0% found this document useful (0 votes)
81 views1 page

Frftts A: or (Ffi

1. Shri Prakash Chandra Tiwari, AGM (SMS-1), has been transferred and posted as AGM (Projects) and shall report to ED (Projects). 2. Shri Vinay Kumar Jain, Sr. Mgr. (SMS-3), has been transferred and posted as Sr. Mgr. (SMS-2) and shall report to CGM (SMS-2). 3. Arrangements have been made for one week of familiarization training in their new departments and areas of posting.

Uploaded by

Supriya Manoj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
81 views1 page

Frftts A: or (Ffi

1. Shri Prakash Chandra Tiwari, AGM (SMS-1), has been transferred and posted as AGM (Projects) and shall report to ED (Projects). 2. Shri Vinay Kumar Jain, Sr. Mgr. (SMS-3), has been transferred and posted as Sr. Mgr. (SMS-2) and shall report to CGM (SMS-2). 3. Arrangements have been made for one week of familiarization training in their new departments and areas of posting.

Uploaded by

Supriya Manoj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

6*a snll

r&a oTqTfr&
M
dm vruqT
u*qro qql
ortstnrfr {etrqfl
frftts

ffi6": oB ei-qr*fi 2o2o

edrqqr ont{r m. ooz (R)

The following transfer/posting shall take place in Bhilai Steel plant


with immediate effect:-
Name (Shri) Present Transferred/ Shall report
s.N.
P.No SAIL P.No. Code/ Inc
Designation posted as for duty to Bill No
Prakash Chandra Tiwari
L4937 03577 AGM (SMS-1) AGM (Projects) ED (Projects) s1s1/8500
1
* This supersedes Estt Order No.5BB(R),
dated:18/08/2O2O issued in rlo
Shri P C Tiwari AGM SMS-1
2
Vinay Kumar Jain
4062 F001956 Sr. Mgr. (SMS-3) Sr. Mgr. (SMS-2) cGM (SMS-2) 1456/1896

Arrangements for their familiarisation training for one


week in the deptt/zone and one week in the area
of their posting will be done by the department under intimation
to GM (HRD). They are requested to
obtain NDC from C & IT.

T6 sTrt{r vurq qffi + or{ffi t qrfr fuu1 q61 g1 \


5lt a*,n, -
,. . o3'to.1o?-o
(3n rq Hrrtr)
qR q-qrfi (or-erDer)

fro-qoT,-

1.fr FITI:

2 sTdqTG-6 ft.*r6 (qRM)


3. 5Eq
q-dTqdLrfi (emTq\q., em.8qfl. fq oilT.ftSfi),zUw qdrqiiEro (VsgqVq._3/Ts\q\-q_2)l
5W TdtyErrrfi (qRqrffi\)
4. qETsrirfi
(rrwva.-r;
5. sfuqrdq-tfttq-o q'qrfi, ft {q Z6rdqril6 ftevrfi(n-{Td)/6Tdqrd-6 frerro(oTffi-r qq qflrsm)l
6. 6Tffi-o. Grffi
t. UEq q-flIdEro (f,lgaTr*A)
B" rumitr5lrr66*1 / q-6Tq-qsm qqrft (sTffi6) /qETq-q{fi (or_fiord) qr{i q-q-iTQf
e. w q-unqsr6 (6.t-frq,zrq gs giT/3rT$ gs t

10. sdr{fr qETqdro (ft-f,_ildq)


w (rd--€ oift i trd ilT)

11" tqfum m,r{dlwrqrFq spc/oqil qr{d


* Kindly intimate the
reporting/reviewing relationship of the above executives for
updation in EpMS.

You might also like