0% found this document useful (0 votes)
31 views6 pages

Indwell Constructions Private Limited Bhel/Nttps/U#8/Vijayawada Erection Programme For The Month of November'19

This document outlines the erection program for Indwell Constructions Private Limited at BHEL/NTTPS/U#8 in Vijayawada for the month of November 2019. It details the targets for structure, pressure parts, non-pressure parts, air preheater, and rotary parts erection with totals of 751 MT, 20 MT, 356 MT, 0 MT, and 225 MT respectively. It notes that roads are required for material movement and that the left hand side feeder erection clearance and right hand side bunker columns are required immediately.

Uploaded by

Alanka Prasad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views6 pages

Indwell Constructions Private Limited Bhel/Nttps/U#8/Vijayawada Erection Programme For The Month of November'19

This document outlines the erection program for Indwell Constructions Private Limited at BHEL/NTTPS/U#8 in Vijayawada for the month of November 2019. It details the targets for structure, pressure parts, non-pressure parts, air preheater, and rotary parts erection with totals of 751 MT, 20 MT, 356 MT, 0 MT, and 225 MT respectively. It notes that roads are required for material movement and that the left hand side feeder erection clearance and right hand side bunker columns are required immediately.

Uploaded by

Alanka Prasad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

INDWELL CONSTRUCTIONS PRIVATE LIMITED

BHEL/NTTPS/U#8/VIJAYAWADA
ERECTION PROGRAMME FOR THE MONTH OF NOVEMBER'19

SL. NO. DESCRIPTION UNIT#1 REMARKS


1 STRUCTURE 150.000
2 PRESSURE PARTS 20.000
3 NON PRESSURE PARTS 356.000
4 APH 0.000
5 ROTARY PARTS 225.000
GRAND TOTAL 751.00 0.00

1 ROADS REQ. FOR MATERIAL MOVEMENT.


2 LHS FEEDER ERECTION CLEARANCE REQUIRED IMMEDIATELY.
3 RHS BUNKER COLUMNS REQUIRED IMMEDIATELY.
INDWELL CONSTRUCTIONS PRIVATE LIMITED
BHEL/NTTPS/U#8/VIJAYAWADA
ERECTION PROGRAMME FOR THE MONTH OF NOVEMBER'19

WEIGHT
SL. NO. PGMA DESCRIPTION REMARKS
IN MT

1 36 GROUP ALL PLATFORMS 50.000


36&38 100.000 RHS BUNKER COLUMNS
2 GROUP ALL PLATFORMS REQUIRED.

150.000

TOTAL 150.000
INDWELL CONSTRUCTIONS PRIVATE LIMITED
BHEL/NTTPS/U#8/VIJAYAWADA
ERECTION PROGRAMME FOR THE MONTH OF NOVEMBER'19

WEIGHT
SL. NO. PGMA DESCRIPTION REMARKS
IN MT
NON PRESSURE PARTS
1 30 GROUP 5.000
2 45 GROUP 10.000

3 47 GROUP COAL PIPE 60.000 RHS BUNKER COLUMNS REQ.


PG 39 STRUCTURE AND
4 48-012 FD DISCHARG DUCT 55.000 BUNKER COLUMNS REQ.
5 48-112 PA DISCHARGE DUCT 13.000 PG 39 STRUCTURE REQ.
6 48-142 TEMPERING DUCT 50.000 RHS FEEDER FLOOR REQ.
7 48-222 HOT PA DUCT 50.000 RHS BUNKER COLUMNS REQ.
8 48-432 APH O/L TO BOF DUCT 40.000 PG 39 STRUCTURE REQ.
9 48-662 MILL DUCT 50.000 BUNKER COLUMNS REQ.
10 57-010 FD DISCHARG DUCT GATE 13.000 PG 39 STRUCTURE REQ.
11 57-110 PA DISCHARGE DUCT GATE 10.000 PG 39 STRUCTURE REQ.

356.000

TOTAL 356.000
INDWELL CONSTRUCTIONS PRIVATE LIMITED
BHEL/NTTPS/U#8/VIJAYAWADA
ERECTION PROGRAMME FOR THE MONTH OF NOVEMBER'19

WEIGHT
SL. NO. PGMA DESCRIPTION REMARKS
IN MT
PPARTS
1 ALL PRESSURE PARTS 20.000

20.000

TOTAL 20.000
INDWELL CONSTRUCTIONS PRIVATE LIMITED
BHEL/NTTPS/U#8/VIJAYAWADA
ERECTION PROGRAMME FOR THE MONTH OF NOVEMBER'19

WEIGHT
SL. NO. PGMA DESCRIPTION REMARKS
IN MT
AIR PRE HEATER
1

0.000

TOTAL 0.000
INDWELL CONSTRUCTIONS PRIVATE LIMITED
BHEL/NTTPS/U#8/VIJAYAWADA
ERECTION PROGRAMME FOR THE MONTH OF NOVEMBER'19

WEIGHT
SL. NO. PGMA DESCRIPTION REMARKS
IN MT
ROTARY PARTS
FOUNDATION REQ. FOR MILLS
1 MILL A,B&C 225.000 A,B,C,D

225.000

TOTAL 225.000