM C/C
BOTH WAY
SHOULD CONFIRM TO I.S - 456 - 2000 .
FOOTING LAYOUT PLINTH BEAM LAYOUT 6. REINFORCEMENT SHOWN IN THE DRAWING IS OF
HIGH YIELD STRENGTH DEFORMED TMT BARS (Fe -
SCHEDULE OF COLUMN 500 OR Fe - 500 D ) CONFORMING TO I.S 1786 - 1985 .
7. LAP LENGTH OF BARS SHALL BE 50 Ø UNLESS
SL NO. MARK SIZE REINFORCEMENT STIRRUPS SHAPE
1 2 3 4 5
3-16 #
OTHERWISE MENTIONED .
PL
LAP REINFORCEMENT SHALL BE STAGGERED.
PLINTH
250 X 350
1 C1 250 X 400 8-16 #
4L-8MM STIRRUP 4339

2-16 #
8. GRID LINES ARE TAKEN ACCORDING TO C/L OF
@150 MM C/C
COLUMN .
3125 3125 5001 2249
900

GL 3-16 #
A
RB RB RB RB
A 9. THE BUILDING IS DESIGNED FOR (G+1) AND
3075 RB RB RB RB
RB
1100
SCHEDULE OF PLINTH BEAM THERE WILL BE NO FURTHER EXTENSION OF IS
10 mm Ø @150 ALLOWED .
B B
1800
mm c/c both way SL. NO. PLINTH BEAM BEAM SIZE REINFORCEMENT AT SUPPORT REINFORCEMENT AT MID SPAN EXTRA TOP STIRRUP BEAM SHAPE BEAM SHAPE
RB RB RB RB
350
12 mm Ø @150 MARK AT TOP AT BOTTOM AT TOP AT BOTTOM BAR AT SUPPORT AT MID SPAN 10. STANDRD OF LOADING IS AS PER I.S 875 - 1987 (
2301 RB RB mm c/c both way
RB RB
350
S1 2L 8# mm @
125 mm C/C
250
2-16 # (THR.)
250
2-16 # (THR.)
PART - I, PART - II ).
C C 2-16#(THR.)
RB RB 0.25 X 0.3 3-12# 2-16#(THR.) (from support to L/3 distance) 1-16 # (EXT.)
11. SEISMIC LOAD IS AS PER IS 1893 - 2002 ( PART - I

400

400
RB RB 150 mm P.C.C (1:3:6) 1. PB 3-12# 1-16# S1 S2
150 mm Sand
+1-16# S2 2L 8# mm @ 125
RB (EXTRA TOP)
2725
RB RB RB
1500
mm C/C
(at mid span) 3-12# 3-12 # ).
RB RB RB
D D 12. THE COLUMN AND FOOTING REINFORCEMENT IS
FOOTING SECTION SCHEDULE OF ROOF BEAM AS PER R.C.C DETAILS OF FOUNDATION & COLUMN .
SL. NO. ROOF BEAM BEAM SIZE REINFORCEMENT AT SUPPORT REINFORCEMENT AT MID SPAN EXTRA TOP STIRRUP BEAM SHAPE BEAM SHAPE
AT SUPPORT AT MID SPAN
1 2 3 4 5 MARK AT TOP AT BOTTOM AT TOP AT BOTTOM BAR
2-16 # (THR.) 2-16 # (THR.)
SPECIAL NOTES ON FOOTING : -
S1 2L 8# mm @ 250 250
125 mm C/C
0.25 X 0.3 2-16#(THR.) 3-12# (from support to L/3 distance) 1-16 # (EXT.)
2-16#(THR.)

400

400
1. RB 3-12# 1-16# S1
+1-16# S2
ROOF BEAM LAYOUT (EXTRA TOP)
S2 2L 8# mm @ 125
mm C/C
(at mid span)
1. THE FOUNDATION IS EXCLUSIVELY FOR ( G + 1 )
3-12# 3-12 #

1D 3D 4D 5D
STOREYED ONLY.
1D 3D 4D 5D
2. THE FOUNDATION DESIGN IS BASED ON SOIL
REPORT (SBC - 18 T/SQM)
2-16 # (THR.) +
2-16 # (THR.) + 2-16 # (THR.) + 2-16 # (THR.) + 2-16 # (THR.) +
2-16 # (THR.) +
1-16 # (EX. TOP)
2-16 # (THR.) + 2-16 # (THR.) + 2-16 # (THR.) + 2-16 # (THR.) + 1-16 # (EX. TOP) CLIENT:- CONSULTANT:-
1-16 # (EX. TOP) 1-16 # (EX. TOP) 1-16 # (EX. TOP) 1-16 # (EX. TOP)
1-16 # (EX. TOP) 1-16 # (EX. TOP) 1-16 # (EX. TOP) 1-16 # (EX. TOP)
2-16 mm # 2-16 mm # 2-16 mm #
2-16 mm # 2-16 mm # 2-16 mm #
CHARBATIA (R&B) DIVISION ,
ATHAGARH
3-12 mm # 3-12 mm # 3-12 mm #
3-12 mm # 3-12 mm # 3-12 mm # CRAPTS
PLOT NO- 171(P), MAA GHARA,BAYA BABA
MATHA LANE,UNIT-9, BHUBANESWAR-22

W
SW
PROJECT:-

NW
1D 3D 4D 5D
1D 3D 4D 5D
CONSTRUCTION OF PROPOSED

SE
BUS-STAND AT ATHAGARH. FOR

N
SECTION OF PLINTH BEAM "PB"

E
SECTION OF ROOF BEAM "RB"
NE
THE YEAR 2019-2020.
DRG. TITLE:- DT:-
COLUMN ,FOOTING,PLINTH BEAM &
ROOF BEAM LAYOUT OF WORKSHOP.
06/11/2019
DRAWING NO:- SHEET NO:- REV. SCALE
CRAPTS/D/STR/0010(A) 10(A)/12 R0 1:100