0% found this document useful (0 votes)
253 views5 pages

Ball Valve Leak Test Report

The document summarizes the results of a pressure test on a ball valve. It describes the test equipment used, lists the test parameters like pressure and duration, and documents the test results for four cycles with the ball in different positions. No leaks or deformations were observed and the test was deemed acceptable. Photos and measured values from the test are provided on subsequent pages.

Uploaded by

Manikandan M
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
253 views5 pages

Ball Valve Leak Test Report

The document summarizes the results of a pressure test on a ball valve. It describes the test equipment used, lists the test parameters like pressure and duration, and documents the test results for four cycles with the ball in different positions. No leaks or deformations were observed and the test was deemed acceptable. Photos and measured values from the test are provided on subsequent pages.

Uploaded by

Manikandan M
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Pressure Test certificate FASTWELD ENGINEERING CONSTRUCTION

PTE LTD

Project: Ball Valve leak test Report No: FEC-HT-038


Title/S.No: 0C03Z Date of Test: 02-09-2019
Client: SWTC Page: 1 of 5
PART 1: PRESSURE GAUGE
Pressure Gauge Model : CPG1500 Pressure Gauge Range (Bar): 0-600
Pressure Gauge S.No : 1106299783 Accuracy Range : 0.1% FS
Calibration Date: 30-10-2018 Expiry Date: 30-10-2019
Test Gauge Calibration Certificate Attached: Yes
PART 2: TEST DATA
Working Pressure: 1440psi Test Temperature: Ambient
Type of Test: Hydrostatic
Test Medium: Water Test Location: FW Workshop
No’s of Test cycle : 4
Cycle 1 : (Ball fully open position)
Test Pressure: 2160psi Duration: 15 min
Start Time: 1.32Pm End Time: 1.47Pm
Cycle 2 :
Test Pressure: 1440psi (Ball open 45 deg) Duration: 15 min
Start Time: 1.59Pm End Time:2.14Pm
Cycle 3 :
Test Pressure: 300psi (Ball fully closed) Duration: 15 min
Start Time: 2.21Pm End Time:2.36Pm
Cycle 4 :
Test Pressure: 1440psi (Ball fully closed) Duration: 15 min
Start Time: 15.00Pm End Time:15.15Pm
PART 3: TEST RESULT

No Leak and no visible deformation, Test is acceptable

Remarks / Exceptions if any:


Please refer to the following page for test pictures

Conduct by (FASTWELD ENGRG CONST. PTE LTD) Name/


Signature/ Date

Name/
Witnessed / Reviewed by (SWTC)
Signature/ Date
Pressure Test certificate FASTWELD ENGINEERING
CONSTRUCTION PTE LTD

Project: Ball Valve leak test Report No: FEC-HT-038


Title/S.No: 0C03Z Date of Test: 02-09-2019
Client: SWTC Page: 2 of 5

Test Item Photo’s

Graph View
Pressure Test certificate FASTWELD ENGINEERING
CONSTRUCTION PTE LTD

Project: Ball Valve leak test Report No: FEC-HT-038


Title/S.No: 0C03Z Date of Test: 02-09-2019
Client: SWTC Page: 3of 5

Measured Value’s
Pressure Test certificate FASTWELD ENGINEERING
CONSTRUCTION PTE LTD

Project: Ball Valve leak test Report No: FEC-HT-038


Title/S.No: 0C03Z Date of Test: 02-09-2019
Client: SWTC Page: 4 of 5

Measured Value’s
Pressure Test certificate FASTWELD ENGINEERING
CONSTRUCTION PTE LTD

Project: Ball Valve leak test Report No: FEC-HT-038


Title/S.No: 0C03Z Date of Test: 02-09-2019
Client: SWTC Page: 5 of 5

Measured Value’s

You might also like