"CPVUMiami Beach Monorail Consortium
The Miami Beach Monorail Consortium is a partnership led by global infrastructure development
firm Meridiam, which is proposing a monorail as an innovative and sustainable solution for
connecting Downtown Miami and Miami Beach, fulfilling the need for mass transit infrastructure to
serve both commuters and visitors.
Demand for Beach Corridor Experienced Team
Over the past three decades, studies have The lead investment partner on the Consortium is
confirmed that the Beach Corridor, stretching Meridiam, a global infrastructure development
from Interstate 395 to the MacArthur Causeway, firm with over $8 billion in assets under
needs a robust mass-transit solution. This area has management across the globe. The firm
been identified as one of six SMART Plan successfully completed the landmark Port of
Corridors by the Miami-Dade Transportation Miami Tunnel on time, providing a sustainable
Planning (TPO), underscoring its priority. and resilient infrastructure for the local
community.
The monorail will support Miami’s thriving
tourism industry by providing thousands of
Quick Facts
workers and tourists an accessible and efficient
solution to traveling between Miami and Miami • Length: The monorail will extend approx.
Beach. 3.45 miles on the South side of MacArthur
Causeway.
Proven Technology • Capacity: There will be two trains constantly
A Parsons study, approved by the Miami-Dade operating, with one spare, each holding up
County Commission, recommends the monorail to 300 riders.
as one of the top transit options for the Beach • Speed: The trains will run at 50mph, serving
Corridor. The monorail’s elevated rubber tire 12 trips per hour.
technology does not require a dedicated lane of • Fares: The Consortium will work with the
traffic, ensuring service is uninterrupted by County to set a fare that provides the best
Causeway traffic. The Consortium worked with value for residents and is integrated into
Bombardier to develop this proposal based off of existing ridership programs.
their innovative INNOVIA 300 train technology • Connectivity: The monorail's mainland
and state-of-the-art CITYFLO 650 train control transit hub will serve as a stop for the
system. County Bus and People Mover.
• Expected delivery date: 2026
Job Creation
The monorail project will create thousands of
local jobs. The team leading the Consortium also
successfully completed the Port of Miami Tunnel
project delivered by a workforce of 7,000 people,
83% of which came from the local community.
October 15, 2020